Professional Documents
Culture Documents
ANNEX 11 FINAL 2 SRC Summary of Information
ANNEX 11 FINAL 2 SRC Summary of Information
7.Number and rate of YEAR No. For three years the school EOSY Graphical Presenta
dropouts by cause 2013-14 0 dropout rate is sustained
2014-15 14 back to 0%.
2015-16 0
QUALITY AND RELEVANCE
8.Percentage of YEAR No. The completion rate for three EOSY Graphical presenta
learners who 2013-14 100 years is 100%.
completed the school 2014-15 100
year 2015-16 100
9.National Subject MPS The NAT MPS in all subject is EOSY Graphical presenta
Achievement Test English 77.29 above the division target with
(NAT) Filipino 83.75 over-all MPS of 85.58%
Math 92.40
Science 89.27
HKS 85.21
10.Literacy level ENGLISH Out of 299 pupils only 121 in EOSY Graphical presenta
Independen 121 English are independent
t readers and 136 in Filipino.
FILIPINO
Independen 136
t
11.School-Based The SBM Level of Practice of EOSY Picture presentatio
Management Level I the School is still in level 1
Assessment Level due to some indicators not
complied.
12.Child-Friendly Child-Friendly School The school is child friendly EOSY Picture presentatio
School Survey Result. but needs to improve to
become very outstanding.
13.Stakeholders YEAR % Stakeholders` participation EOSY Graphical presenta
Participation 1 84% has been increasing for the
2 88% past three years.
3 90%
14. Learner-Teacher YEAR RATIO Learner-Teacher Ratio is less BOSY Picture Presentatio
Ratio 1 40:1 than the division target of
2 40:1 45:1
3 35:1
15. Learner-Classroom YEAR RATIO Learner-classroom ratio is BOSY Picture presentatio
Ratio 1 40:1 within standard considering
2 45:1 that the classrooms are sub-
3 35:1 standard in size.
16. Learner-Toilet TOILET RATIO The data shows a problems BOSY Picture presentatio
Ratio Male 35:1 with toilet-boys ratio.
Female 35:1
17.Learner-Seat Ratio YEAR RATIO The seats are enough for all BOSY Picture presentatio
CY 1:1 number of pupils
18.Status of Annual YEAR Utilization The MOOE for three years EOSY Graphical presenta
Implementation plan 1 100 has been utilized to the
(AIP)/ CI Projects 2 100 fullest.
3 100