Professional Documents
Culture Documents
28 May 2018 165902957I5Q8DT6EOmShivEIAreport-Ilovepdf-compressed
28 May 2018 165902957I5Q8DT6EOmShivEIAreport-Ilovepdf-compressed
OF
PREPARED BY
TABLE OF CONTENTS
LIST OF TABLE
LIST OF FIGURES
LIST OF ANNEXURE
ABBREVIATIONS
HC Hydrocarbon
HCl Hydrochloric acid
HDPE High Density Polyethylene
HP Horse Power
HSD High Speed Diesel
H2SO4 Sulphuric Acid
IMD Indian Meteorological Department
IBA Isobutyl alcohol
INR Indian Rupees
ISCST-3 Industrial Source Complex Short Term-3
KG Kilo Gram
KLD Kilo Liter per Day
KVA Kilo Volt Ampere
kW Kilowatt
MCLS Maximum Credible Loss Scenarios
MEE Multiple Effect Evaporator
MoEF Ministry of Environment and Forest& Climate Change
MoU Memorandum of Undertaking
MS Mild Steel
MSI HC Manufacture, Storage and Import of Hazardous Chemical
MSDS Material Safety Data Sheet
MSW Municipal Solid Waste
MT Metric Tone
NA Not Applicable
NABET National Accreditation Board of Education and Training
NAAQS National Ambient Air Quality Standards
NaOH Sodium Hydroxide
NCTL Narmada Clean Tech Limited
NH National Highway
NH3 Ammonia
NOC No Objection Certificate
NOX Nitrogen Oxides
OHS Occupational Health& Safety
OSHAS Occupation Health and Safety Assessment Series
PCU Passenger Car Unit
PEL Permissible Exposure Level
PESO Petroleum and Explosives Safety Organisation
PHC Public Health Center
PM Particulate Matter
PP Project Proponent
PPE Personal Protective Equipments
PPMV Parts per Million by Volume
CHAPTER - 1
INTRODUCTION
1.1 PURPOSE OF THE REPORT
M/s. Om Shiv Industries (formally Known as M/s. Aims Industries Ltd.) is located at Plot
No. 915, Near Gayatri Chemical, Panoli, Dist: Bharuch, State: Gujarat. M/s. Aims
Industries Ltd. was doing work of refilling oxygen cylinder for medical and corporate at
plot no. 915. There is minor construction i.e. Security building, Admin house, 4-5 rooms.
The same plot is transferred to M/s. Om Shiv Industies by GIDC. M/s. Om Shiv
Industries has proposed for manufacturing of API intermediates, organic & inorganic
chemicals 775 MT/Month. The proposed products by the unit fall in the Schedule
attached to the EIA Notification, i.e. Project No. 5(f), Synthetic Organic Chemicals.
Since the project is established in notified industrial estate, Panoli, and it was classified as
Category “B” project, public hearing is not applicable to this project. Environment
Clearance will be evaluated by the SEAC/SEIAA, Gujarat.
Purpose of EIA studies and preparation of detailed EIA/EMP report is to comply with
Terms of References (TOR) finalized by MoEF, Delhi in its “25th meeting” held on 23rd
January, 2017. The EIA report is based on the TOR vide File no. J-11011/264/2017-IA.II
(I)] dated: - 23rd August, 2017 on environmentclearance.nic.in. The copy of TOR is
attached as Annexure-I.
required information with regards to the project as mentioned in the Terms of Reference
issued by the Industrial committee of MoEF, New Delhi.
This Report is prepared based on ‘General Structure of EIA’ given in Appendix III and
IIIA of mentioned EIA Notification.
M/s. Om Shiv Industries has proposed to manufacture API intermediates, organic &
inorganic chemicals at Plot No. 915, Near Gayatri Chemical, Panoli, Bharuch, Gujarat.
The plot area is 3089 sq. m. The expected cost of proposed expansion is Rs. 250 Lakhs.
M/s. Om Shiv will develop strong environment management cell and possess in house
capabilities to undertake implementation of cleaner production technologies, green
chemistry, etc. besides carrying out environment impact assessments.
The lists of the products and byproducts details are provided in Table 1.1.
TABLE: 1.1
LIST OF PRODUCTS SCENARIO
Sr. Product Name CAS No. Quantity End Use
No. MT/M
1. Valproic Acid 1069-66-5 5 Intermediate of sodium
valporate API
2. 6- Chloro Phenylhexanone 1444-65-1 5 Intermediate of
phynoxyfyline API
3. Tetra Isopropyl Titanate 546-68-9 100 It is use as coupling
agent in Adhesive,
plasticizer, polyester,
glass ,& metal
4. Ketoprofen Nitrite 22071-15- 5 Intermediate of
4 ketoprofen API
5. Sodium Bromo Propionate 137-40-6 10 Intermediate of
Flubiprofen
6. 4-Bromo 2-Flouro 326-66-9 10 Intermediate of
Acetanilide Flubiprofen
7. 2- Chloro 5 Nitro Benzioic 2516-96-3 10 Intermediate of
Acid Masalamine API
8. Sodium 2 ethyl Hexanoate 19766-89- 10
Pharma intermediate API
3
9. Cocamidopropyl Betanine 61789-40- 50 Food & personal care
0 product
10. Glycerol Monostearate 123-94-4 50 Food & personal care
product, anticaking agent
The Indian pharmaceuticals market is the third largest in terms of volume and thirteenth
largest in terms of value, as per a report by Equity Master. India is the largest provider of
generic drugs globally with the Indian generics accounting for 20 per cent of global
exports in terms of volume. Of late, consolidation has become an important characteristic
of the Indian pharmaceutical market as the industry is highly fragmented. The Indian
pharma industry, which is expected to grow over 15 per cent per annum between 2015
and 2020, will outperform the global pharma industry, which is set to grow at an annual
rate of 5 per cent between the same periods. The market is expected to grow to US$ 55
billion by 2020, thereby emerging as the sixth largest pharmaceutical market globally by
absolute size, as stated by Mr Arun Singh, Indian Ambassador to the US. Branded
generics dominate the pharmaceuticals market, constituting nearly 80 per cent of the
market share (in terms of revenues). The sector is expected to generate 58,000 additional
job opportunities by the year 2025. *
India’s pharmaceutical exports stood at US$ 16.4 billion in 2016-17 and are expected to
grow by 30 per cent over the next three years to reach US$ 20 billion by 2020, according
to the Pharmaceuticals Export Promotion Council of India (PHARMEXCIL).
Looking toward the increasing day by day API Intermediates demand and having well
experience. Unit have decided to manufacture API Intermediates.
The major activities to be carried out at site during project work are as follows:
TABLE: 1.3
PROJECT IMPLEMENTATION SCHEDULE
Sr. No. Work implementation Time
1. Construction work 6 Months
2. Machinery installation 3 Months
3. Recruitment process 1 Month
4. Commissioning 1 Month
5. Operation and functions 1 Month
Total Time 12 months
The company premises are already established in 3089 square meter of total land. The
premise was used by trader. Trading activity of gas cylinders was carried out by earlier
owners. The security cabin, admin building, toilet blocks are already existing.The
additional investment for proposed expansion will be Rs. 280 Lacs. The cost break up is
provided in Table 1.4.
TABLE: 1.4
CAPITAL COST PROJECTION
Sr. Purpose Proposed
No. (Rs. In Lacs)
1. Land 50
2. Building 50
3. Plant and Machinery 111
4. Q.A. Lab Set Up 20
5. Environment Protection & Safety
a) Effluent treatment Plant 40
b) Safety Equipment (PPE, fire extinguishers, 2
Ventilation, etc.)
c) Green belt development 4
d) Fire 3
Total 280
The project proponent did not consider any other alternative site for proposed project. A
letter of land allotment from GIDC of industrial plot no 915, is attached as Annexure -
III.
The project site is located at plot No. 915, GIDC Estate Panoli, Ankleshwar, Dist:-
Bharuch, in the state of Gujarat which is one of the fastest growing industrial estate and
having all the essential facilities & infrastructure for the management & disposal of
effluent discharge. It is approximately 16 km distance from Dist.: Bharuch.
The site location map on Indian map of 1:10, 00,000 scale followed by 1:50,000/1:25,000
scale on A3/A2 sheet and Location map showing 10 km radial distance from project site
is attached as Annexure-IV. The proposed plant layout is attached as Annexure – V. The
photograph of project site area are attached as Annexure- VI.
FIGURE 1.1-A
LOCATION OF PROJECT SITE
PANOLI
FIGURE 1.1-B
GOOGLE EARTH OR SATELLITE IMAGE OF PROJECT LOCATION WITH IN 0.5 KM
FIGURE 1.2
GOOGLE EARTH OR SATELLITE IMAGE OF PROJECT LOCATION WITH IN 2 KM
FIGURE 1.3
GOOGLE EARTH OR SATELLITE IMAGE OF ALL FOUR CORNERS OF THE SITE
The Panoli GIDC falls at Bharuch District of Gujarat. The Panoli GIDC Industrial area,
developed by Gujarat Industrial Development Corporation (GIDC) having myriad of
small, medium and large scale industrial units within Panoli GIDC as well as in
surrounding GIDC and area.
Panoli is a very important industrial center having the advantage of close proximity to
Ankleshwar & Bharuch. Due to NH-8 and Bharuch railway station, GIDC is well
connected by road and rail to rest parts of the country. Communication facility available
in the area is good.
Water is available from G.I.D.C. water supply through Tapi river canal. A letter from
GIDC stating that the proposed additional quantity of water will be provided is attached
as Annexure - VII. The G.I.D.C. Panoli is large industrial estate with a number of
chemical plants, pigments plants, processing plants and other industries total to about
more than 300 units.
Panoli industrial association (PIA) has set up a disaster management cell to take care of
any disaster in the vicinity. A common effluent treatment plant (CETP) is established and
operated by M/s. Panoli Enviro Technology Ltd. (PETL). There is Common
Hazardous Waste Storage Site established and operated by M/s. BEIL at GIDC,
Ankleshwar. The present unit will utilize this TSDF facility.
Final effluent treatment plant (FETP) of M/s. Narmada Clean Tech (NCT), formally
known as M/s. Bharuch Eco-Aqua Infrastructure Ltd. (BEAIL), Ankleshwar, is
available for further treatment and disposal into deep sea.
TABLE: 1.6
SALIENT FEATURES OF THE PROJECT SITE
Particular Details Distance from Site
Villages Shanjali 0.488 Km E
Approx. Geographical Latitude: 21°33’32.86”N
positioning Longitude: 72°59’25.24”E
assessment has been chosen to reflect the impacts in two distinct phases of the project
namely:
1) Construction phase 2) Operation phase
This report is also made in the overall frame work of the Environmental Impact
Assessment (EIA) Notification dated 14th September 2006 (and subsequent amendments
to the same) issued by the Ministry of Environment and Forests (MoEF). The unit
requires to take Environmental clearance from Industrial Committee of MoEF & CC,
New Delhi.
• To describe the Project and associated works together with the requirements for
carrying out the Project.
• To identify and describe the elements of the community and environment likely to be
affected by the Project, and / or likely to cause impacts upon the Project, including both
the natural and man-made environment;
• To identify and quantify emission sources and determine the severity of impacts on
sensitive receivers and potential affected uses;
• To recognize and quantify any environmental impacts associated with the Project and
recommend appropriate mitigation measures;
• To study existing landscape and visual quality in the Study Area so as to evaluate the
landscape and visual impacts of the Project;
• To identify, predict and evaluate the residual (that is, after practicable mitigation)
environmental impacts and cumulative effects expected to arise during the construction
and operation phases of the Project in relation to the sensitive receivers and potential
affected uses;
• To identify, assess and specify methods, measures and standards, to be included in the
detailed design, construction and operation of the project which are necessary to mitigate
these impacts and reduce them to allowable levels within established standards /
guidelines;
• To investigate the extent of side-effects of proposed mitigation measures that may lead
to other forms of impacts;
• To identify any additional studies necessary to fulfil the objectives to the requirements
of this EIA Study.
The generic structure of the EIA report, as per the guideline provided by MoEF & CC is
illustrated in the following tabulated format.
TABLE: 1.8
STRUCTURE OF EIA REPORT
Sr. EIA Structure Contents
No.
1. Introduction • Purpose of the report and regulatory frame work
• Identification of the project and project
proponent
• Key Information of project
• Regulatory Frame work
• Scope & Objective of EIA study
• Structure of EIA report
• Terms of reference & Its Compliance
2. Project Description • Condensed description of those aspects of the
project (based on project feasibility study), likely
to cause environmental effects. Description
contains the details of the following:
• Type of project
• Need for the project
• Location details showing general location,
specific location, project boundary & project site
layout)
TABLE: 1.9
TOR GIVEN BY EXPERT APPRAISAL COMMITTEE OF MoEF, DELHI
II Information about the project proponent. Details are given in topic no.
1.2.2 of chapter-1 on page no. 3.
III Importance and benefits of the project Details are given in topic in 1.3.1
of chapter-1 on page no. 4.
3. Project Description
I Cost of project and time of completion. Details are given in topic in 1.3.2
& 1.3.3 of chapter-1 on page no.
5-8.
II Products with capacities for the proposed Details are given in topic no. 1.2
project. of chapter-1 on page no. 2.
III If expansion project, details of existing This is a new project.
products with capacities and whether
adequate land is available for expansion,
reference of earlier EC if any.
IV List of raw materials required and their Details are given in table No. 2.1
source along with mode of transportation. & 2.6 of chapter 2 on page no. 45
& 60 respectively.
V Other chemicals and materials required Details are covered in table no.
with quantities and storage capacities 2.5 of chapter-2 on page no.54.
VI Details of Emission, effluents, hazardous Details are given in topic no. 2.8
waste generation and their management. to 2.10 of chapter-2 on page no.
102 to 110.
VII Requirement of water, power, with source Details are given in topic no.
of supply, status of approval, water 2.7.7, 2.7.2 & 2.7.5 of chapter-2
balance diagram, man-power requirement on page no. 95 to 102.
(regular and contract)
30. Economical and technical viability of the Details are covered in chapter 8
effluent treatment system. under section 8.8.2.1(A) on page
no.291.
31. Plans for management, collection and Details are covered in chapter 8
disposal of waste streams to be generated under section 8.8.2.1(B) on page
from spillage, leakages, vessel washing, no.292.
used container washing etc. Measures
proposed for preventing effluent discharge
during unforeseen circumstances.
32. Action plan for reuse of waste streams like Details are covered in chapter 8
Spent acids, Poly Aluminium Chloride etc. under section 8.2.2.1 (C) on
within premises to convert into valuable page no.292.
products instead of sending outside to
actual end-users.
33. One season Site-specific micro- Details are covered in chapter 3
meteorological data using temperature, under section 3.2 on page
relative humidity, hourly wind speed and no.114.
direction and rainfall should be
incorporated.
34. Anticipated environmental impacts due to Anticipated environment
the proposed project/production may be impacts due to the proposed
evaluated for significance and based on projects are covered in chapter 4
CHAPTER -2
PROJECT DESCRIPTION
The Indian pharmaceuticals market is the third largest in terms of volume and thirteenth
largest in terms of value, as per a report by Equity Master. India is the largest provider of
generic drugs globally with the Indian generics accounting for 20 per cent of global exports
in terms of volume. Of late, consolidation has become an important characteristic of the
Indian pharmaceutical market as the industry is highly fragmented. The Indian pharma
industry, which is expected to grow over 15 per cent per annum between 2015 and 2020, will
outperform the global pharma industry, which is set to grow at an annual rate of 5 per cent
between the same period . The market is expected to grow to US$ 55 billion by 2020, thereby
emerging as the sixth largest pharmaceutical market globally by absolute size, as stated by
Mr Arun Singh, Indian Ambassador to the US. Branded generics dominate the
pharmaceuticals market, constituting nearly 80 per cent of the market share (in terms of
revenues). The sector is expected to generate 58,000 additional job opportunities by the year
2025. *
India’s pharmaceutical exports stood at US$ 16.4 billion in 2016-17 and are expected to
grow by 30 per cent over the next three years to reach US$ 20 billion by 2020, according to
the Pharmaceuticals Export Promotion Council of India (PHARMEXCIL).
Looking toward the increasing demand of API Intermediates and having well experience
partners , project proponents have decided to implement the project.
Product wise raw materials consumption with quantity in MT/Month is given in Table 2.1.
TABLE: 2.1
Hydrochloric 7647-01-0 1
Acid
Sodium 497-19-8 9
Carbonate Sol
Iso Propyl 67-63-0 0.4
Alcohol
Total 24.4
5. Sodium 10 Bromo Proponic 590-92-2 10
Bromopropionate Acid
Toluene 108-88-3 2
Sodium 124-41-4 8
Methoxide
Total 20
6. 4-Bromo , 10 2 Fluro Aniline 348-54-9 5.08
2Fluoro Acetic Anhydrous 108-24-7 6.10
Acetanilide Sodium 1310-73-2 6.27
Hydroxide
(NaoH)
Methanol 67-56-1 0.68
Bromine 7726-95-6 8.76
Total 26.90
7. 2-Chloro 5Nitro 10 Methline 75-09-2 1.14
Benzoic Acid Dichloride
Sulphuric Acid 8014-95-7 30
Chloro Benzoic 118-91-2 14
Acid
Nitric Acid 7697-37-2 9
5% Sodium 144-55-8 11
Bicarbonate
Solution
Methanol 67-56-1 0.6
Total 65.74
8. Sodium 2 Ethyl 10 Octoic Acid 124-07-2 10.00
Hexanoate Caustic prill 1310-73-2 2.87
Toluene 108-88-3 0.32
Methanol 67-56-1 0.53
Total 13.71
9. Cocamidopropyl 50 Coconut Oil 8001-31-8 9.74
Betamine Dimethyl amine 124-40-3 5.01
Sodium Boro 16940-66-2 0.01
Hydrate
Mono Chloro 79-11-8 1.98
Acetic Acid
Caustic Flakes 1310-73-2 1.98
Total 18.72
10. Glycerol 50 Glycerine 56-81-5 13.88
Monosterate Staric Acid 57-11-4 40
Caustic Flakes 1310-73-2 0.29
Total 54.17
11. SorbitonMonoole 50 Sorbitol 70% 608-66-2 23.74
Production table is covered in Table 1.1 & 1.2 of chapter 1.Solid products willbestored in
HDPE woven bag with PP liner. Liquid products will be stored in MS/ SS Tank or HDPE
Tank or drums. The quality of products will be checked properly and stored in the close shed
with due consideration of compatibility of chemicals.
The storage area will be designed in such a way that the floor level will be 150 mm above the
maximum floor level with 2.5 mm thickness of HDPE geo membrane and two layers of RCC
in storage is proposed.
Details of Product & By product Storage and handling is given in Table 2.2.
TABLE 2.2
Sr. Name of Products Chemical Name State Storage in Capacity MOC End Use
No. Tank/Bags
14 Derivatives of 2 Derivatives of 2 SOLID Drums 50 kg FIBRE Intermediate of anto ulcer
Mercaptobenziamidazole Mercaptobenziamidazole POWDER drugs Lansoprazole,
rabeprazole
15 2 Mercapto 5 2 Mercapto 5 SOLID Drums 50 kg FIBRE Intermediate of anto ulcer
methoxyBenziamidazole methoxyBenziamidazole POWDER drugs Lansoprazole,
16 Derivatives of Sorbiton Derivatives of Sorbiton Mono SOLID Bags 25/5 0kg HDPE Use as heat transfer agent,
Mono Stearate Stearate laboratory Agent
17 Sulphanilic Acid Sulphanilic Acid SOLID Bags 25/50 kg HDPE Food & personal care
product, anticaking agent
*Product will be manufacture on the campion basis and storage will be provided according to that.
Product wise monthly raw material consumption is covered in above Table 2.1 & 2.2. Raw
materials will be stored in M.S. Tanks, S.S. Tanks, HDPE Tanks, HDPE Carboys, HDPE
bags, fiber drums. The quality of raw material will be checked properly and stored in the
close shad storage area as per characteristic of raw material.
The storage area will be designed in such a way that the floor level is 150 mm above the
maximum flood level with 2.5 mm thickness of HDPE geo membrane and two layers of RCC
in storage is proposed.
Hazardous flammable substances will be separately stored in (solvent) tank farm area within
premises. Chemicals likeliquor ammonia and methanol will be stored in MS/SS tank with all
precautionary process instrumentation and safety appliances. All the liquid chemicals storage
tanks will be fitted with appropriate controls to avoid any leakages and bund/dyke walls will
be provided 1.5 times higher than storage tanks for Hazardous chemicals. The provision of
raw material & solvent total solid & tank farm area is 927sq.m. Close handling system for
chemicals will be provided. Flame arrester cum breather valve and flame proof fittings will
be provided at tank farm. Solvent transfer will be done by pumps. Reactor and solvent
handling pumps will have mechanical seal with flame proof electrical fitting. The solvent
storage area will be restricted for unauthorized persons. Proper earthling will be provided in
all electrical equipment whenever solvent handling is done. Also jumpers & flange guards
will be provided in piping.
Details of quantity of raw material and solvent storage are given in Table 2.3& 2.4.
TABLE: 2.3
DETAILS OF RAW MATERIAL STORAGE
Sr. Name of Raw Maximum
State Storage Capacity MOC
No. Material Storage
1 Ethanol Liquid Drums 0.5 MT 0.5MT HDPE
Drums
2 Sodium Metal Solid with 0.2MT 0.2MT MS
kerosene
Dimethyl Melanic Bag FIBRE 50KG FIBRE
3 Solid
Acid Esater DRUM
Bag FIBRE 50KG FIBRE
4 N Propyl Bromide Solid
DRUM
TABLE: 2.4
DETAILS OF SOLVENT STORAGE
Sr. Name of solvents No. of Total MOC
No. Tank capacity
1 Ethanol 1 5KL HDPE
2 Methanol 1 5KL MS
3 Toluene 1 10 KL MS
4 Iso Propyl Alcohol 1 20 KL MS
5 Methylene Dichloride 1 1KL HDPE
Details of other chemical use in ETP to be stored are given in Table 2.5.
TABLE: 2.5
Note: All the RM material will be purchased and stored according to manufacturing of the
products schedule. Products will be manufactured on campaign basis.
Physical & Chemical Property / Characteristics of Raw Materials:
TABLE: 2.6
CHARACTERISTICS OF RAW MATERIALS
PRODUCTS
Sr. Name of Products Physical State M.P B.P F.P LEL/UEL TLV LD50 Sp. Vapor
No. 0C 0C 0C % ppm or (mg/Kg) Gravity Density
mg/m3 LC50 (mg/l) (water=1) (air =1)
1. Valproic Acid Liquid 1300C 2280C 950C NA NA 0.9210 3.5
13. 4 Amino 1,2,4 Solid 860C 2600C 1700C NA NA 265mg/kg 1.5 6.91
Triozole
14. Derivatives of 2 Solid 1710C 3600C NA NA NA 300mg/kg 1.242 NA
Mercaptobenziami
dazole
15. 2 Mercapto 5 Solid 2550C 3090C 1400C NA NA 300mg/kg . 1.38 NA
methoxyBenziamid
azole
16. Derivatives of Solid 680C 1000C NA NA NA NA 1.043 NA
Sorbiton Mono
Stearate
17. Sulphanilic Acid Solid 2880C NA NA NA NA 12300mg/k 1.485 NA
g
RAW MATERIALS
Sr. Name of Raw Physical M.P B.P F.P LEL/UEL TLV LD50 Sp. Vapor
No. material State 0C 0C 0C % ppm or (mg/Kg) Gravity Density
mg/m3 LC50 (mg/l) (water=1) (air =1)
1 Ethanol Liquid -1300C 78.20C 120C NA NA NA NA NA
2 Sodium Metal Solid 97.80C 8810C NA NA NA NA 0.97 NA
Dimethyl Solid 1570C NA NA NA NA NA NA NA
3
MelanicAcid Esater Yellow
4 N Propyl Bromide Liquid -240C 710C NA 4% NA 4260mg/kg 1.32 4.3
5 Sulphuric Acid Liquid -1.10C 3300C NA NA NA 510mg/kg 1.843 3.4
6 Toluene Liquid 1110C -950C 8% 5000mg/kg 0.87 3.14
-900C 900C -800C 6% 200PP 5000mg/kg 0.792 1.105
7 Methanol
M
Methyl Aceto Liquid -980C 570C -5.80C 3.1% 760mg/ 5000mg/kg 0.92 2.8
8
Acetate kg
Bromochloro Liquid -59.20C 1450C 450C NA NA 930mg/KG 1.592
9
Propane
10 Pottassium Solid 8910C NA NA NA NA 1870mg/kg 2.29 NA
Carbonate
11 Hydro Chloric Acid Liquid -46.20C 330C NA NA NA 1108mg/kg 1.15 1.267
12 Sodium Carbonate Solid 8540C NA NA NA NA 4090mg/kg 2.29 NA
13 Iso Propyl Alcohol Liquid -88.50C 820C 150C NA NA 5000mg/kg 0.79 2.1
14 N Hexane Liquid -950C 690C -7.60C NA NA 5048mg/kg 0.79 2.1
Titanium Tetra Liquid -250C 1350C NA NA NA 1300mg/kg 1.73 NA
15
Chloride
16 Ammonia Gas NA -28.10C NA 25% 2000mg/kg 0.045 114.4
0 0
17 Benzene Liquid NA 80 C -1.1 C 1.8% NA 4700mg/kg 0.877 2.7
3(1-cynoethyl Solid 1430C0C 0
355 C 1690C NA NA 10000mg/k 1.204 4.21
18
benzoic acid) g
19 Thionyl Chloride Liquid -1040C 760C NA NA NA 324mg/kg 1.638 NA
Aluminium Solid NA NA NA NA NA 3805mg/kg 2.44 NA
20
Chloride
21 Hydrochloric Acid Liquid -46.20C 330C0 NA NA NA 1108mg/kg 1.15 1.267
Sodium Carbonate Liquid 8540C NA NA NA NA 4090mg/kg 2.29 NA
22
Sol
BromoProponic Liquid -20.80C 140.990 56.70 2.9% NA 3500mg/kg 0.9954 2.56
23
Acid C C
24 Toluene Liquid NA 1110C -950C 8% NA 5000mg/kg 0.87 3.14
Solid 72.50C 2320C 104.40 NA NA 100mg/kg 1.169 NA
25 2 Fluro Aniline
C
Liquid -73.10C 139.90 510C 2.7% NA 1780mg/kg 1.08 3.52
26 Acetic Anhydride
C
Sodium Hydroxide Solid 6040C 13900C NA NA NA 1350mg 2.13 NA
27
(NaoH)
28 Bromine Liquid -7.250C 580C NA NA NA 2600mg/kg 3.11 7.1
Methylene Liquid -970C 400C NA 13% NA 162mg/kg 1.33 2.93
30
Dichloride
Chloro Benzoic Solid 1420C NA 173 NA NA 510mg/kg 1.544 NA
31
Acid
The raw materials and finished goods will be transported through tankers and trucks. There
is well developed road structure in GIDC, Panoli as well as within premises also. No
additional road infrastructure will be required for transportation.
The number of trucks per day for raw material and finished product transportation will be
approx. 10 to 12 trucks. The raw material source will be standard manufacturer or supplier.
Indicative list along with mode of transportation is included in Table 2.7.
TABLE: 2.7
DETAILS OF RAW MATERIAL SOURCE AND METHOD OF TRANSPORTATION
Sr. Name of Raw Material State/Na Source Mode of
No. tion transportation
1 Ethanol Gujarat Kanoria Chemical Ltd Road Tanker
Sodium Metal Private
2 Sodium Metal Gujarat Limited, Vadodara Road Truck
Charge ethyl alcohol & sodium metal in SS reactor under stirring at 75C to 80 C and
maintain stirring for 3 hours.
Then transfer material to GLR reactor & add diethyl Malanic acid & add N propyl
bromide solution within 8 hours & stir it for 1 hr.
Then distill out ethanol
Add DM water and stir material for one hour.
Settle the material & separate out aqueous layer of sodium bromide 25%.
Stir this material at 80C for 8 hours then charge toluene and Sulphuric Acid and stir for
2 hour at 160 C & settle and separate out aqueous layer.
Then crude valproic acid for distillation after distillation.
Pure Valproic Acid packed in drum.
