CHAPTER -6(Brick Work) 'SLNo. Description Of Work Unit Rate Full tem Rate Jalaun[ Jhansi [Lalitpur Labour Rate 2 3 4 5 6 304 First class brick work In Kankar lime and surkhi in proportion of 1:3 in foundation and plinth including supply of all materials, labours and T & P etc. required for proper completion of the cum 5874.80 | 6051.30 [6478.80 697.20 302 first class brick work in one white lime and two |surkhi mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for Proper completion of the lwork. cum ‘8759.80 | 6464.60 [7096.70 697.20 302A First class brick work in one white lime and three surkhi mortar in foundation and plinth including supply of all materials labour and T & P etc required for proper completion of the work. cum 8639.50 | 6366.00 [7015.70 697.20 303 First class brick work in 1:6 cement and fine [sand of 1.25 FM. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion lof the work. cum) 5320.10 | 6726.80 [6293.60 697.20 304 {As in item (303) above but in 1:5 cement and {find sand of 1.25 F.M. mortar. cum 5407.60 | 6844.30 [6381.20 697.20 305 [As in item No. 303 above but in 1: 4 cement and fine sand of 1.25 F.M. mortar. cum 5495.20 | 5901.80 | 6468.70 687.20 306 [As in.item No. 303 above but in 1:3 cement and fine sand of 1.25 F. M. mortar cum 5767.70 | 6164.40 [6731.20 687.20 307 [As in.item No. 303 above but in 1:3 cement and lcoarse sand mortar cum 5765.40 | 6172.00 [6738.90 687.20 308 first class brick work in mud mortar in {toundation and plinth including supply of all materials, labour and T & P etc required for proper completion of the work cum ‘4437.80 | 4906.60 [6327.10 697.20 309 [As in item (304 to (304) above but in super- structure. including necessary cutting and moulding of bricks as required and also - including honey comb brick work, thickn |wall not to be less than 1.5 brick thick. Add extra labour to above item no. 301 to 304 cum 23830 | 23830 | 23830 238.30 0 [As in item (308) above but for wall of one brick thick. Add for extra labour. eum 224.80 | 224.80 | 224.80 224.80 10 (al [As in item (309) above but for wall of half brick (4 1/2") thick. Add for Extra labour over Item No. 310. cum 337.20 | 337.20 | 337.20 337.20 10 (b] [As in Item (309) above but wail upto 3” thick |Add for extra labour over item No 310(a) cum 493.00 | 493.00 | 493.00 493.00 SI.No| Description Of Work Unit Rate Full item Rate Labour 3it For second class brick work deduct from items (301) to (310). cum 234.10 234.10 234.10 32 For third class brick work in mud mortar |deduct from item no (301) to (310) eum 284.70 284.70 284.70 33 ‘Sundried Brick work in mud mortar in foundation and plinth, including supply of all, materials, labour and T & P etc. required for proper completion of the work. cum 1566.40 2408.90 2572.40] 674.70 314 First class brick work in arches including shuttering and centering add to item (301-307). Extra labour, centering and shuttering required. cum) 676.40 675.40 675.40 675.40 35 [As in item 314 above but in jack arches, including shuttering & centering add to item (301-307) .Extra labour, centering and [shuttering required. cum 729.60 723.60 729.60 723.60 346 [As in item 314 above but in well steining with ordinary bricks, add to item (301 to 307).Extra cost of labour centering and shuttering etc cum 870.10 870.10 870.10 870.10 37 ‘As in Item 316 above but in well steining but with specially moulded bricks, add to item 316. Extra labour required for workmanship and handling. cum 250.40 250.40 250.40 250.40 318 17.5 em. (4 172") thick string or drip course with '6 cm. (2 1/4") projection of First class brick in kankar lime including 12 mm (1.5") thick lime plastering with simple moulding and cutting drip notch as required and including supply of all materials, labour and T & P etc. required for proper completion of the work. Rm 114.60 117.90 120.90 62.50 39 [As in item (318) above but both masonary and plaster in 1:6 cement and fine sand of 1.25 F.M. Rm 108.50 407.70 413.10 62.50 320 [As in item (348) above but in 23 em. (9°) cornice in three courses with 6 cm. (2 1/4" projection in each course in kankar lime with 12 mm. thick lime plaster or pointing Rm 286.70 300.30 312.60 121.60 3a |-As in item 320 above but both masonary and plaster and pointing in 1:6 cement and local [sand mortar. \, Rm 284.80 292.40 316.60 421.70 Wer te ISLNo. Description Of Work Unit Rate Full item Rate [tater | 322 [Extra cutting of bricks for moulding. As required for cornice, etc. including rubbed finish not exceeding 11.5 cm. (4 1/2") width labour only) Rm 77.00 77.30 | 77.50 75.20 | 323 ‘Making opening through walls in lime or ‘cemeni mortar for doors and windows or enlarging existing opening or cutting out brick \work for under pinning including necessary ‘supports staging etc. cleaning site and stacking the dismantled materials at the place as directed by the Engineer-in-charge within a distance of 60 metres (200 ft.). Assuming size of opening 5 ft. wide and 7 feet height and 1 1/8 ft. thick=40 eft. labour for making holes for s, fixing pins for proper safety of superstructure and removing the same after ‘completion of the job. cum 566.70 566.70 | 566.70 566.70 324 Laying reinforced brick work in sunshade with first class brick laid in cement and approved coarse sand mortar 1: 3 excluding supply of reinforcement and its bending but including its fixing in position and binding the same with 24 B.W.G |. binding wire and including all centering and shuttering etc. and curing and also including cost of binding wire, supply of, all materials labour and T & P etc. required for proper completion of the work. cum 3673.60 ‘4017.40 |4288.80 1973.40 325 {As in item (324) but in lintels. cum 3306.20 3615.60 [3859.90 1061.50 | 326 Encasing rolled steel sections as in beams and ‘columns in 1 : 3 brick work in cement and approved coarse sand, with 10 mm. (3/8"). thick ‘cement plaster in 1:3 cement and approved coarse sand Including supply and fixing of wire netting .of required gauge where necessary including supply of all material, labour and T & P etc. required for proper completion of the work. ‘Sqm 538.90 552.50 | 871.50 160.90 327 ‘Add to all items of brick work in superstructure extra for bricks work in circular pillars as per ‘Skelton analysis from item no. 36(P) 152 CPWD analysis of rates 1955. cum 1787.40 1934.60 [2067.00 629.50 Providing and laying 40 mm gauge brick ballast in soak pit including supply of all material, labour, T&P required for proper completion of work cum 2592.60 3613.50 [4529.20 700.00 ( wae NY shfipal Singh) Superentending Engineer hans) rg|e, P.W.D., Jhansi =

You might also like