You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


GENERAL LUNA MUNICIPALITY

SCHEDULE OF LOAD RECOMMENDING APPROVAL AS TO:

HEAD ELECTRICAL SECTION DATE


OUTLETS SWITCHES
APPROVED:
CKT DESCRIPTION WATTS VOLTS AMPS BREAKER REMARKS
L.O. O. S S2 S3
GENERAL NOTES 1 LIGHTING LOAD 8 - 3 1 - 144 220/240 .65 15 A #3.5 mm2 THHN BUILDING OFFICIAL DATE
1. ALL ELECTRICAL INSTALLATION HEREIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISIONS OF THE LATEST EDITION OF THE
PHILIPPINE ELECTRICAL CODE. THE RULES, REGULATIONS AND REQUIREMENTS OF THE LOCAL POWER COMPANY AND THE LAWS 2
AND ORDINANCES OF THE LOCAL ENFORCING AUTHORITY. 2 CONVENIENCE OUTLET - 7 - - - 1260 220/240 5.72 15 A #3.5 mm THHN
2. POWER SERVICE SHALL BE 230V, 3Ø, 3W+G 60Hz.
3 ACU 1 - - - - 746 220/240 3.39 30 A #5.5 mm2 THHN
3. ALL CONDUCTORS SHALL BE COPPER, TYPE THHN 90°C 600 VOLT INSULATION, MINIMUM SIZE SHALL BE 3.5mm2 (NO. 12 AWG)
UNLESS OTHERWISE SPECIFIED. INSULATION COLOR OF THE CABLES SHALL BE AS FOLLOWS:

LIVE WIRES
4 SPARE - - - - - - 220/240 - - -
SINGLE PHASE - RED, YELLOW, BLUE
THREE PHASE - RED, YELLOW, BLUE
GROUND WIRE - GREEN TOTAL 8 7 3 1 - 2150 220/240 9.76 60 A #8.0 mm2 THHN
4. UNLESS SHOWN OTHERWISE THE MOUNTING HEIGHT FROM FINISHED FLOOR LEVEL FOR THE VARIOUS ITEMS OF ELECTRICAL
EQUIPMENT SHALL BE AS FOLLOWS:

RECEPTACLE OUTLETS - 300mm TO CENTER LINE


LIGHTING SWITCHES - 1300mm TO CENTER LINE
MAIN SWITCH: TRANSFORMER CAPACITY THHN UPPLY
2 # 150 mm² TO POWER S
DISTRIBUTION BOARD - GENERALLY 1700mm TO TOP OF PANEL

0 VOLT
1 PHASE, 22
5. FINAL MOUNTING HEIGHTS AND LOCATIONS OF ELECTRICAL DEVICES AND EQUIPMENT SHALL BE DETERMINED BY THE
ARCHITECT
UPON COORDINATION WITH THE ELECTRICAL ENGINEER. IT = 9.76 + 3.40 (2.5) KVA = 9.76 (220) + 3.40 (220)
= 18.26 Amp. 1000
6. ALL DEVICES AND EQUIPMENT SHOWN ARE ONLY APPROXIMATE LOCATION, ACTUAL SETTING CAN BE MOVED WITHIN 5.0 METERS.
= 2 895.20 KVA 1 - 100 KVA
ER
TRANSFORM
RADIUS WITHOUT ADDITIONAL COST TO THE OWNER.

7. ALL MATERIALS SHALL BE NEW AND OF THE APPROVED TYPE IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS FOR USE = 60 Amp. C.B. = 3 KVA
THE LOCATION INTENDED. 1 PHASE 230V
8. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATION AND OTHER APPURTENANCES FOR THE ENTIRE
ELECTRICAL INSTALLATIONS SHALL BE USED IN ACCORDANCE WITH PEC REQUIREMENTS.
USE = 3 KVA. D. TRANSFORMER
- KILOWATT HOUR METER H.D.
100 KVA
9.

10.
FOR ACTUAL LOCATION OF LIGHTING FIXTURES, MOTORS, FANS AND OTHER ELECTRICAL EQUIPMENT, SEE ARCHITECTURAL,
MECHANICAL, FIRE PROTECTION AND SANITARY DRAWINGS.

ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT AND LIGHTING FIXTURE SHALL BE EFFECTIVELY
MAIN WIRE: SYMMETRICAL FAULT: G GENERATOR
GROUNDED.