Chemical Reaction
O O CH3 CH3
Na+, C2H5OH
O O
+ Br
CH3 CH3 CH3
Toluene
Diethyl Propanedioate Bromobutane HO O
M.W.=160 M.W.=137 2-Butylhexanoic Acid
M.W.=172
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 568 Reaction Mass 280
DISTILLATION
Ethanol 288
Total 568 Total 568
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 280 Reaction Mass 268
EXTRACTION
Water 800 NaBr Solution 25% 812
Total 1080 Total 1080
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 268 Reaction Mass 763
LAYER
Sulphuric Acid 25 Water/ effluent 30
SEPERATION
Toluene 500
Total 793 Total 793
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 763 Product 110
DISTILLATION Recovered Toluene 480
Water/ Efflunent 173
Total 763 Total 763
Chemical Reaction
O
H3C Pottasium Carbonate,
Cl Cl
Methyl Aceto Acetate
Br Methanol, Water
2-bromo-1-chloropropane 6-chloro-1-phenylhexan-1-one
M.W.=157 M.W.=209
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Methanol 1200 Reaction Mass 2700
Methyl Aceto Acetate 400 COUPLING
Bromochloro Propane 500 REACTION
Pottassium Carbonate 600
Total 2700 Total 2700
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 2700 Reaction Mass 1550
DISTILLATION
Methanol Recovered 1150
Total 2700 Total 2700
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1550 EXTRACTION & Reaction Mass 1900
Water 2500 LAYER NaBr Solution 25% 2450
Sulphuric Acid 300 SEPERATION
Total 4350 Total 4350
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1900 LAYER Reaction Mass 2600
Hydro Chloric Acid 1000 SEPERATION & Water/ Efflunent 1000
Toluene 700 EXTRACTION
Total 3600 Total 3600
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 2600 WASHING & Reaction Mass 2600
Sodium Carbonate LAYER
500 Water/ Effluent 500
50% solution SEPERATION
Total 3100 Total 3100
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 2600 Product 350
Residue 50
DISTILLATION
Recovered Toluene 690
Effluent to ETP 1510
Total 2600 Total 2600
Charge Iso Propyl Alcohol & N-hexane into lead bonded reactor.
Start stirring & maintain temperature 50 C and then charge Titanium tetra chloride & neutral
it by adding ammonia.
Neutralize then add second lot of Titanium Tetra Chloride.
Neutral the reaction mass by addition of ammonia. All four lot of titanium tetra chloride
charge and neutral it by ammonia after completion of titanium chloride.
Check the sample for free chloride.
Transfer reaction mass to centrifuge & separate filtrate & send to storage tank and remove
ammonium chloride from centrifuge.
Charge filtrate to SS reactor for reaction mass upto 100 C & distill out N. Hexane to storage
tank
After rising the temperature of reaction mass upto 15C under vacuum & separate out tetra iso
propyl titanate& send to storage tank.
Chemical Reaction
H3C CH3
Cl O
OH H3C CH3
Cl Ti Cl + 4 + 4 NH3
O Ti O + 4 NH4Cl
Cl H3C CH3 CH3
H3C O
Titanium Isopropyl
Tetrachloride Ammonia
Alcohol H3C CH3
Ammonium
M.W.=190 M.W.=4X60=240 M.W.=4X17=68 Tetra Isopropyl titanate Chloride
M.W.=284 M.W.=4X53.5=214
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Iso Propyl Alcohol 520 Reaction Mass 1850
N Hexane 800
REACTION
Titanium Tetra Chloride 390
Ammonia 140
Total 1850 Total 1850
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1850 Reaction Mass 1625
CENTRIFUGE
N Hexane 375 Ammonium Chloride 600
Total 2225 Total 2225
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1625 Product 500
DISTILLATION N-Hexane 1113
Distillation Waste 12
Total 1625 Total 1625
4. KETOPROFEN NITRITE
Brief Manufacturing Process
Chemical Reaction
O
NC CH3 N
3-(1-cyanoethyl)benzoic acid CH3
M.W.=175 2-(4-benzoylphenyl)propanenitrile
M.W.=235
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Benzene 800 Reaction Mass 1675
3(1-cynoethyl benzoic
500 CHLORINATION
acid)
Thionyl Chloride 375
Total 1675 Total 1675
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1675 Reaction Mass 875
DISTILLATION Benzene Recovered 780
Loss 20
Total 1675 Total 1675
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 875 Reaction Mass 3338
Benzene 1650 CONDENSATION
Aluminium Chloride 813
Total 3338 Total 3338
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 3338 Reaction Mass 2951
Water 2000 STIRING Water 2500
Hydrochloric Acid 113
Total 5451 Total 5451
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
pH ADJUSTMENT
Reaction Mass 2951 Reaction Mass 2893
& LAYER
Sodium Carbonate Sol 1042 Water 1100
SEPERATION
Total 3993 Total 3993
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 2893 Reaction Mass 1243
DISTILLATION Recovered Benzene 1630
Loss 20
Total 2893 Total 2893
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1243 Reaction Mass 2293
PRECIPITATION
Iso Propyl Alcohol 1050
Total 2293 Total 2293
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 2293 Product Cake 650
Centrifuge Mother
CENTRIFUGE 643
Liquor
Iso Propyl Alcohol 1000
Total 2293 Total 2293
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Product Cake 650 Product Cake 650
M/S. WASHING
WaterJYOTI OM CHEMICAL 600 RESEARCH CENTRE PVT. LTD., ANKLESHWAR.
Water 66 600
Total 1250 Total 1250
Input: Output:
EIAREPORT OFM/S. OM SHIV INDUSTRIES, PANOLI GIDC, BHARUCH.
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Product Cake 650 Product Cake 650
WASHING
Water 600 Water 600
Total 1250 Total 1250
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Product Cake 650 Product 600
DRYING
Evaporation Loss 50
Total 650 Total 650
Chemical Reaction
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Bromo Propionic Acid 300 Reaction Mass 1600
Toluene 1050 COUPLING
Sodium Meythoxide 250
Total 1600 Total 1600
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1600 Reaction Mass 600
DISTILLATION
Toluene + Methanol 1000
Total 1600 Total 1600
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 600 Reaction Mass 450
Toluene 250 DISTILLATION Toluene 400
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 450 Wet Cake 350
CENTRIFUGE Toluene 100
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Wet Cake 350 Product 300
DRYING Evaporation Loss 50
Brief Manufacturing
Charge 2 fluoro aniline & acetic anhydride at 90-95 C in glass line reactor.
Charge NaOH slowly in methanol at 45-60 C after completion of reaction then add
slowly bromine then cool reaction mass at 25-30 C.
Then transfer this reaction mass to centrifuge product & ML separate then wet cake in
dryer at 45 C then pack in drum.
Chemical Reaction
O
O O O
NH2 HN CH3
O CH3
F H3C F
MDC, W ATER
Br
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
2 Fluro Aniline 300 Reaction Mass 2920
Acetic Anhydrous 360
Water 1000
COUPLING
Sodium Hydroxide
270
(NaoH)
Methanol 990
Total 2920 Total 2920
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 2920 Reaction Mass 4137
Bromine 517
BROMINATION
Sodium Hydroxide (NaoH) 100
Water 600
Total 4137 Total 4137
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Wet Cake 740 Product 590
DERYING Evaporation Loss 150
Chemical Reaction
O OH O OH
H2SO4, HNO3 Cl
Cl
MDC, WATER
O2N
Material Balance
Chemical Reaction
H3C
H3C CH3 O Na
+ Na OH
HO O O
+ H2O
CH3
Octoic Acid Sodium Hydroxide
Sodium Ethyl Hexonoate Water
M.W.=144 M.W.=40
M.W.=166 M.W.=18
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Octoic Acid 380 Reaction Mass 1519
Caustic prill 109 Recovered Toluene 290
D M Water 1000 REACTION
Toluene 300
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1519 Crude wet cake product 480
Water recovery 1039
DISTILLATION
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 480 Reaction Mass 450
Methanol 650 PURIFICATION Methanol + Water 680
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Product 450 Product 380
DRYING
Evaporation Loss 70
Total 450 Total 450
9. COCAMIDOPROPYL BETAMINE
Chemical Reaction
HO N
+ H2N
O Dodecanoic acid N,N-dimethylethane-1,2-diamine
M.W.=200 M.W.=88
N
O
NH
O
Dimethylamino Propyl Amine
M.W.=286 O
ClCH2COOH -
O
NaOH
+
O
N + NaCl
NH
O
Cocamidopropyl betaine Sodium Chloride
M.W.=342.5 M.W.=58.5
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Coconut Oil 2455 Reaction Mass 3670
Water Evaporation
Ist STAGE
Dimethyl amine 1263 Loss 50
REACTION
Sodium Boro Hydrate 2
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 3670 CAPB 12600
D M Water 8000 2nd STAGE Evaporation Loss 70
Mono Chloro Acetic Acid 500 REACTION
Caustic Flakes 500
Total 12670 Total 12670
Chemical Reaction
OH
O
CH2 CH CH2 + OH
OH OH
Glycerine Stearic Acid
M. W.= 92 M. W.= 284
O
O
OH + H2O
OH
Glycerol monostearate Water
M. W.= 358 M. W.= 18
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Glycerine 666 Product 2400
Stanic Acid 2000 Ist STAGE Evaporation Loss 280
Caustic Flakes 14 REACTION
Charge oleaic acid in SS reactor, then charge sorbitol & charge 1060 kg fatty acid.
Start heating & rise temperature upto 115C.
Then charge 7 kg caustic flakes at 140C then start purging Nitrogen gas under stirring.
Under stirring maintain 240C for 2 hour, then stop heating & down temperature by
cooling at 180C.
Transfer the material to another reactor & keep it for settling for 2 hours. Separate solid
emulsion from bottom of reactor. Then start stirring & drop temperature upto 90C
Chemical Reaction
OH OH
OH O
HO
+ HO OH
OH OH
Sorbitol Oleaic Acid
M.W.= 182 M.W.= 282
OH
O O
+ 2 H2O
HO O OH
OH OH
Sorbitan Monooleate Water
M.W.= 428 M.W.= 2X18=36
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Sorbitol 70% 1567 Product 3300
Oleaic Acid 1590 Evaporation Loss 924
Fatty Acid 1060 REACTION
Caustic Flake 7
Charge 500 kg formic acid in SS reactor. Then slowly pass ammonia gas up to pH 8
then cool this mass at room temperature.
It gets completely solidification. Then heat this material up to 140C water will be
removed completely.
Then rise temperature upto 180C.
Slowly add hydrazine hydrate at 180C within 5 to 6 hours.
After addition completed, maintain it for 2 hours.
Then cool to 100C & then unload in SS tray, it will get completely solidify in tray
Get it wash & load in centrifuge wash with 50 kg chilled methanol
Then charge material in tray dryer & dry it for 60 to 65 C and then packed it in fiber
drum
Chemical Reaction
H
N
2HCONH2 + NH2-NH2.H2O
N + 3H2O + NH3
N
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Formic Acid 500 Reaction Mass 650
AMIDATION
Ammonia Gas 150
Total 650 Total 650
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 650 Reaction Mass 510
CONDENSATION
Hydrazine Hydrate 170 Water 310
Total 820 Total 820
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 510 Wet Cake 425
CENTRIFUGE
Mother Liquor 85
Total 510 Total 510
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Wet Cake 425 Product 400
DRYING Evaporation
Loss 25
Total 425 Total 425
CHEMICAL REACTION
NH2
2HCOOH NH2-NH2.H2O N N
+ 4H2O
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
H Hydrate 1000 Reaction Mass 1080
CONDENSATION
Formic Acid 860 Evaporation Loss 780
Total 1860 Total 1860
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1080 Wet Product 650
Iso Propyl Alcohol 400 WASHING IPA + Water 830
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Product 650 Product 625
CENTRIFUGE
Mother Liquor 25
Total 650 Total 650
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Wet Product 625 Dry Product 600
DRYING
Evaporation Loss 25
Total 625 Total 625
14. 2- MERCAPTOBENZIAMIDAZOLE
Chemical Reaction
H2N H2N
H2N
+ CS2 HS
H2N
+ H2S
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Process Water (1000
kg water from 1000 Reaction Mass 1255
Purification)
Caustic Lye 330 SSR I Water 825
OPDA 400
Carbon disulphide 350
Total 2080 Total 2080
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1255 Reaction Mass 1250
Water from WASHING
Water 250
purification 245
Total 1500 Total 1500
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1250 Crude MBI 935
Water 200 Effluent 1245
Caustic Lye 330 PURIFICATION
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Crude MBI 935 Wet Cake of 2 MBI 935
Water (1000 kg to Water 1000
1000 WASHING
reuse in next batch)
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Charge 2100 kg Sodium Hydro Sulphide Solution. Apply steam and raise temperature
up to 55C then stop heating & charge 1050 kg methoxy 2 nitro amine slowly with in 1
to 2.5 hour.
Maintain reaction mass under stirring at temperature 90-100 C for 2 hours.
Then check sample for TLC. If TLC is Ok then cool reaction mass upto 40-50 C. Stop
stirring & settle reaction mass for 3.0 hours & separate bottom aqua layer & charge
1200 kg process water in organic mass & 540 kg caustic lye in reactor & charge 900
kg ice in reactor.
Cool reaction mass upto 15-20 C. Then stop stirring & add 560 kg CS2 slowly with 30
minute and then start stirring & maintain reaction mass for 3 hours at temperature 40-
45C.
Then apply heating & rise temperature upto 85-90 C for 1 hour and then sample for
TLC.
If TLC is Ok then down temperature upto 35-40 C.
Then transfer reaction mass to neutch filter and apply vacuum to neutch filter &
remove all mother liquor, then give wash to material by 1000 lit water upto pH turns
neutral and then remove crude material & store in drum only 1450 kg
Charge 3000 liter water & 725 kg crude material in reactor with 325 kg 48 % caustic
lye solution.
Stir it for 10-15 minute then check clarity of material
Solution should be clear, if it not found clear then add more caustic lye solution and 30
kg charcoal powder in reaction mass & apply steam. Rise temperature to 50-60C.
Keep this material under stirring for 1 hour and then transfer this solution to second
reactor through sparkler filter.
After completion of filtration wash reactor with 800 lit water and collect filtrate
through sparkler filter till PPT is absent in washing water.
Then charge 10-12 kg sodium hydro sulphite into filtrate. Meanwhile charge 500 kg
HCL slowly in reaction mass & adjust pH 6.5-6.0.
Then stir reaction mass for 40 minutes. Then transfer this reaction mass neutch filter.
Wash reactor with water. Remove all mother liquor by applying vacuum in neutch
filter & give water wash to material until pH turns neutral.
Water come out of centrifuge material & dry in FBD/try dryer & pack in 25 kg bags.
Chemical Reaction
O H
+ H2N N
- N O Na2S2O3 CS2/NaOH
O HS
N O
H2N O
H2N
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Sodium Hydrosulphide
2100 Reaction Mass 1000
Solution-23-30% SSR-1 REACTION I
4 methoxy 2 nitro 1050 Water 2150
aniline
Total 3150 Total 3150
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1000 Reaction Mass 1550
Water 500 Water 1950
Caustic Lye 540 SSR-II REACTION II
Ice 900
Carbon Disulphide 560
Total 3500 Total 3500
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Reaction Mass 1550 Crude MBI 1550
Water 1500 Water 3150
PURIFICATION
Caustic Lye 48 % 650
Hydrochloric Acid 1000
Total 4700 Total 4700
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Crude MBI 1550 Crude MBI 1500
WASHING
Water 500 Water 1050
Total 2050 Total 2550
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Wet 2 MBI 1500 Product 1050
DRYING Evaporation
Loss 450
Total 1500 Total 1500
Charge 1235 kg sorbitol 70% in reactor and then charge 1900 kg staric acid.
Start heating upto 100 C and start stirrer. Than charge caustic flake at 140C then
close manhole of reactor & start nitrogen purging and rise temperature upto 220 C.
Maintain temperature upto 220C for 15-30 minute and then cool this material upto
180C.
Transfer this material to second rector & keep it for settling for 2 hours.
Separate solid emulsion from bottom valve of reactor. Then start cooling and drop
temperature upto 95C and then pack in 25 kg bags.
Chemical Reaction
OH OH
OH O
HO
+ OH
OH OH
Sorbitol Stearic Acid
M. W.= 284
M.W.= 182
OH
O O
O
+ 2 H2O
OH
OH OH
Sorbitan Monostearate Water
M.W.= 428 M.W.= 2X18=36
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Sorbitol 70 % 1235 Reaction Mass 2300
Stanic Acid 1900 REACTION Evaporation Loss 840
Caustik Flakes 5
Total 3140 Total 3140
Chemical Reaction
O
NH2 OH
S
O
+ H2SO4 + H2O
H2N
Material Balance
Input: Output:
Raw Material Input. Kgs Product Output. Kgs
Aniline 340 Reaction Mass 630
Sulphuric Acid 360 REACTION Evaporation Loss 70
PROCESS DESCRIPTION
A solvent recovery system comprises of two stage heat exchangers. Cooling tower water
will be circulated in primary heat exchanger and in secondary heat exchanger chilled water
circulation will be done. The uncondensed solvent after the secondary heat exchanger will
be diverted to water scrubber. The traces of solvent will get dissolved in water. On getting
saturation, the solvent mix water will be subjected for recovery of solvent (if feasible)
and/or water will be diverted to ETP plant for further treatment. The remaining air will be
passed through carbon tower. The process will ensure no VOC emission from solvent
recovery system. Solvent recovery plant will be designed to recover the solvent from the
mother liquor. Plant will work efficiently with approx.90 to 99 % recovery. Recovered
solvent will be reused in next batch. There will no loss in the atmosphere. Details of
solvents to be used and recoveredas per worst case scenario are given in below Table. 2.8.
Diagram for solvent recovery system is shown in Figure 2.1.
FIGURE: 2.1
FLOW DIAGRAM OF SOLVENT RECOVERY SYSTEM
VOC Vent
Cooling Tower Line
Chilled Water
Circulation Spray
Primary Secondary
Condenser Condenser
Receiver
Un
Reactor scrubbed
VOCs
Water Tank
Carbon
Adsorption tower
TABLE: 2.8
DETAILS OF SOLVENTS TO BE USED AND RECOVERED
Sr. Name of Product Name of Solvent Product Solvent Solvent Solvent Percentage
No. used Quantity in Quantity recovered Recovered Recovery
MT/Month used in ton Quantity in Quantity in
per ton of Ton per ton MT/Month
product of product
The solvent recovery is the part of the process. Unit has not proposed to install separate
solvent recovery unit. Even though, unit will follow the solvent recovery guidelines. Brief
compilation of guidelines is given in Table 2.9.
TABLE: 2.9
i. The distillation unit shall maintain the Records of receipt, management and
records of receipt, management and disposal of the all the solvents in the
disposal of the all the solvents in the prescribed format will be maintained.
prescribed format as per Annexure- II
attached herewith and shall produce to the
Gujarat Pollution Control Board (Board) /
Authority as and when demanded.
ii. In case of off-site toll distillation, entire Noted by the unit.
quantity of distillation residue, condensate The distillation residue will be
etc. shall be collected / lifted back by disposed through co-processing /
generating unit from the outsourced incineration.
distillation unit to which solvents were
given for distillation. In the case of the
independent off site distillation unit, the
distillation residue shall be disposed
through co-processing / incineration.
iii. Recovered solvent shall be either used in- Distilled solvent will be sold to actual
house or sold to the actual user. Only the users or traders. Distilled solvent not
recovered solvents not suitable for reuse suitable for reuse (by actual user) will
(in-house or by actual user) shall be be reused in process.
disposed-off through co-processing or else
shall be incinerated following the
requirement of the prevailing Acts and
Rules.
iv. As per hazardous waste rule 2008, spent Not Applicable. 97% Purity/ Pure
solvents (before distillation) and solvent is not falling under any
Recovered solvents along with other schedule of Hazardous Waste Rule
hazardous wastes generating from the 2008. There will be no applicability of
process shall not be stored for more than solvent storage guideline to the unit.
90 days. The time may be extended with
prior permission of the Board as per
provisions of the Hazardous wastes
(Management, Handling & Trans
Boundary Movement) Rules, 2008.
v. Selling of the spent solvent, recovered Distilled solvent will be sold to end
The total plot area of the unit is 3089 sq. m. The greenbelt area will be1089.5 sq. m.
Details of breakup of plot area are covered under following Table 2.10. Adequate green
belt is kept in periphery and provision of two gates is also kept.
TABLE: 2.10
LAND USE BREAK UP OF TOTAL PLOT AREA
Sr. Title Area in m2 % of Total Area
No.
1. Admin & warehouse-A 150 4.86
2. Plant-B 225 7.28
3. Plant-C 150 4.86
4. ETP-D 144 4.66
5. MEE Plant-E 200 6.47
6. Ammonia Storage-F 35 1.13
7. Tank Farm-G 180 5.83
8. Utility-H 150 4.86
9. Security Cabin -I 16 0.52
10. Green Belt 1089.5 35.27
11. Parking 72 2.33
12. Road 617 19.97
13. Open Space 60.50 1.96
TOTAL 3089 100.00
The energy requirement in terms of power and fuel for proposed unit is shown in following
Table 2.11.
TABLE: 2.11
FUEL CONSUMPTION & ELECTICITY CONSUMPTION
ENERGY REQUIREMENT
Sr.
Name of Equipments Connected Electricity load in HP
No.
1. Reactors 44
2. Cooling Tower 7.5
3. Boiler 5.0
4. Dryer 5.0
5. Filter press NA
6. Pumps & Motors 25
7. Pulverizer 3
8. ETP 10
9. Centrifuge 15
10 Chilling plant 25
11 Thermic Fluid 5
12 Ball mill 15
TOTAL 150
2.7.4 UTILITIES
The project the utilities to be installed will be Cooling tower, Compressor and Chilling plant. Details of utilities are given in below Table 2.13.
TABLE: 2.13
DETAILS OF UTILITIES
Sr. Name of Capacity MOC Nos. Fuel APCM Pollutant Concentration Concentration
No. Utilities before APCM After APCM
1. Steam 1TPH MS 1 Natural PM 200-250 mg/NM3 125-150mg/NM3
Boiler Gas/Bio-coal Bag Filter SO2 80-100 PPM 80-100 PPM
NOx 40-50 PPM 40-50 PPM
2. TFH PM 200-250 mg/NM3 125-150mg/NM3
250000 Natural
MS 1 Bag Filter SO2 80-100 PPM 80-100 PPM
Kcal/Hr Gas/Bio-coal
NOx 40-50 PPM 40-50 PPM
3. D.G.Set 250 KVA MS 1 Bio-coal Adequate PM 200-250 mg/NM3 125-150mg/NM3
Stack height SO2 80-100 PPM 80-100 PPM
NOx 40-50 PPM 40-50 PPM
Cooling Electricity- -- -- -- --
4. 50 KLD -- 2
tower
Air -- -- -- --
5. 100 CFM MS 5 Electricity-
compressor
Vacuum -- -- -- --
6. 100 M3/Hrs MS 5 Electricity-
pump
Vacuum SS/gra -- -- -- --
7. 50 M3/Hrs 4 Electricity-
pump phite
*Technical details of Bag Filter along with it adequacy, details of its operational controls with DCS, system for online monitoring of the pollutants
from the stack etc are covered in chapter 8. Details of provisions to be kept in Bag Filter to ensure that in any case the air emission does not cross
the GPCB norms including preventive maintenance, failure / tripping control system, guarantee from the APCM supplier.
2.7.5 MANPOWER
The manpower required for the project as well as during the construction/ commissioning
activities will be employed from the local area. The man power requirement is shown in
Table no. 2.14.
TABLE: 2.14
2.7.6 EQUIPMENTS/MACHINERIES
TABLE: 2.15
PROPOSED EQUIPMENTS/MACHINERIES
Quantity in
Sr. No. Name of utilities Capacity MOC
Number
1 Reactor 6KL 4 SS316
2 Reactor 6KL 2 GLASS LINED
3 Reactor 4KL 5 SS316
4. Reactor 3KL 2 SS316
5 Reactor 6KL 2 MSLB
6 Reactor 5 KL 2 PP /FRP
7 Reactor 2 KL 1 GLASS LINED
8 Centrifuge 48” 2 SS316
9 Chilling Plant 25 TR 1 MS
10 Cooling Tower 50TR 1 PP/FRP
11 Steam Boiler 800KG/HR 1 MS
12 TFH 300000KCAL/HR 1 MS
15 Trey Dryer 36TREY 1 SS316
16 Ball Mill 1000KG 2 MS
17 FBD 200KG/HR 1 SS316
18 Sparkler Filtr 18 1 SS316
19 Crystalliser 6KL 2 PP/FRP
Water consumption will beprimarily for processing, washing, boiler, cooling tower,
gardening and domestic purpose. The existing fresh water requirement for domestic and
industrial purpose is met through GIDC water supply. GIDC has its own water reservoir
and distribution network throughout the GIDC Estate. A letter from GIDC stating that the
proposed additional quantity of water will be provided and it is attached asAnnexure–VII.
Total water consumption will be 63 KL/day (35.5 KL/day of fresh water + 27.5 KL/day of
recycled water). Stream wise bifurcation of water consumption is given in Table 2.16 and
water balance diagramisgiven in Figure 2.2& 2.3.
TABLE: 2.16
FIGURE: 2.2
Process 16 KL/Day Water for scrubber Cooling Tower 15KL/Day Boiler Gardening Domestic
(Fresh 3 Kl & Re.13 Kl) 2KL/Day (Re.2 Kl) (Fresh 2.5 Kl & Re.12.5KL) 15KL/Day 10KL/Day 10 KL/Day
Loss 14KLD
(Fresh Kl& Re. Kl)
Effluent Effluent Blow down Blow down Loss
25 KL/Day 2KL/Day Septic
1 KL/Day 1 KL/Day 14 KL/Day
Tank/Soak Pit
4 KL/Day
Effluent Treatment Plant 29
92 KL/Day
ETP Sludge
1KL/Day
RO
RO85
28 RO Permeate Recovered Water21 KL/Day
RO Reject 7 KL/Day KL/Day 21 KL/Day
To TSDF
The details of proposed plant waste water generation are given in below Table 2.17.
The waste water generation from industrial activities will be 29 KL/Day. The concentrated
process effluent and washing waterwill be treated in unit’s own ETP having primary,
secondary and tertiary treatment. Detail of ETP plant is given in Chapter 8.The ETP treated
water27KL/Day will be send to RO plant and the RO permeate water 21 KL/Day will be
recycle. RO reject water 7KL/Day will be send to MEE. MEE condensate will be reuse and
MEE salt will be disposed at TSDF site along with ETP sludge.
The details of waste water generation are given in below Table 2.17.
TABLE: 2.17
DETAILS OF WASTE WATER GENERATION
TABLE: 2.18
DETAILS OF PRODUCT WISE WASTE WATER GENERATION WITH QUALITATIVE AND QUANTITATIVE ANALYSIS OF
THE EACH WASTE STREAM
Sr. Name of Products Quantity of pH COD in COD in BOD BOD in TSS in TSS in TDS in TDS in
No. effluent in mg/L KG/Day in KG/Day mg/L KG/Day mg/L KG/Day
KL/Day mg/L
1. 2 Mercapto 6.5-7.0 9020 138.90 2706 41.672 350 5.390 1120 17.248
15.4
5Methoxybenziami
2. 2Mercapto 6.5-7.0 8100 37.26 2630 12.098 420 1.932 1470 6.762
4.6
Benziamidazole
3. 4Amino 1,2,4 6.0-7.0 4972 0.9944 1491 0.2982 230 0.046 970 0.194
0.2
Triozole
4. Valproic Acid 0.2 5.5-6.5 5225 1.045 1567.5 0.3135 220 0.044 1050 0.21
5. 6 Chloro Phenyl 6.5-7.0 977 0.8793 294 0.2646 120 0.108 250 0.225
0.9
Hexanone
6. Ketoprofen Nitrile 0.7 6.5-7.0 1147 0.8029 344 0.2408 110 0.077 320 0.224
7. 2-Chloro 5 Nitro 6.5-7.0 683 1.9807 205 0.5945 260 0.754 185 0.5365
2.9
Benzoic Acid
8. 1H 1,2,4 Triozole 0.3 6.5-7.0 1833 0.5499 550 0.165 140 0.042 420 0.126
*Effluent will be generated from the above product and from other products no effluent will be generated.
TABLE: 2.19
SLUDGE RECIRCULATION
V - NOTCH Recycle to Premises
CHAMBER Sludge
RO Permeate
ACTIVATED SLUDGE MEE
RECIRCULATION Permeate
FINAL CLARIFIER
Sand Carbon RO MEE
PUMP
Filter Filter Salt to TSDF site
RO RO Rejected
The waste water generation from industrial activities will be 29 KL/Day.The concentrated
process effluent and washing water will be treated in unit’s own ETP having primary,
secondary and tertiary treatment. The ETP treated water27KL/Day will be send to RO
plant and the RO permeate water 21 KL/Day will be recycle. RO reject water 7KL/Day
will be send to MEE. MEE condensate will be reuse and MEE salt will be disposed at
TSDF site along with ETP sludge. The stage wise charactestics of effluent is given in
above table. The Charactestics of RO permeate and MEE condensate is usable in process,
washing and cooling tower. The cost of effluent treatment will be 0.31Rs./Lit of effluent.
So, the provided ETP system is adequate for ZLD.
2.9GASEOUS EMISSION
The source of air pollution will be in a form of flue gas emission and process emission.
To control the emission of pollutants from these sources, scrubbers and stacks are
installed of appropriate height and diameter.
A common stack will be attached to Boiler (1 TPH, Natural Gas/ Biocoal based) and
Thermic Fluid Heater (TFH) (2, 50,000 Lack K cal/hr, Natural Gas/ Bio coal based). A
stack attached to 250 KVA D.G. Set.
