PROJECT CRASH

Normal Crash
Activity
Duration Cost Duration Cost
B.5 1 4258.86 0.75 4603.42
B.9 2 39311.99 2 39311.99
803(1)a 5 203.26 2.5 627.44
902(1)a 50 73.74 47 74.63
900(1)c6 20 7376.99 6.38 7799.33
900(1)c5 20 7376.99 6.38 7799.33
900(1)c1 5 6707.22 3 6830
1047(2)a 22 73.84 10 49.68
1047(2)b 10 79.16 3 81.2
1014(1)b1 10 1342.55 6 1422.02
1013(2)a1 5 567.79 0.141 573.74
1013(2)a2 5 425.84 2 431.79
1027(1) 20 272.43 8 295.58
1021(1)c 10 483.83 2 514.78
1051(6) 10 72433.17 1 74433.17
1032(1)a 20 466.51 22 637.93
1032(1)b 10 466.51 7 580.79
1007(1)b 5 352.23 1 466.51
1010(2)a 4 352.23 1 466.51
1004(2) 4 339.02 1 453.3
B.9 2 39311.99 2 39311.99
TOTAL 240 182276.15 134.151 186765.13