11. RACEWAY AND OTHER WIRE ROUTING SHOWN ARE ONLY REPRESENTATION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS
ON IT = 9.76 + 3.40 (.25) 100 AMP. C.B.
ALL PROPOSED ROUTING (SHOWN OR EVEN NOT SHOWN IN THE PLAN) AND INSTALLATION FOR APPROVAL.
= 10.61 Amp.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY PERMITS/TESTING/CALIBRATION/ENGINEER'S ENDORSEMENT FEES, ETC.
REQUIRED BEFORE THE ELECTRICAL INSTALLATION IS PUT INTO OPERATION. ALL COSTS CONNECTED THEREWITH SHALL BE 3 KVA TRANSFORMER
DEEMED TO BE INCLUDED IN THE ELECTRICAL CONTRACT. USE = # 8.0 MM2 THW
13. ALL CIRCUIT BREAKER SHALL BE BOLT-ON TYPE WITH 18 KAIC MINIMUM OR AS INDICATED IN THE LOAD SCHEDULE.
ISEC = 11000
14. UNLESS OTHERWISE INDICATED, ALL WIRING SHALL BE IN IMC AND FLEXIBLE METAL CONDUIT. = 50 Amp.
220
a. UNLESS OTHERWISE INDICATED, ALL TYPE OF CONDUIT SHALL BE INTERMEDIATE METAL CONDUIT TO BE INSTALLED OR
EXPOSED INTERIOR WIRING, IN CONCRETE SLAB, IN DRY PARTITIONS, FOR EXPOSED EXTERIOR WIRING AND AS SHOWN ON VOLTAGE DROP:
THE DRAWINGS. ISYM = 50
0.02
= 2,500 Amp. LPB1
b. ALL EQUIPMENT WHICH ARE SUBJECTED TO VIBRATION SHALL BE CONNECTED LIQUIDTIGHT PVC JACKETED STEEL
CONDUIT V.D. = 2(164) (.6405) 46
IN WET OR DAMP LOCATION.
1000
X .866 60 AMP. C.B.
c. CONDUIT MINIMUM SIZE SHALL BE
- IMC, 15mm DIAMETER
= 8.37 Amp.
- FLEXIBLE METAL CONDUIT. 15mm DIAMETER

15. THE CONTRACTOR SHALL SUBMIT FOR THE PROJECT MANAGER'S/ENGINEER'S ENDORSEMENT/APPROVAL OF THE EQUIPMENT V.A. = 220 - 8.37 Amp. 15 A 15 A
CATALOGUES AND MANUFACTURER'S SPECIFICATION, SHOP DRAWING AND/OR SAMPLES BEFORE ANY EQUIPMENT IS TO BE
ORDERED. 211.63V
LIGHTING OUTLET C1 C2 CONVENIENCE OUTLET
16. UNLESS OTHERWISE PERMITTED, ALL WIRING/CABLING SHALL BE PULLED CONTINUOUSLY WITHOUT SPLICE FROM
SWITCHBOARD/PANELBOARD UP TO THE ELECTRICAL LOAD SERVED.
RATING OR SETTING OF SIZE
30 A
17. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZE OF EQUIPMENT GROUNDING CONDUCTOR FOR GROUNDING RACEWAY & AUTOMATIC OVERCURRENT
EQUIPMENT SHALL BE AS FOLLOWS: DEVICE IN CIRCUIT AHEAD OF mm2 COPPER
EQUIPMENT, CONDUIT, ETC.,
NOT EXCEEDING (AMPERES)
WIRE ACU C3 C4 SPARE
15 2.0
20 3.5
30 5.5
40 5.5
60 5.5
100 8.0
200 14
300 22

18. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED/REGISTERED ELECTRICAL GROUND WIRE ON 20 MM DIA.
ENGINEER. RIGID PVC. CONDUCTED TAPPED
TO THE WATER LINE.
19. ALL NECESSARY HACKING/CHASING OF FLOOR AND MAKING GOOD SHALL BE INCLUDED IN THIS CONTRACT AND SHALL BE WITH
PRIOR APPROVAL FROM THE STRUCTURAL ENGINEER/BUILDING OPERATIONS MANAGER.

20. THE CONTRACTOR SHALL CONDUCT PHASE SEQUENCE TEST, INSULATION RESISTANCE TEST, CONTINUITY TEST AND OTHER TEST
AS REQUIRED BEFORE THE ELECTRICAL INSTALLATION IS PUT INTO OPERATION. ALL SUCH TEST SHALL BE SUBMITTED TO THE
PROJECT MANAGER/ENGINEER FOR CHECKING AND APPROVAL.

PROJECT : OWNER : DATE NO. REVISIONS BY DATE SHEET CONTENT SHEET NO.
MICHAEL D. LITANG
SCHEDULE OF LOADS
ARCHITECT RISER DIAGRAM
AR.ENP.RMP. MICHAEL D. LITANG UAP
AS-BUILT PLAN OF MARAJAW HOMESTAY EL-02
REG.NO. : 022956 PTR NO. : REG.NO. : PTR NO. : MA.ANGELA ISABEL B. LAMUG
23 STO NINO ST., BRGY 11, DAPA, SURIGAO DEL NORTE MOB. # 09288188623 6156742 2 STOREY (GUEST HOUSE 1)
NOTE: THIS DRAWING AS AN INSTRUMENT OF SERVICE IS A PROPERTY OF THE
ARCHITECT. AS SUCH, IT MUST NOT BE REPRODUCED OR COPIED IN PART
DATE : AUG. 15, 2008 DATE : JAN 4, 2013 DATE : DATE :
OR IN WHOLE WITHOUT PERMISSION. ALL DRAWINGS ARE TO BE RETURNED CHECKED : DRAWN : DREF SCALE PROJ. NO.
TO THE ARCHITECT WHEN NO LONGER IN USE.
TIN NO. SURIGAO CITY TIN NO. LOCATION: PUROK 5, CATANGNAN, GENERAL LUNA, SURIGAO DEL NORTE ADDRESS: GENERAL LUNA, SURIGAO DEL NORTE
R.A. 545 : 259-120-658 AT : : AT : APPROVED : DATE :03-27-19 AS SHOWN @ 20x30