Details of stack height, fuel consumption, air pollution control system etc. are shown in
below Table 2.20.
TABLE: 2.20
There will be two stacks attached to two fluid bed dryer. There will be bag filters as
APCM to control particulate matter. There will be three vents attached to three scrubbers
to scrub H2S, HCL and Cl.The process gas emissions from proposed manufacturing
activities are given in the Table 2.21.
TABLE: 2.21
The APCM systems proposed by the unit are more than adequate. For HBr,HCl, SO2 and
H2S provision of water scrubberfollowed bycaustic scrubber and for NH3provision of
water scrubber followed by acid scrubber is proposed. All the calculations are given in
the table 2.22 and table 2.23. Pollutants concentration quantification are carried out based
on material balance. The designing is done considering all products are running at the
time. Looking towards number of reactors, it is unlikely that such a situation will ever
arise. Absorbed solution will go as effluent at ETP. However for designing purpose the
quantity is shown as going to scrubber. Thus the air pollution management seems to be
adequate.
TABLE: 2.22
QUANTITY OF AIR POLLUTANT S COMING OUT OF REACTOR
Sr. Name of Product Air Quantity of Quantity of Efficiency
No. Pollutant air pollutant air pollutant
Ton/Ton Ton/Ton (%)
before APCM After APCM
1. 4-Bromo 2-Flouro Bromine gas 0.02 0.002 90
Acetanilide
2. 2-Chloro 5 Nitro NOx 0.02 0.002 90
Benzoic Acid
3. HCl Gas 0.02 0.002 90
2 Mercapto
Benziamidazole Hydrogen 0.31 0.003 90
sulphide gas
4. 2Mercapto 5Methoxy HCl Gas 0.02 0.002 90
Benziami
TABLE: 2.23
DETAILS OF HAZARDOUS WASTE GENERATION
Sr. Name of Hazardous Category Generation Mode of Disposal
No. Waste Quantity
1. Effluent Treatment 35.3 25 MT/M Collection, Storage,
Plant Sludge + MEE Transportation & disposal at
salt TSDF site.
2. Used Oil 5.1 0.10 MT/M Collection, Storage,
Transportation & sale to
authorized recycler
3. Empty Barrels/ 33.1 1.2 MT/M Disposal by reuse or sale to
Containers/ Liners authorized vendor
Contaminated with
hazardous chemicals/
wastes
4. Spent Solvent 28.6 26 MT/M Collection, Storage,
(IPA, methanol, Transportation & Sale under Rule
toluene, hexane, 9 or dispose to common
ethanol & MDC) incinerator system at BEIL or co-
processing industry.
5. Sodium Bromide II 38 MT/M Collection, Storage,
Solution (NaBr) Transportation & Sale under Rule
9 permission
6. Ammonium Chloride II 120 MT/M Collection, Storage & Transport
powder to sister concern unit or to sale
under Rule 9.
7. Distillate residue 20.3 18.55 Collection, Storage,
MT/Month Transportation & dispose to
common incinerator system at
BEIL or co-processing industry.
8. Spent Carbon 28.3 0.4 Collection, Storage,
MT/Month Transportation & dispose to
common incinerator system at
BEIL or co-processing industry.
CHAPTER – 3
BASELINE ENVIRONMENT STATUS
3.1 INTRODUCTION
It is essential to monitor the environment quality prevailing in the surrounding area before
implementation of the any project for assessing the environmental impacts. The Environment
status within the study area could be used for identification of significant environmental issues
to be addressed in the impact assessment study.
The impact from an existing industrial project on its surrounding environment are mainly
regulated by,
• The nature of the pollutants,
• Their quantities discharged to the environment,
• Existing environment quality
• Assimilative capacity of the surrounding environment and
• Topography and terrain of the project site.
In order to identify and establish the extent of likely impacts, it is necessary to gather
information on existing environmental quality relating to various components of the
environment.
Primary data were collected for baseline collection. Secondary data were also gathered for
remaining information like meteorological data, Socio-economic data, Ecological data and
Land use data. For the purpose of collection of primary data, study area was selected within 5
km radius taking project site as a center which also included towns and villages.
The main factor of local, sub-regional and regional meteorology that influence the air quality in
area of the proposed project are diurnal and seasonal wind pattern and wind direction, humidity
,temperature etc.
Panoli is a very important industrial center having the advantage of due to NH-8 and Panoli
railway station, GIDC is well connected by road and rail to rest parts of the country.
Communication facility available in the area is good. Water is available from GIDC.
Panoli is large industrial estate with a number of chemical plants, paper mills, textile
processing plants and other allied industries totaling to about more than 500 units.
At present there are several industries located in this area. Lists of major industries in the Panoli
are given in Table 3.1.
TABLE: 3.1
LIST OF MAJOR INDUSTRIES IN THE PANOLI-GIDC
Sr. No. Name Of The Company Address
1. Krishna Polymers Plot No: 227/3, Phase-i, Opp. Cheminova India
Ltd., G.I.D.C., Panoli- 393416, Gujarat, India.
2. Saffron Chemical Industries Plot No-3003, G.I.D.C., Near Gujrat Agro
Chemicals, Panoli - 393416, Gujarat, India
3. Yash Engineering Shed No. J-1415, G.I.D.C., Estate,, Panoli -
394116, Gujarat, India
4. P K Intermediates Pvt. Ltd. C1b 1906 & 1907 G.I.D.C. Panoli, Dist -
Bharuch, Panoli - 394116, Gujarat, India
5. Shreeji Chemical Industries Plot No- 506, G.I.D.C. Estate, Panoli District-
Bharuch, Panoli - 394116, Gujarat, India
6. Vrundavan Chemicals C1-b 407/6, G.I.D.C. Estate, Tal-ankleshwar,,
Panoli - 394116, Gujarat, India
7. Arihant Inorganics Process Plot No. 906/19, Nr. Ganeshanand Chowkdi,
(pvt.) Ltd. G.I.D.C., Panoli - 394116, Gujarat, India
8. Navkar Chemicals Plot No. 3010, Third Phase, G.I.D.C. Industrial
Estate, Panoli - 394116, Gujarat, India
9. Jackson & Sons Plot No. 514, 515, 516, B/h, V-trans (i) Ltd.,
G.I.D.C. Estate, Panoli - 394116, Gujarat, India
10. Sun Chloride Pvt. Ltd. Plot No. 603, G.I.D.C. Estate, Panoli, Panoli -
394116, Gujarat, India
11. Pragna Life Science Pvt. Ltd. Plot No. 409/b/2, Panoli - 394116, Gujarat, India
12. Visual Pharma Chem Plot No.: 2216/2217, G.I.D.C., Phase-3, Panoli -
394115, Gujarat, India
13. Impro Interchem Pvt. Ltd. Plot No. 414, G.I.D.C. Industrial Estate, Panoli -
394116, Gujarat, India.
14. Shivnath Industries Plot No.1815, I-phase, G.I.D.C. Panoli - 394116,
Gujarat, India.
15. Enzal Chemicals (i) Ltd. Plot No-2803/4, G.I.D.C. Estate, Bharuch
District, Panoli - 394116, Gujarat, India.
16. Dalmiya Chemicals Ltd Plot No.425, G.I.D.C., Panoli - 394116, Gujarat,
India.
17. Sai Vision Chem India Pvt. Ltd. Plot No. 2912, G.I.D.C. Phase-3, Panoli - 394116,
Gujarat, India.
18. Machhar Industries Limited Office No.614, G.I.D.C. Panoli - 394115,
Gujarat, India.
19. Plus Chemicals Plot No. 220/a, Near J.b. Chemical, Water Tank,
G.I.D.C. Panoli - 394 116, Gujarat, India.
20. Solvay Specialities India Pvt. Plot No. 3526/27, G.I.D.C. Estate, Panoli,
Ltd. Bharuch, Panoli - 394116, Gujarat, India.
22. Trikaldarshi Chemical Plot No.: 104, Road No.: 1, G.I.D.C. Panoli -
Industries 394116, Gujarat, India.
23. Gujarat Reclaim & Rubber Plot No.664, G.I.D.C. Panoli - 394116, Gujarat,
Products Ltd. India
24. Karunesh Remedies Plot No. 417/2, G.I.D.C. Panoli, Tal; Ankleshwar,
Dist: Bharuch, Panoli - 394116, Gujarat, India
25. Rahul Intermediates Plot No: 422, G.I.D.C., Panoli, near Dalmia
Chemical, Road No-4, Opp. Blueblend Syntex,
Panoli - 394116, Gujarat, India.
26. Abs Industries Plot No: 408/10, Opp. Achechem Limited
G.I.D.C., Panoli - 394116, Gujarat, India.
27. Gujarat Amines Plot No.:2107, G.I.D.C., Opp. Sanjali Railway
Station, Panoli - 394116, Gujarat, India.
28. Acmechem Limited Plot. 412-413, G.I.D.C. Estate, Dist. Bharuch,
Panoli - 394116, Gujarat, India.
29. S. R. Chemicals Plot No. 1917 & C-1/1918, G.I.D.C., Dist.
Bharuch, Panoli - 394116, Gujarat, India.
30. Sunwell Organics Pvt. Ltd. Plot No. 602, G.I.D.C. Estate, Panoli - 394116,
Gujarat, India.
31. Shubhlaxmi Pigments Plot No-502, G.I.D.C. Industrial Estate, Panoli -
394116, Gujarat, India.
32. Meghmani Organics Ltd. Plot No.21/21/1, G.I.D.C. Estate, Panoli -
394116, Gujarat, India.
33. R. P. Industries Plot No.314/315, G.I.D.C. Panoli - 394116,
Gujarat, India.
34. Ohm Dye Chem Plot No-517, G.I.D.C. Industrial Estate,, Panoli -
394116, Gujarat, India.
35. Rajchem Industries Plot No. 2915/2916, Phase-iii, Opp. Gujarat Agro
Chem, G.I.D.C. Panoli - 394116, Gujarat, India.
M/s. Om Shiv Industries will be located in GIDC Estate, Panoli. The location aspects of the site
are provided in Table 1.4 in Chapter 1.
For Baseline Study, the monthly meteorological data for study period from March-2017 to
May-2017 is shown at below Table 3.2.
3.2 WINDROSE
Based on the meteorological data, wind rose have been prepared for the summer season period
between the March-2017 to May-2017. The wind rose diagram prepared from same data is
shown at Figure 3.1(A), Figure 3.1(B) Figure 3.2.
TABLE: 3.2
METEOROLOGICAL DATA
Month Temperature(oC) Humidity (%) Rain fall (mm)
Maximum Minimum Maximum Minimum Maximum Minimum
March-2017 36.5 16 49 4 00 00
April-2017 38.5 14 86 3 00 00
May-2017 43.5 16 72 16 00 00
FIGURE: 3.1(A)
WIND ROSE DIAGARM FOR PERIOD OF MARCH-2017 TO MAY-2017
FIGURE: 3.1(B)
WIND ROSE DIAGARM ON SATELITE IMAGE
FIGURE: 3.2
WIND CLASS FREQUENCY DISRTIBUTION
It was observed that wind is blowing mainly towards the North East direction. Average wind
speed was 4.01 m/s with calm winds recorded to be 0.54%.
3.3. AIR ENVIRONMENT
The basic objective of collection of base line data for air environment is to identify project
specific air pollutants being released into atmosphere, which will have significant impact on air
environment of immediate locality of the proposed project site. For assessment of the baseline
data it is important to specify the study area in respect of the location of the proposed project. It
was decided to the study ambient air quality at 8 locations in the different direction in probable
impact zone including the project site.
Ambient air quality stations were chosen considering the various factors like the most
prevailing wind direction, pockets of habitation, available infrastructure facilities like power
supply, accessibility etc. The location of AAQ monitoring stations are shown in Figure 3.3 and
Table 3.3.
FIGURE: 3.3
LOCATION OF AMBIENT AIR QUALITY MONITORING STATIONS
TABLE: 3.3
DETAILS OF SAMPLING LOCATION OF AMBIENT AIR QUALITY MONITORING
Sr. Location Sample ID Distance & Direction District
No. w.r.t project site
1. Project Site A1 -- Bharuch
2. Kharod A2 2.45, SE Bharuch
3. Panoli A3 4.13, SW Bharuch
4. Nana Borsana A4 3.76, S Bharuch
5. Sanjali A5 1.22, SSE Bharuch
6. Umarwada A6 2.85, NNW Bharuch
7. Bakrol A7 2.51, ENE Bharuch
8. Bhadi A8 4.34, ESE Bharuch
The ambient air quality monitoring was carried out during period of March-2017 to May-2017.
Monitoring details like location, monitoring date are attached as Annexure-IX. The frequency
of monitoring was twice in a week for a period of 12 weeks to assess the existing the sub
regional air quality status. All the sampling locations were monitored for PM2.5, PM10, SO2,
NOX, CO, HCl, Cl2, Br2, HBr, H2S and VOC on 24 hr basis to enable the comparison with
ambient air quality standards prescribed by the CPCB.
Based on the data obtained through ambient air quality survey statement showing maximum,
minimum average concentration values of different monitoring location in the study area have
been computed and presented at Table 3.4.
TABLE: 3.4
AMBIENT AIR QUALITY STATUS OF STUDY AREA
Locations Min. Value Max. Value Avg. Value
3
PM10 (Permissible Limit (CPCB standard) : 100 µg/m )
A1-Project Site 60 71 66.5
A2-Kharod 64 74 69
A3-Panoli 74 86 80
A4-Nana Borsana 75 88 81.5
A5-Sanjali 77 91 84
A6-Umarwada 70 81 76.5
A7-Bakrol 66 78 72
A8-Bhadi 62 76 69
3
PM2.5 (Permissible Limit (CPCB standard) : 60 µg/m )
A1-Project Site 26 33 29.5
A2-Kharod 27 31 29
OBSERVATION:
Based on data obtained, it could be stated that, during the study period the values of PM10 at
monitored locations is ranged between 62-91 µg/m3 while the values PM2.5 fluctuates in the
range of 26-40 µg/m3. The values of SO2 and NOx were observed to be in the range of 24-46
µg/m3 and20-44 µg/m3 respectively. The values of NH3 were observed in the range of 06-08
µg/m3.The values of VOC & CO were observed to be in the range of 1.2- 4.2 ppm & 0.2-0.8
mg/m3 respectively. The values of Br2, Cl2, HBr & H2S were observed below detectable limit.
The values of HCl was observed to be in the range of 1-9 µg/m3.
The average concentration of PM10, PM2.5, SO2, NOx, VOC and NH3 are within prescribed limit
at all locations.
PM was carried out. It was found that, it is visibly due to transport activity in the study area.
These concentrations at all AAQM locations were primarily caused by local phenomena
including vehicular movement and natural dusting due to human activities and wind movement.
Sampling Method
The samples were collected as per Indian standard IS: 3025 (part-1) for ground water and
surface water quality assessment.
Analysis Method
The analysis method followed for the measuring different parameters to evaluate water quality
is given in Table 3.5.
TABLE: 3.5
METHOD OF ANALYSIS
Sr. Parameters Applicable Standard Detection Limit
No. Method of Analysis
1. Color in Pt. Co. Sc. APH (22nd Edition) Spectrophotometer 1
(analogous to APHA 2120 C) (Platinum
Cobalt Method)
2. pH APHA(22nd Edition) 4500 H+ B 0.01
Electrometric Method
3. Total hardness APHA(22nd Edition) 2340 C: Page 2 – 37 2
(as CaCO3) in mg/l EDTA Titrimetric Method
4. Chloride (as Cl) in APHA(22nd Edition) 4500-Cl-B- 1
mg/l Argentometric method
5. TDS in mg/l APHA (22nd Edition) 2540 C Total 4
Dissolved Solid Dried at 180˚ C
6. TSS in mg/l APHA (22nd Edition) 2540-D-Total 4
Suspended Solids Dried at 103-1050C
7. Calcium (as Ca) in APHA (22nd Edition) 3500- Ca : B Page 3 – 2
mg/l 65 EDTA Titrimetric Method
8. Magnesium (as Mg) APHA(22nd Edition) – 3500 - Mg : B Page 3 2
in mg/l – 84 Calculation Method
9. Sulphate (as SO4) APHA (22nd Edition) 4500–SO4-2 E: Page 4- 1
in mg/l 188 Turbid metric Method/ IS 3025 (Part 24)
1986 (Reaffirmed 1986) Gravimetric Method
10. Alkalinity (as APHA (22nd Edition) – 2320 B: Page 2 – 27 2
CaCO3) in mg/l Titration Method
11. COD in mg/l APHA(22nd Edition)– 5220 B Open Reflux 4
Method
12. BOD in mg/l IS: 3025 (Part – 44) 1993 1
(Reaffirmed 1999)
13. MPN Coliform APHA -9221 C --
Count
14. E.coli APHA- 9221 D (Presence Absence Test) --
15. Nitrate in mg/l Spectrophotometer 1
16. Iron (as Fe) in mg/l By NOVA 60 spectrophotometer (Triazine) 0.01
Eight locations were selected for ground water sampling and six locations were selected for
surface water sampling. Collected samples were analyzed for drinking water quality
parameters like physic-chemical parameters and heavy metals. During study period, the
sampling was done for one time. The map viewing location for sampling points is shown at
Figure 3.4 and Figure 3.5. The analysis results are presented at Table 3.6 & 3.8.
FIGURE: 3.4
LOCATION OF GROUND WATER QUALITY MONITORING STATIONS
TABLE: 3.6
DETAILS OF GROUND WATER MONITORING LOCATIONS
Sr. Location Sample Distance & Direction District
No. ID w.r.t project site
1. Project Site GW1 -- Bharuch
2. Kharod GW2 2.45, SE Bharuch
3. Panoli GW3 4.13, SW Bharuch
4. Nana Borsana GW4 3.76, S Bharuch
5. Sanjali GW5 1.22, SSE Bharuch
6. Umarwada GW6 2.85, NNW Bharuch
7. Bakrol GW7 2.51, ENE Bharuch
8. Bhadi GW8 4.34, ESE Bharuch
TABLE: 3.7
WATER QUALITY PARAMETERS (GROUND WATER SOURCES)
Parameter Unit IS 10500 : 2012 Sampling Location
Desirable Permissible Project site Kharod Panoli Nana Sanjali Umarwada Bakrol Bhadi
Limit Limit (GIDC (GW2) (GW3) Borsana (GW5) (GW6) (GW7) (GW8)
Water) (GW4)
(GW1)
pH --- 6.5 – 8.5 6.5 –8.5 8.5 8.1 8.3 7.08 8 7.5 7.3 7.2
Color Hazen 5 25 <1 <1 <1 <1 <1 <1 <1 <1
TDS mg/L 500 2000 240 3505 1115 685 1230 3325 1090 4185
Total mg/L 300 600 143 1623 312 427 493 909 390 1455
Hardness
(as CaCO3)
Chloride mg/L 250 1000 48 1513 251 627 357 174 116 270
(as Cl)
Calcium mg/L 75 200 78 623 78 160 260 481 254 545
(as Ca)
Magnesium mg/L 30 100 65 1000 234 267 233 428 156 910
(as Mg)
Iron (as Fe) mg/L 0.3 1 ND 0.1 0.01 0.36 0.02 0.05 0.02 0.02
Fluoride mg/L 1 1.5 0.02 0.02 0.01 0.47 0.03 0.2 0.01 0.01
(as F)
Sodium mg/L -- -- 25.3 500 246 488.2 279 624 311.5 219
(as Na)
Potassium mg/L -- -- 26 2719 1005 48.9 1238 3313 665.2 458.6
(as K)
Sulphate mg/L 200 400 44.8 120 150 54 52 360 102 420
(as SO4)
Nitrate mg/L 45 45 ND ND ND ND ND ND ND ND
Alkalinity mg/L 200 600 135 393 471 358 370 325 404 235
• Chloride concentrations varied from 48 mg/l to 1513 mg/l in the groundwater samples project site, umarwada & bakrol had
chloride concentrations within the acceptable limit (250 mg/l), Samples collected from kharod were found to be exceeding the
permissible limit (2000 mg/l).
• Magnesium concentrations varied between 65 – 1000 mg/l. all the samples were found to be not exceeding the permissible limits
(100 mg/l).
• The level of total dissolved solids (TDS) recorded in the groundwater samples varied from 240 mg/l to 4185 mg/l. In samples
collected from project site the TDS levels were found to be exceeding the acceptable limit of 500 mg/l, while samples collected
from kharod, umarwada and bhadi was found to be exceeding the permissible limit (2000 mg/l).
• Fluoride levels in the groundwater samples were found to be in the range 0.01-0.47 mg/l. However, fluoride concentrations at all
location were found to be within the permissible limit (1.5 mg/l).
• Nitrate concentrations in all the samples were found to be within the acceptable limits (45 mg/l).
• E. coli concentrations were found to be absent for all the samples.
• Total coliform in the groundwater samples were found to be in the range of ND- <1.8 MPN/100 ml. All the samples were found
to be within the acceptable limits.
Analysis of collected samples reveals that rest of the parameters satisfy the permissible limits as per IS 10500:2012 specified for drinking
water and hence are suitable for drinking, however it is suggested that the water may disinfected by boiling or by use of chlorine tablets
before use.
FIGURE: 3.5
LOCATION OF SURFACE WATER QUALITY MONITORING STATIONS
TABLE: 3.8
DETAILS OF SURFACE WATER MONITORING LOCATIONS
Sr. Location Sample Distance & Direction w.r.t District
No. ID project site
1. Project Site SW1 -- Bharuch
2. Kharod SW2 2.45, SE Bharuch
3. Panoli SW3 4.13, SW Bharuch
4. Nana Borsana SW4 3.76, S Bharuch
5. Sanjali SW5 1.22, SSE Bharuch
6. Umarwada SW6 2.85, NNW Bharuch
7. Bakrol SW7 2.51, ENE Bharuch
8. Bhadi SW8 4.34, ESE Bharuch
TABLE: 3.9
WATER QUALITY PARAMETERS (SURFACE WATER SOURCES)
Sodium mg/L -- -- 102 239.6 146.6 28.3 321.6 82.6 36.4 252.7
(as Na)
Potassium mg/L -- -- 53.5 978 415.2 46.6 1568 122.9 39.7 999.9
(as K)
Sulphate mg/L 200 400 18.3 52 54 120 56 220 220 63
(as SO4)
Nitrate mg/L 45 45 ND ND ND ND ND ND ND ND
Alkalinity mg/L 200 600 129 303 236 180 112 493 134 370
(as CaCO3)
COD mg/L -- -- 08 40 52 4 12 12 16 4
BOD mg/L -- -- ND 9 14 ND ND ND ND ND
E.Coil MPN/ -- -- Absent Absent Absent Absent Absent Absent Abse Abse
100 nt nt
ml
Total MPN/ -- -- ND <1.8 <1.8 <1.8 <1.8 <1.8 <1.8 <1.8
coliform 100
Bacteria ml
ND-Not Detected
• The level of total dissolved solids (TDS) recorded in the surface water samples varied from 345 mg/l to 2440 mg/l. In samples collected
from all location in the TDS levels were found to be exceeding the acceptable limit of 500 mg/l, while samples collected from dharmod
was found to be exceeding the permissible limit (2000 mg/l).
• Biochemical Oxygen demand (BOD) of the samples varied between ND to 14 mg/l. highest BOD value was obtained for the sample
collected from panoli.
• Chemical Oxygen Demand (COD) of the samples varied between 4.0-52 mg/l. highest COD value was obtained for the sample
collected from panoli.
• E. coli concentrations were found to be absent for all the samples.
• Total coliform in the groundwater samples were found to be in the range of ND- <1.8 MPN/100 ml. All the samples were found to be
within the acceptable limits.
In summary, surface water from the village ponds is used for bathing, irrigation and catching fish. The surface water quality reveals that the
water conforms to CPCB Class “B “(Outdoor bathing organized) and Class “D” (Propagation of wildlife and fisheries) water quality criteria.
3.5.1 RECONNAISSANCE
In order to measure the existing noise sources and to identify the background noise levels, the
noise pollution survey around the proposed site was carried out.
TABLE: 3.10
NOISE LEVEL DATA
Sr. Location Sample Area LEQ (dB (A))
No. ID Category Day Time Night Time
1. Project Site N1 Bharuch 53-72 45-53
2. Kharod N2 Bharuch 53-61 42-52
3. Panoli N3 Bharuch 52-59 41-51
4. Nana N4 Bharuch 48-55 37-47
Borsana
5. Sanjali N5 Bharuch 49-57 44-49
6. Umarwada N6 Bharuch 53-59 45-51
7. Bakrol N7 Bharuch 50-55 42-50
8. Bhadi N8 Bharuch 48-53 41-45
TABLE: 3.11
CPCB RECOMMENDATIONS FOR COMMUNITY NOISE EXPOSURE
Area Code Category of area Leq. (dBA) Leq. (dBA)
(Daytime) (Night time)
(06:00 to 21:00hrs.) (21:00 to 06:00hrs.)
A Industrial area 75 70
B Commercial Area 65 55
C Residential Area 55 45
D Silence Zone 50 40
Note : 1 Silence zone is defined as areas up to 10 meters around such premises as hospitals,
education, institutions and courts. The silence zones are to be declared by the Component
Authority.
Note : 2 Mixed categories of areas should be declared as one of the four above-mentioned
categories by the Component Authority and the corresponding standard has apply.
(Source: The Noise Pollution (Regulation & Control) Rules, 2000)
FIGURE: 3.7
LOCATION OF SOIL MONITORING STATIONS
TABLE: 3.13
SOIL QUALITY PARAMETERS
Parameter Sampling Location
S1 S2 S3 S4 S5 S6 S7 S8
pH
7.92 7.4 7.96 7.93 7.6 7.5 7.1 7.78
(5% slurry)
Specific
1.46 2.5 1.28 1.15 2.1 2.53 2.56 1.32
Gravity
Porosity
20 47 20 22 45 41.2 48.17 22
(%)
Water
Holding
Capacity
46 37 41 39 45 39 38 39
(90% by
wt. of Soil
(%)
Grain Size Distribution (%)
Clay
(< 0.002 10.9 44 50 8.1 44 45 43 20
mm)
Slit 30 25 14.6 10 27 24 28 15.9
FIGURE: 3.8
LAND COVER MAP WITH VILLAGE LOCATION
The study of the environmental components like flora and fauna is required to assess the
biological diversity of the region. Flora and fauna can be used for biological surveillance in
assessing the environmental status .The ecological interpretation of study area is based on
secondary sources of information.
Water is the basic and essential resource for the survival of flora and fauna. The flora being the
primary producer influences the fauna of the region. The characteristic flora existing in a region
depends upon the existing conditions such as intensity of sunlight, type of soil, quality of air,
including the quality and quantity of water available, etc.
The topography of Bharuch district is plain with numerous small watersheds and water logged
areas resulting from agriculture wasteland, fallow land and pastures collecting rainwater or
backwater and becoming marshy /saline. The waterlogged areas are dominated by hydrophytes.
The coast is silty to clayed silt substratum with some sandy part. The areas near the seashore are
mostly affected by tides and remain submerged for considerable time.
3.8.2 FOREST
Bharuch area is characterized by tropical dry deciduous forests. The total forest area of district is
1449. 68 sq. km. That accounts for 0.73 % of the total geographical area of the district. The study
area does not have any identified endangered species and also does not have any designated
forest, national park, sanctuaries.
(Source: Forest Department, Government of Gujarat).
3.8.3 FLORA
The list of flora found during field survey is given in Table 3.15.
TABLE: 3.15
LIST OF FLORA
Sr.No. Scientific name Common name Family
I Trees
1 Acacia aurriculifarmis Bangali Babool Fabaceae
2 A.leucopholia Aniar Fabaceae
3 A.catechu Khair Fabaceae
4 A.ferrungula Pandhara Khair Fabaceae
5 A.nilotica Babul Fabaceae
6 A.lebbeck Siris Fabaceae
3.8.4 F AUNA
Some of the fauna found in study area is listed in Table 3.16.
