ITP Concrete Repair
ITP Concrete Repair
Bid No : 32DS230801
Main Contractor : PT. Prima Jaya Sentosa Energi
Sub-Contractor :-
Star Energy Geothermal Salak, LTD PT. Prima Jaya Sentosa Energi Project Owner : STAR ENERGY GEOTHERMAL SALAK, LTD
Document No :
RESPONSIBILITY
No DESCRIPTION INSPECTION METHOD REF. DOCUMENT ACCEPTANCE CRITERIA
Sub. Sign PJSE Sign SEGS Sign Remarks
1 General P H H
2 Grouting
A Preparation
1 Construction Method Review Work Method Statement Company Approval P W SW
2 Quality of Material Monitoring Owner Spec Company Approval P W SW
3 Surface Rought Monitoring Owner Spec Company Approval P W SW
4 Cleaning Monitoring Owner Spec Company Approval P W SW
B Installation
1 Mixing & Placing Monitoring Owner Spec Company Approval P W SW
2 Temperature Test Owner Spec Company Approval P W SW
3 Curing Monitoring Owner Spec Company Approval P W SW
4 Dimension, alignment & Stability of Formwork Witness Owner Spec Company Approval P W SW
5 Top Elevation of Form Work Dimension, Survey Owner Spec Company Approval P W SW
6 Champer / Surface Finish Monitoring Owner Spec Company Approval P W SW
7 Location Monitoring Owner Spec Company Approval P W SW
8 Coating with Bonding Agent Monitoring Owner Spec Company Approval P W SW
9 Ensure the gap around is Full Monitoring Owner Spec Company Approval P W SW
10 Check that shim are fix Monitoring Owner Spec Company Approval P W SW
Project Name : Cooling Tower Repair and Associated Services for Salak
Bid No : 32DS230801
Main Contractor : PT. Prima Jaya Sentosa Energi
Sub-Contractor :-
Star Energy Geothermal Salak, LTD PT. Prima Jaya Sentosa Energi Project Owner : STAR ENERGY GEOTHERMAL SALAK, LTD
Document No :
RESPONSIBILITY
No DESCRIPTION INSPECTION METHOD REF. DOCUMENT ACCEPTANCE CRITERIA
Sub. Sign PJSE Sign SEGS Sign Remarks
3 CONCRETE
RESPONSIBILITY
No DESCRIPTION INSPECTION METHOD REF. DOCUMENT ACCEPTANCE CRITERIA
Sub. Sign PJSE Sign SEGS Sign Remarks
RESPONSIBILITY
No DESCRIPTION INSPECTION METHOD REF. DOCUMENT ACCEPTANCE CRITERIA
Sub. Sign PJSE Sign SEGS Sign Remarks
3.2 FORMWORK
A Preparation
Quality and Shape of Material Monitoring Owner Spec Procedure P W W W
Formwork Fabrication Dimension AFC Drawing None P W W W
B Installation
Location, Dimension, Alignment, Plumb and
Dimension AFC Drawing Procedure P W W W
Elevation
Chamfer Monitoring AFC Drawing Procedure P W W W
Stability againts concrete placing & vibration Monitoring Owner Spec Procedure P W W W
Surface Treatment (cleaning and form oil
Monitoring Owner Spec Procedure P W W W
application)
Protection of form scaffolding Monitoring Owner Spec None P W W W
Time of removal form, shoring and support:
Submit data on method for determing material Monitoring ACI 318 None P W W W
strength for formwork removal
Final Inspection (pre-pouring) Monitoring AFC Drawing Procedure P W W W
4 Final Documents
RESPONSIBILITY
No DESCRIPTION INSPECTION METHOD REF. DOCUMENT ACCEPTANCE CRITERIA
Sub. Sign PJSE Sign SEGS Sign Remarks