1 M3 BETON 1 : 2 : 3
= SEMEN
PASIR COR
KERIKIL
1 M3 BETON 1 : 2 : 3
= LEBAR
TEBAL
PANJANG
= SEMEN
PASIR COR
KERIKIL
3.24 ZAK
0.243 M3
0.369 M3
= PASIR COR
KERIKIL
0.075 M3
0.114 M3
KAPASITAS GEROBAK
1.641 GEROBAK
2.492 GEROBAK
0.048 M3
= SEMEN
PASIR COR
KERIKIL
3 ZAK
0.2 M3
0.3 M3
= PASIR COR
= KERIKIL
1.6 MAL
2.4 MAL
7.2 ZAK
0.54 M3
0.82 M3
4M
15 CM
1.667 M
0.45 M3
0.0457 M3
=
=
4.7 MAL
7.1 MAL
25 SKOP
3 MAL