TABLE: 3.16
LIST OF FAUNA
Sr.No. Scientific name Common name Family
1 Acridothers tristis Common myna Sturnidae
2 A.ginginianus Bank myna Sturnidae
3 Athene brama Spotted owlet Striginae
4 Aegithina tiphia Common lora Lrenidae
5 Ardeola grayee Pond Heron Ardeidae
6 Amaurornis Whitebrested waterhen Phasinidae
phoenicurus
7 Babulcus ibis Cattle Egret Ardeidae
8 Centropus cinensis Crow-phesant Cuculidae
9 Columba Livia Blue Rock Pigeon Columidae
10 Corvus splendens House Crow Carvidae
11 Coracious Indian Roller Coracidae
benghalensis
12 Dicrurus adsimilis Black Drongo Dieruridae
13 Dinophum Goldenbacked Picidae
benghalense Woodpecker
14 Eudynamys Koel Cuculidae
scolopacea
15 Fracolinus Black partiridge Pharianidae
francollinus
16 Halcyon rustica Whitebrested Kingfisher Aicenidae
17 Hirundo rustica Common swallow Hirundinidae
18 Lanius exubitor Grey Shrike Daniidae
19 Launchura Whitethroated munia Estrildinae
malabarica
20 Megalaima Smallgrren barbet Capilonidae
rubricapilla
21 Merops orientalis Littlegreen Bea-eater Miropidae
22 M.malabarica Crimsonbrestwd Barbet Capilonidae
23 Milvus migrans Pathi Kite Accipitridae
24 Motacilla Large pied wagtail Motacillidae
maderatensis
25 Nactarinia asiatica Purplerumpled sunbird Nectarinidate
26 Nectarinia minima Small sunbird Nectarinidae
27 Oriolus oriolus Golden oriole Oriolidae
28 Orthotomus sutorius Tailor Bird Pachycephaline
29 Passer domesticus House Sparrow Passerinae
30 Psittacula Blossamheaded parakeet Psittacidae
cyanocephala
31 Pycnonotus caffer Redvented bulbul Pycnonotidae
32 Ploceus philipinensis Weaver bird Plocidae
33 Sexicoloides fulicate Indian Robin Corvidae
Demography covers the information related to population density sex ratio and literacy level of
the public in the study area. Table 3.19 provides the data on inhabitations of the Jhagadia Taluka.
On an average, Taluka Jhagadia has population density of about 228 persons per sq.km. (2011
Census data), compared to the Bharuch District, which has a population density of about 295
persons per sq.km. (2011 Census data).
TABLE: 3.17
DEMOGRAPHIC DATA
Sr. Village name Taluka Total Total Total Total
No population male female population
<6 years
1 Panoli Ankleshwar 5462 2817 2645 800
2 Kharod Ankleshwar 4658 2623 2035 537
3 Bakrol Ankleshwar 1591 851 740 199
4 Bhadi Ankleshwar 2831 1381 1450 444
5 Umarwada Ankleshwar 3711 1847 1837 476
6 Amrutpura Ankleshwar 943 502 441 125
7 Avadar Ankleshwar 1333 707 626 152
8 Dadhal Ankleshwar 3695 1838 1857 540
9 Jitali Ankleshwar 4225 2160 2065 523
10 Kararvel Ankleshwar 1526 785 741 199
11 Mandvabuzarg Ankleshwar 5938 2995 2943 646
12 Motali Ankleshwar 895 459 436 153
13 Naugama Ankleshwar 920 502 418 101
14 Pardi Mokha Ankleshwar 586 292 294 63
15 Piprod Ankleshwar 607 298 309 97
16 Samor Ankleshwar 1294 670 624 152
17 Sangpor Ankleshwar 2670 1369 1301 286
18 Sarangpore Ankleshwar 16671 9373 7298 2666
19 Uchhali Ankleshwar 895 451 444 117
20 Andharkachhala Jhagadia 293 156 137 45
21 Boridara Jhagadia 960 495 465 94
22 Borjai Jhagadia 1519 787 732 199
23 Bhojpur Jhagadia 698 369 329 89
24 Dadheda Jhagadia 1094 559 535 135
25 Dholakuva Jhagadia 310 158 152 45
26 Damalai Jhagadia 563 298 267 77
27 Fulwadi Jhagadia 1783 916 867 202
28 Govali Jhagadia 4381 2297 2084 444
29 Haripara Jhagadia 816 433 383 70
30 Jhagadia Jhagadia 5446 2779 2667 550
31 Kapalsadi Jhagadia 2024 1038 986 208
32 Kharchi Jhagadia 1068 575 493 108
33 Kharchi Jhagadia 998 501 497 158
Bhilwada
34 Kharia Jhagadia 531 277 254 74
35 Kunvarpara Jhagadia 200 99 101 31
36 Karad Jhagadia 727 368 359 94
37 Limet Jhagadia 1739 893 846 215
38 Malpor Jhagadia 906 466 440 121
(Dumala)
TABLE -3.18
POPULATION DENSITY & SEX RATIO
Population Sex ratio
Sr. Population
Name Density (No. of females per
No (Persons)
(Person/Sq.km.) 1000 males)
1 Within 10 km radius 117837 375 928
(2011)
2 Taluka Jhagadia 185337 228 949
(2011)
3 Taluka Ankleshwar 315596 725 882
(2011)
4 Taluka Valia 145400 283 962
(2011)
5 District Bharuch 1551019 295 925
(2011)
In economic development of the region its geographical location, natural resources, business and
employment, industries and manpower play vital role. Table 3.19 provides the occupational
patterns in all villages of Ankleshwar Taluka.
TABLE-3.21
OCCUPATIONAL STRUCTURE
Sr. Village Cd block Total Total Total main Total Total non Employment
No. name Name population Work Worker marginal Worker ratio%
Population Population Worker population
Population
1 Panoli Ankleshwar 5462 1897 1667 230 3565 34.73
2 Kharod Ankleshwar 4658 1290 1236 54 3368 27.69
3 Bakrol Ankleshwar 1591 782 554 228 809 49.15
4 Bhadi Ankleshwar 2831 898 868 30 1933 31.72
5 Umarwada Ankleshwar 3711 1429 1389 40 2282 38.50
6 Amrutpura Ankleshwar 943 388 252 136 555 41.14
7 Avadar Ankleshwar 1333 607 361 246 726 45.53
8 Dadhal Ankleshwar 3695 1301 1152 149 2394 35.21
9 Jitali Ankleshwar 4225 1610 1384 226 2615 38.1
10 Kararvel Ankleshwar 1526 544 403 141 982 35.64
11 Mandvabuz Ankleshwar 5938 2258 2086 172 3680 38.02
arg
12 Motali Ankleshwar 895 385 347 38 510 43.01
13 Naugama Ankleshwar 920 412 361 51 508 44.78
14 Pardi Ankleshwar 586 199 191 8 387 33.95
Mokha
15 Piprod Ankleshwar 607 264 251 13 343 43.49
16 Samor Ankleshwar 1294 617 587 30 677 47.68
17 Sangpor Ankleshwar 2670 1186 1147 39 1484 44.41
18 Sarangpore Ankleshwar 16671 5905 5587 318 10766 35.42
19 Uchhali Ankleshwar 895 324 297 27 571 36.2
20 Andharkac Jhagadia 293 140 81 59 153 47.78
hhala
Sr. Village Cd block Total Total Total main Total Total non Employment
No. name Name population Work Worker marginal Worker ratio%
Population Population Worker population
Population
21 Boridara Jhagadia 960 411 377 34 549 42.81
22 Borjai Jhagadia 1519 478 466 12 1041 31.46
23 Bhojpur Jhagadia 698 398 397 1 300 57.02
24 Dadheda Jhagadia 1094 331 282 49 763 30.25
25 Dholakuva Jhagadia 310 185 124 61 125 59.67
26 Damalai Jhagadia 563 340 95 245 223 60.39
27 Fulwadi Jhagadia 1783 748 535 213 1035 41.95
28 Govali Jhagadia 4381 1857 1774 83 2524 42.38
29 Haripara Jhagadia 816 515 219 296 301 63.11
30 Jhagadia Jhagadia 5446 2164 2003 161 3282 39.73
31 Kapalsadi Jhagadia 2024 787 654 133 1237 38.88
32 Kharchi Jhagadia 1068 538 397 141 530 50.37
33 Kharchi Jhagadia 998 382 239 143 616 38.27
Bhilwada
34 Kharia Jhagadia 531 214 210 4 317 40.3
35 Kunvarpara Jhagadia 200 72 66 6 128 36
36 Karad Jhagadia 727 354 333 21 373 48.69
37 Limet Jhagadia 1739 683 679 4 1056 39.27
38 Malpor Jhagadia 906 579 566 13 327 63.90
(Dumala)
39 Moran Jhagadia 866 381 327 54 485 43.99
40 Mota Sanja Jhagadia 1053 498 483 15 555 47.29
41 Mulad Jhagadia 1043 437 393 44 606 41.89
42 Nana Sanja Jhagadia 1644 755 506 249 889 45.92
43 Navagam Jhagadia 520 160 160 0 360 30.76
Mota
Sr. Village Cd block Total Total Total main Total Total non Employment
No. name Name population Work Worker marginal Worker ratio%
Population Population Worker population
Population
44 Padal Jhagadia 1743 664 442 222 1079 38.09
45 Panvadi Jhagadia 592 363 356 7 229 61.31
46 Rajpore Jhagadia 339 134 133 1 205 39.52
47 Randedi Jhagadia 447 145 110 35 302 32.43
48 Ranipara Jhagadia 2225 1030 1005 25 1195 46.29
49 Ratanpor Jhagadia 2130 743 545 198 1387 34.88
50 Sardarpura Jhagadia 456 202 106 96 254 44.29
51 Selod Jhagadia 1653 626 550 76 1027 37.87
52 Sultanpura Jhagadia 5864 2025 1844 181 3839 34.53
53 Shiyali Jhagadia 1069 403 344 59 666 37.69
54 Talodara Jhagadia 2057 715 579 136 1342 34.75
55 Uchedia Jhagadia 2438 1057 931 126 1381 43.35
56 Untia Jhagadia 752 506 402 104 246 67.28
57 Vanthevad Jhagadia 661 253 235 18 408 38.27
58 Vasna Jhagadia 1522 605 581 24 917 39.75
59 Vaghpara Jhagadia 274 79 78 1 195 28.83
60 Bhilod Valia 3476 1312 1127 185 2164 37.74
61 Dholgam Valia 2556 900 499 401 1656 35.21
62 Hirapor Valia 1963 869 743 126 1094 44.26
63 Kondh Valia 4562 1783 1563 220 2779 39.08
64 Valia Valia 7678 2976 2558 418 4702 38.76
(Source: Census-2011 for Bharuch District)
Main worker is a worker who has worked last year for six month or more. Marginal worker is a worker who has worked last year for less than
six months. Non-worker is worker who did not work at all during the reference period of one year.
Distribution of main worker and marginal worker into further following four categories are shown in Table 3.22.
I) Cultivators II) Agricultural labors III) Household industry IV) others workers
TABLE- 3.22
DISTRIBUTION OF WORKERS
TABLE: 3.24
LEVEL OF SERVICE
Results:
The above traffic reveals the LOS (Levels of Service) as “C” Good for the NH-8 Road, Which
are 4 lane roads divider for proposed project scenario. Since adequate parking is provided and
increase in traffic due to proposed project has taken care by the six lane road.
CHAPTER - 4
IDENTIFICATION & ASSESSMENT OF IMPACT
INTRODUCTION
This chapter identifies and predicts the potential impacts on different environmental components
due to the construction and operation of the proposed project. It details all the potential impacts
on biophysical and socio-economic components of the local environment due to the proposed
activities and sub-activities.
Prediction of impacts is the most important component in the Environmental Impact Assessment
studies. Several qualitative and quantitative techniques and methodologies are used to conduct
analysis of the potential impacts likely to build up as a result of the proposed development
activities on physico-chemical, ecological and socio-economic environments. Such predictions
are superimposed over the baseline (pre-project) status of the environmental quality to derive at
the ultimate (post-project) scenario of environmental conditions. The prediction and
identification of impacts helps to minimize the adverse impacts and maximize the beneficial
impacts on environmental quality during pre and post project execution.
The proposed project would create impacts on the environment in two distinct phases:
1) During the construction phase which may be regarded as temporary or short term.
2) During operation phase which would have long term effects.
Identification of significant impacts for the proposed project is a prominent step in the process of
environmental impact assessment. This provides a way forward to other elements of EIA study
such as quantification and evaluation of site specific impacts exclusively from proposed project.
Although, variety of concerns/ issues are identified while describing existing (baseline)
environmental status, it is necessary to identify the likely critical impacts on various components
of environment due to proposed project.
For construction and operation phases of the proposed project the “Network Method” has been
adopted for identification of impacts, which involves understanding of cause-condition effects
relationships between an activity and the consequences/ impacts on environmental and socio-
economic parameters for identification of significant impacts and has been found to be the most
appealing tool.
The impact networks have been delineated for construction and operation phases of proposed
project. The type of identified potential impacts on various environmental components i.e. Air,
Noise, Water and Land are presented in below Figure 4.1 to 4.6.
It should be noted that in these illustration the lines are to be read as “might have an effect on”.
4.1.1 IMPACT DURING CONSTRUCTION PHASE
The impact during construction will be localized and short term with permanent changes in
profile of the project site as compared to the current conditions. Impact will be primarily related
to the civil works and less intensive impact is expected during erection of the equipment and trial
operation. The various activities involved in construction phase of a proposed project are listed
below:
A) Excavation. B) Construction. C) Erection/Installations of equipment and machinery
D) Transportation E) Material handling F) Employment of labour
4.1.2 IMPACT ON AIR ENVIRONMENT
The main source of emission during the construction phase is the movement of equipment and
vehicles at site. Equipment deployed during the construction phase is also likely to result in
marginal increase in the levels of SO2, NOX, and PM and fugitive emissions. The impact is
reversible, marginal and temporary in nature. The construction activities at site will be restricted
to civil and structural fabrication. The main sources of air pollution are:
• Fugitive dust emissions from digging, filling, material handling, transportation and use of
construction machinery etc.
• Increase in traffic volume resulting in additional vehicular emissions from vehicles
bringing construction material and labour onsite.
• The impact will be for short duration and will be confined to the project boundary.
• However, use of tarpaulin for covering the material being transported in trucks,
sprinkling of water will control the dust generated and proper maintenance of vehicle will
be carried out.
Mitigation Measures:
Water sprinkling will be regularly carried in order to arrest the fugitive dust to the maximum
extent possible. All construction equipment will be maintained properly. Only “PUC” certified
vehicles of contractor will be deployed at site. The green belt will reduce fugitive emissions in
the environment.
FIGURE: 4.1
IMPACT NETWORK ON AIR ENVIRONMENT
Project
Operational
Phase
Activity
Tertiary
Impact
Impact on
Economic Output Impact on Socio –
Cultural
Environment
FIGURE: 4.2
IMPACT NETWORK ON NOISE ENVIRONMENT
Project
Activity
Operational
Phase
Noise
Emission
Change in
Primary Ambient Noise
Impact
Level
Tertiary
Impact Impact on Impact on Socio-cultural
Economic Output Environment
FIGURE: 4.3
IMPACT NETWORK ON WATER ENVIRONMENT
Project
Operation Phase
Activity
Abstraction of
Water Release of
wastewater
Cost of Water
Treatment
Primary Impact on Hydraulics of
Impact Water Courses Environmental
health
And Aesthetic Risk
Secondary
Impact
Impact on Hydraulic Impact on Impact on
Water Courses Aquatic Life Amenity /
Recreation
Tertiary
Impact
FIGURE: 4.4
IMPACT NETWORK ON GROUND WATER ENVIRONMENT
Project
Operation Phase
Secondary
Impact
Impact on Soil Impact on Flora and Impact on
Biota Fauna landscape
Impact on agricultural
production Impact on livestock
Tertiary
Impact
Impact on Economic Impact on Socio-Cultural
Output Environment
FIGURE: 4.5
IMPACT NETWORK ON SOCIO-ECONOMIC AND CULTURAL ENVIRONMENT
Project
Activity Operational
Phase
Saving foreign
Exchange Effect on Effect on Effect on Effect on
Tertiary Human Agriculture visual Buildings
Impact Health & fisheries Environment Materials
Monuments
FIGURE: 4.6
IMPACT NETWORK ON LAND ENVIRONMENT
Project
Operational
Phase
Activity
Tertiary
Impact
Impact on Economic Impact on Socio-Cultural
Output Environment
An impact can be defined as any change in physical, chemical, biological, cultural and/or Socio-
economic environment that can be attributed to activities related to alternatives under study for
meeting the project needs. Impact methodology provides an organized approach for prediction
and assessing these impacts.
Scientific techniques and methodologies based on mathematical modeling are available for
studying impacts of various project activities on environmental parameters.
The nature of the impacts due to said project activities are discussed here in detail. Each
parameters identified in the proceeding chapter, is singularly considered for the anticipated
impact due to various activities listed. The impact is quantified using numerical scores 0, 1, 2, 3,
4 and 5 in increasing order of activity. In order to assess the impact accurately, each parameter is
discussed in detail covering the following:
Mitigative measures:
Effluent will be treated in ETP. Total quantity 29 KL/Day of effluent will be treated in ETP. ETP
treated water will be send to RO plant. RO permeate 21 KLD will be reuse and RO reject 6 KLD
will be send to MEE. MEE condensate (6.5 KLD) will be reuse and salt will be disposed at
TSDF site.
Dust will be generated during excavation and hauling operation and vehicle transportation on
unpaved tracks at the site. Other exhaust gases like carbon monoxide, hydrocarbons, nitrogen
oxides, particles, volatile organic compounds and sulfur dioxide may be also slightly released
into the local ambient air due to vehicular traffic movement. Thus, the local ambient air quality
may be temporarily affected. It will be confined within the project boundary and expected to be
negligible outside the plant boundaries.
Mitigative Measures
Water sprinkling and provision of enclosures will allow the particles to settle down prior to
discharge. There will be provision of enclosures to construction area to allow the particles to
settle down prior to discharge.
Mitigative measure:
In the case of natural gas will be used as fuel in Boilers & TFH, there will not be any provision
of APCM to control emission of PM, SO2 & NOX and in the case of bio-coal will be used as fuel
in Boilers & TFH, there will be any provision of bag filter as APCM to control emission of PM,
SO2 & NOX.
For process gas emission, there will be provision of Water scrubber + Alkali Scrubber to control
emission of H2S, HCl, HBr and Br2 and Charcoal Tower to control emission of VOC, bag filter
will be used as APCM with stack attached to fluid bed dryer and tray drier.
The air quality impacts of source are evaluated by use of model. The model stimulates the
relationship between air pollutants emission, meteorology and air chemistry, all of which are
determined by formulating impact scenario.
MODELING DETAILS
DISPERSION MODEL
TABLE: 4.1
DETAILS OF FLUE GAS
Sources of Steam Boiler * TFH
gaseous (1 TPH) (2,50,000
emissions (Natural Gas Kcal/Hr)
Based)
Fuel used Natural Gas/ Natural Gas/
Biocoal Biocoal
Quantity of fuel 800 M3/Day / 800 M3/Day/
4 MT/Day 4 MT/Day
Type of PM PM
emissions SO2 SO2
NOx NOx
Stack height 30 30
(m)
Stack diameter 600 mm 600 mm
at the top (mm)
Stack gas exit 250oC 250oC
temperature
(oC)
Stack gas exit 7.0 m/s 7.0 m/s
velocity (m/s)
APCM -- --
Emissions:
PM 150 mg/NM3 150 mg/NM3
Concentration
NOx 100 ppm 100 ppm
Concentration
SO2 50 ppm 50 ppm
Concentration
TABLE: 4.2
DETAILS OF PROCESS STACKS
Sources of gaseous Fluid Bed Dryer Tray Dryer Vent Vent Vent
emissions (1 Nos.) (1 Nos.) attached attached attached
to reactor to reactor to reactor
Fuel used -- -- -- --
--
Quantity of fuel -- -- -- --
Type of emissions Particulate Matter Particulate H2 S Cl2
Matter HCl
VOC HBr
Br2
NOx
Stack height (m) 30 30 25 25
Stack diameter at the 300 300 300 300
top (mm)
Stack gas exit 100 110 50 50
temperature (oC)
Stack gas exit velocity 6.5 m/s 6.5 m/s 6.5 m/s 6.5 m/s
(m/s)
APCM Bag Filter Bag Filter Water Water Scrubber +
scrubber + Alkali Scrubber
Alkali
Scrubber
Charcoal
Tower
Emissions:
PM Concentration 150 mg/Nm3 150 mg/Nm3 -- --
NOx Concentration -- -- -- 25 mg/Nm3
H2S Concentration -- -- 40 --
mg/Nm3
Cl2 Concentration -- -- -- 9 mg/Nm3
HCl Concentration -- -- -- 20 mg/Nm3
HBr Concentration -- -- -- 20 mg/Nm3
Br2 Concentration -- -- -- 9 mg/Nm3
VOC Concentration -- -- -- --
TABLE: 4.3
CONCENTRATION OF PM, NO2
Highest Incremental increase in X Co-ord Y Co-ord
Values Concentration (µg/m3) (mts) (mts)
NO2 PM
1 1.486 2.811 1000 1000
2 1.219 2.303 1000 1000
3 1.153 2.185 1000 1000
4 1.139 2.15 1000 0
5 1.13 2.14 1000 1000
6 1.128 2.133 1000 1000
7 1.071 2.047 1000 1000
8 1.071 2.025 1000 0
9 1.058 2.02 1000 1000
10 1.049 1.997 1000 1000
TABLE: 4.4
CONCENTRATION OF SO2
Highest Incremental X Co-ord Y Co-ord
Values increase in (mts) (mts)
Concentration
(µg/m3)
SO2
1 2.067 1000 1000
2 1.698 1000 1000
3 1.604 1000 1000
4 1.586 1000 0
5 1.571 1000 1000
6 1.57 1000 1000
7 1.489 1000 0
8 1.486 1000 1000
9 1.469 1000 1000
10 1.459 1000 1000
TABLE: 4.4
CONCENTRATION OF Br, Cl, H2S, HBr & HCl
Highest Incremental increase in Concentration (µg/m3) X Co-ord Y Co-ord
Values (mts) (mts)
Br Cl H2S HBr HCl
Based on the modeling results, isopleths for PM, SO2, NOx, and NH3 were drawn and were
superimposed on an aerial view of the site using maps from Google Earth which is as shown in
the figures given below.
FIGURE: 4.7
ISOPLETHS OF PM (SITE COORDINATES 0, 0)
FIGURE: 4.8
ISOPLETHS OF SO2 (SITE COORDINATES 0, 0)
FIGURE: 4.9
ISOPLETHS OF NO2 (SITE COORDINATES 0, 0)
FIGURE: 4.10
ISOPLETHS OF Br (SITE COORDINATES 0, 0)
FIGURE: 4.11
ISOPLETHS OF Cl (SITE COORDINATES 0, 0)
FIGURE: 4.12
ISOPLETHS OF H2S (SITE COORDINATES 0, 0)
FIGURE: 4.13
ISOPLETHS OF HBr (SITE COORDINATES 0, 0)
FIGURE: 4.14
ISOPLETHS OF HCl (SITE COORDINATES 0, 0)
The construction activities such as transportation of raw materials for civil works, operation of
heavy equipment and construction machinery are likely to cause increase in the ambient noise
levels. However, the impact of this noise generated will be localised, short term and reversible in
nature.
Mitigative measures:
Operation of construction equipments generating higher noise will be strictly restricted during 10
p.m. to 6 a.m. The construction machinery and equipment will be well maintained. Provision of
encloser, damper and other engineering control will control noise pollution. Workers operating
these equipments will be given ear plugs/muffs.
The sources of noise pollution will be D.G. sets, boilers and other noise generating units.
Vehicular movements during operation phase for loading/unloading of raw materials and
finished products and other transportation activity may also increase noise level.
Mitigative measures:
Adequate noise control measures such as mufflers, silencers at the air inlet/outlet, anti vibration
pad for equipment with high vibration etc. is already provided. Housing/casing shall be provided
for all noise generating machines. Job rotation will reduce exposure to some extent. More ever,
PPE like earmuff and ear plugs is provided to the operators/worker exposed to high noise. The
green belt is further helpful in reducing the ambient noise level. The above control measures will
be continuously followed after proposed expansion.
The following impacts on the land environment are anticipated during the construction phase of
the proposed project:
hazardous materials like paints and diesel oil will be stored and handled as per the existing
practice to prevent any spillage on land. The construction debris and scrap materials are inert in
nature and will not result into leaching of any substance or constituent. These materials will also
be stored at a designated location to prevent any scattered discharges on land. On completion of
civil work, materials like wooden scrap, steel scrap etc. unused paint, diesel oil and other debris
will be disposed of from time to time as per the existing practice of non-hazardous and hazardous
waste disposal through authorized recyclers and buyers to prevent any adverse impact on the
environment and also to avoid any incompatibility with future use.
Mitigative measures:
The impact significance in view of the above on the land environment during construction is
anticipated to be low.
If the raw materials and hazardous wastes are not handled properly, it can pose danger of land
contamination and can affect land system adversely.
Transportation is one of the most important areas of concern associated with handling and
spillage of raw materials and hazardous waste because of the packaging and method of
transporting hazardous waste will prevent the likelihood that an accident or spill would occur.
Mitigative measures:
Liquid chemicals storage tanks are fitted with appropriate controls to avoid any leakages, transfer
through pumping and bund/dyke walls are provided 1.5 times higher than storage tanks so, there
is no impact on land. The storage area of hazardous waste is insulated with impervious flooring.
Transportation of hazardous waste to the TSDF site is governed as per the Hazardous Waste
(Management, Handling and Transboundary Movement) Rules 2016.
Separate collection system is provided for collection of spillage material. Impervious layer, RCC
roads and flooring is provided to area, where the chemical storage and handling activities will be
involved. Separate storm water collection system is provided to prevent contamination of soil
through contaminated water.
Hence, there will be no significant adverse impact on land environment due to handling of
hazardous solids waste. The unit is following Standard Operating Procedure (SOP) for storing
and handling of hazardous wastes.
STANDARD OPERATING PROCEDURE:
All the departments will collect the various types of the waste and segregate it in various types
like paper and packing material, plastic bags, process waste, metal waste glass waste etc.
1.The person will shift the various type of waste in the designated areas of the waste category.
Before shifting it he will inform and hand over the filled slip to ETP operator/ chemist/ EHS –
HOD.
2.According to the nature of the waste ETP operator/ Chemist will guide the person carrying the
waste, where to store.
3.On sufficient stock of the waste type, it will be disposed off.
4.For disposal of empty containers, carboys or drums disposal, the guidelines provided by the
Gujarat Pollution Control Board will be followed. It will be ensured that containers are empty
before taken for disposal.
1. Person handling the hazardous waste should wear gloves, shoes/ gum boots etc., mask like
Personal Protective Equipments.
2. It should be collected in to the double polyethylene bags or suitable container. Take due care
that it should not spill out on the floor or on the ground. After filling in to the bag / container tie
the bags/container and label as "Hazardous waste” and keep it in the area designated for the
waste.
3. Forklift will be used in shifting, loading and unloading operation for hazardous waste to
minimize manual handling of hazardous waste.
The impact due to the proposed expansion on ecological parameters like natural vegetation,
cropping pattern, fisheries and aquatic life, forest land species diversity are briefly summarized
below:
The project site is located within the panoli GIDC Estate .The project site is devoid of trees; it
will not harbor any important flora. There will be no impact on natural vegetation during
construction. Since, the project is established on a non-agriculture land, it will not to alter the
crop production of the area. The project site is at a far distance from the forest land, wild life
sanctuaries and national parks. Hence, no adverse impact on this account is anticipated.
The green belt will be approx. 35%. Developed by unit having different species of flora, which
will lead to beneficial impact on ecological environment. There will be necessary environmental
protection measures which have been planned under EMP, i.e. air/water pollution control system
designed to take care of release of the gaseous pollutants like PM, SO2, NOx, and NH3.The waste
water generated from the process and domestic activity will be properly treated and recycle
treated water use in process. The unit has proposed ETP having primary & secondary treatment.
Treated water from ETP will be sent to CETP. Proper storage facility will be provided for raw
material and hazardous waste. Hence there will be no impact on ground water and surface water
quality, Raw material and hazardous waste will be transported by road and will be stored in plant
premises. The project proponent shall consider all the safety measures in planning, designing and
operation of the plant as per standard practices.
The plant is located in a GIDC, Panoli having all essential facilities such as water, power, post,
and telecommunication.
Impact due to vehicular movement: The GIDC, Panoli has four lanes internal roads with
separate parking areas at different locations. At present there are no traffic issues in the project
area. Due to proposed expansion, there will be additional 5 to 7 truck / tanker moments will be
increase. This will not results in any traffic issues. Also, the unit has made parking arrangement
of 25 Vehicles within the premises. The parking for staff and worker’s vehicle is also available
within the premises. This will have almost negligible impact on road network.
The power requirement of total project of 150 KVA will be fulfilled from DGVCL. DGVCL is
having large amount of electricity production thus due to extra consumption of electricity no
adverse impact of electricity supply is predicted.
The unit is using water from GIDC water supply scheme. Also, the treated water will be used to
conserve fresh water. As a result of development of GIDC, Panoli the neighboring areas will be
developed for commercial use. The infrastructure services e.g. roads, post and telegraph,
communication, medical facilities, education; housing will get improved in surrounding area.
Thus, the economic and commercial activities of the area will also improve. This will be a
beneficial impact on the local socio-economic environment.
During operation phase some additional jobs for operation and maintenance of project and for
operating and maintaining various facilities like water supply, power supply, roads, gardens,
transportation etc will be available. The migration of employees in addition to the local ones will
lead to a faster growth rate of economical and social status of the local area.
Emission, if uncontrolled from process and utility stacks may cause discomfort to people in the
down wind direction. This may be caused due to the failure of control equipment / process.
