ISTQB Sample Question Paper #4 #0000015836 | On April 1, 2020 3:17 pm

First Name Anonymous

IP Address 113.190.138.15

Score Obtained 15 out of 39 (38.46%)

Test Result Fail

Completion Time 19 minutes, 43 seconds

Administrator Remarks Processing

User Account Guest

Link https://www.toolsqa.com/submission-con rmed/?id=VnQHYuXt%2FNh3DeUnUSMPmi7B9sAsbGsSUY9dCeTdPrg%3D

Page - 1

Test Implementation and execution

Test Analysis and Design


(score 1)

Designing the test environment set-up and identifying any required infrastructure and tools are a part of which phase Evaluating the Exit Criteria and
reporting

Test Closure Activities

Score Obtained/Total 1/1

Test Implementation and execution has which of the following major tasks? i,ii,iii are true and iv is false
(score .3)
i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally preparing the test
harnesses and writing automated test scripts. i,,iv are true and ii is false

about:blank 1/11
4/1/2020 Submission Confirmed
ii. Creating the test suite from the test cases for e cient test execution. (score .3)
iii. Verifying that the test environment has been set up correctly.
i,ii are true and iii,iv are false
iv. Determining the exit criteria.
(score .3)

ii,iii,iv are true and i is false

Score Obtained/Total 0.3/0.9

i,ii,iii are true and iv is false


(score .3)

A Test Plan Outline contains which of the following :- i,iii,iv are true and ii is false
i. Test Items ii,iii are true and i and iv are false
ii.Test Scripts (score .3)
iii.Test Deliverables
iv.Responsibilities i,ii are false and iii , iv are true
(score .3)

Score Obtained/Total 0.3/0.9

17
(score 1)

19
One of the elds on a form contains a text box which accepts numeric values in the range of 18 to 25. Indentify the invalid
24
Equivalance class
21

Score Obtained/Total 1/1

Page - 2

22,23,26

21,39,40

In a Examination a candidate has to score minimum of 24 marks inorder to clear the exam. The maximum that he can score 29,30,31
is 40 marks. Identify the Valid Equivalance values if the student clears the exam. (score 1)

0,15,22

Score Obtained/Total 1/1

Which of the following statements regarding static testing is false: static testing requires the running of
tests through the code
(score 1)

static testing includes desk checking

about:blank 2/11
4/1/2020 Submission Confirmed
static testing includes techniques
such as reviews and inspections

static testing can give measurements


such as cyclomatic complexity

Score Obtained/Total 1/1

Options i,ii,iii,iv are true.


(score 1)
Veri cation involves which of the following :-
i is true and ii,iii,iv are false
i. Helps to check that we have built product right.
ii. Helps to check that we have built the right product. i,ii,iii are true and iv is false
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness. ii is true and i,iii,iv are false.

Score Obtained/Total 0/1

i,ii,iii are true and iv is false


(score .3)

Component Testing is also called as :- i,ii,iii,iv are false


(score .3)
i. Unit Testing
ii. Program Testing i,ii,iv are true and iii is false
iii. Module Testing (score .3)
iv. System Component Testing .
all of above is true

Score Obtained/Total 0.3/0.9

Page - 3

Component Integration testing


(score 1)

Component System Testing

Link Testing is also called as : Component Sub System Testing

Maintenance testing

Score Obtained/Total 0/1

Methodologies adopted while performing Maintenance Testing:- Breadth Test and Depth Test
(score 1)

Retesting

Con rmation Testing

about:blank 3/11
4/1/2020 Submission Confirmed
Sanity Testing

Score Obtained/Total 0/1

ii is true and i,iii,iv are false


(score .3)

Which of the following is true about Formal Review or Inspection:- i,iii,iv are true and ii is false
i. Led by Trained Moderator (not the author). i,iii,iv are false and ii is true
ii. No Pre Meeting Preparations (score .3)
iii. Formal Follow up process.
iv. Main Objective is to nd defects iii is true and I,ii,iv are false
(score .3)

Score Obtained/Total 0/0.9

i,ii,iii,iv,v,vi
The Phases of formal review process is mentioned below arrange them in the correct order.
vi,i,ii,iii,iv,v
i. Planning
ii. Review Meeting i,v,iv,ii,iii,vi
iii. Rework (score 1)
iv. Individual Preparations
v. Kick Off i,ii,iii,v,iv,vi
vi. Follow Up
Score Obtained/Total 0/1

Page - 4

A,C,B

B,C,A
Consider the following state transition diagram of a two-speed hair dryer, which is operated by pressing its one button. The A,B,C
rst press of the button turns it on to Speed 1, second press to Speed 2 and the third press turns it off. Which of the (score 1)
following series of state transitions below will provide 0-switch coverage?
C,B,A

Score Obtained/Total 1/1

Single Options TitlWhite Box Techniques are also called as :-e Structural Testing
(score 1)

Design Based Testing

Error Guessing Technique

Experience Based Technique

Score Obtained/Total 0/1

about:blank 4/11
4/1/2020 Submission Confirmed

A set of test cases for testing


classes of objects
(score 1)

An input or output range of values


such that only one value in the range
become s a test case

What is an equivalence partition (also known as an equivalence class)? An input or output range of values
such that each value in the range
becomes a test case

An input or output range of values


such that every tenth value in the
range bec omes a test case.

