Professional Documents
Culture Documents
REV. JOB Nº
DATE UNIT
DONE CLIENT
CHECK'D LOCATION
APPRV´D DOC. Nº
REV
REV
HEAVY REFINERY SLOP OIL TANK
40 N6 1 2" Temp transmitter N16 A/B 2 4" Steam coil - inlet line
41 N8 1 hold In-tank mixer N17 A/B 2 4" Steam coil - outlet line
42 N9 1 8" Pump suction DO N18 A/B 2 12"/4" Bottom drain
43 MW A/B/C 3 24" Manway N19A/B/C 3 8" Overflow
6" N21
45 N11 1 Open vent 4 2" Sampling
A/B/C/D
46
47
7
STORAGE TANK
PROCESS DATA SHEET
REV. JOB Nº
UNIT
DONE CLIENT
CHECK'D LOCATION
APPRV´D DOC. Nº
HEAVY REFINERY SLOP OIL TANK
REV GENERAL NOTES
1
2 1.- Minimum metal design tempeature is -18ºC
3 2.- One spare of other completed with blind flanged and gasket.
4 3.- Tank could receive: Light Coker Gasoil,Heavy Cocker Gasoil,Vacuum Residue, Heavy Vacuum Gasoil, Medium vacuum gasoil,
5 1 Light Vacuum Gasoil, Diesel, Kerosene, Unconverted oil an sour water (Wet H2S service 487ppm).
6 4.- All drain connection shall be furnished complete with the following: 4 inch nozzle, 48 inch diameter by 24 inch deep draw off sump, internal
7 piping (including downturned elbow) terminating 4 inches above bottom of sump.Two drawoff sump, set at 180º one from others.
8 5.-Nozzle near the bottom between drain nozzle and LLLL.
9 6.- Vendor shall provide accesories according to Spec last edition including clips and ring for insulation and sampling system connection.
10 1 7.- Steam-coil:lenght per coil. Low pressure steam shall be used.
11 1 8.- Deleted
12 1 9.-For normal venting and emergency venting vendor shall provide the required nozzles to comply with API-2000.(MW=242.3 Kg/Kmol, L=65.73Kcal/Kg)
13 1 (steam coil rupture :steam flowrate=21575kg/h; MW=18; Cp/Cv=1.34; Z=0.984; Tªrelieving=100ºC).
14 10.-Deleted.
15 11.- One pump
p p out nozzle,, close to suction line,, shall be furnished complete
p with drawoff sump,
p, internal piping
p p g (including
( g downturned elbow))
16 terminating one pipe diameter above the bottom of a drawoff sump and valve.Pump out nozzle shall also be connected to the suction lines
17 with external piping.
18 12.-Deleted
19 13.-Design pressure excludes static head of liquid. For product properties see Note 18. Tank shall be affected by vapor pressure changes.
20 14.-Number of Manholes and other tank's connections shall be according to Spec last eddition.
21 1 15.-It shall be determined and guarantee by tank vendor.
22 16.-Total tank's height and Nominal Capacity shall be confirmed by tank vendor.
23 17.-Tank could contain water(wet H2S service) coming from process units, interface level has to be determined.Pump suction shall be located above
24 LLLL to prevent ingress of water.
25 18.- Product properties at inlet temperature that could reach to tank are shown below:
26 Thermal
Density Vapor Press Heat capacity Viscosity
27 Product conductivity Others
43
44
8
TK-04 STORAGE TANK
PROCESS DATA SHEET
REV. JOB Nº
DATE UNIT
DONE CLIENT
CHECK'D LOCATION
APPRV´D DOC. Nº
REV
REV
CRUDE OIL TANK
37 N4 A/B/C/D 4 4" Drain 1 N13 A..L 4 6" Steam coil - inlet line
38 1 N5 1 2" Thermowell 1 N14 A..L 4 6" Steam coil - outlet line
39 1 N6 1 3" Temp transmitter N15 VTA VTA Emergency venting
40 1 N7 1 3" Pres. transmitter N16 VTA VTA Automatic Bleeder vents
(hold) (hold)
41 1 N8 In-tank mixer N17 1 8" Gauge Hatch
N18
42 1 N9 1 24" Pump suction DO 1 4 12"/4" Bottom drain
A/B/C/D
43 MWA/B/C/D 4 24" Manway D1 1 VTA Roof drain
6"
44 1 N10 1 Level transmitter 1 N19 1 2" Sampling Return
4" N20
45 1 N11 1 Level transmitter 1 4 2" Sampling
A/B/C/D
46 See general notes of following page.
47
9
STORAGE TANK
PROCESS DATA SHEET
REV. JOB Nº
DATE UNIT
DONE CLIENT
CHECK'D LOCATION
APPRV´D DOC. Nº
CRUDE OIL TANK
REV GENERAL NOTES
1
2 1.- Minimum metal design tempeature is -18ºC
3 2.- One spare of other completed with blind flanged and gasket.
4 3.- Appart from Crude oil: Slops from Vacuum Distillation Unit(wet H2S service), Slops from Hydrogen unit,Slops from Amine Regeneration Unit,
5 Slops from Sour Water Stripper Unit,Coker Naphtha from Delay Coker Unit and Light Slops from Hydrockacking unit could reach this tank.
6 4.- All drain connection shall be furnished complete with the following: 4 inch nozzle, 48 inch diameter by 24 inch deep draw off sump, internal
7 piping (including downturned elbow) terminating 4 inches above bottom of sump.Four drawoff sump, set at 90º one from others.
8 5.-Nozzle near the bottom between drain nozzle and LLLL.
9 6.- Vendor shall provide accesories according to Spec last edition including sampling system connection.
10 1 7.- Steam-coil: lenght per coil. Low pressure steam shall be used.
11 1 8.- Deleted
12 1 9.-For normal venting and emergency venting vendor shall provide the required nozzles to comply with API-2000.(MW=80 Kg/Kmol, L=194.5Kcal/Kg)
13 1 (for steam coil rupture:steam flowrate=86300 kg/h;MW=18; Cp/Cv=1.31; Z=0.984; Tªrelieving=100ºC).
14 10.- Deleted
15 11.- One pump
p p out nozzle,, close to suction line,, shall be furnished complete
p with drawoff sump,
p, internal piping
p p g (including
( g downturned elbow))
16 terminating one pipe diameter above the bottom of a drawoff sump and valve.Pump out nozzle shall also be connected to the suction lines
17 with external piping.
18 12.-Tank shall contain water(wet H2S service) coming from slops pumps. Interface level has to be determined.
20 13.-Design pressure excludes static head of liquid. For product properties see Note 17. Tank shall be affected by vapor pressure changes.
21 14.-Number of Manholes and other tank's connection nozzles shall be according to Spec last eddition.
22 15.-It shall be determined during Detail Engineering.
23 16.-Total tank's height and Nominal Capacity shall be confirmed by tank vendor.
24 17.- Product properties at inlet temperature that could reach to tank are shown below:
25 Product Density (Kg/m3) Vapor Press (Kg/cm2(a) Others
27
28
29 1
30
31
34
35 1
36 1
37 1
38 1
39 1
40
41
42
43
44
45 1
46 1
47
48
10