3 Phase, 415V, 50 Hz Power connection shall be provided by client and connected to the Control panel located inside the Container. The valves in the reject line will be replaced with New Manual Duplex stainless steel vaives. he entire pipe works from the RO High Pressure pump discharge should be modified to Duplex Stainless stee! materials of Pipes and fitings. The RO System Design should modify to operate for a period of 22 hours a day. The RO plant is designed at the Average flux of less than 18 LMH. The RO plant should be designed ata recovery of 40%. Layout and required technical support for pipe line works other than OWATCO scope 800 and material specification for Pipe line works other than OWATCO scope. If Exova required, PPE wili be given on chargeable basis. OWATCO should make sure that final purified water shall comply éll parameters as mentioned in SP-1232 — HSE Specification — Public Health 3.4APPENDIX D - D, inking Water Standards (Oman STDS 08/2006) and should comply below mentioned paramevers, Description Unit Guideline ‘| | Conductivity MicroSiemens/em Lessthan800 TotalDissolvedSolids Me/i Lessthansoo pH Mest 6.5to7.5 350m3perdayasROProdu Flow M3perday ctwater(22hrs.ofoperati L on) stl CWATCO should design and commission the RO plant as it should work with TDS of 26000 mg/L. OWATO should supply chemicals for one month operation after commissioning.

You might also like