You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIALS
CONSTRUCTION NOTES MUN. OF DAANBANTAYAN

TABLE OF LAP SPLICE RECOMMENDING APPROVAL:


STRUCTURAL SECTION
STANDARD HOOK (mm) TENSION LAP SPLICE (mm)
BAR Ø ANCHORAGE BEAM COMP. UNIT WT.
Ldh(mm) LAP CLASS BEAM COLUMN DATE
(mm) LENGTH (mm) SPLICE (mm) (kg/m)
A. GENERAL 90° 180° 135°-90° TOP BAR BOTTOM BAR TIED SPIRAL

A 380 300
10 600 150 160 110 120~120 300 300 300 0.616 APPROVED:
B 490 390
1. "CONSTRUCTION NOTES AND TYPICAL DETAILS" APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED.
A 680 520
2. IN THESE DRAWINGS INDICATED DIMENSIONS SHALL GOVERN AND DISTANCES OR SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. 12 710 260 200 120 130~130 350 520 520 0.888
3. FOR ALL OTHER REQUIREMENTS, REFER TO ARCHITECTURAL, SANITARY, ELECTRICAL AND MECHANICAL WORKING DRAWINGS. B 880 680 BUILDING OFFICIAL DATE
4. SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL, MISCELLANEOUS IRON, PRECAST CONCRETE, ETC. SHALL A 910 700
BE SUBMITTED FOR ENGINEERINGS APPROVAL BEFORE FABRICATION. 16 950 350 260 130 160~160 460 700 700 1.579
B 1180 910
5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS BEGUN, CHECK WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR
CONDUITS, PIPE SLEEVES, ETC. TO BE EMBEDDED IN CONCRETE. A 1140 870
20 1180 440 320 160 200~320 580 870 870 2.466
6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORINGS AND BRACING OF THE STRUCTURES FOR ALL LOADS THAT B 1480 1130
MAY BE IMPOSED DURING CONSTRUCTION.
25 1900 550 400 200 250~400 720
A 1780 1370
1370 1370 3.854
A B C D E F
B 2310 1780
TIE BEAM/FOOTING fc' 2,500 psi @ 28 DAYS, G1,S4 A 1990 1530
28 2190 620 480 260 810 1530 1530 4.833
B 2590 1990
A 2270 1750 23.00
B. CONCRETE & REINFORCEMENTS 32 2590 700 550 290 930
B 2950 2280
1750 1750 6.313

36 2990 790 650 360 1040


A 2560 1970
1970 1970 7.991 2.21 4.28 5.17 5.83 5.51
1. ALL MATERIALS AND WORKMASHIP SHALL CONFORM WITH THE LATEST BUILDING CODE OF THE AMERICAN CONCRETE INSTITUTE (ACI 318-83). B 3330 2560
2. ALL CONCRETE SHALL DEVELOP A MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT THE END OF B28BB DAYS WITH CORRESPONDING
NOTES:
MAXIMUM SIZE OF AGGREGATES AND SLUMPS AS FOLLOWS:
1. DEVELOPMENT LENGTH OF INDIVIDUAL BARS WITHIN A BUNDLE, IN TENSION OR COMPRESSION, SHALL BE THAT FOR INDIVIDUAL BARS, INCREASED 20% FOR THREE-BUNDLED AND 33% FOR FOUR-BUNDLED
BARS.
2. FOR COLUMNS AT ANY LEVEL, NO MORE THAN ALTERNATE BARS SHOULD BE SPLICED, NOT MORE THAN 33% OF THE BARS SHALL BE SPLICED WITHIN THE REQUIRED LAP LENGTH, MINIMUM DISTANCE
MIN. 28 DAYS MAX. SIZE OF BETWEEN TWO ADJACENT SPLICED SHALL BE 600mm.
1
TB1 TB1 TB1 TB1 TB1

LOCATION STRENGTH AGGREGATES


MAX. SLUMP 3.
4.
TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 300mm DEPTH OF CONCRETE CAST BELOW REINFORCEMENT.
LAP SPLICE SHALL BE "CLASS B" TENSION LAP SPLICE IF MORE THAN ONE HALF OF THE BARS WERE SPLICED AT ANY SECTION, WHILE "CLASS A" TENSION LAP SPLICE IF HALF OR FEWER THAN HALF OF BARS C2F1 C2F1 C2F1 C2F1 C2F1 C2F1

1.50
WERE SPLICED.

TB1
FOOTING 20.7 MSa 3,000 PSI 3/4 15.00 CM

COLUMN 20.7 MPa 3,000 PSI 3/4 15.00 CM E. FOUNDATION 2 C2F1 C2F1

BEAM 20.7 MPa 3,000 PSI 3/4 15.00 CM C2F1 C2F1 C2F1
3

6.00

0.70
1. FOOTING SHALL REST ON STIFF UNDISTURB SOIL STRATA, OR AN ENGINEERED (COMPACTED) FILL.

