Professional Documents
Culture Documents
E BCMS 04
E BCMS 04
E BCMS 04
E/BCMS/04
Department Naman Infotech Center Rev. No. 01
BCMS Exhibit for Exercise and test program Date 01.03.2021
1.
Period of test and
Sr. Stages of
Limits / Expected results Ref. record Person
No. Inspection responsible
Products received
On receipt of
from Sub Meet our specification and Incoming
1. material by QC
contractors/outside purchase order requirements inspection record head
party
Back up re All directory and files working Back up check Once in Quarter IT
2.
installation ok and available reports Asset head
Cloud logs/Cloud
Cloud back up and Speed of operation normal as Once in Quarter IT
3. back up check
functionality defined and all data available Asset head
report
Server inspection No malware attack or spam
Various server Once in Quarter IT
4. and malware attack attack and server inspection
logs Asset head
logs and test report
Note:
1. The user can prepare the above test plan based on their own business continuity management
system requirements.
2. All the results of this BCMS evaluation criteria is reviewed and evaluated by BCMS head once in a
quarter and discussed in the management review meeting for future need of change or necessary
action for continual improvement.