Hicban, Alcy-ASSIGMENT ON WORK MEASUREMENT
Hicban, Alcy-ASSIGMENT ON WORK MEASUREMENT
1. A hotel housekeeper was observed five times on each of four task elements shown in the
following table. .
OBSERVATION IN MINUTES
ELEMENT 1 2 3 4 5 PR %
Compute the Mean Time for each element and the OT, NT, ST, given an allowance job time of 15%
ELEMENT PR OT NT ST
Solutions:
Compute for the OT,NT and ST assuming and allowance factor of 15% of job time.
Elements PR 1 2 3 4 5 6
ELEMENT PR OT NT ST
Solutions:
1 = 1.19*110% = 1.31
2 = 0.83*115% = 0.95
3 = 0.56*105% = 0.59
1 = 1.31*1.15 = 1.51
2 = 0.95*1 15 = 1.10
3 = 0 59*1.15 = 0.68
How many observations would be needed to estimate the mean time for element 2 within 1% of its
true value with 95% level of confidence?
0.83 0.83 0
0.87 0.83 0.0016
0.78 0.83 0.0025
0.82 0.83 0.0001
0.85 0.83 0.0004
TOTAL 0.0046
a (given as a %) = 0.01
CL = 95% = 1.96