TB1
SUS. SLAB 20.7 MPa 3,000 PSI 3/4 15.00 CM 2. POURING OF CONCRETE SHALL NOT BE ALLOWED WHERE WATER IS PRESENT IN THE EXCAVATION WATER SHALL BE PUMPED OUT FIRST
BEFORE POURING THE CONCRETE.

3.80
3. BACK-FILLING SHALL BE DONE LAYER BY LAYER OF 200 mm FILL, THOROUGHLY COMPACTED 95% OF M.M.D. UNTIL THEDESIRED

TB1
ELEVATION IS ESTABLISHED.
3. MILD STEEL REINFORCEMENTS SHALL BE 16mm‘‘Ø & LARGER 414 MPa (G60) 4. SOIL BEARING CAPACITY = 3,500 PSF
10mm‘‘Ø & 12mmØ 276 MPa (G40)
10mm‘‘Ø SMALLER 228 MPa (G33)

AND SHALL BE FREE OF MILL SCALE OIL OR ANY OTHER SUBSTANCES WHICH TEND TO WEAKEN BOND STRENGTH.
ACI MINIMUM STRIPPING TIME MANUAL 4 C2F1
TB1

C2F1
TB1

C1F1
TB1

C2F1
TB1

C1F1
TB1

C2F1
4. IN GENERAL, THE LATEST EDITION OF ACI MANUAL OF ‘STANDARD PRACTICE FOR DETAILING CONCRETE STRUCTURES SHALL BE ADHERED
TO, UNLESS OTHERWISE SHOWN OR NOTED.
5. MAINTAIN MINIMUM CONC. COVER FOR REINFORCING STEEL AS FOLLOWS:
OF CONCRETE PRACTICE
WALL ABOVE GRADE 40 mm. SUSPENDED SLABS 20 mm.
BEAM STIRRUPS AND COLUMN TIES 40 mm. WALLS* 12 hr.
WHERE CONCRETE IS EXPOSED TO EARTH
BUT POURED AGAINST FORMS 50 mm.
WHERE CONCRETE IS DEPOSITED DIRECTLY
COLUMNS*
SIDES OF BEAMS AND GIRDERS*
12 hr.
12 hr.
FOUNDATION PLAN
AGAINST THE EARTH 75 mm.
6. SPLICES SHOULD BE SECURELY WIRED TOGETHER AND SHALL LAP OR EXTEND A MINIMUM OF 40 BAR DIAMETERS UNLESS OTHERWISE
PAN JOIST FORMS
30 IN. WIDE OR LESS 3 days
S1-1
SHOWN ON PLAN, SPLICES SHALL BE STAGGERED WHEREVER POSSIBLE.
OVER 30 IN. WIDE 4 days
1: 100 MTS
7. PROVIDE DOWELS FOR ALL STRUTS AND COLUMNS, BEARING ON BEAMS AND WALLS, DOWELS SHALL BE EQUAL IN NUMBER AND SIZE TO
STRUT AND COLUMN REINFORCEMENTS, ALL DOWELS SHALL HAVE EMBEDMENT OF 40 BAR DIAMETERS.
8. ALL ANCHOR BOLTS, DOWELS AND OTHER INSERTS SHALL BE PROPERLY POSITIONED AND SECURED PRIOR TO PLACING OF CONCRETE. STRUCTURAL LIVE STRUCTURAL LIVE
9. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, EQUIPMENTS AND MECHANICAL BASES THAT ARE LOAD LESS THAN LOAD MORE THAN
REQUIRED BY THE ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS. STRUCTURAL STRUCTURAL
10. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS IMMEDIATELY AFTER POURING BY THE USE OF A WET DEAD LOAD DEAD LOAD
BURLAPS, FOG SPRAYING, CURING COMPOUNDS OR ANY OTHER APPROVED METHODS. ARCH CENTERS
11. STRIPPING OF FORMS AND SHORES: SEE MINIMUM STRIPPING TIME (ACI MANUAL OF CONC. PRACTICE STANDARD) JOIST, BEAM, OR GIRDER SOFITS UNDER 10 ft. CLEAR SPAN
BETWEEN STRUCTURAL SUPPORTS
14 DAYS 7 DAYS A B C D E F
7 DAYS 4 DAYS
10 TO 20 ft. CLEAR SPAN BETWEEN STRUCTURAL SUPPORTS 14 DAYS 7 DAYS
OVER 20 ft. CLEAR SPAN BETWEEN STRUCTURAL SUPPORTS 21 DAYS 14 DAYS
C. MASONRY, CONCRETE BLOCKS ONE-WAY FLOOR SLABS
2-2" x 8" WOOD BEAM- TYPICAL
23.00
UNDER 10 ft. CLEAR SPAN BETWEEN STRUCTURAL SUPPORTS 4 DAYS 3 DAYS 2" x 8" WOOD JOISTS
SPACED @ 400mm O.C.
10 TO 20 ft. CLEAR SPAN BETWEEN STRUCTURAL SUPPORTS 7 DAYS 4 DAYS
1. PROVIDE 1-12 mm DIA. BAR AT CORNERS, INTERSECTION, END OF WALLS AND EACH SIDE OF OPENINGS. OVER 20 ft. CLEAR SPAN BETWEEN STRUCTURAL SUPPORTS 10 DAYS 7 DAYS 2.21 4.28 5.17 5.83 5.51
2. WALL REINFORCEMENT SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED:
TWO-WAY SLAB SYSTEM . . . REMOVAL TIMES ARE CONTINGENT ON RESHORES WHERE
REQUIRED, BEING PLACED AS SOON AS PRACTICABLE AFTER STRIPPING OPERATIONS ARE
CHB WALL VERT. HOR. COMPLETE BUT NOT LATER THAN THE END OF THE WORKING DAY IN WHICH STRIPPING B2
C2 C2 C2 B2 C2 B2 C2 C2
THICKNESS REINFORCEMENT REINFORCEMENT OCCURS. WHERE RESHORES ARE REQUIRED TO IMPLEMENT EARLY STRIPPING WHILE 1 B2 B2
MINIMIZING SAG OR CREEP (RATHER THAN FOR DISTRIBUTION OF SUPERIMPOSED CONSTRUC-

