Professional Documents
Culture Documents
APPROVED:
C RT-4(2SETS)
0
S-T2
COLUMN SCHEDULE
DIMENSION (mm)
A RT-3(2SETS) MARK
A B
10mmØ Lateral Ties
0
S-T2
Spaces:5-0.05,
B RT-1,RT-2(4SETS) C1 0.20 M 0.20 M 5-0.10, Rest @ 0.20M O.C.
0
S-T2 Spaces:5-0.05,
C2 0.20 M 0.20 M 5-0.10, Rest @ 0.20M O.C.
Reinforcement
Reinforcement Reinforcement FOOTING SCHEDULE
Along Line A
Along Line A Along Line A
DIMENSION (mm)
MARK REINFORCEMENT
Reinforcement Reinforcement Reinforcement
H A B T H
Along Line B Along Line B Along Line B
F1 VARIABLE 1.00 M 1.00 M 0.20 M 1.00 M 6-16 MM Ø DEF.BAR
EARTH
EARTH FILL FILL EARTH FILL 4-16 MMØ
Main Bars
10mmØ
Lateral Ties
PLAN (C2)
D TYP.FOOTING/COLUMNDETAIL F WOODENCONNECTIONDETAIL
0
S-T2
0
S-T2
PROJECT : OWNER : DATE NO. REVISIONS BY DATE SHEET CONTENT SHEET NO.
MICHAEL D. LITANG
RT-1 , RT-2
ARCHITECT RT-3
AR.ENP.RMP. MICHAEL D. LITANG UAP
AS-BUILT PLAN OF MARAJAW HOMESTAY RT-4
ST-02
REG.NO. : 022956 PTR NO. : REG.NO. : PTR NO. : MA.ANGELA ISABEL B. LAMUG TYP. FOOTING COLUMN DETAIL
23 STO NINO ST., BRGY 11, DAPA, SURIGAO DEL NORTE MOB. # 09288188623 6156742 2 STOREY (GUEST HOUSE 1) TYP. COLUMN SECTION DETAIL
NOTE: THIS DRAWING AS AN INSTRUMENT OF SERVICE IS A PROPERTY OF THE
DATE : DATE : JAN 4, 2013 DATE : DATE :
WOODEN CONNECTION DETAIL
ARCHITECT. AS SUCH, IT MUST NOT BE REPRODUCED OR COPIED IN PART AUG. 15, 2008
OR IN WHOLE WITHOUT PERMISSION. ALL DRAWINGS ARE TO BE RETURNED CHECKED : DRAWN : DREF SCALE PROJ. NO.
TO THE ARCHITECT WHEN NO LONGER IN USE.
TIN NO. SURIGAO CITY TIN NO. LOCATION: PUROK 5, CATANGNAN, GENERAL LUNA, SURIGAO DEL NORTE ADDRESS: GENERAL LUNA, SURIGAO DEL NORTE
R.A. 545 : 259-120-658 AT : : AT : APPROVED : DATE :03-27-19 AS SHOWN @ 20x30