Figures for Intro Lecture

Monday, January 6, 2020 11:06 PM

LDCs

Generation

Intro and Chapter 2 Page 1


Generation

Intro and Chapter 2 Page 2


Intro and Chapter 2 Page 3
Portlands

Intro and Chapter 2 Page 4


Intro and Chapter 2 Page 5
Transmission

Intro and Chapter 2 Page 6


Dark blue: 500kv, lighter blue: 230 kV, grey: 115 kV

Interconnection

Intro and Chapter 2 Page 7


Interconnection

EI (https://en.wikipedia.org/wiki/Eastern_Interconnection)

60k miles of transmission lines


5600 generators
710 GW installed capacity
Ontario: 38 GW (5%)
Bruce: 6.4 GW (1%)
Typical household: 1 kW (0.0001%)

Generator outage video

Intro and Chapter 2 Page 8