1.50
CONTINUE 2" x 4" WOOD JOISTS LAYOUT
100 mm. 10 mm DIA. AT 40 cm. 10 mm DIA. AT 60 cm. TION LOADS AS COVERED IN SECTION 3.8), CAPACITY AND SPACING OF SUCH RESHORES
SHOULD BE SPECIFIED BY THE ENGINEER/ARCHITECT.

B2
C1 C1
150mm. (EXT.) 10 mm DIA. AT 40 cm. 10 mm DIA. AT 60 cm. 2 B1
C2 B2 C2 B2 C2

150mm. (INT.) 10 mm DIA. AT 40 cm. 10 mm DIA. AT 60 cm.


3

6.00

0.70

B2

B2
3. REINFORCING BARS SHALL BE LAPPED AT A MINIMUM OF 40 BAR DIAMETER. CONTINUE 2" x 4" WOOD JOISTS LAYOUT

B1

B1
S1

3.80

B2
B2
D. STRUCTURAL STEEL
C2 C1 C1 C2 C1 C1

1. ALL MATERIALS AND WORKMANSHIP CONFORM WITH THE LATEST EDITION OF AMERICAN INSTIITUTE OF STEEL CONSTRUCTION (AISC)
4 B2
B1 B2 B2 B1
MANUAL UNLESS OTHERWISE NOTED.
2. ALL STRUCTURAL STEEL INCLUDING THAT OF GUSSET PLATES SHALL BE ASTM A36 WITH YIELD STRENGTH Fy=248.22 MPa.
3. ALL BOLTS AND THREADED FASTENERS SHALL BE ASTM A 307.
4. ALL WELDS SHALL BE E 60 XX ELECTRODE AND SHALL DEVELOP AT LEAST 100% OF THE STRENGTH OF THE CONNECTED MEMBERS.

FLOOR FRAMING PLAN


S1-2
1: 100 MTS

NAME: RA 9266 SEC. 4 ART. 33: PROJECT TITLE: INSTRUCTOR: THIS DRAWING IS ISSUED FOR REVISIONS SHEET CONTENTS SHEET NO.
AS BUILT

LUMAPAS, CLARISSE L. - BS ARCH 3


ARCH264 - R7 DRAWINGS, SPECIFICATIONS, AND OTHER CONTRACT DOCUMENTS,
AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE
PROPOSED 1-STOREY VACATION HOUSE AR. EDAIN SANTOS
APPROVAL
PRESENTATION
1

2
S1
REYNES, MARY GEN O. - BS ARCH 3 BUILDING TECHNOLOGY 2 MADE IS EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS
BIDDING
ESTIMATE
3
FOR USE IN THE REPETITION OF OTHER PROJECTS OR BUILDINGS,
WHETHER IN PART OR IN WHOLE, WITHOUT THE WRITTEN CONSENT BUILDING PERMIT DATE:
OF THE ARCHITECT.
BAKHAWAN, DAANBANTAYAN, CEBU CEBU INSTITUTE OF TECHNOLOGY - UNIVERSITY
CONSTRUCTION / FABRICATION DRAWN BY: SC DD CD REV

You might also like