You are on page 1of 3

PT GEMILANG BINA LINTAS TIRTA

SHIP MANAGEMENT
PRE ARRIVAL CHECKLIST (BRIDGE) (17.07.2018) D – 02

Ship’s Name : MT. BULL FLORES Month: OCTOBER 2019


Date: Date: Date: Date: Date: Date: Date: Date: Date: Date:
No Check Item

Pre-arrival documentation complete and


1
sent
Passage plan updated with additional
2
information received since departure
Updated passage plan checked and
3
approved by the Master
Updated passage plan briefed to the Bridge
4 Team
Updated passage plan available on the
bridge with the route plotted on up to date
5
and appropriate scale charts (official
paper or electronic)
Updated route displayed on ECDIS
6 and/or other electronic navigation aids, as
appropriate
7 Is cargo/ballast rearrangement required
8 Clocks synchronized with engine room
Controllable pitch propeller controls and
9
indicators
10 Deck power
ECDIS and/or other electronic navigation
11
aids
12 Echo sounder
13 Electronic position fixing systems
14 Emergency engine stops

Date: Date: Date: Date: Date: Date: Date: Date: Date:


No Check Item
PT GEMILANG BINA LINTAS TIRTA
SHIP MANAGEMENT
PRE ARRIVAL CHECKLIST (BRIDGE) (17.07.2018) D – 02
15 Engine(s)/propulsion (ahead and astern)
Gyro/magnetic compass and repeaters,
16
including repeater in steering gear area
Internal communications (particularly
17 bridge to engine room/bridge to mooring
stations)
Navigation lights, shapes and sound
18
signals
19 RPM and ROT indicators
Signaling equipment including flags,
20
search lights and signal lamps
21 Steering gear (Checklist B1)
22 Thrusters
23 Anchors cleared and ready for use
24 Any stabilizers’ housed
25 Bridge Team ready
26 Cargo/passenger details available
27 Engine room ready
If available, use more than one steering
28 gear power unit
29 Manual steering engaged
30 Mooring stations manned and ready
31 Pressure on fire main
Stability and draught information
32 verified and available
33 Watertight doors closed

Date: Date: Date: Date: Date: Date: Date: Date: Date:


No Check Item
PT GEMILANG BINA LINTAS TIRTA
SHIP MANAGEMENT
PRE ARRIVAL CHECKLIST (BRIDGE) (17.07.2018) D – 02
Master/Pilot information exchange
34
checklist completed (Checklist A1)
Pilot Card prepared (Checklist A2)
35
Pilot boarding time confirmed
Pilot boarding arrangements ready for
36 disembarkation of the Pilot (Checklist
A4)
37 Port and VTS channels monitored
Port, VTS and Pilot advised of any
38
special requirements
Preparations for pilotage complete
39
(Checklist B8)

Others /Remarks (if any):

OOW

Master

This form to be completed within 12 hours prior to arrival at port.


An entry is to be made in the deck log book referring to this form

You might also like