1 Mobilization LS 1 Rp 1,000,000,000.00
2 Staking out m 10,000 Rp 20,000.00
3 Excavation m3 1,000,000 Rp 34,140.63
4 Demobilization LS 1 Rp 100,000,000.00
Total
11% VAT
Total
Q'ty 1,000,000.00 m3
Rp 1,000,000,000.00
Rp 200,000,000.00
Rp 34,140,625,000.00
Rp 100,000,000.00
Rp 35,440,625,000.00
Rp 3,898,468,750.00
Rp 39,339,093,750.00
Browsing
Assumed Number of EquipmentProductivity Duratio Equipment. H
Days H
Bakhoe 41.67 320.00 75 600.00 25,000.00
DT 208.33 320.00 75 750 156,250.00
Volume 1,000,000
AHS 1 m3 galian
Koef Unit Rate Total
Material
Labour
Equipment
Bakhoe 0.03 250000 6250
DT 0.16 150000 23437.5
Total 29687.5
OH+Margin 15% 4453.125
34140.63