Mitigative measure: Provision of adequate APCM and maintenance of APCM will prevent any
accidental emission from stacks and reduce risk to the health of the people in the vicinity of the
project. As a result the project activities there will not be adverse impacts on sanitation,
communication and community health as sufficient measures have been proposed in EMP.
The parameter discussed are presented in the form of a matrix in Table no. 4.6.There will be both
construction and operation phases.
The quantification of impact is done using numerical scores 0 to 5 as per the following criteria.
Score 0 1 2 3 4 5
Severity No No Slight/short Occasional Irreversible Permanent
criteria Impact damage term effect reversible /Long –term damage
effect effect
TABLE 4.5
ENVIRONMENT IMPACT MATRIX (WITH MITIGATION MEASURES)
Activity Activities during Air Water Noise Land Infra- Ecological Health, Socio-
Construction Phase quality quality & quality Structure Environment Safety & Economic
Odour /Services Aesthetics Status
Excavation, civil work, 1 1 1 1 1 1 1 1
Construction
transportation of construction
vehicle
phase
Water requirement 0 1 0 0 1 0 0 0
Material Storage/handling/ 2 1 1 0 0 1 2 0
Transport
Effluent discharge (considering 0 1 0 0 1 1 0 0
zero liquid discharge)
Utilities 2 0 1 0 1 1 1 0
Gaseous emissions 2 0 1 1 0 1 2 0
Fugitive emissions 1 0 0 0 0 0 2 0
Solid/hazardous Waste 1 0 1 1 2 1 2 0
Disposal
Spills & Leaks 1 0 0 1 1 1 2 0
Operation phase
Plant Operations 2 1 1 0 1 1 2 1
Equipment Failures/ Shutdown/ 2 2 1 0 2 1 2 1
Startup
Transport of workers/ Movement 1 0 1 0 1 1 1 1
of vehicles
Cumulative score 15 7 8 4 11 10 17 4
TABLE 4.6
CUMULATIVE IMPACT CHART
Environmental Parameter Total Cumulative
Air Quality 15
Water Quality 7
Noise and Odor 8
Land Quality 4
Infrastructure/ Service 11
Ecological Environment 10
Health, Safety & Aesthetics 17
Socio Economic Status 4
Conclusion:
CHAPTER -5
ENVIRONMENTAL MONITORING PROGRAM
5.1 INTRODUCTION
Environmental monitoring describes the processes and activities that need to take place to
characterize and monitor the quality of the environment. Environmental monitoring is used
in the preparation of environmental impact assessments, as well as in many circumstances
in which human activities carry a risk of harmful effects on the natural environment. All
monitoring strategies and programmed have reasons and justifications which are often
designed to establish the current status of an environment and Prediction of the impact of
future development and/or alteration in the operation and design of existing installations.
Environmental Monitoring Network is operation phase of the project for monitoring of
various environmental parameters like air, water, noise, soil etc.
A well-defined environmental monitoring programme would be employed with trained and
qualified staff of Environmental Management Cell of the proposed expansion project to
monitor the environmental attributes of the area with respect to EMP as well as the
guidelines of the GPCB/CPCB. Environment monitoring schedule proposed to be adopted
by the project.
The log book shall be maintained at environment cell for evaluation of impact and to
decide required migratory measures.
All the flue gas stacks in the proposed project shall be monitored with respect to
temperature, oxides of nitrogen (NOX), Suspended Particulate Matter (SPM) and Sulphur
dioxide (SO2) level. The process stacks shall be monitored for PM, HCl, HBr, Br2, H2S
&NOx.
Daily analysis of effluent stream is recommended. Sampling and analysis of the raw
effluent, collection tank, Primary Settling Tank&Multiple Effective Evaporator will be
conducted regularly.Online meter will be fitted for monitoring of flow, pH, COD.
TABLE: 5.2
EMISSION MONITORING PLAN
Sr. Description Location Parameter To Frequency of
No. be Monitored Monitoring
1. Flue Gas Three boilers PM ,SO2 and Monitoring will be done
Emission stacks (Baggase), NOX by online monitoring
Monitoring two stacks of systems for PM in boiler
Plan Thermopack (6 and external monitoring
Nos.), agency once in three
(D.G.Set) months.
(2 Nos.),
One stack of Hot
Air Generator for
Spray Dryer
2. Process Reactor Vessels, PM, HCl, HBr, Quarterly by external
Emission Spin flash Drier Br2, H2S &NOx. monitoring agency.
Monitoring Online monitoring
Plan system with alarm
facility for HCl.
3. Fugitive Process area & Relevant solvent Quarterly by external
Emission storage area (VOC) and monitoring agency.
Monitoring acidic fumes.
Plan
4. Ambient Air ETP, Process PM10,PM2.5, SO2, Quarterly by external
Monitoring area,storage area NOX monitoring agency
Plan and one location
in downwind
direction
5. Noise Any five location Noise Quarterly by external
Monitoring within company monitoring agency in day
premises time and night time.
TABLE 5.4
CHAPTER - 6
RISK ASSESSMENT
In order to support the environment impact assessment and environment management plan,
following additional studies have been included in this report.
• Risk Assessment
• Onsite and Offsite Disaster (natural and manmade)Preparedness and Emergency
Management Plan
• Occupational Health Program
The study has been carried out with a view to comply the following TOR points:
• TOR No. 47:Occupational health impacts on the workers and mitigation measures
proposed to avoid the human health hazards along with the personal protective equipment
to be provided. Provision of industrial hygienist and monitoring of the occupational injury
to workers as well as impact on the workers. Plan for periodic medical checkup of the
workers exposed.
• TOR No. 49: Risk assessment including prediction of the worst-case scenario and
maximum credible accident scenarios should be carried out. The worst-case scenario
should take into account the maximum inventory of storage at site at any point of time. The
risk contours should be plotted on the plant layout map clearly showing which of the
facilities would be affected in case of an accident taking place. Based on the same,
proposed safeguard measures including On-Site / Off-Site Emergency Plan should be
provided.
• TOR No. 51: Details of hazardous characteristics and toxicity of raw materials and
products to be handled and the control measures proposed to ensure safety and avoid the
human health impacts. This shall include the details of Antidotes also.
• TOR No. 52: Details of quantity of each hazardous chemical (including solvents) to be
stored, Material of Construction of major hazardous chemical storage tanks, dyke details,
threshold storage quantity as per schedules of the Manufacture, Storage & Import of
Hazardous Chemicals Rules of major hazardous chemicals, size of the biggest storage tank
to be provided for each raw material & product etc. How the manual handling of the
hazardous chemicals will be minimized?
• TOR No. 53: Details of the separate isolated storage area for flammable chemicals. Details
of flame proof electrical fittings, DCP extinguishers and other safety measures proposed.
Detailed fire control plan for flammable substances and processes showing hydrant
pipeline network, provision of DG Sets, fire pumps, jockey pump, toxic gas detectors etc.
• TOR No. 54: Submit checklist in the form of Do’s & Don’ts of preventive maintenance,
strengthening of HSE, manufacturing utility staff for safety related measures.
• Part A. Std TOR NO.: 3.9: Hazard identification and details of proposed safety systems.
• Part A. Std TOR NO.: 7.13 Onsite and Offsite Disaster (natural and Man-made)
Preparedness and Emergency Management Plan including Risk Assessment and damage
control. Disaster management plan should be linked with District Disaster Management
Plan.
• Part A. Std TOR NO.: 8 Occupational Health:
i. Plan and fund allocation to ensure the occupational health & safety of all contract and
casual workers.
ii. Details of exposure specific health status evaluation of worker. If the workers' health
is being evaluated by pre designed format, chest X-rays, Audiometry, Spirometry,
Vision testing (Far & Near vision, colour vision and any other ocular defect)
ECG, during pre-placement and periodical examinations give the details of the
same. Details regarding last month analyzed data of above mentioned parameters
as per age, sex; duration of exposure and department wise.
iii. Details of existing Occupational & Safety Hazards. What are the exposure levels of
above mentioned hazards and whether they are within Permissible Exposure level
(PEL). If these are not within PEL, what measures the company has adopted to
keep them within PEL so thathealth of the workers can be preserved.
iv. Annual reportof health status of workers with special referenceto Occupational Health
and Safety.
• Specific TOR No. 13: Risk assessment for storage and handling of hazardous chemicals
/solvents. Action plan for handling & safety system to be incorporated.
• Specific TOR No. 14: Arrangements for ensuring health and safety of workers engaged
in handling oftoxic materials.
TABLE: 6.1
STORAGE DETAILS OF RAW MATERIALS
Mode of
Name of the Storage &
Sr Quantity Possible type of
Raw Material of State Proposed Control Measures
No stored hazards
Materials Construction
for the same
1 Toluene 10 KL Tank Liquid • Flammable • Proper storage area shall be provided.
2 Methanol 5 KL Tank Liquid • Flammable • Eye wash station shall be provided.
3 N-Hexane 10 KL Tank Liquid • Flammable • Chilling Water Circulation shall be provided.
• Specialist to be consulted, if required..
4 Dimethylamine 200L Drums Liquid • Flammable • PPEs shall be used.
5 Ammonia 100Kg Cylinder Gas • Toxic • Self contained breathing apparatus shall be used
6 Thionyl 200L Drums Liquid • PPEs like Splash goggles, Full suit, Vapor respirator or
• Toxic
Chloride self-contained breathing apparatus, Gloves etc., shall be
used while handling this chemical.
NOTES:
1. The size of the biggest storage tank is 10 KL and Dyke of sufficient capacity (i.e. 10% extra than tank capacity) shall be provided
for all the chemicals stored in tanks.
2. The unit shall be classified as Non Major Accident Hazard (NMAH) unit based on the quantity of Hazardous Chemicals stored
at site, as the quantity of these chemicals being stored within the factory premises are well within the threshold storage
quantity as per schedules of Manufacture, Storage & Import of Hazardous Chemicals (MSIHC) Rules of major hazardous
chemicals.
TABLE 6.2
PROPERTIES OF HAZARDOUS CHEMICALS
SP. TLV-
Vap. LD50 LD50 STEL
GR Vap. IDLH Value TWA
Sr. Physical FP BP Pr. LEL UEL ORAL DERMA LC50 by
Chemical o o @ Den. by ACGIH/ by
no State C C @ % % mg/ L mg/L OSHA
20o Vs air o NIOSH OSHA
20 C kgs mg/kgs (PPM)
C (PPM)
3.8
1 Toluene Liq 4.4 110 0.87 3.2 1.3 7 636 14100 440 - 150 100
KPa
5628
12.26 20 mg/kg 64000 200
2 Methanol Liq 12 64.5 0.79 1.1 6 36 mg/kg 200 310
kPa (Rabbit) ppm (Rat) ppm
[Rat].
151m
25
m Hg 48000ppm
3 N-Hexane Liq -23 69 0.66 2.97 1.2 7.5 gm/Kg - 1,100 ppm - 50 ppm
@ 4h. (Rat)
(Rat)
25°C
698
Dimethyl- 170kp 4700 ppm
4 Liq 6.7 6.9 0.66 1.59 2.8 14.4 mg/kg - 500ppm 15ppm 10ppm
amine a (rat, 4 hr)
(Rat)
ACGIH
2000 ppm
860 TLV- ACGIH
5 Ammonia Gas NA -33 0.6 0.6 16 25 NA NA (rat, 4 300
kpa STEL: :25
hours)
35
500 ppm
Thionyl 13.3 N.
6 Liq. N.A 78.8 1.63 4.1 N.A - - 1 Hrs 25 ppm - -
Chloride kPa A
[Rat].
The Risk Matrix presented below should be referred in evaluating this assessment.
In Qualitative Risk Assessment, risk has been analyzed using methodology called
HIRA-Hazards Identification & Risk Assessment. In HIRA, major manual activities
carried out by plant personnel as well as contract labours have been considered.
Qualitative Risk Assessment has been carried out for the following areas:
1. Storage and Handling of Solid Chemicals.
2. Storage and Handling of Caustic Lye.
3. Storage and Handling of Acids.
TABLE: 6.3
RISK MATRIX FOR QUALITATIVE RISK ASSESSMENTRISK MATRIX
FOR QUALITATIVE RISK ASSESSMENT
LIKEHOOD/ SEVERITY
PROBABILITY Catastrophic Major/ Moderate Minor/Margi Insignificant
(Death/ Critical (Less nal /Negligible
System Loss) (Serious Serious (Minor (No injury/
injury/ Injury/ Injury/ Illness)
Illness) Illness) Illness)
5 4 3 2 1
Almost 5 H H H M M
Certain
Likely 4 H H M M L
Possible 3 H M M M L
Unlikely 2 M M M L L
Impossible 1 M M L L L
TABLE: 6.4
RISK RANGE & ACCEPTABILITY CRITERIA
TABLE: 6.5
RISKS AND RECOMMENDATIONS
INITIAL RESIDUAL
RISK RISK
SR HEALTH &
PROCESS ADDITIONAL
ASSOCIATED SAFETY EXISTING
SEVERIT
SEVERIT
LIKELIH
LIKELIH
OR RECOMMENDATI
No HAZARDS IMPACT MEASURES
ACTIVITY ONS
. (RISK)
RISK
RISK
OOD
OOD
Y
Y
1. Handling • Chemical • Skin/Eye 4 3 M • PPEs like suitable 4 2 L 1. Operators/Workers
Chemical bags Exposure. irritation. protective clothing, to be trained for
• Dusting. • Ingestion & gloves, face shield, dust Safe Work
Inhalation of and splash proof safety Practices.
dust powder. goggles, chemically 2. Chemical handling
resistant safety shoes, bags & dusty area
etc. shall be used. to be labeled
• Standard Approved properly for each
respirator shall be used. chemicals.
• Eyewash station and
safety showers shall be
made available.
• Air bag filters shall be
installed where the
product is pulverized.
• Dust monitoring shall
be carried out
periodically.
TABLE: 6.6
RISKS AND RECOMMENDATIONS
INITIAL RESIDUAL
RISK RISK
SR HEALTH &
PROCESS ADDITIONAL
ASSOCIATED SAFETY EXISTING
SEVERIT
SEVERIT
LIKELIH
LIKELIH
OR RECOMMENDATIO
No HAZARDS IMPACT MEASURES
ACTIVITY NS
RISK
RISK
OOD
OOD
. (RISK)
Y
1 NaOH • Exposure due • Skin burn. 4 3 M • Dyke shall be made 4 2 L 3. Proper trainings to
handling to leakage • Eye irritation available. be provided to the
/Loading & from joints, and • NaOH shall be stored in operators/workers.
Unloading corroded lines respiratory well ventilated area. 4. SOPs to be prepared
failure etc. disorder. • Eye wash station to be and followed the
made available nearby. same.
• Maintenance to be 5. Corroded lines to be
carried as per schedule. painted/replaced.
• Appropriate PPEs to be
used.
2 Working in • Exposure due • Severe 4 3 M • Neutralization media to 4 2 L
Storage Area to spillage irritation to be kept available.
eyes, skin • PPEs like face mask,
etc. gloves etc. shall be
• Internal body worn by concerned
burns. person.
• Eye wash station to be
made available nearby.
TABLE: 6.7
INITIAL RESIDUAL
RISK RISK
SR HEALTH &
PROCESS ADDITIONAL
ASSOCIATED SAFETY EXISTING
LIKELIH-
LIKELIH-
SEVERIT
SEVERIT
OR RECOMMENDATI
No HAZARDS IMPACT MEASURES
ACTIVITY ONS
. (RISK)
RISK
RISK
OOD
OOD
Y
Y
1. Loading & • Exposure to • Skin/Eye 4 3 M • Loading & Unloading 4 2 L
Unloading of Acid fumes irritation. activity shall be carried
Acids Drums. due to leakage • Toxic Vapor out in well ventilated
in inhalation area.
pipe/container etc. • Neutralization media
/valves etc. shall be made available
• Spillage of in areas where acid is
liq. Acid. stored/handled/used.
• PPEs will be used.
CONSEQUENCE ANALYSIS
In a plant handling hazardous chemicals, the main hazard arises due to storage
and handling of hazardous chemicals as mentioned above. If these chemicals are
released into the atmosphere, it may cause damage due to resulting fires or vapour
clouds. Blast Overpressures depend upon the reactivity class of material between
two explosive limits.
DAMAGE CRITERIA
In Consequence Analysis studies, in principle three types of exposure to
hazardous effects are distinguished:
1. Heat radiation, from a jet, pool fire, a flash fire or a BLEVE.
2. Explosion
3. Toxic effects, from toxic materials or toxic combustion products.
In the next three paragraphs, the chosen damage criteria are given and explained
as per the Guidelines for QRA – Phast (Micro) Software (DNV) & Purple Book
for QRA released by Centre for Chemical Process Safety (CCPS).
Heat Radiation
The consequence caused by exposure to heat radiation is a function of:
2
• The radiation energy onto the human body [kW/m ];
• The exposure duration [sec];
• The protection of the skin tissue (clothed or naked body).
In this report following damage criteria has been considered for the effects
due to Fire/Explosion.
TABLE: 6.8
EFFECTS DUE TO INCIDENT RADIATION INTENSITY
INCIDENT RADIATION –
TYPE OF DAMAGE
kW/m2
Immediate ignition of wood (without flame
37.5
Contact). 100 % fatal.
Minimum Energy required for igniting wood
25 (Without flame contact). 100 % fatal in 1min.
Significant injury in 10 sec.
Minimum heat required to ignite wood
12.5 (With flame contact). 1 % fatal in 1 min. First
degree burn in 10 sec.
4 Pain after 20 sec. Blistering unlikely.
2 No discomfort for long exposure.
Explosion
In case of vapour cloud explosion, two physical effects may occur:
* a flash fire over the whole length of the explosive gas cloud;
* a blast wave, with typical peak overpressures circular around ignition source.
As explained above, 100% lethality is assumed for all people who are present
within the cloud proper.
The following damage criteria may be distinguished with respect to the peak
overpressures resulting from a blast wave:
TABLE: 6.9
DAMAGE DUE TO OVERPRESSURE
Peak Overpressure Damage Type
0.40 bar Ear Drum Rupture to humans
50 % probability of fatality inside
15% probability of fatality in open
0.21 bar Structural Damage to buildings
20% probability of fatality to personnel inside
0% probability of fatality in the open
0.13 bar Minor Structural Damage to nearby structures
10% probability of fatality to personnel inside
0% probability of fatality in the open
0.02 bar Glass Damage
0.01 bar Minor Damage
Intoxication
In this report, IDLH & LC50 Concentrations have been considered for
Consequence Analysis.
2. This report considers the worst case scenario which is possible during any set
of operation variable and production methodologies. The objective of the study
is emergency planning, hence only holistic & conservative assumptions are
used for obvious reasons. Hence though the outcomes may look pessimistic,
the planning for emergency concept should be borne in mind whilst
interpreting the results.
In this regard, the failure cases which may lead to release of hazardous
chemicals are as under, out of which maximum worst case shall be
considered:
3. The scenarios of flammable solvent storage tanks (if it is stored in tanks) have
been considered assuming unavailability of bunds. Practically a bund shall be
provided as per OISD guidelines.
4. In this study, results of consequence analysis shall be used for;
a. Emergency Planning,
b. Deciding Evacuation Routes,
c. Deciding Location of Assembly Points and ECC,
d. Resource Allocation for mitigation.
Considerations Made:
• In Case of Solvents (i.e. Toluene, Methanol& N-Hexane) we have
considered the failure case of unloading line (1” i.e. 25 mm pipe dia.) for a
period of 10 mins. As the solvents tankers are compartmentalized, the
maximum release quantity equals the storage quantity of a single compartment.
Note: Release of above chemicals from process equipments like Reactor or any
other equipment is not possible as these chemicals will be in diluted/intermediate
form in all process equipments and not in pure form.
TABLE: 6.12
SCENARIO # 1 – RELEASE OF TOLUENE
Basis: Possible Release/Leakage due Failure of leakage from 25mm hole size in case of
unloading line
Input Data
Leak Duration 600 secs
Leak Size considered 25 mm
Release Rate 5012.85gms/sec
Pressure atm
Temperature 30oC
Weather Condition 1.5/F, 1.5/D, 5/D
LFL 12000 ppm
UFL 71000 ppm
CASE:1 FLASH FIRE
FIGURE: 6.2
Risk Contour for Flash Fire:
FIGURE: 6.3
Risk Contours for Late Pool Fire:
TABLE: 6.13
SCENARIO # 2 – RELEASE OF METHANOL
Basis: Possible Release/Leakage due Failure of leakage from 25mm hole size in case of
unloading line
Input Data
Leak Duration 600 secs
Leak Size considered 25 mm
Release Rate 4678.17gms/sec
Pressure Atm
Temperature 30oC
Weather Condition 1.5/F, 1.5/D, 5/D
LFL 73000 ppm
UFL 360000 ppm
CASE:1 FLASH FIRE
FIGURE: 6.4
Risk Contour For Flash Fire:
FIGURE: 6.5
Risk Contour For Late Pool Fire:
TABLE: 6.14
SCENARIO # 3 – RELEASE OF N-HEXANE
Basis: Possible Release/Leakage due Failure of leakage from 25mm hole size in case of
unloading line
Input Data
Leak Duration 600 secs
Leak Size considered 25 mm
Release Rate 8984.92gms/sec
Pressure Atm
Temperature 30oC
Weather Condition 1.5/F, 1.5/D, 5/D
LFL 10500 ppm
UFL 76800 ppm
CASE:1 FLASH FIRE
FIGURE: 6.6
Risk Contour For Flash Fire:
FIGURE: 6.7
Risk Contour For Overpressure:
FIGURE: 6.8
Risk Contour For Late Pool Fire:
TABLE: 6.15
SCENARIO #4 – RELEASE OF DIMETHYLAMINE
TABLE: 6.16
RESULTS:
FIGURE: 6.9
Risk Contour For Flash Fire:
FIGURE: 6.10
Risk Contour For Overpressure:
FIGURE: 6.12
Risk Contour For Fire ball:
FIGURE: 6.13
Risk Contour For IDLH Concentration:
TABLE: 6.17
SCENARIO # 5– RELEASE OF AMMONIA
Basis: Possible Release/Leakage due to:
• Ferrule Joint
• Flange Leakage
Input Data
Leak Size considered 2 mm
Release Duration 100Secs (Cylinder gets 100% empty)
Pressure 18 bar
Temperature 35 deg C
Weather Condition 1.5/F, 1.5/D, 5/D
LC50 2000 ppm
IDLH 300 ppm
TABLE: 6.18
RESULTS:
FIGURE: 6.14
Risk Contour For IDLH Concentration:
TABLE: 6.19
SCENARIO # 6 – RELEASE OF THIONYL CHLORIDE
TABLE: 6.20
RESULTS:
FIGURE: 6.15
Risk Contours for Dispersion of Thionyl Chloride:
Distance (meters)
SR. Concentration
Scenario Category Category Category
No. (ppm)
1.5/F 1.5/D 5/D
Release of LFL Frac.6000 7.86 6.44 1.92
1
Toluene LFL. 12000 2.18 1.91 1.50
TABLE: 6.22
Explosion Overpressure Scenarios:
TABLE: 6.23
Late Pool Fire Scenarios:
TABLE: 6.24
Toxic Release Scenarios:
Recommendations:
• Evacuation routes shall be planned such that alternate route is available from any
corner in more than one direction.
• Extra precautions to be taken in unloading of flammable/toxic chemicals. The details
of precautions during storage handling and transportation of chemicals have been
given in separate paragraph.
• Fire fighting arrangements shall be provided as per the guidelines of OISD.
• In case of release of toxic chemicals, evacuation shall be done up to 35.15 meters.
TABLE: 6.25
SAFETY PRECAUTIONS
2 Unloading of • Priority will be given for truck to immediately enter the storage
Solvent Drums premises at site and will not be kept waiting near the gate or the
/Barrels from main road.
Truck. • Security person will check License, TREM CARD, Fire
extinguisher condition; SCBA set condition, Antidote Kit,
required PPEs as per SOP laid down.
• QC check & other required checks shall be done & after the
Do's:
Don’ts:
• Don't allow anyone who hasn't received specific safety and operational training
to get indulge in any site activity.
• Don't perform your own maintenance.
• Don’t compromise on Design and Engineering part.
• Don't perform any activity without proper permit.
• Don't panic if you are in a risky situation.
• Don't allow spilled chemicals to drain to sewers/gutters etc.
Do's:
Don’ts:
1) No worker in a factory-
• Shall will fully interfere with or misuse any appliance, convenience or other
thing provided in the factory for the purpose of securing the Health, Safety or
Welfare of the workers therein:
• Shall will fully and without reasonable cause do anything likely to endanger
himself
• or others; and
• Shall will fully neglect to make use of any appliance or other thing provided in
the factory for the purposes of securing the Health or Safety of the workers
therein.
• Do not make vague statements, do not overrule supervisor, and do not adopt
shortcuts.
TABLE: 6.26
ANTIDOTES
Chemical Antidote / Medical Treatment
LEVEL - 1:
The leakage or emergency, which is confinable within the plant/area which may
arise due to:
LEVEL - 2:
The emergency, which is confinable within the factory premises which may arise
due to -
LEVEL - 3:
The emergency, which is not confinable within the factory premises and general
public in the vicinity are likely to be affected. It may arise due to
• Medical arrangements.
• Other arrangements.
• Immediately on being informed of the emergency and its location, will arrive
at the site, review the situation and control further actions.
• Direct all Emergency Operations within the approved area with the following
priorities:
a. Personnel Safety,
b. Plant, Property and Environment Safety and
c. Minimum loss of production.
• Co-ordinate to avail services from external agencies like fire brigade, hospitals
etc, if called for, following the declaration of major emergency. If necessary,
major installations in the vicinity may also be informed of the situation.
• Exercise direct operational control of the unaffected section of the plant.
• In consultation with the advisory team, expedite the shutting down of loading /
unloading operations and if necessary, instruct the supervisor / security
personnel to evacuate that area.
• Ensure that all employees are evacuated from the affected area and the
casualties, if any, are given necessary medical attention. Instruct P & A
Assistant / Security for rushing casualties to hospitals if required.
• Liaise with fire and police officials, pollution control board officials and other
statutory bodies and advise them of all possible consequence effects outside
the premises.
• Arrange for relief of personnel when emergency is prolonged.
• Issue authorized statement or press release to the news – media.
• Ensure preservation of evidence for enquiries to be conducted by statutory
authorities.
• Authorize the sounding of “All Clear” and “Evacuation Siren”.
• Arrange for obtaining the head – count of all personnel within the premises
and cross-checking with the data from records available for no. of persons
within the premises.
• Nominate a person from advisory team, to maintain chronological log of event
during the entire period of emergency.
• Give information to the head of fire fighting and rescue team and other
emergency services.
• Depending on the incident, instruct partial or total shut down, isolations,
depressurization, Nitrogen purging, fire fighting, rescue operations.
• Instruct upstream/downstream units to take emergency shutdown /cutting off
supply and other appropriate actions and emergency evacuation help etc.
• Direct for search of casualties.
• Evacuate non-essential workers/visitors/contractors to safe assembly points.
• Brief site main controller and keep him informed about the developments.
• Preserve evidences. This will be necessary for investigation for cause and
concluding preventive measures.
KEY PERSONNELS
Senior officers of various departments like Fire, Security, Safety, Administration,
Engineering, Project, Production, Transport, Pollution control, Technical Services
and Stores shall be nominated as Key Personnel in their respective fields. As
necessary, they shall decides the actions needed to shutdown plants, evacuate
personnel, carryout emergency engineering work, arrange for supplies of
equipments, utilities, carryout
environment monitoring, provide catering facilities, liaise with police, fire brigade
and other local authorities, relative of casualties, hospital, press & neighbouring
industries, action at assembly points, outside shelters and mutual aid centre under
the direction of the SMC. All the key personnel and other called in so to assist,
shall report to the ECC. They are available at any time on duty or on call or on
holidays.
ESSENTIAL WORKERS
Essential Workers shall be those who shall be trained in Fire Fighting and First
Aid. One Supervisor and two helpers from each shift will be Identified as E.W.’s
& shall suppose to report at EMERGENCY SITE to take instructions from I.C. or
Dy. I.C. Such work instructions will include:
• Fire fighting and spill control till a Fire Brigade takes the charge.
• To help the Fire Brigade and mutual aid teams, if it is so required.
• Shutting down plant and making it safe.
OTHERELEMENTS OF DMP:
ASSEMBLY POINT
In affected & vulnerable plants, all nonessential workers (who are not assigned
any emergency duty) will be evacuated from the area & they shall report to
specified Assembly Points. Assembly Point will be marked at main security gate
well away from area of risk and least affected by the down wind direction.
To ensure that workers do not have to approach the affected area to reach the
Assembly Point, proper location and number shall be marked at Assembly Points.
Each Assembly Point shall be manned by a nominated person to record the names
and dept. At each Assembly Point, duties of Assembly Point In-charge are
displayed in brief. Before reaching an Assembly Point or subsequently, if it is
A) Role of Manager (Fire and Safety) / Shift In-Charge (Fire & Safety)
1. Incident Controller shall direct the fire fighting and Emergency operation. His
duties include…
2. Keep the constant touch with the SMC / In charge - EHS.
3. Direct the crew members to the scene of emergency and arrange replenishment
of Manpower / equipment / extinguishing media etc.
