PEKERJAAN BETON
1/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
PEKERJAAN PEMBESIAN
PEKERJAAN BEKISTING
2/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
PEKERJAAN WATERPROOFING
PEKERJAAN PAS.DINDING
3/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Pagar Depan Pasangan Batu Bata + Besi (pj. ) m' 289,46 245.400,00 71.033.484,00
1,50 bh Bata ringan 0,155 594.000,00 91.773,00
zak Semen portland 0,315 63.250,00 19.923,75
m3 Pasir pasang 0,063 308.000,00 19.404,00
m2 Upah pas bata ringan max t. 10 cm 1,500 27.000,00 40.500,00
praktis m'/m² 0,83 Balok/Kolom praktis
4 dia 10, begel dia 6 - 20 m' Besi Kolom praktis - 20.750,00 -
3,00 kg kg Besi beton 3,745 10.937,00 40.959,07
kg Waste Besi beton - 10.937,00 -
kg kawat bendrat 0,037 20.900,00 782,71
m3 Papan 2/20 - 1.677.500,00 -
zak Semen portland 0,086 63.250,00 5.419,26
m3 Pasir pasang 0,007 308.000,00 2.191,73
m3 Splite 0,013 280.500,00 3.704,07
m' Upah kolom prktis(besi,bekisting,cor) 0,833 24.970,00 20.808,33
Total 245.465,91
4/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
5/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
GRANIT
HOMOGENIOUS
6/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
KERAMIK
7/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
8/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
PEKERJAAN FLOORHARDENER
9/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Total 97.400,00
Finishing Floor hardener 3kg (tangga darurat) m' 281,00 66.700,00 18.742.700,00
m2 FloorHardener 3 Kg / m2 0,500 26.400,00 13.200,00
m' Besi Siku 0.4 x 0.4 1,000 17.500,00 17.500,00
m3 Mortar Screning K 175 0,026 780.000,00 20.085,00
m2 Upah Screeding lantai 0,500 29.000,00 14.500,00
m2 Proteksi floorhardener 0,500 3.000,00 1.500,00
Total 66.785,00
PEKERJAAN PLAFOND
PEKERJAAN PINTU
Cylinder P exit KEND 12500 For Panic exit bh 64,00 161.000,00 10.304.000,00
bh Cylinder P exit KEND 12500 For Panic exit 1,000 161.000,00 161.000,00
Total 161.000,00
10/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Total 289.800,00
11/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
12/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Total 6.603.300,00
13/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
14/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
15/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
16/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Lock case pelor kayu KEND K87738-60 US32D bh 2,00 313.900,00 627.800,00
bh Lock case pelor kayu KEND K87738-60 US32D 1,000 313.950,00 313.950,00
Total 313.950,00
Kusen + Daun Pintu Aluminium Pos Jaga Unit 2,00 562.800,00 1.125.600,00
Unit Jendela kaca clear 6mm + rangka 400x2150 1,000 562.810,00 562.810,00
Total 562.810,00
Kusen + Daun Jendela Kaca Aluminium Sliding Unit 2,00 562.800,00 1.125.600,00
Unit Jendela kaca clear 6mm + rangka 400x2150 1,000 562.810,00 562.810,00
Total 562.810,00
PEKERJAAN SANITAIR
17/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Total 324.000,00
18/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
INTERIOR MELEKAT
19/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Total 254.394,62
The RAILLING
Island m' 285,66 50.000,00 14.283.000,00
0,15 Island
zak Semen portland 0,714 63.250,00 45.160,50
m3 Pasir pasang 0,008 308.000,00 2.587,20
m3 Splite - 280.500,00 -
m3 Upah Island 0,105 21.750,00 2.283,75
Total 50.031,45
Meja Beton Meja Lavatory fin.marmer bianco m' 779,30 1.413.700,00 1.101.696.410,00
0,60 Meja Beton
90,00 kg/m3
kg Besi beton 6,480 10.937,00 70.871,76
kg kawat bendrat 0,104 20.900,00 2.166,91
m3 upah pembesian struktur 6,480 1.160,00 7.516,80
zak Semen portland 0,490 63.250,00 30.967,20
m3 Pasir pasang 0,006 308.000,00 1.774,08
m3 Splite 0,006 280.500,00 1.615,68
m3 Upah cor meja beton 0,072 525.000,00 37.800,00
Lapisan Bianco
m² Marmer bianco traverinoa 0,830 750.000,00 622.500,00
zak Semen portland 0,394 63.250,00 24.904,81
m3 Pasir pasang 0,032 308.000,00 9.714,32
kg Semen grout MU-408 0,017 9.070,00 150,56
kg Kawat anti karat - 13.200,00 -
m' Upah pasang pingul marmer / granit 2,000 65.250,00 130.500,00
m2 Upah pasang lantai Marmer 0,830 326.250,00 270.787,50
bh Upah lubang wastafel 1,000 202.500,00 202.500,00
Total 1.413.769,63
20/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
LANDSCAPE
21/22 13/03/2018
ANALISA HARGA SATUAN -
CENGKARENG BUSINESS CITY RAB
HARGA JUMLAH
NO ITEM PEKERJAAN SAT. URAIAN / VOLUME TOTAL KOEF. H SAT SAT RAB
Rp. Rp.
Total 6.885.870,00
135.131.034.738,08
22/22 13/03/2018