Score Obtained/Total 0/1

Are most useful in uncovering


defects in the process ows during
real world use of the system
(score 1)

Are most useful in uncovering


defects in the process ows during
the testing use of the system
The Test Cases Derived from use cases
Are most useful in covering the
defects in the process ows during
real world use of the system

Are most useful in covering the


defects at the Integration Level

Score Obtained/Total 0/1

Page - 5

Is impractical but possible


(score 1)

Is practically possible

Exhaustive Testing is Is impractical and impossible

Is always possible

Score Obtained/Total 0/1

Which of the following is not a part of the Test Implementation and Execution Phase Creating test suites from the test

about:blank 5/11
4/1/2020 Submission Confirmed
cases

Executing test cases either manually


or by using test execution tools

Comparing actual results

Designing the Tests


(score 1)

Score Obtained/Total 1/1

Statement Testing and coverage

Decision Testing and coverage

Condition Coverage
Which of the following techniques is NOT a White box technique ?
Boundary value analysis
(score 1)

Score Obtained/Total 1/1

Organizational Factors
(score 1)

Poor Software characteristics

A Project risk includes which of the following : Error Prone software delivered.

Software that does not perform its


intended functions

Score Obtained/Total 0/1

Page - 6

ii is True; i, iii, iv & v are False


(score .3)

In a risk-based approach the risks identi ed may be used to : i,ii,iii are true and iv is false
(score .3)
i. Determine the test technique to be employed
ii. Determine the extent of testing to be carried out ii & iii are True; i, iv are False
iii. Prioritize testing in an attempt to nd critical defects as early as possible. (score .3)
iv. Determine the cost of the project
ii, iii & iv are True; i is false

Score Obtained/Total 0.3/0.9

Which of the following is the task of a Tester? i, ii, iii is true and iv is false
(score .3)
about:blank 6/11
4/1/2020 Submission Confirmed
i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.
ii. Prepare and acquire Test Data ii,iii,iv is true and i is false
iii. Implement Tests on all test levels, execute and log the tests.
i is true and ii,iii,iv are false
iv. Create the Test Speci cations
(score .3)

iii and iv is correct and i and ii are


incorrect
(score .3)

Score Obtained/Total 0/0.9

Explaining the objectives

Selecting the personnel, allocating


roles.
(score 1)
The Planning phase of a formal review includes the following :-
Follow up

Individual Meeting preparations

Score Obtained/Total 0/1

Moderator.

Scribe
(score 1)

A Person who documents all the issues, problems and open points that were identi ed during a formal review. Author

Manager

Score Obtained/Total 0/1

Page - 7

i,ii,iii,iv are true


(score .3)

Who are the persons involved in a Formal Review :- i,ii,iii are true and iv is false.
(score .3)
i. Manager
ii. Moderator ii,iii,iv are true and i is false.
iii. Scribe / Recorder (score .3)
iv. Assistant Manager
i,iv are true and ii, iii are false.

Score Obtained/Total 0.3/0.9

Which of the following is a Key Characteristics of Walk Through Scenario , Dry Run , Peer Group
(score 1)

about:blank 7/11
4/1/2020 Submission Confirmed

Pre Meeting Preparatio ns

Formal Follow Up Process

Includes Metrics

Score Obtained/Total 0/1

the use of a variable before it has


been de ned

unreachable (“dead”) code

What can static analysis NOT nd? memory leaks


(score 1)

array bound violations

Score Obtained/Total 0/1

requirements

documentation

test cases
Incidents would not be raised against:
improvements suggested by users
(score 1)

Score Obtained/Total 1/1

Page - 8

Security Testing
(score 1)

Recovery Testing
A Type of functional Testing, which investigates the functions relating to detection of threats, such as virus from malicious
Performance Testing
outsiders.
Functionality Testing

Score Obtained/Total 0/1

Which of the following is not a major task of Exit criteria? Checking test logs against the exit
criteria speci ed in test planning.

Logging the outcome of test


execution.
(score 1)

about:blank 8/11
4/1/2020 Submission Confirmed
Assessing if more tests are needed.

Writing a test summary report for


stakeholders.

Score Obtained/Total 0/1

Load Testing
(score 1)

Integration Testing
Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance
System Testing
behaviors and ability of the target and of the test to continue to function properly under these different workloads.
Usability Testing

Score Obtained/Total 1/1

System Level Testing

Integration Level Testing


(score 1)
Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated
Unit Level Testing
components is :-
Component Testing

Score Obtained/Total 1/1

Page - 9

The analysis of batch programs.

The reviewing of test plans.

The analysis of program code.


Static analysis is best described as: (score 1)

The use of black box testing

Score Obtained/Total 0/1

One of the elds on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class BOOK

Book

Boo01k
(score 1)

book

about:blank 9/11
4/1/2020 Submission Confirmed
Score Obtained/Total 1/1

Test Analysis and Design


(score 1)

Test Implementation and execution

. Reviewing the test Basis is a part of which phase Test Closure Activities

Evaluating exit criteria and reporting

Score Obtained/Total 1/1

Test Analysis and Design

Test Implementation and executi on


(score 1)

Reporting Discrepancies as incidents is a part of which phase :- Test Closure Activities

Evaluating exit criteria and reporting

Score Obtained/Total 0/1

Page - 10

operating systems

test documentation

live data
Which of the following items would not come under Con guration Management? (score 1)

user requirement document

Score Obtained/Total 0/1

Test Analysis and Design

Test Planning and control

Test Closure Activities


Handover of Testware is a part of which Phase (score 1)

Evaluating exit criteria and reporting

Score Obtained/Total 0/1

A program with high cyclometic complexity is almost likely to be: Large

Small

about:blank 10/11
4/1/2020 Submission Confirmed

Di cult to write

Di cult to test
(score 1)

Score Obtained/Total 0/1

12,16,22

24,27,17

The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 22,23,24
21. When the temperature is more than 21. Identify the Equivalance values which belong to the same class. (score 1)

14,15,19

Score Obtained/Total 1/1