MEDICAL SERVICES
The roles of Medical officers are as follows;
(a) He will report immediately to the SMC/IC.
(b) He will render necessary treatment, at Occupational Health Center.
(c) He will arrange for Hospitalization and Treatment at outside hospitals, if
required.
(d) He will mobilize in getting the services of External medical agencies, other
Para –medical services etc. and transportation services etc.
(e) He will arrange for extra medical assistance/antidotes, from out, if required.
(f) He will arrange for first-aid trained volunteers for necessary help.
(g) He will liaise with the Government Health Authorities for treatment of the
affected persons nearby.
OTHER ARRANGEMENTS
Other arrangements include external transport (transport centre), heavy vehicles,
lift/cranes, generator sets to supply emergency power, environment monitoring
equipment, special instruments/equipments, rescue items etc. shall be made
available (if required) from near-by Industries /locations, when available
resources do not meet the requirements.
• IC would keep SMC informed about the status of control measures being taken
at the site and ask for other requirements eg. Mutual aid, equipment, etc if he
find necessary.
• SMC would co-ordinate with outside agencies regarding control measures
being taken, need for external help, evacuation, medical treatment etc.
Each and every section, Plant & Department of the Factory will be connected by
internal telephones with SMC, Supervisor or IC’s. External Phone at Office and
Residence and
Mobile shall also be made available with Key Personnel and top executive of the
factory. The Communication System shall begins with raising the alarm
declaring the emergency, Telephone messages and Procedure to communicate the
emergency to other persons & General Public.
Telephone Messages
A Telephone operator who is precise, sharp, attentive and quick in receiving and
noting the message and subsequently effective in further Communication, shall be
appointed. A form to record emergency telephone calls will be available with
telephone operator or Person available in Emergency Control Center, who shall
record such calls during emergency. Telephonic messages shall be given out by
the telephone operator to Site main Controller and key personnel as per the
COMMUNICATION OF EMERGENCY
STATUTORY INFORMATION
a) Information to Workers
Set of Statutory information regarding types of hazards and their prevention and
control as directed in the Factories Act shall be prepared by the unit. This
information shall be printed in the local language and will be given in the form
of booklet to all workers including contract workers.
The probable emergency situation that can arise in the unit and the corresponding
control actions as described below shall be followed:
1. FLAMMABLE RELEASES
Source / Incident – Fire involving spilled combustible material near or in
flammable storage areas
Following Control actions shall be taken –
1. Any one who notices fire shall sound emergency alarm.
2. SMC/IC who is at site, shall immediately rush to the scene and assess the
situation.
For fire due to spillage of combustible material, he activates the on-site plan
as -
• He cuts off electric supply to that area and evacuates all the persons to safe
assembly points.
• He calls in DIC (if DIC is not present there) and asks essential workers to
fight fire with dry chemical / CO2 fire extinguisher or sand.
• He inform fire brigade telling them in briefly about kind of fire and type of
extinguishers required.
• He informs mutual aid teams and asks for necessary help.
• He arranges first-aid / hospitalization for the affected persons.
• Fire officer on reaching the site, takes charge of the fire-fighting operations
• Mutual aid teams are asked for help in the form of first-aid, transport etc.
• If fire is growing, fire officer informs IC who alerts neighbouring units and
through SMC gets more fire-fighting help.
• Fire fighting shall be continued till fire is fully overcome.
• After extinguishing fire, fire officer cools the entire area with water spray
and checks that no re-ignition is likely to occur. After that, he declares the
area safe.
• IC tells essential workers to sound all clear.
• The incident shall be recorded.
• SMC arranges to inform families / relatives of injured / dead.
• SMC issues authorized statement to press / media.
• SMC informs Factories Inspector about the incident and related information
2. TOXIC RELEASES
• Source / Incident – Pressure release due to failure of
- Stuffing box gland packing
- Pressure release valve
- Vessel / pipeline failure
Following Control Actions will be taken –
1. Any one who notices the release shall sound emergency alarm.
2. SMC/IC who is at site, shall immediately rush to the scene and assess
the situation.
For toxic release from a reactor, he activates the on-site plan as -
• He evacuates all the persons to safe assembly point.
• He calls in DIC (if DIC is not present there) and asks essential workers to
wear self-breathing apparatus and if the reaction is exothermic, start cooling
water flow in the reactor jacket and cool the reactor as soon as possible.
• The essential workers stop all the charging pumps of that reactor and the
nearby reactors.
• He informs mutual aid teams and asks for necessary help.
• He arranges first-aid / hospitalization for the affected persons.
• Mutual aid teams shall be asked for help in the form of first-aid, transport
etc.
• When the leak stops and the air shall clear of toxic release, IC tells essential
workers to sound all clear.
• The vessel / rupture disc/gland packing will be attended by maintenance
department.
• The incident shall be recorded
• SMC arranges to inform families / relatives of injured / dead.
• SMC issues authorized statement to press / media.
• SMC informs Factories Inspector about the incident and related information
3. CHEMICAL SPILL
Most of the chemicals will be stored in Drums & drums shall be located in
separate isolated storage area. Neutralizing material shall be kept available.
Spill containment kit shall be kept available. For dilution, water connection
will be provided on all sides of Storage Area. Sand buckets shall be available
for covering spillage of flammable / corrosive materials. Fire fighting facilities
shall be made available nearby.
A qualified doctor will be appointed as FMO on retainer shift basis. Apart from
him, required medical facilities applicable as per Gujarat Factories Rules and
Factories Act shall also be made available.
All types of first aid related accessories, Medicines & Antidotes as prescribed by
FMO, etc shall be made available at conspicuous locations.
First Aid Boxes will be made available at the different location in the plant.
Training shall be given to employees for First Aid.
Number of Samples
Range of contaminant concentration as measured in sample
Average concentration
TWA concentration of contaminant (As given in Second Schedule of
Factories Act)
Reference method used for analysis
Number of workers exposed at the location being monitored
Signature of the person taking samples
Other relevant details
Impact of the above mentioned unsafe conditions on workers will be studied and
remedial measures for the same will be adopted.
Company shall prepare Safety Plan and implementation for the new project
activity. Also, management shall allot enough funds to ensure the occupational
health & safety of all contract & causal workers. Details of the same are as
follows:
• To allocate sufficient resources (like PPEs) to maintain safe and healthy
conditions of work;
• To take steps to ensure that all known safety factors are taken into account in
the design, construction, operation and maintenance of plants, machinery and
equipment;
• Daily briefing/ safety instructions shall be given by security at main gate ,
• Daily checking of helmet and shoes shall be done by security at gate,
• Tool Box Talk by plant personnel before start up of work, like informing
employees about materials, equipment or processes to be used in their work
which shall be known to be potentially hazardous to health or safety;
• To keep all operations and methods of work under regular review for making
necessary changes from the point of view of safety in the light of experience
and up to date knowledge;
• To provide appropriate facilities for first aid and prompt treatment of injuries
and illness at work;
SAFETY CIRCLE
In order to fully develop the capabilities of the employees in identification of
hazardous processes and improving safety and health, safety circle can also be
constituted. The circle shall consist of about three to four employees. The circle
shall meet for about an hour every week.
SAFETY TRAINING
Company shall made a policy of identifying the Safety Training Needs at
different positions/levels. Safety trainings shall be arranged by Safety
department in consultation with the plant/area in-charge and the Occupier and
sometimes external faculty deputed for the same. One day training on safety
induction shall be arranged for each category of new employee.
MOCK DRILLS
To evaluate the effectiveness of emergency preparedness and to spread the
awareness among employees mock drill will be carried out at the interval of
every six months.
After completion of the mock drill, summary report shall be made and
corrections will be done if any weakness has been observed.
CHAPTER -7
PROJECT BENEFITS
INTRODUCTION
The company is committed for contribution of funds and provides the services for the upliftment
of local community in the nearby villages and growth in the industrial sector creates new
opportunities for employment and can also help diversify the economy. This is especially
important given the high level of urbanization, growing levels of unemployment and poverty in
many cities.
Synergistic growth in the chemical industries could have positive spin-offs for the
socioeconomic development. The use of chemical further leads to development in fieldof
research and development. This chapter describes about benefits of the project on improvements
in the physical infrastructure, social infrastructure and employment potential in the region.
7.1 CORPORATE SOCIAL RESPONSIBILITY ACTIVITIES
From the very initial stage of the inception of the project, infrastructure development in and
around the project site has been kept in consideration. Infrastructure development will be
done based on actual required socio-economic development of the region. The infrastructure
development will be rolled out as part of company’s CSR activity.
• There will be more employment generated due to the proposed project both during
the construction phase and operation phase. On the basis of technical knowledge
acquired by the local village youths, they will be provided with suitable employment
opportunity in the company.
• The labour force required during construction and operation phase shall besourced
from nearby village.
• Based on the ground survey it has been found that there is requirement of upliftment
of skill of workers.
• During training period, they will be given their lodging, boarding, expenses as well as
some stipend will be offered.
• At the end of successful training, they will be absorbed in the proposed project.
• The proponent has also planned to provide training of tailoring to ladies of 1 or2
villages.
This project will increase the economic activities around the area, creating avenues fordirect/
indirect employment during operation phase of the project. There would be awider economic
impact in terms of generating opportunities for other business likeworkshops, marketing, repair
and maintenance tasks etc.
• This project will enhance India’s potential of supplying Organic Pigment / products to
leading to step-up of India’s position in global market sector and strengthening of Indian
economy.
• The continuous inflow of people will require local transport systems like autos, taxis etc
which would help economic boost.
There will be increase in the employment facilities due to the upcoming project like
• There will be employment opportunity for local people during construction and operation
phase.
• The Unit will use latest STATE OF ART technology. Thus man power will be exposed to
new technology.
• There will be employment opportunity for local people during construction and operation
phase.
4. Road side tree plantation and garden Rs. 1.5 Lakhs 5 Years
development in surrounding village
5. Providing Medical instrument for SEWA Rs. 5 Lakhs 5 Years
rural hospital.
TOTAL 12.5 Lakhs 5 Years
CHAPTER – 8
ENVIRONMENTAL MANAGEMENT PLAN
8.1 INTRODUCTION
Environmental protection is an issue that no organization can neglect and hope to survive. The
key to the success of the integrated approach to pollution prevention and control is the
management and operation of the organization. Effective committed management delivers a
successful industry. A total commitment to the environment, not just for compliance with legal
or regulatory compliance will be the essence of environment management of an industry. Many
companies have recognized the benefits of implementing an effective environmental
management system.
This report is also made in the overall frame work of the Environmental Impact Assessment
(EIA) Notification dated 14th September 2006 (and subsequent amendments to the same) issued
by the MoEF & CC, by providing required information with regards to the project as mentioned
in the Terms of Reference issued by the SEAC, Gandhinagar, Gujarat.
“It is of utmost concern for a company to conduct its business in a manner that will promote the
protection of the occupational Health & Safety; Welfare of its employees and others involved in
or affected by its business operations and address the environmental concerns regarding
sustainable development.
As an integral part of the company’s business performance, the company has declared full
commitment to achieve high levels of performance in Health, Safety and Environment.”
The policy will be further amended to fulfill the requirement of Corporate Environment
Responsibility (CER).
The environmental management plan for the proposed project aims to mitigate the potentially
detrimental impacts on the environment, both during construction and operation phases of the
project. It is also necessary that continued compliance with existing environmental regulations is
ensured. The construction and associated activities have been planned so as to minimize impacts
on the physical, biological and socio-economic-cultural environments. Even though it would be
naive to expect that all detrimental impacts can be avoided, it is apparent that most of the impacts
will be localized and temporary in nature.
Company will ensure to conduct all business operations in compliance with applicable laws,
regulations and standards related to occupational Health, Safety and Environment. An
Environmental Management Cell with adequate professional expertise and resources has
established to discharge responsibilities related to environmental management including
statutory compliance, pollution prevention, environmental monitoring, etc. The EMC will be
made responsible for all issues related to environmental management of the proposed project
facilities.
There will be EHS Manager for overseeing all environment and safety responses to ensure the
implementation of EMP mentioned during construction and operation phase including findings /
recommendations of third party audits and monitoring results as mentioned in the EMP.
At least one permanent employee with adequate educational and professional qualification and
experience to discharge responsibilities related to environmental management including statutory
compliance, pollution prevention, environmental monitoring will be employed by company and
will directly report to the Director of the organization operations. Proposed Environment
management cell/ Hierarchical system is shown in below Figure 8.1.
FIGURE: 8.1
FLOW DIAGRAM OF ENVIRONMENTAL MANAGEMENT CELL
Director
Manager
Operator
Operator Chemist Helper
Worker
The proposed project would create impacts on the environment in two distinct phases:
Phase 1: During the construction phase which may be regarded as temporary or short - term.
Phase 2: During the operation phase which will have marginal impact.
The unit has already developed system of reporting of non-compliances / violations of
environmental norms to the Board of Directors of the company.
When ever such situations come in, which could be detrimental to environmental in that case, shift
in-charge will directly coordinate with plant Head & Manager (EHS). This will ultimately lead to the
highest chain of command which has authority to take decisions. The unit has developed
environment violation reporting system is shown in below Figure 8.2.
FIGURE: 8.2
FLOW DIAGRAM OF ENVIRONMENT VIOLATION REPORTING SYSTEM
DIRECTOR
The unit has planned to revise environment policy based on following points to fulfill corporate
environment responsibility.
PROPOSED CORPORATE ENVIRONMENT POLICY:
1. We will abide by the conditions laid down in Environment Clearance.
2. We will follow regulatory frame work of environment rules and regulations.
3. The focus will be for sustainable development. This will be ensured by adopting cleaner
production technology, recycling all waste water, conserving resources and utilization of
Green operations.
4. The stack holders of the company- employees, suppliers, share holders, final product users,
financial institutes and local residents will be regularly informed the environment
performance of the company. Their suggestions and involvement in environment issues will
be encouraged.
5. A manager level person will be employed to supervise day to day operations of pollution
control equipments and related area. The manager will directly report to the Director. The
daily performance report will be circulated amongst in charges of production, maintenance,
quality control and HR department besides executive Director. Any deviations noticed will
be immediately circulated with Red mark highlighted report. Prompt actions will be sought
from all departments.
Environmental impacts during the construction phase can be attributed to the site preparation,
excavation of trenches, erection & mechanical fabrication, construction activities, transportation
etc. and provision of civic amenities to the construction workforce. The potential for
environmental impact during construction phase on most of the environmental components are
temporary and the environment returns back to its previous status on completion of the
construction. State of the art technology will be adopted for control of pollution during project
execution phase, whenever and wherever applicable.
All construction activities generally cause disruptions to the pre project environmental quality.
The following environmental protection measures should be incorporated as part of terms and
conditions of contract for implementation by the contractor or the authority as appropriate.
Recommendations made to minimize impacts during construction phase are delineated below:
The new project will be carried out at GIDC Estate, Panoli which has well developed road
network and plain plots. However M/s. Om Shiv Industries is ensuring to keep the pollution
potential level in the construction phase to a minimum.
The control measures proposed by the unit to minimize the pollution load are as under:
TABLE 8.1
CONSTRUCTION PHASE DETAILS
Sr. Source Waste type/ Control measures
No.
Pollution
(A) SITE PREPARATION
1. Uplift of dust during the Dust Sprinkling of water over paths, land,
excavation, leveling and along the temporary roads.
operations etc.
(B)SANITATION
1. Sanitation facilities. Sewage Sewage disposed through soak pit
(C)NOISE
1. Movement of vehicles like Noise Restrict movement of vehicle
truck, Dozer, Cranes, pollution between 10 p.m. to 6 a.m.
2. Construction activity Noise Engineering control, Provide noise
pollution protection devices like earmuffs, ear
plug to worker, Rotation of work to
minimize exposure.
(D) WASTES FROM CONSTRUCTION EQUIPMENT
1. Dozer, Cranes Waste oil Avoid spillage, proper storage ,
disposal by selling to reprocessor
2. Painting Empty Proper storage, disposal by selling to
containers of authorized buyers/incineration.
paints and oils
3. Construction Construction Use for leveling purpose within
waste premises
The Central Pollution Control Board (CPCB) has set standards with regard to the ambient air
quality levels and emission levels. The particulate matter, PM10 (size 10 µm) levels in Industrial,
residential and rural area not to exceed 100 µg/m3. The standard for industrial areas is 100
µg/m3. The vehicular emission standards for Heavy diesel driven vehicles as per Bharat stage-III
for Hydrocarbons: 1.6 g/km hr; Carbon Monoxide: 2.1 g/km hr and Oxides of Nitrogen: 5 g/km
hr and PM: 0.1 g/Kw hr. These standards will have be met.
(http://www.cpcb.nic.in/Vehicular Exhaust.php).
Environmental pollution during construction phase will be mainly due to the activities involving
site preparation and construction. Preparation of site will involve movement of substantial
quantity of soil to fill the land. During dry weather conditions, it is necessary to control the dust
pollution created by leveling, grading and transportation activity. Materials required for earth
filling should be collected from the site. The transportation routes should be selected such that
movement of trucks through inhabited villages is reduced. It should be ensured that construction
vehicles are properly maintained to minimize smoke in exhaust emissions. The vehicle
maintenance area will be located in such a way that contamination of surface soil/water by
accidental spillage of oil/diesel will not take place and dumping of waste oil should be strictly
prohibited.
One or more of the following measures may be implemented to minimize impacts on air quality
during construction and operation of the project. Face masks should be provided to prevent
inhalations of dust particle.
• It will be ensured that all the vehicles deployed for the project possess Pollution Under
Control (PUC) Certificate.
• All vehicles will be properly maintained to minimize emissions of contaminants, for this
necessary measure will be taken.
• A schedule for the operation of vehicles will be established to minimize to the extent
practicable, the time of operation of emission sources.
• Water should be sprayed by high pressure water hoses during dust generating
construction activities e.g. excavation, crushing/demolishing, concrete mixing, material
handling etc. to suppress dust.
• Wetting (sweeping or sprinkling) will be used, wherever practicable, to minimize dust
dispersion. As far as possible unleaded and Sulphur free petrol will be used for petrol
driven vehicles.
• Construction work should not be carried out during storm conditions.
The Central Pollution Control Board (CPCB) has set standards for ambient noise levels in
various activity zones. For industrial areas the daytime noise levels are not to exceed 75 dB (A)
and the night time levels 70 dB (A). In case of residential areas, the day and night standards are
55 db and 45 dB (A) respectively. Suitable conditions will be incorporated in the construction
contract agreement, to ensure compliance of these standards. The sources of noise generation
will be transportation activities, process area etc.
The following measures may be adopted to minimize the impact of noise during construction
phase of the project:
• Construction equipment generating minimum noise and vibration will be chosen.
• Ear plugs and/muffs will be provided to construction workers working near the noise
generating activities / machines / equipment.
• Vehicles and construction equipment with internal combustion engines without proper
silencer will not be allowed to operate.
• Construction equipment meeting the norms specified by EP Act, 1986 will only be used.
• Noise control equipment and baffling will be employed on generators especially when
they are operated near the residential and sensitive areas.
• Noise levels will be reduced by the use of adequate mufflers on all motorized equipment.
Following measures will be taken to minimize impact on land environment and improve soil
conditions.
(I) Earth / Construction Debris
• Excavated earth will be backfilled in the trench after foundation work and top soil will be
restored for the agricultural/ gardening purpose. The remaining excavated material will
be disposed off or spread out in low laying area.
• Precautions should be taken to minimize damage to native plants (if any) on the periphery
of construction area.
• The natural gradient of the area should be maintained after reinstatement to avoid water
logging.
• The construction debris as well as debris from demolition work will be utilized within
the site for leveling purpose and base course preparation of internal roads.
• The materials like steel and other recyclable material will be segregated and reused or
sold to authorize vendors for reuse.
(II) Topsoil Segregation
• Where topsoil is present, it is required to be segregated. The soil will be used within the
premises for filling, leveling etc. Top soil of the site will be collected at site and reused
for landscaping. Debris generated will be used for leveling. The following practices, as
regard to top soil segregation will be adhered during trenching:
• Existing topsoil which is removed during construction should be stockpiled temporarily
for replacement whenever required.
• Topsoil and sub-soil will be segregated during trenching and stockpiled separately.
• Topsoil should be removed to its actual depth or to a maximum of 30 cm as determined
by HSE representative for the spread.
• Topsoil will not be used for padding, backfill or trench breakers, under any
circumstances.
• Topsoil will be stored on the non-traffic side of the trench.
• Topsoil will not be used as fill for the trench.
Construction activities can lead to solid waste generation including sand, gravel, stone, plastic,
paper, wood, metal, glass, waste concrete, excavated soil, broken bricks, waste plaster, metallic
scrap etc. This will be segregated into biodegradable and non-biodegradable will be handed over
to authorized vendor. No trash or debris from construction activities should be left at project site
after construction is completed. The construction debris as well as debris generated due to
demolition will include Concrete; Brick bat debrisetc will be further used for leveling of low
lying areas or in preparation of sub-surfaces for roads or pavements.
To minimize adverse impacts arising out due to the project activity, mitigative measures are
suggested in the EMP. Proper implementation of EMP would mitigate adverse impacts in the
region. Prior information about the project should be given to locals in study area.
Before the activity is considered as complete by the authority, appropriate measures should be
taken to restore the project site and surrounding areas to that of pre-construction condition.
Temporary structures, equipment, surplus material and refuse should be removed from the
project site at the earliest. Land will be restored as discussed below:
• To be restore as good as pre-construction condition.
• Provision of proper drainage pattern.
• Construction debris and other wastes should be cleared from the site.
• Fences and other facilities will be repaired during this stage.
Operational activities of the project would be associated with the following potentially
significant environmental impacts. These activities associated with the impacts are listed here
under:
• Domestic waste water disposal,
• Transport of men and material,
• Storage of material and pumping,
• Chemical spills and leaks and Fire / Explosion.
The operational phase activities due to proposed project have the potential to cause long term
environmental impacts. Cumulative impacts due to the air pollution are predicted using
simulation models as discussed in chapter 4.
Several control measures have been incorporated to minimize the generation of wastes and
subsequent environmental impacts during the operational phase. Strict adherence to these
pollution prevention and control measures will be moderate the environmental impacts to the
minimum possible level during operational phase. In general, the environmental management
plan during operational phase of the plant will be directed to the following:
• It will be ensured that all the pollution control / environment management systems are
commissioned before the commencement of operation of the project.
• Wherever possible, the control systems will be interlinked with the operational units, so that
failure of the control system will shut down the respective operational unit. Regular
performance evaluation of the control systems will be undertaken to ensure their optimum
performance.
• Preventive maintenance schedule of the control systems will be matching with that of the
respective operational unit.
• Regular monitoring for various components of environment will be undertaken to ensure
effective functioning of pollution control measures as well as to safe guard against any
unforeseen changes in environment.
During the operational phase, there will not be any significant impacts on various environmental
components. Hence, the following Management Plan is recommended to mitigate adverse
impacts during operation phase:
The emissions from the existing and proposed manufacturing activities are given in Chapter 2 in
section 2.9. The possible sources of flue gas emission and process emission and fugitive
emission are as under.
TABLE: 8.1
DETAILS OF ALL EMISSIONS CONTROL MEASURES
Sr. Source Probable Pollutant Control Measures/ APCM
No. Emission
FLUE GAS EMISSION
1. Steam Boiler Air polluant Bag Filter in case of Bio-coal will
(1 TPH) (PM, SOX, NOX) be used as fuel
As per above mention flue gas, process gas & fugitive emissions their APCM are adequate.
Regular ambient air quality monitoring will be carried out within premises and near by area for
PM10, PM2.5, SOX, NOX, NH3 and VOC in the downwind directions as well as where maximum
ground level concentration are anticipated and record of the same will be maintained.
8.8.1.1 Action plan for other control process & fugitive emissions following measures are
recommended:
A. Provision of mechanical seal in pumps.
B. Regular inspection of tank roof seals.
C. Adequate measures for the minimization/prevention of the fugitive emission.
D. Regular maintenance of valves, pumps and other equipment to prevent leakage.
E. Entire process to be carried out in the closed reactors with proper maintenance of
temperature.
F. Regular periodic monitoring of work area to check the fugitive emission.
G. Adequate stack heights as per the CPCB estimation will be provided at all locations to
reduce GLCs of pollutants.
H. Greenbelt development will be implemented to mitigate impacts from fugitive emissions.
I. Air Pollution Control System will be installed in the plant.
8.8.1.2 AIR POLLUTION CONTROL MEASURES
A.BAG FILTER:
Dust contained gas by the intake into the middle, from the filter bag into the in a bag, dust is
blocked in the filter bag of the surface; purify air into the bag, again by the upper bag into the
case on, finally by the exhaust system.
FIGURE: 8.3
DIAGRAM OF BAG FILTER
B.SCRUBBER:
1. WATER SCRUBBER FOLLOWED BY ALKALI SCRUBBER
Working Process:
Stage 1: First of all mixture of un-reacted hydrogen bromide gas, hydrogen chloride gas&
hydrogen sulphide are scrubbed in water scrubber here 90-95% through re-circulation of water
and un-reacted gases go to secondary scrubbing system.
Stage 2 :In secondary scrubbing system having column and all un – reacted gases from water
scrubbing system (unabsorbed chlorine) and the unscrubbed reacted hydrogen bromide gas,
hydrogen chloride gas & hydrogen sulphide gas scrubbed here in alkali solution or caustic
solution and remaining fresh air goes to environment.
FIGURE: 8.4
Gas inlet
from
Reactor
TABLE 8.4
DETAILS OF SCRUBBER SYSTEM
Sr. Name of Units Capacity of scrubbing Quantity MOC
No. media tank
1 Water Scrubber 5KL 2 HDPE/PP FRP
2. Caustic Scrubber 5 KL 2 HDPE/PP FRP
TABLE 8.5
FEATURES OF SCRUBBER SYSTEM
TABLE: 8.6
Total effluent generation will be 29 KL/Day. Proposed industrial effluent29 KL/Day will be
treated in ETP. Treated water will be send in RO. RO permeate will be reuse and RO reject will
be send to MEE. MEE condensate will be reuse and salt will be disposed at TSDF site.
The description of effluent treatment plant process is given in Chapter-2 in section 2.7.2.
The detail Treatability study is attached as Annexure – VIII.
Water required for the proposed project will be fulfilled by GIDC water supply system. Water
conservation measures will be taken to explore possibility of reuse/recycle of water. Process
optimization, reduction, reuse and recycle of water will be carried out to minimize the impact.
Record of water consumption will be maintained for each usage.
TABLE 8.7
DETAILS OF CONTROL MEASURES FOR EFFLUENT AND SEWAGE GENERATION
Sr. Source Waste Control Measures
No. Type/Pollution
1. Process, Effluent • Adequate Effluent treatment plant having
Washing, primary.
Boiler Blow • Proper house keeping preventing contamination
Down, of ground water & storm water drainage.
Cooling • Record of hazardous waste generation during the
Tower. treatment of waste water and its disposal.
• Water conservation measures will be taken to
explore possibility of reuse/recycle of water.
• Process optimization, reduction, reuse and
recycle of water will be carried out to minimize
the impact.
• Record of water consumption will be maintained
for each usage in future.
2. Domestic uses Sewage • Sewage sent to Sock pit/ETP.
TABLE: 8.8
Capital and Recurring Cost of the effluent treatment system
Operating Cost
(Lacs/Month)
Installed Capacity
Maintenance cost
Total Recurring
Sr.
(Lacs/ Month)
(Lacs/Month)
Consumables
(Rs. in Lacs)
Unit
Chemical &
Capital cost
Manpower
Electricity
No.
(KLD)
Cost
1 ETP 30 0.2 0.5 0.15 0.3 1.15
2 RO 27 40 0.1 0.3 0.05 0.2 0.65
MEE 10 0.1 0.2 0.03 0.2 0.53
Total 40 0.3 0.8 0.2 0.5 2.23
The capital cost of the proposed project is Rs. 280 lacs, whereas total capital investment
required for effluent handling, treatment and disposal system is Rs. 40 Lacs. It comes to 14%
of the total project cost and hence it seems to be economically viable and will not affect the
overall project cost.
The recurring cost for the effluent handling and treatment as narrated in the Table 8.9 will be
Rs. 2.23 Lakh per month. Now, considering the total installed capacity of the proposed project
775 TPM, it would cost only Rs. 0.29 per kg of product. The market value of the products
proposed by the unit is ranging from Rs. 40 to 50 per kg, with the average value of 45 Rs/kg,
thus the effluent treatment and handling cost is very low compared to the product value. Also,
considering quantity of effluent to be treated, it would cost 0.31 Rs/Lit. of effluent. Thus, the
cost for operating proposed ETP viable for unit.
Pumps and reactors will be having mechanical seal, so there will be no leakages. The unit will
provide connection system for possibility of leakages. Leakages will be collected in a small pit
which will carry the leakages to effluent plant.
