You are on page 1of 2

Subject:Business Invitation for Building Maintenance Unit at EMMAR PARK EDGE Hotel Project

in Pakistan

Dear Sir/Madam,

I hope this email finds you well.


I am writing on behalf of China State Construction Engineering Corporation (CSCEC), a leading
global construction company, to invite Modern Building Materials Trading (Genie Dealer) to
participate in a bidding process for the supply and installation of Building Maintenance Unit at
the EMMAR PARK EDGE Hotel Project in Pakistan. China State Construction Engineering
Corporation (CSCEC) is a Fortune 500 company and one of the largest construction and
engineering companies in the world. We are a leading player in the fields of housing construction,
international engineering contracting, real estate development, infrastructure construction, and
design and exploration. Our main products are modern industrial buildings, and we are currently
the largest investment and construction group and engineering contractor in the world.
THE CONSTRUCTION OF THE PARK EDGE (RP#06) project is located in the eighth phase of the
Defense Housing Authority, Karachi, Pakistan, Emmar Coastal Development plot 06,the project
covers an area of about 12,000 square meters, a total construction area of 208,700 square
meters, a total of 43 floors, a total height of 152 meters. Construction content: Construction of 2
high-end multi-storey apartment buildings (towers A and B), construction of 2 basement floors
(B2 and B1), ground floor, mezzanine and podium buildings (1 to 4 floors, 4 floors for fitness and
other convenient facilities), more than 5 floors for the main structure of the tower, two towers
with 37 floors; Main work content: main structure construction, electrical engineering, generator,
HVAC engineering, pipeline engineering, fire engineering.
We are currently in the final stages of price negotiation with EMMAR Company. The project
requires the supply and installation of Building Maintenance Unit. As a world-renowned dealer,
we believe that Modern Building Materials Trading (Genie Dealer) is well-positioned to provide us
with high-quality and reliable Building Maintenance Unit solutions.
We would appreciate it if you could provide the following information as part of its bidding
package.
1. Company Introduction. Please provide a brief overview.
2. CIF Price. We would appreciate if you could provide us with a CIF (Cost, Insurance, and Freight)
price for the delivery of the elevators from the point of origin to the Port of Karachi, Pakistan.
3. Quality Assurance and After-Sales Service Commitment. We require a clear statement of
quality assurance measures and after-sales service commitments, including warranties,
maintenance, and repair services.
4. Scheme. We would appreciate it if you could provide us with a detailed plan for the project,
including design, manufacturing, factory testing, supply, installation, testing, debugging, and
maintenance.
5. Payment Terms. Please tell us with your preferred payment terms for the project, including
payment methods, schedules, and any additional fees or charges.
We look forward to receiving your proposal and hope to establish a long-term and mutually
beneficial business relationship with your esteemed company.Thank you for your attention, and
we look forward to your prompt response.
Subject:Business Invitation for Elevator Works (Vertical Transportation Engineering) at EMMAR
PARK EDGE Hotel Project in Pakistan

Dear Sir/Madam,

I am writing on behalf of China State Construction Engineering Corporation (CSCEC), a leading


global construction company, to invite KONE MIDDLE EAST LLC to participate in a bidding process
for the supply and installation of elevators at the EMMAR PARK EDGE Hotel Project in Pakistan.
China State Construction Engineering Corporation (CSCEC) is a Fortune 500 company and one of
the largest construction and engineering companies in the world. We are a leading player in the
fields of housing construction, international engineering contracting, real estate development,
infrastructure construction, and design and exploration. Our main products are modern industrial
buildings, and we are currently the largest investment and construction group and engineering
contractor in the world.
THE CONSTRUCTION OF THE PARK EDGE (RP#06) project is located in the eighth phase of the
Defense Housing Authority, Karachi, Pakistan, Emmar Coastal Development plot 06,the project
covers an area of about 12,000 square meters, a total construction area of 208,700 square
meters, a total of 43 floors, a total height of 152 meters. Construction content: Construction of 2
high-end multi-storey apartment buildings (towers A and B), construction of 2 basement floors
(B2 and B1), ground floor, mezzanine and podium buildings (1 to 4 floors, 4 floors for fitness and
other convenient facilities), more than 5 floors for the main structure of the tower, two towers
with 37 floors; Main work content: main structure construction, electrical engineering, generator,
HVAC engineering, pipeline engineering, fire engineering.
We are currently in the final stages of price negotiation with EMMAR Company. The project
requires the supply and installation of elevators for vertical transportation purposes. As a world-
renowned brand in the elevator industry, we believe that KONE MIDDLE EAST LLC is well-
positioned to provide us with high-quality and reliable elevator solutions.
We request the following information from you to facilitate the bidding process
1. Company Introduction. Please provide a brief overview.
2. CIF Price. We would appreciate if you could provide us with a CIF (Cost, Insurance, and Freight)
price for the delivery of the elevators from the point of origin to the Port of Karachi, Pakistan.
3. Spare Parts List. Please provide a detailed list of spare parts and accessories that will be
included in the bidding package.
4. Quality Assurance and After-Sales Service Commitment. We require a clear statement of
quality assurance measures and after-sales service commitments, including warranties,
maintenance, and repair services.
5. Construction Schedule. We would like to see proposed construction schedule for the supply
and installation of the elevators, including timelines, labor requirements, and any potential
challenges or risks.
6. Payment Terms. Please tell us with your preferred payment terms for the project, including
payment methods, schedules, and any additional fees or charges.
Thank you for your time and consideration.
We look forward to receiving your response and working together on this exciting project.

You might also like