Possible spillages will be from vessel washing, transfer of liquids, to avoid the spillage fixed
pipeline will be provided. Vessel washing will be collected to effluent treatment plant. The unit
will provide dedicated area made with HDPE lining so that the washing can be directly sent to
ETP plant.
The products are run on campaign basis change over and washing is being avoided. Where ever
washing is required we use the high pressure jet cleaning procedure hence to reduce by ~ 35-
40%.
The sources of noise generation will be transportation activities, D.G. set, cooling tower, plant
machinery etc. The unit will take following measures to control noise pollution.
TABLE 8.9
DETAILS OF CONTROL MEASURES FOR NOISE POLLUTION
Sr. Source Waste Type / Control Measures
No. Pollution
1. Transportation Noise pollution • Green belt
activities • Restriction on transportation between 10 p.m.
to 6 a.m.
• Maintain vehicle in good condition.
2. D.G. set Noise pollution • Acoustic Enclosure/silencer,
• Engineering control,
• Provision of PPE, Green belt.
3. Plant/ Noise pollution • Maintain equipment & machines in good
Process area working condition.
(Pump & • Isolated noisy area from other area by distance
Blower) and if it is not possible than by physical
separation or noise proof valve.
• Provide silencer to safety valve, relief valve.
• Provision of PPE.
• Green belt.
• Record noise level monitoring of different
places within and outside premises,
• Periodically Audio metric test,
• Rotation of work to minimize exposure.
To minimize the noise pollution the unit proposes the following noise control measures:
• Manufacturers / suppliers of major noise generating machines / equipments like air
compressors, feeder pumps, etc. will be instructed to make required design modifications
wherever possible before supply and installation to mitigate the noise generation and to
comply with the national / international regulatory norms with respect to noise
generation. Periodic maintenance of machinery and vehicles should be undertaken to
reduce the noise impact.
• Noise suppression measures such as enclosures, buffers and / or protective measures will
be provided (wherever noise level is more than 75 dB (A)).
• Employees will be provided with Personal Protective Equipments like earplugs or
earmuffs, wherever required.
• Extensive oiling, lubrication and preventive maintenance will be carried out or the
machineries and equipments to reduce noise generation.
• The selection of any new plant equipment will be made with specification of low noise
levels.
• Areas with high noise levels will be identified and will include prominently displayed
caution boards. The green belt area will be developed within industrial premises and
around the periphery to prevent the noise pollution in surrounding area.
• Noise monitoring will be carried out to check the efficacy of maintenance schedules
undertaken to reduce noise levels and noise protection measures.
• Good quality digital sound level meter will be in place to monitor noise level.
• The sources of intermittent noise generating equipment (water pumping equipment, DG
set, compressor etc.) will be provided with appropriate acoustic barriers so that, the noise
level within 1 m of these facilities when in operation will be less than 75 dB (A) to meet
stringent MOEFCC/ CPCB norms.
• Implementation of greenbelt development / landscaping etc. will reduce noise impacts
within the project premises to a great extent.
8.8.4 MANAGEMENT OF SOLVENT RECOVERY AND EMISSION CONTROL
A solvent recovery system comprises of two stage heat exchangers. Cooling tower water is
circulated in primary heat exchanger and in secondary heat exchanger chilled water circulation is
done. The uncondensed solvent after the secondary heat exchanger will be diverted to water
scrubber the traces of solvent will get dissolved in water. On getting saturation, the solvent mix
water will be subjected for recovery of solvent (if feasible) and/or water will be diverted to ETP
plant for further treatment the process will ensure no VOC emission from solvent recovery
system.
The scrubbing system consists of a scrubber (packed column absorber), an exhaust blower and
scrubbing media circulation via pumps followed by carbon adsorption tower. The vapors coming
from the process vents and raw material storage area enters the primary scrubber where they are
absorbed in water. Thus, the air leaving from the scrubber is clean, which is again feed into the
secondary tower consists of carbon to trap any remaining VOC. The figure of scrubber system is
given below as figure. The detail of scrubber system is given below in Table no. 8.5.
TABLE 8.10
DETAILS OF WATER SCRUBBER SYSTEM FOR VOC
Sr. No. Name of Units Capacity Quantity MOC
1 Water Scrubber 5 KL 1 HDPE/PP FRP
FIGURE 8.3
FLOW DIAGRAM OF SOLVENT RECOVERY SYSTEM
VOC Vent
Cooling Tower Line
Chilled Water
Circulation Spray
Primary Secondary
Condenser Condenser
Receiver
Reactor Un
scrubbed
VOCs
Water Tank
Carbon
Adsorption
tower
The management plan for this component of environment lays emphasis on development of
greenbelt comprising of appropriately selected species of shrubs and trees. It is recommended
that plantation be made on sites, road sides, around waste treatment units. Such a development of
greenbelt and plantation of shrubs and trees will not only significantly reduce or mitigate adverse
impacts due to aerosols and gaseous pollutants, noise, odour and nuisance etc, but also serve as
shelter belts for avifauna, stabilize and improve soil permeability and aesthetic environment.
The unit will take following control measures to prevent land contamination from raw material
storage and handling.
Raw materials are stored in HDPE Tanks, HDPE bags, fibre drums, etc. in sepereate storage
room. Product and Raw material storage & handling are given in Chapter-2 in section 2.3.1 and
2.3.2.
1. Solid waste
• The paper, plastic, insulation waste will be handed over to authorized TSDF side for
further handling and disposal.
• The Fly ash waste will be handed over to authorized recycler for further handling and
disposal.
• Reuse of paper, plastic waste and garden waste.
• Planned system for waste collection, segregation and disposal.
2. Hazardous waste
• Hazardous waste will be stored in proper storage room and handed over to authorized
vendor for final disposal.
• The collection, treatment and disposal of hazardous waste will be as per Hazardous waste
(Management and Handling) Rules 2008 & 2016, and hence no adverse impact on land
environment is envisaged.
• Hazardous waste will be stored separately in dry & covered place with RCC plat form.
Forklift truck will be used in shifting, loading and unloading operation for hazardous
waste to minimize manual handling of hazardous waste.
• Necessary PPE’s will be provided to workers while handling of hazardous waste.
• The hazardous wastes generated from the industry will be residue from MEE, ETP
sludge, and spent/waste oil. The details of quantity of hazardous waste generated and
disposal facility is given in Chapter 2 in section 2.9.
METHODOLOGY FOR DECONTAMINATION
• For disposal of discarded bags and containers, the guideline provided by theGujarat
Pollution Control Board will be followed. It will be ensured that containers are empty
before taken for disposal. As per the guidelines all the containers will be washed
properly, the washings will be checked for pH and COD. The pH should be neutral and
COD should be NIL. This will ensure that the containers are cleaned before taken for
disposal. Removal or defacing of all labeling and content of all product and waste
material will be regular practice. The sticker will be put on individual container as
"cleaned". The container will be deposited in the area marked for disposal. Then the
containers will be inspected by the certifying agency approved by the GPCB. In
confirmation of the quality of the cleaning they will issue the stickers for identification.
After receiving stickers, that should be pasted on to the containers. Then the containers
are disposed off to actual raw material supplier.
The main objective of green belt is to provide a barrier between source of pollution and
surrounding area by filtering the air particulate and interacting with gaseous pollutants before it
reaches to the ground. An ideal green belt always imparts scenic beauty besides providing
roosting/perching place for birds and ground surface for naturally available reptiles, other flora
and fauna species, to make the area more natural and hazard free.
The company will developed greenbelt within area of 1089 square meter. There will be provision
of budget of 4 Lakhs rupees for green belt development. The unit will plant/rearrange 125-150
trees and shrubs in green belt area. Development of green belt with carefully selected native
plant species is of prime importance due to their capacity to reduce noise and air pollution
impacts by attenuation / assimilation and for providing food and habitat for local macro and
micro fauna. This not only overcomes the problem but also enhances the beauty of area that will
attract bird and insect species and by this way ecology of the area will maintain to a great extent.
For developing the greenbelt in and around proposed project sites care need to be taken to plant
the evergreen species. The planting of evergreen species may have certain advantages that may
reduce the environmental pollution.
TABLE 8.11
LIST OF PLANT SPECIES TO CONTROL GAS, DUST EMISSION AND NOISE LEVEL
Sr. Scientific Name Common Name Ecological Type
No. Performance*
1. Delonix regia Gulahor DC Tree
2. Azardirachta Neem CN, OGE, DC Tree
indica
3. Casuarina Saru CN, DC Tree
Equisetifolia
4. Terminalia Badam CN, DC Tree
catappa
5. Syzygium cumini Jamun, Jambu CN, DC Tree
6. Tamarindus Emali CN, OGE, DC Tree
indica
7. -- Kadam CN, OGE, DC Tree
8. Cassia siamea Kashid, Kasod CN, OGE, DC Tree
9. -- Gogan vel CN, DC Tree
*Ecological performance: CN – Control Noise level, OGE – Absorb Gas emission (Sexena
V.S. 1991) and (Abbasi & Khan 2000), DC - Dust Controller (CPCB 2007)
The proposed greenbelt development should be of a suitable width along the periphery of project
site area including unit complex, space between the units located within the project, along the
roads, storage areas, loading / unloading areas of products etc.
Criteria for Selection of Species for Greenbelt
The plant species suitable for green belt development should be selected based on the following
characteristics.
• It should have thick canopy cover
• They should be perennial and evergreen
• They should have high sink potential for pollutants
• They should be efficient in absorbing pollutants if any without significantly affecting
their growth.
Greenbelt around the project site will be developed with in initial three to five years. The green
belt around the site plantation with at least 2x2 meters per plant is proposed. Detailed budget
Break-up is given in Table 8.7.
TABLE 8.12
BUDGET FOR GREENBELT DEVELOPMENT
Work or Activity 1st Year 2nd Year 3rd Year 4th Year 5th Year Total
Plantation Technique
Following basic procedures need to be followed for greening the area.
• Since the project area fall under semi-arid condition and having poor soil quality,
plantation of tree species required approx. 1m3 pit for soil enrichment.
• Pit should be filled with imported soil with 3:1:1 the ratio of sand, silt and form yard
manure.
• Procure well grown saplings of recommended species from the nearby Forest Department
nursery.
• Make 1m diameter ring bund around the planted saplings for water retention.
• Watering of sapling is species specific, therefore watering need to be done once in 2 or 3
days for a period of five years.
• Soil wok and weeding need to be done once in a two months.
Monitoring Protocol
• The plantations need to be managed by regular watering, soil enrichment work, applying
manure, weeding and provide proper protection.
• Replacement of sapling (replanting) required whenever mortality occurs in the plantation
during the growth stage.
• Plantation requires after care for a period of minimum five years till the saplings attain
matured tree stage.
Any damage to the developed greenbelt due to any natural or cattle activity should be
redeveloped and maintained by the agency.
TABLE: 8.13
AVAILABLE RAINWATER (ANNUAL) FOR HARVESTING
Description Area in m2 Rainfall intensity Runoff Total storm water
per annum coefficient In m3/ annum
In m
Roof area 1691 0.906 0.8 1226
Total available rainwater ( in m3/ annum) 1226
TABLE: 8.14
AVAILABLE RAINWATER (MAXIMUM) FOR HARVESTING
Description Area in m2 Maximum Runoff Total storm water
Rainfall intensity coefficient In m3/ annum
In m
Roof area 1691 0.391 0.8 529
3
Total available rainwater during peak rainfall (in m /annum) 529
Rainwater collected during peak rainfall for day will be 529 m3. So, it is advised to create storage
tank of volume ~800 m3.
The proposed volume of rainwater harvesting pits can be created below parking area, green area
or roads etc. as per convenience. The stored rainwater will be utilized for various purposes hence
reducing required quantity of water.
STORM WATER MANAGEMENT
• The drains for storm water will be kept clean and dry in summer and winter. The storm water
drains will be connected to the 800 m3 underground pit. The rain water of the premises will
be collected in this underground pit through storm water drains. The collected water will be
analyzed for any contamination of pollutants for 1st and 2nd rain during monsoon. If analysis
indicates any contamination, the collected water will be diverted to ETP plant. In case of no
contamination, the collected water will be used in cooling tower and other applications.
Occupational health impact and mitigation measures to avoid health hazard are as under:
• All reasonably practical measures will be adopted by the unit to minimize the risk of accidents
within a chemical manufacturing unit.
• All building plans and installations will be as per relevant laws and approved by competent
authority.
• Training is imparted to all workers for all the hazardous process operations within the plant and
will be supervised by experienced supervisors.
• Suitable personnel protective equipments and fire extinguishers at strategic locations and
suitable personal protective equipments will be provided.
• Flame proof electrical fittings, flame arrestors etc will be installed.
• All the raw materials & solvents will be stored in designated storage area equipped with
necessary safety features.
• Physical and chemical properties of raw materials and products as MSDS are provided as soft
copy in CD.
• The solvent storage area will be restricted for unauthorized persons. Proper earthling will be
provided in all electrical equipment whenever solvent handling is done. Flame arrester cum
breather valve and flame proof fitting will be provided at tank farm.
• Periodic inspection & testing of pressure vessels, equipments, and machineries will be done.
• Good housekeeping will be ensured within the factory premises.
• All designated staff & workers will be trained for the firefighting, work permit system, first aid
and safe handballing of hazardous chemicals.
• Incident/accident reporting system will be developed and all the employees are made aware for
the same.
• Suitable notices/boards will be displayed at designated locations indicating appropriate hazard
warnings.
• Antidotes as well as MSDS for all the chemicals will be made available within the factory
premises.
• Pre-employment medical checkup at the time of employment will be carried out. In order to
safe guard the health of the employees, all the employees undergo periodic health checkup at
every six month.
In addition to the above suggested measures for management of air, water, soil, etc following
additional measures will be provided.
Energy conservation measures are often the easiest, quickest and cheapest way to reduce costs
and be environmentally pro-active. Energy conservation will be one of the focuses during
planning and operation stages. The conservation efforts would consist of the following:
a. Energy Saving Practices
• Purchase of energy efficient appliances.
• Constant monitoring of energy consumption and defining targets for energy conservation.
• Adjusting the settings and illumination levels to ensure minimum energy used for desired
comfort levels.
• Economizers will be provided to utilize heat.
• Condensate will be recovered and will send back to boiler.
• Proper temperature controls will be provided to reduce load on heating systems.
• Proper load factor will be maintained by the company.
• Company will adopt good maintenance practices and will maintain good housekeeping
which will help in better illumination levels with least number of fixtures.
• On most of roofs transparent acrylic sheets will be provided to use day light and to stop
use of lights during day time.
• CFL lamps will be provided.
• To the extent possible and technically feasible, energy efficient equipment will be
selected.
• Gravity flow will be preferred wherever possible to save pumping energy.
• Recycling of water will be done.
awareness campaigns and circulars. Specific measures that will be implemented include the
following.
(II) Management Measures
• Reduce toilet cistern volume in single flush models.
• Promote awareness on water conservation and reducing water wastage.
• Quick fixing of leaking taps, pipes and toilet cisterns; Sweep with a broom and pan where
possible, rather than hose down external areas.
Minimize water use in gardens by the following measures:
• Drip irrigation system will be used for the lawns and other green area which can save
water between 15-40% of the water use, compared with other watering techniques.
• Plants with similar water requirements will be grouped on common zones to match
precipitation heads and emitters.
• Use of low-volume, low-angle sprinklers for lawn areas.
• Select controllers with adjustable watering schedules and moisture sensors to account for
seasonal variations and calibrate them during commissioning.
• Selecting a drought resistant grass.
(III) Water Saving Investments
• Reduce water delivery in taps and showers, through the installation of low flow devices
or aerators on showerheads.
• Spring-loaded taps;
• Installation of sub-meters on key areas of water use – monitoring water use is a precursor
for management and Water Efficient Plumbing Fixtures
Parking space for vehicles will be provided for loading and unloading products. Adequate roads
to cater to two way traffic and to meet the fire regulations are planned in the complex.
• One gate for entry and exit will be provided with 7m wide approach roads.
• Convex mirror placed along all critical points for visibility.
• Adequate Ramp Feeds will be provided.
• Zebra crossings will be provided on the existing road for pedestrian access.
• Entry and exit will be managed by security personnel who will also regulate traffic.
• Thus the traffic management will be easily and smoothly monitored without any
hindrances to the regular flow of traffic on the main road.
• All designated staff & workers will be trained for the fire fighting, work permit system,
first aid and safe handballing of hazardous chemicals.
• Incident/accident reporting system will be developed and all the employees will be made
aware for the same.
• Suitable notices/boards will be displayed at designated locations indicating appropriate
hazard warnings.
• Antidotes as well as MSDS for all the chemicals will be made available within the
factory premises.
• Pre-employment medical check up at the time of employment will be carried out. In order
to safe guard the health of the employees, all the employees undergo periodic health
checkup at every six month.
8.10 FINDINGS
From the foregoing sections it is clear that environmental considerations are foremost during
development of the project, at all the following levels:
(1) Planning and design (2) Post project operations
The following findings are to be mentioned:
• The project will have no significant environmental impacts during operations.
• Project risks will be minimized through rigorous enforcement of national design and
operational standards.
• The environmental and safety aspects of the project are straightforward and well
understood.
• A detailed environmental impact study is carried out and EMP. No further studies are
required to elaborate these subjects.
The EMP also provides for establishing, and maintaining a system of environmental monitoring
and auditing to ensure strict compliance of all the measures identified in the EMP, and minimize
adverse environmental and social impacts.
8.11 CONCLUSION
The project proponent will follow all the statutory norms and guidelines as per Environmental
Protection Agency, 1986 to safeguard environment.
None of the routine activities will cause any noticeable impact on any component of the
environment, including the socio-economic component. Provision of green belt and energy
conservation will be further facilitating in overall scenario management of Environment.
Thus, it can be concluded on a positive note that after the implementation of the mitigation
measures and Environmental Management Plan, the proposed project will be negligible impact
on environment and will benefit the local people and economy.
CHAPTER – 9
EXECUTIVE SUMMARY& CONCLUSION
9.1 INTRODUCTION
M/s. Om Shiv Industries (formaly Known as M/s. Aims Indstries Ltd.) is located at Plot
No. 915, Near Gayatri Chemical, Panoli, Dist: Bharuch, State: Gujarat. M/s. Aims Indstries
Ltd. was doing work of refilling oxygen cylinder for medical and corporate at plot no. 915.
There is minor construction i.e. Security building, Admin house, 4-5 rooms. M/s. Om Shiv
Industries has proposed for manufacturing of API intermediates, organic & inorganic
chemicals 775 MT/Month. The production capacity of all products and by products is given
in Table 1.1 of Chapter 1.
9.1.1 LOCATION
The project site is located at Plot No. 915, GIDC Estate Panoli, Ankleshwar, Dist:-
Bharuch, in the state of Gujarat which is one of the fastest growing industrial estate and
having all the essential facilities & infrastructure for the management & disposal of effluent
discharge. It is approximately 16 km distance from Dist.: Bharuch.
Panoli is a very important industrial center having the advantage of close proximity to
Ankleshwar & Bharuch. Due to NH-8 and Bharuch railway station, GIDC is well
connected by road and rail to rest parts of the country. Communication facility available
in the area is good.
9.1.2INVESTMENT
The company premises are already established in 3089 square meter of total land. The
additional investment for proposed expansion will be Rs. 250Lacs.
9.1.3INFRASTRUCTURE FACILITIES
The project proponent did not consider any other alternative site for proposed PROJECT. A
letter of land allotment from GIDC of industrial plot no 915, is attached as Annexure - III.
The total plot area of the unit is 3089sq. m. The green belt area will be 1089 square meter.
The plant layout is attached as Annexure – V. The photograph of existing plant area is
attached as Annexure - VI.
Panoli industrial association (PIA) has set up a disaster management cell to take care of any
disaster in the vicinity. A common effluent treatment plant (CETP) is established and
operated by M/s. PanoliEnviro Technology Ltd. (PETL). There is Common Hazardous
Waste Storage Site established and operated by M/s.BEIL at GIDC, Ankleshwar. The
present unit will utilize this TSDF facility.
Final effluent treatment plant (FETP) of M/s. Narmada Clean Tech (NCTL), formally
known as M/s. Bharuch Eco-Aqua Infrastructure Ltd. (BEAIL), Ankleshwar, is
available for further treatment and disposal into deep sea.
M/s. Om Shiv Industries has proposed for manufacturing of API intermediates, organic &
inorganic chemicals775MT/Month.
India’s pharmaceutical exports stood at US$ 16.4 billion in 2016-17 and are expected to
grow by 30 per cent over the next three years to reach US$ 20 billion by 2020, according to
the Pharmaceuticals Export Promotion Council of India (PHARMEXCIL).
Looking toward the increasing day by day API Intermediates demand and having well
experience. Unit have decided to manufacture API Intermediates.
LAND
The total plot area of the unit is 3089sq. m. The green belt area will be 1089 square meter.
WATER REQUIREMENT
Total water consumption will be 63 KL/day (35.5 KL/day of fresh water + 27.5 KL/day of
recycled water).
ENERGY REQUIREMENT
The connected load will be 150 KVA.It will be meet through Daxin Gujarat Vij Company
Limited.
UTILITIES
Total effluent generation will be 29 KL/Day. Proposed industrial effluent will be treated in
unit’s own ETP. ETP treated water will be send to RO. RO permeate will be reuse and RO
reject will be subjected to MEE. MEE condensate will be reuse and MEE salt will be
dispose at TSDF site. Sewage generation will be 4 KL/Day send to soak pit/septic tank.The
details of waste water generation are given Table 2.18 of chapter 2.
GASEOUS EMISSION
Flue Gas Emission:
A common stack will be attached to Boiler (1 TPH, Natural Gas/ Biocoal based) and
Thermic Fluid Heater (TFH) (2, 50,000 Lack K cal/hr, Natural Gas/ Bio coal based). A
stack attached to 250 KVA D.G. Set.
Process Gas Emission:
There will be each stack attached to two Fluid bed Dryer. Each vent will be attached to
three reactors to scrub H2S, HCL, HBr and Br2. To control the process emission from the
stack, bag filter will be attached to proposed stack as APCM.
The following type of hazardous waste will be generated from the operational activities.
All the waste will be stored separately in a designated storage area. The details of
hazardous waste are given in Table 2.22 of Chapter 2.
The collection, treatment and disposal of hazardous waste will be as per Hazardous and
Other Wastes (Management and TransboundaryMovement) Amendment Rules, 2016, and
hence no adverse impact on land environment is envisaged.
Studies were carried out in about 10 km radius area from the project site with respect to
meteorology, flora, fauna, land and socio-economies of the area. Further sampling and
analysis of air quality, water quality, noise level and soil quality were carried out. The base
line data were monitored for study period of March 2017 to May 2017. The study team
conducted site surveys and field experiments to gathering the information on air quality,
water quality, noise quality and soil quality.
Relative Humidity
The maximum relative humidity reported around 86% and minimum relative humidity is
reported around 3% during period of March 2017 to May 2017.
Temperature
The maximum temperature is reported 45.3oC and the minimum temperature is reported
21oC during period of March 2017 to May 2017.
Rainfall
The maximum rain fall is reported zeroand the minimumrain fall is reported is zeroduring
period ofMarch 2017 to May 2017.
Wind
It was observed that wind is blowing mainly towards the SW direction from NE. average
wind speed was 2.90 m/s with calm winds recorded to be 5.97%.
The basic objective of collection of base line data for air environment is to identify
project specific air pollutants being released into atmosphere, which will have significant
impact on air environment of immediate locality of the proposed project site. For
assessment of the baseline data it is important to specify the study area in respect of the
location of the proposed project. It was decided to the study ambient air quality at 8
locations in the different direction in probable impact zone including the project site.
Based on data obtained, it could be stated that the value of all parameter were found within
the permissible limit of Indian standards for all ground water samples and surface water
samples.
The noise levels during daytime varied from 48-53dB (A) Leq to 53-72 dB (A)Leq in the
study area. The noise level in the study area is within the permissible Limits as per Noise
rules 2000.
The night time noise level in the study area is in the range of 37-47dB (A) Leq to 45-53dB
(A) Leq. The night time noise was also within stipulated standards of CPCB.
9.3.6SOIL
On data obtained, it is ensured that the soil quality at around site is appropriate and no
abnormality in terms of soil contaminants is reported.
As per satellite imagery, major land use of study area of10 km is covered by80.32
Square Meter of Agricultural land, 135.48 Square Meter ofFallow land, 31.34Square
Meter ofHabitation, Settlement, 0.20Square Meter ofMarshy Land, 28.44 Square Meter
of Miscellaneous Land, 1.98 Square Meter of degraded vegetation,2.36 Square Meter of
water, 33.37Square Meter of open/barrel land, and0.74 Square Meter of River.
Bharuch area is characterized by tropical dry deciduous forests. The total forest area of
district is 1449. 68 sq. km. That accounts for 0.73 % of the total geographical area of the
district.The study area does not have any identified endangered species and also does not
have any designated forest, national park, sanctuaries.
Total effluent generation will be 29 KL/Day. Proposed industrial effluent will be treated in
unit’s own ETP. Sewage generation will be 4 KL/Day send to soak pit/septic tank.Water
required for the proposed project will be fulfilled by GIDC water supply system. Water
conservation measures will be taken to explore possibility of reuse/recycle of water.
Process optimization, reduction, reuse and recycle of water will be carried out to minimize
the impact. Record of water consumption will be maintained.
9.4.2 AIR ENVIRONMENT
Dust, NOX, SOX, VOC and HC may be slightly released into the local ambient air due to
construction activities and vehicular traffic movement in construction activities of proposed
project.
There will be emission of PM, SOX, NOX from Boilers, TFH and D.G. Set stacks and
emission of H2S,HCl, HBr, Br2 and PMfrom process stacks.
From the dispersion modeling studies It was observed that wind is blowing mainly towards
the SW direction from NE. average wind speed was 2.90 m/s with calm winds recorded to
be 5.97%.
Themaximum ground level concentration occurs in the North East direction. The maximum
incremental increase in concentration for PM, NOx and SO2 is 2.811 µg/m3, 1.486 µg/m3
and 2.067 µg/m3 respectively at a distance of about 1 km in the North East direction.
Whereas, the maximum incremental increase in concentration for HCl, H2S, Cl2, HBr and
Br is 0.04 µg/m3, 0.04 µg/m3, 0.01 µg/m3, 0.01 µg/m3 and 0.004 µg/m3 at a distance of
about 1 km in the North East direction.
Noise will be generated during the intermittent operation of machineries for site clearing
and construction work and also during vehicular movement. There will be short term,
localized and reversible impact on ambient noise levels during the construction activities.
Other sources of noise pollution will be boilers, diesel generator and other noise generating
units.
Adequate noise control measures such as mufflers, silencers at the air inlet/outlet, anti-
vibration pad for equipment with high vibration etc. is already provided. Housing/casing
shall be provided for all noise generating machines. Job rotation will reduce exposure to
some extent. More ever, PPE like earmuff and ear plugs is provided to the operators/worker
exposed to high noise. The green belt is further helpful in reducing the ambient noise level.
It is existing unit and it is already located in GIDC, Ankleshwar. Local workers will be
engaged for construction activities. So, the construction phase will not involve any
temporary housing. The hazardous solid waste generated during construction activity will
be stored and disposed properly. The unit has sanitation facility and sewage will be sent to
STP for treatment. Hence, there will be no significant adverse impact on land environment
due to handling of hazardous solids waste.
The unit has closed hazardous waste storage area with impervious flooring. Transportation
of hazardous waste to the TSDF site is governed as per the Hazardous Waste
(Management, Handling and Trans Boundary Movement) Rules 2016. Separate collection
system is provided for collection of spillage material. Impervious layer, RCC roads and
flooring is provided to area, where the chemical storage and handling activities will be
involved. Separate storm water collection system is provided to prevent contamination of
soil through contaminated water. The unit is following Standard Operating Procedure
(SOP) for storing and handling of hazardous wastes.
The project site is located within the GIDC .The project site is manufacturing unit. Since,
the project is established on a non-agriculture land, it will not to alter the crop production
of the area. The project site is at a far distance from sanctuaries and national parks. The
patches of protected forest and reserved forest are found within study area but it is not
affected by the project. The waste water generated from the process and domestic activity
will be properly treated and reused in cooling tower. There will be no impact on fisheries
and aquatic life as it is zero discharge unit. Hence, no adverse impact on this account is
anticipated.
The plant is located in a GIDC, Ankleshwar having all essential facilities such as water,
power, post, rest room, sanitation and telecommunication. There is a well laid down broad
roads already existing in GIDC, Ankleshwar. At the full capacity of production, there will
be 5-7 taker/trucks per day for transportation of raw material and finished good products.
This will have DGVCL is having large amount of electricity production thus due to extra
consumption of electricity no adverse impact of electricity supply is predicted. Almost
negligible impact on road network.
D.G set are standby facility. Their monitoring will be done by external monitoring agency
whenever it will be in running condition.
The unit will carry out three month monitoring of ambient air, process emission and
fugitive emission. Noise monitoring will be done at the interval of threemonth. Waste water
will be monitored daily. Hazardous waste will be monitored at every one year.
Fire, explosion, toxic release or combinations of them are the hazards associated with
industrial plants using hazardous chemicals. The risk assessment study including
identification of hazard, consequence analysis, recommendation based on consequence
analysis etc are covered in chapter-6.
The unit has developed the emergency management system to tackle the emergency
situation. The detail of disaster management system is discussed in the section 6.2.
Details of occupational health and safety are covered in topic 6.7. It covers planning at
construction & erection stage and operation & maintenance stage. Also, other details like
hospital facilities, FMO, OHC, Ambulance van, First aid box, periodical medical
examination, and work place monitoring plan, safety plan, safety organization, safety circle
and safety training.
The company is committed for contribution of funds and provides the services for the
upliftment of local community in the nearby villages. The detail of budgetary allocation for
socio economic activity is covered in section 7.4.
The unit has planned to spend 5 % of the total cost of the proposed project (Rs.250Lakhs)
over a period of five years towards CSR activity. So, as per the project cost Rs. 12.5 Lakhs
used for five year in the CSR activities.
M/s. Om Shiv Industries has assigned responsibility to officers from various disciplines to
co-ordinate the activities concerned with management and implementation of
environmental control measures.
The unit has planned to revise environment policy to fulfill corporate environment
responsibility.
The control measures proposed by the unit to minimize the pollution load are as under:
1) Sprinkling of water over paths, land, and along the temporary roads.
3) Movement of vehicles like truck, Dozer, Cranes. Restrict movement of vehicle between
10 p.m. to 6 a.m.
4) Wastes from construction equipment: Avoid spillage, proper storage, disposal by selling
to re processor, Proper storage, and disposal by selling to authorize buyers/incineration.
WATER
The details of waste water generation are given Table 2.18 of chapter 2 and the treatment is
given in topic no. 2.8.2 & 2.83 of chapter 2.
NOISE
Audio metric test should be conducted periodically for employees working close to the
high noise sources. D.G. set will be sound proof and located in an enclosure. Adequate
noise control measures such as mufflers, silencers at the air inlet/outlet, anti-vibration pad
for equipment with high vibration, earmuff and ear plugs to the operators, etc. shall be
provided. Rotation of work will minimize exposure.
LAND
Raw materials will be stored in M.S tanks, S.S tank and HDPE Carboys, HDPE bags,etc in
sepereate storage room. All the raw effluent storage tanks will be covered with RCC slab.
Separate collection system is provided for collection of spillage material. Impervious layer,
RCC roads and flooring is provided to area, where the chemical storage and handling
activities is involved. The acid tanks are provided with dyke wall to control spread of
leakages.
The hazardous wastes generated from the industry are ETP waste from ETP, discarded
containers/ bags /liners from raw material handling and used oil from maintenance of
engineering unit. This will be properly stored in a hazardous waste storage area and then
transported and properly disposed. The unit will take same precautions for the hazardous
wastes which will be generated after proposed expansion.
GREEN BELT
The company has existing green belt in plot no.906/23, after expansion703sq.m green belt
area which is approximately 22.75%of the total land area 3089 Sq. m. will be utilized for
green belt development. There will be provision of budget of 4 Lakhs rupees for green belt
development .The unit will total plant/rearrange 40 trees and shrubs in green belt area.
Energy conservation measures are often the easiest, quickest and cheapest way to reduce
costs and be environmentally pro-active.
MANAGEMENT OF TRAFFIC
Parking space for vehicles will be provided for loading and unloading products. Adequate
roads to cater to two way traffic and to meet the fire regulations are planned in the
complex.
There will be provision of PPE, antidotes, periodic inspection & testing of pressure vessels,
equipment, machineries, pre-employment medical checkup, periodic health checkup,
training of firefighting, work permits system, first aid, safe handling of hazardous
chemicals and integrating safety. Hazardous processes will be operated by trained workers
and will be looked after by qualified & experienced supervisors.
Public Hearing has been exempted for the industrial project within GIDC Area.
9.11 CONCLUSION
The project proponent will follow all the statutory norms and guidelines as per EPA, 1986
to safeguard environment.
Wastewater generated from the proposed project will be collected & send for treatment in
to CETP.
The project will generate employment opportunities during construction stage and also at
operation stage. The standard of living of local people due to employment is likely to be
better, so we may say that it is positive socio-economic impact. The overall the project will
have positive impact for socio-economic and cultural development.
CHAPTER -10
1) Received Gujarat Cleaner Production Award for CP work at M/s. The Ankleshwar
Poly Dyestuff Pvt. Ltd. on 5th June, 2006 from Chief Minister Mr. NarendraModi.
2) Received contract from UNIDO, Vienna, for writing PDD and developing new
methodology for sulphuric acid project.
4) Engaged in creating cluster base recycling unit of spent sulphuric acid to pure
sulphuric acid.
5) UNIDO, VIENNA has also assigned work to find out alternative Air oxidation
technology in place of nitric acid oxidation technology to reduce Green House gas
emission.
6) Clean Technology tie up with following companies: (i) for recovery of sulphuric acid
from spent sulphuric acid – M/S Aker Kvaerner Chemetics, Canada. (ii) Destruction of
hazardous waste using Plasma Technology, PEAT International, USA.
(iii) Catalytic Air Oxidation in place of Nitric acid oxidation, M/S Buss Chem Tech AG,
Switzerland (iv) CDM consultancy , BSS, Switzerland
7) Received contract from UNIDO, Vienna, for writing PDD and developing new
methodology for Air Oxidation Technology.
8) The organisation wrote two methodologies and Project Development Document (PDD)
and submitted to UNFCCC. The working committee of UNFCCC approved the
methodologies. They are for recovery of sulphuric acid from spent sulphuric acid and
substitution of incineration with Plasma Technology.
Our associate for Air Pollution Monitoring & Control, Air Quality modelling & prediction
is Dr. KhyatiChanana, Enviro Technologies, Vadodara
Our associate for safety & risk assessment for, Health &Hygine, Risk &Hazard is Mr.
NileshJogal, JogiSafeteck, Surat.
The organization has obtained stay order from the Honorable High Court of Gujarat. The
copy of the stay order is attached as Annexure-XVIII. The cases from various high courts
of the countries are transferred to Hon. Supreme Court. It is further declared that at the time
of submission of EIA report, the stay order is valid.
320
321
ANNEXURE - 2- STANDARD TOR OF SEIAA.
322
323
324
325
326
327
328
ANNEXURE - 3- LAND PASSASION DOCUMENT
329
330
ANNEXURE-4-SURVEY OF INDIA TOPOSHEET
331
STAMP OF APPROVAL
GATE GATE
5.00 5.00
I-4mt.X PARKING F
4.00
4.00
4mt.
18mt.X4mt.
4.00 G 18.00
15.00
NAME SIZE SQ.MT.
15mt.X10mt.
BLOCK A 15.0X10.0 150.00
GREEN BELT
ADMIN + 10.00
PARKING 18.0X4.0 72.00
5mt. WIDE R.C.C. ROAD
10.00
SPACE
A 15mt.X10mt. TOTAL
20.00
3089.00
AREA
15.00
MEE N
20.00
7.00
PLANT -B PLANT-E
15.00
STORAGE-H DIS.-BHARUCH
7mt.X5mt.
B 7.00 E SIGN OF PARTNER
15.00
15.00
10.00
12.00
C
D
333
ANNEXURE - 7- GIDC WATER PERMISSION LETTER
334
ANNEXURE - IX - MONITORING SAMPLING DATES
Ambiant Air Project Site Kharod Panoli Nana Borsana SANJALI Umarwada Bakrol Bhadi
Sr. No. (A1) (A2) (A3) (A4) (A5) (A6) (A7) (A8)
1 02.12.2016 02.12.2016 10.12.2016 12.12.2016 12.12.2016 12.12.2016 07.12.2016 12.12.2016
2 07.12.2016 07.12.2016 12.12.2016 09.12.2016 09.12.2016 10.12.2016 12.12.2016 10.12.2016
3 12.12.2016 12.12.2016 10.12.2016 14.12.2016 14.12.2016 12.12.2016 13.12.2016 12.12.2016
4 16.12.2016 16.12.2016 14.12.2016 18.12.2016 18.12.2016 17.12.2016 19.12.2016 17.12.2016
5 20.12.2016 20.12.2016 19.12.2016 21.12.2016 21.12.2016 23.12.2016 19.12.2016 23.12.2016
6 24.12.2016 24.12.2016 23.12.2016 26.12.2016 26.12.2016 24.12.2016 23.12.2016 24.12.2016
7 28.12.2016 28.12.2016 26.12.2016 28.12.2016 28.12.2016 27.12.2016 24.12.2016 27.12.2016
8 31.12.2016 31.12.2016 29.12.2016 30.12.2016 30.12.2016 28.12.2016 27.12.2016 28.12.2016
9 02.01.2017 02.01.2017 02.01.2017 10.01.2017 10.01.2017 11.01.2017 06.01.2017 11.01.2017
10 11.01.2017 11.01.2017 06.01.2017 07.01.2017 07.01.2017 07.01.2017 09.01.2017 07.01.2017
11 06.01.2017 06.01.2017 09.01.2017 10.01.2017 10.01.2017 11.01.2017 14.01.2017 11.01.2017
12 07.01.2017 07.01.2017 13.01.2017 16.01.2017 16.01.2017 14.01.2017 17.01.2017 14.01.2017
13 11.01.2017 11.01.2017 14.01.2017 20.01.2017 20.01.2017 18.01.2017 21.01.2017 18.01.2017
14 14.01.2017 14.01.2017 17.01.2017 23.01.2017 23.01.2017 21.01.2017 24.01.2017 21.01.2017
15 18.01.2017 18.01.2017 21.01.2017 25.01.2017 25.01.2017 27.01.2017 28.01.2017 27.01.2017
16 21.01.2017 21.01.2017 24.01.2017 28.01.2017 28.01.2017 30.01.2017 28.01.2017 30.01.2017
17 01.02.2017 01.02.2017 02.02.2017 06.02.2017 06.02.2017 07.02.2017 11.02.2017 07.02.2017
18 11.02.2017 11.02.2017 11.02.2017 09.02.2017 09.02.2017 11.02.2017 08.02.2017 11.02.2017
19 07.02.2017 07.02.2017 08.02.2017 11.02.2017 11.02.2017 14.02.2017 13.02.2017 14.02.2017
20 11.02.2017 11.02.2017 11.02.2017 15.02.2017 15.02.2017 18.02.2017 16.02.2017 18.02.2017
21 13.02.2017 13.02.2017 14.02.2017 23.02.2017 23.02.2017 20.02.2017 21.02.2017 20.02.2017
22 16.02.2017 16.02.2017 18.02.2017 25.02.2017 25.02.2017 25.02.2017 23.02.2017 25.02.2017
23 18.02.2017 18.02.2017 20.02.2017 27.02.2017 27.02.2017 28.02.2017 25.02.2017 28.02.2017
24 21.02.2017 21.02.2017 22.02.2017 29.02.2017 29.02.2017 30.02.2017 28.02.2017 30.02.2017
Project Site Kharod Panoli Nana Borsana Sanjali Umarwada Bakrol Bhadi
Location
(A1) (A2) (A3) (A4) (A5) (A6) (A7) (A8)
Noise 07.01.2017 11.01.2017 14.01.2017 11.01.2017 09.01.2017 12.01.2017 13.01.2017 10.01.2017
Project Site Kharod Panoli Nana Borsana Sanjali Umarwada Bakrol Bhadi
Location
GW1 GW2 GW3 GW4 GW5 GW6 GW7 GW8
Ground Water 07.01.2017 10.01.2017 11.01.2017 11.01.2017 12.01.2017 07.01.2017 07.01.2017 10.01.2017
Project Site Kharod Panoli Nana Borsana Sanjali Umarwada Bakrol Bhadi
Location
SW1 SW2 SW3 SW4 SW5 SW6 SW7 SW8
SurfaceWater 10.01.2017 11.01.2017 02.01.2017 12.01.2017 11.01.2017 10.01.2017 13.01.2017 10.01.2017
Project Site Kharod Panoli Nana Borsana Sanjali Umarwada Bakrol Bhadi
Location
S1 S2 S3 S4 S5 S6 S7 S8
Soil Sample 02.01.2017 10.01.2017 14.01.2017 16.01.2017 19.01.2017 12.01.2017 13.01.2017 10.01.2017
335
ANNEXURE - 9- EHS POLICY
336
337
ANNEXURE - 10- MEE OFFER
Techno Commercial
Offer of
Single Effect Evaporator
for
3
10 M /day
SUBMITTED TO:
By
INDEX
339
Page 2 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Om Shiv Industries,
Plot No. 915, Near Gayatri Chemical,
Panoli GIDC, Dist. Bharuch
Mobile: +91- 8155067212
E-mail: kalyani_kadlag@yahoo.co.in
Dear Sirs,
We thankfully acknowledge receipt of your inquiry. We are enclosing hereunder our detailed offer of
Single Effect Forced Circulation Evaporator for your kind perusal.
We wish to inform you that we have pilot plant facility of Double Effect Forced Circulation Evaporator
having 400 Kg/hr water evaporation capacity. We can conduct trial of your feed liquor to establish
desired results. We are also enclosing herewith photographs of our pilot plant facility.
We also wish to inform you that we have pilot plant facility for ATFD too. Water Evaporation capacity of
ATFD of 50 Kg/hr.
1. Technical datasheet
2. Scope of Supply
3. Material break up & Price Bid
4. Terms & Conditions
5. P & ID
6. Mass Balance
7. Brochure
We hope you will find our offer reasonable and in line with your requirement. For any query pl. feel free to
contact to us.
Thanking you,
Pranay Bidwalkar
(+91 8980028338)
340
Page 3 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Page 4 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Photographs of Installation
342
Page 5 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
343
Page 6 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
344
Page 7 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
345
Page 8 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Proposed Evaporator is Single Effect Forward Feed Evaporator which means feed will enter in 1st Effect and
concentrated outlet will be withdrawn from 1st Effect. Feed will be concentrated in one stage. Calandria
and Vapour Separators are installed separately and they are connected through circulation lines.
Vapour Thermo Compressor is attached to the 1st Stage Calandria. Live and saturated motive steam will be
fed to Thermo Compressor. Suction of the Thermo Compressor is connected to the vapour separator of 1st
Stage from where fixed amount of water vapours will be sucked. Discharge of Thermo compressor will
have mixture of motive steam and water vapours. This discharge is connected to the shell side of 1st Stage
Calandria.
Evaporated water vapours from 1st Stage Vapour Separator will be condensate in Surface Condenser.
Partial amount these water vapours have already been sucked by Thermo Compressor.
Condensate from 1st Stage Calandria will go to the suction of condensate pump. Discharge from
Condensate Pump will be collected in Condensate Pot. Similarly, condensate from surface condenser will
also be collected in the same condensate pot through barometric sealed pipe line.
Vacuum is generated through Vacuum Pump in whole system. Non condensable lines are provided in each
stage for removal of non condensable.
346
Page 9 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
First Stage Calandria shall receive vapour from vapour separator through most efficient thermo compressor (TVR)
system. Subsequent stage calandrias will receive vapours from previous vapour separators.
Circulation Pumps:
This is a centrifugal pump/axial flow pump with very high flow rate & low head. This pump will be used for re-
circulating the liquid mass within the same stage of the evaporator. The pump will have mechanical sealing
arrangement with stuffing box and will be coupled to an electric motor of suitable horse power rating.
Vapour Separator:
Vapour Separator shall separate the condensate from vapour and shall be placed above the calandria with suitable
vapour ducting having tangential inlet. Separator shall have manhole cover, product outlet, vapour outlet,
temperatures dial gauge, vacuum gauge, light and sight glasses etc.
Condenser:
This will be surface type, connected from I Effect vapour separator. The condenser shall be completed with water
inlet/ outlet connection with matching flanges, Vacuum connection, sight glass etc.
Vapour Ducting:
This will be made of suitable thickness for inter connecting calandria, vapour separator, condenser, TVR etc.
Product Piping:
Complete with necessary pipes, bends, tees, valves, pipe supports etc. For inter connecting feed pump, calandria,
circulation pump, noncondensable gas lines etc.
Local Mountings:
Pressure gauge for steam indicator before TVR. Temp.dial gauge for calandria, Vapour separator, condenser water
inlet/outlet, product inlet to the calandria. Pressure/Vacuum gauges on vapour separator and calandria.
347
Page 10 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
348
Page 11 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Utility Requirement:
349
Page 12 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Material Balance
Water Evaporation:
480 Kg/hr
Steam Consumption:
391 Kg/hr
Page 13 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
351
Page 14 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
1. SS Plate : Jindal
2. MS Plate : Essar/SAIL
3. Tubes : Inox/Pars Bhavani/Scoda
4. Pumps : JEC
5. Vacuum Pump : PPI
6. Valves : Marck/ Hawa Control/Linnet
7. Motors : Crompton/ ABB/ Siemens
8. Vacuum Gauges : Air Master/Instonnic
9. Temperature Gauges : Air Master/Instonnic
10. Pressure Gauges : Air Master/Instonnic
352
Page 15 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Scope of Work
Client’s obligation
353
Page 16 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Delivery : 10 to 12 weeks from the date of receipt of order clear in all technical / commercial
aspects.
Payment : 40% Advance & Balance 60% against Performa Invoice prior to dispatch.
Inspection : Inspection can be held by you / your representative at our works prior to dispatch.
Guarantee : The offered equipment/s is guaranteed for trouble free operation, mechanical
workmanship and material for a period of 12 months from the date of commissioning
or 18 months from the date of dispatch, whichever is earlier. The guarantee is valid
subject to regular preventive maintenance of plant by you.
The standard guarantee clause of original manufacturer shall be applicable for all the
bought out items like blowers, motor, pumps, instruments etc., The guarantee shall
not be applicable for consumable ,Mechanical Seals / rubbers / plastics / glass
/electrical / electronic items / rotary equipment, etc.
Performance guarantee dependence upon design parameter specified in the offer and
is valid / applicable if and only if operating parameters are maintained as specified in
our offer. Any deviation in design parameter will result in deviation in terms of
performance.
354
Page 17 of 18
Ref No. : OFFER/3520/Rev – 00
Date: March 17, 2018
------------------------------------------------------------------------------------------------------
Cancellation : After finalization of contract, buyer does not reserve the right to cancel this order at
its sole discretion whatsoever may be the reason. If such situation arises then buyer
will make full payment as per contract value to Jet Vacuum before cancelling order.
Validity : 45 days.
Pranay Bidwalkar
355
Page 18 of 18
ANNEXURE - 11- BEIL CERTIFICATE
356
357
ANNEXURE-12-PROPONENT UNDERTAKING
358
ANNEXURE - 13 - HIGH COURT ORDER
359
360
361
362
5/5/2017 Case Detail
Office Details
Court Fee on
S. No. Filing Date Document Name Advocate Name Document Details
Document
1 30/03/2016 VAKALATNAM A ANSHUL N SHAH ADVOCATE 0 ANSHUL N SHAH(8540) for
for PETITIONER(s) 1 P:1 - 12
2 30/03/2016 VAKALATNAM A M R NILESH P SHAH ADVOCATE 5 M R NILESH P SHAH(3215)
for PETITIONER(s) 1 for P:1 - 12
363
3 30/03/2016 M EM O OF M R NILESH P SHAH ADVOCATE 100 M R NILESH P SHAH(3215),
http://gujarathc-casestatus.nic.in/gujarathc/casedetail_1.jsp 1/4
5/5/2017
3 30/03/2016 M EM O OF M R NILESH PCase
SHAHDetail
ADVOCATE 100 M R NILESH P SHAH(3215),
PETITION/APPEAL/SUIT for PETITIONER(s) 1 ANSHUL N SHAH(8540),
for P:1 - 12
4 01/04/2016 ADDITIONAL FEE ON M R NILESH P SHAH ADVOCATE 500 M R NILESH P
M EM O OF for PETITIONER(s) 1 SHAH(3215),ANSHUL N
APPEAL/PETITION/SUIT SHAH(8540) for P:1 - 12
Linked Matters
S.
CaseDetail Status Name Disposal Date Action/Coram
No.
1 SPECIAL CIVIL PENDING - -
APPLICATION/17039/2016 HONOURABLE THE CHIEF JUSTICE M R. R.SUBHASH
REDDY
HONOURABLE M R.JUSTICE VIPUL M . PANCHOLI
Court Proceedings
Notified Board
S. No. CourtCode Stage Action Coram
Date Sr. No.
1 05/04/2016 1 6 URGENT ADM ISSION (FRESH FIXED NOTICE HONOURABLE THE CHIEF JUSTICE
M ATTERS) M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
2 13/06/2016 1 31 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
3 04/07/2016 1 35 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
4 21/07/2016 1 55 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
5 14/09/2016 1 119 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
6 05/10/2016 1 119 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
M . PANCHOLI
9 19/12/2016 1 88 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
10 20/01/2017 1 69 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
11 21/02/2017 1 50 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
12 14/03/2017 1 86 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
13 20/04/2017 1 109 NOTICE & ADJOURNED NEXT DATE HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
14 03/07/2017 1 - NOTICE & ADJOURNED HONOURABLE THE CHIEF JUSTICE
M ATTERS M R. R.SUBHASH REDDY
HONOURABLE M R.JUSTICE VIPUL
M . PANCHOLI
Available Orders
S. Order
Case Details Judge Name CAV Judgement Questions Transferred Download
No. Date
1 SPECIAL CIVIL HONOURABLE 05/04/2016 N ORDER - Y
APPLICATION/5312/2016 Download
THE CHIEF
JUSTICE M R.
R.SUBHASH
REDDY
HONOURABLE
M R.JUSTICE
VIPUL M .
PANCHOLI
2 SPECIAL CIVIL HONOURABLE 21/07/2016 N ORDER - Y
Download
APPLICATION/5312/2016 THE CHIEF
JUSTICE M R.
R.SUBHASH
REDDY
HONOURABLE
M R.JUSTICE
VIPUL M .
PANCHOLI
3 SPECIAL CIVIL HONOURABLE 18/11/2016 N ORDER - Y
Download 365
APPLICATION/5312/2016 THE CHIEF
http://gujarathc-casestatus.nic.in/gujarathc/casedetail_1.jsp 3/4
5/5/2017 Case Detail
JUSTICE M R.
R.SUBHASH
REDDY
HONOURABLE
M R.JUSTICE
VIPUL M .
PANCHOLI
4 SPECIAL CIVIL HONOURABLE 20/01/2017 N ORDER - Y
APPLICATION/5312/2016 Download
THE CHIEF
JUSTICE M R.
R.SUBHASH
REDDY
HONOURABLE
M R.JUSTICE
VIPUL M .
PANCHOLI
Certified Copy
S. Application UOL Notify Delivery Nature Of
ApplicantName ApplicationType Order Date Status
No. Date Number Date Date Document
1 M R NILESH P URGENT 05/04/2016 U/2292/2016 05/04/2016 07/04/2016 11/04/2016 Delivered ORDER
SHAH
2 M R NILESH P URGENT 18/04/2016 U/2604/2016 05/04/2016 19/04/2016 21/04/2016 Delivered ORDER
SHAH
TOP CLOSE
366
http://gujarathc-casestatus.nic.in/gujarathc/casedetail_1.jsp 4/4
ANNEXURE - 14 - SANJALI VILLAGE CSR REQUIREMENT
367
ANNEXURE - 15 - TREATABILITY STUDY REPORT
OF
OBJECTIVE
M/s. Om Shiv Industries is located at Plot No. 915, Near Gayatri Chemical, Panoli, Dist:
Bharuch, State: Gujarat. This treatability is carried out to justify for proposed effluent
treatment process.
PROJECT DETAILS
MANUFACTURING PROCESS
AVAILABILITY LAND
ELECTRICAL INSTALLATION
The power requirement in the company will be met through DGVCL. The requirement
load will be 150 KVA.
AVAILABILITY OF WATER
The source for water is GIDC supply and total water consumption will be 101 KL/day (66
KL/day of fresh water + 20 KL/day of recycled water + 15 Kl/Day water from Boiler and
cooling Tower).
The below given table consists of all the plants merged into one table to give better
understanding.
The calculation for composite sample effluent for all plant is given in below table.
Total Effluent
Sr. Scrubbe Cooling Boiler
Parameter Unit Process send to
No. r Tower Blowdown
Neutralization
Effluent
KL/Day 25 1 1 1 27
Qty.
Effluent
L/Day 25000 1000 1000 1000 27000
Qty.
Sr.
Parameter Unit
No.
1 pH -- 5.2 5.6 8.7 8.4 5.8
2 Colour -- Light Light Light Light Light Yellow
Yellow Yellow Yellow Yellow
3 TDS mg/l 7908 1754 3621 4207 6749
4 TSS mg/l 1266 142 85 97 981
5 COD mg/l 7615 1874 167 68 5915
6 BOD mg/l 2538 625 56 23 1972
7 Ammonical mg/l 34 0 12 10 30
Nitrogen
The percentage COD reduction after settlement was found to be almost 15 to 25 % .The
treated water was passed through coagulation and filtration.
The percentage COD reduction after secondary aeration was 70-80% and after secondary
clarifier was found to be almost 65 to 70 %.The treated water was passed through sand
filter and carbon filter.
The sample ware given to RO supplier for further treatment. They have conformed 75 to
80 % recovery of RO and remaining reject water send to the MEE.
374
375
ANNEXURE - 17 - RO OFFER
Dear Sir,
This is with reference to the discussion with you regarding your requirement of drinking water
plant.
We are please to submit our offer as follows:
Annexure I : Design Basis & Treatment Scheme.
Annexure II : Scope of Supply.
Annexure III : Schedule of Exclusions.
Annexure IV : Commercial terms and conditions.
We hope you will find our offer in line with your requirement if you require any further
clarification please feel free to contact us.
Thanking You,
Yours faithfully,
For SAI ENTERPRISE
Mr. YOGESH PATIL – 098253 62183 , 07350262002
(Authorized. Signatory)
ANNEXURE I (Design Basis and Treatment Scheme)
REQUIREMENT:
You have indicated your requirement of R.O plant capacity 1000 LPH
Design Basis:
We have designed the R.O Plant of cap.1000 LPH Based upon Water T.D.S: 7500 mg/ltrs.
PROPOSAL:
Based on the above, we have designed the following water treatment scheme, as per your
requirement.
376
1) MULTIGRADE SAND FILTERATION.
The raw water shall be passed through coarse filtration sand filter, so as to get outlet water
quality of< 5 NTU. TURBIDITY.
3) ANTISCALENT DOSING:
The Antiscalent on line dosing with filtered water to prevent scaling in
R.O membranes.
4) MICRON FILTERATION:
The water from the above unit shall be passed through a cartridges filter assembly with cartridge
of 5 micron nominal rating. This has been incorporated to carry on fine
Filtration before feeding the water to R.O membranes this will avoid chocking of the
R .O Membranes.
The R.O Permeate water shall be than confirming to the following treated water analysis.
377
ANNEXURE II ( SCOPE OF SUPPLY)
1) RAW WATER FEED PUMP.
Qty : 01
Make : Kirloskar/ c.r.i /cnp
Model : as per requirement
Power : 1. H.P
MOC : C.I
4) ANTISCALENT DOSING.
Qty : 01
Make : seko/ Eq.
Type : Metering
Model : EABA-2
Capacity : 0-6 ltrs/Hr
Chemical tank cap. : 100 ltrs (HDPE)
5) MICRON FILTERATION.
Housing : 01 No.
No.of cartridges : 01 Nos.
Cartridge Size : 4”x 20”
Micron rating : 5
Housing MOC : P.P.
378
6) HIGH PRESSURE PUMP.
Qty : 01 No.
Make : SUMO/ CRI./CNP
Model : 1-180
Working pressure. : 12 kg/cm2
Power : 2.2 k w
MOC : SS 304
7) R.O SYSTEM
Membranes MOC : Polyamide
Qty : 2Nos.
Make : burton (Dow)/ Hydranautics (USA)/ C S M (COREA)
Size of membranes : 4” x 40” (BW 30-4040)
Qty of Housing : 01 Nos.2 element
MOC of pressure tubes: FRP.
Make : Maxima/Wave cyber.
R.O Skid : 01
MOC Skid : MS PAINTED
10) INSTRUMENTS
Rota meter 02 Nos.
Cap. 2000LPH
Pressure switches 02 Nos.
Make Indfoss/Eq.
Pressure gauge 04
379
MOC SS-glycerin filled.
T.D.S meter 01.
Make Aster.
11) ELECTRIC COINTROL PANEL.
Qty 01 Set.
Make SBIEE
Device L&T/SIEMENS.
Cabinet MOC M.S Powder Coated.
Type Dual Operation (Manual/Auto)
ANNEXURE III (Schedule of Exclusions)
380
ANNEXURE - 18 - CONSULTANT UNDERTAKING
381
Scanned by CamScanner
382
Scanned by CamScanner