RENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN

1 2

I PEKERJAAN DRAINASE PERUMAHAN

1 PEKERJAAN PERSIAPAN
1.1 Pembuatan Papan Nama Pekerjaan
1.2 Penggambaran Shop Drawing dan As Built Drawing
1.4 Pengukuran Uitzet Trase Saluran
1.5 Foto Dokumentasi
1.6 Kistdam Pasir/ Tanah
1.7 Kerangka Kayu Untuk 1 m3 Kistdam Pasir/ Tanah uk. 43 cm x 65 cm
1.9 Pasang 1 m' profil melintang galian tanah dan pasang bouwplank

2 PEKERJAAN TANAH
2.2 Galian Tanah Biasa Sedalam <1m
2.4 Timbunan / Urugan Tanah Kembali

3 PEKERJAAN PASANGAN
Drainase Perumahan :
3.1 Pasangan Batu 1 PC : 4 PP
3.2 Plesteran 1 PC : 3 PP
3.3 Siaran 1 PC : 2 PP
3.4 Bongkar Pasangan Batu

4 PEKERJAAN BETON
Drainase Peumahn :
4.1 Beton Mutu fc'= 9,8 MPa (K125) Kedap air, Slump (12x2)cm,
w/c =0,56 (b. Mollen)
4.3 Bekisting Dinding Beton Biasa Dengan Multiflex 12 mm atau 18 mm
4.4 Bongkar Bekisting Secara Biasa

Page 1
RENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN

1 2
4.5 Perancah Bekisting Kayu Dolken Dia. 8-10 cm Tinggi 4 m
4.6 Pembesian 100 Kg Dengan Besi Polos / Ulir
4.7 Bongkar Beton Secara Konvensional
4.9 Pemasangan Water Stop 1 m Rubber Lebar 150 mm - 200 mm
4.10 Elastic Joint Filler
4.11 Dowel Bar dia. 19 mm

[A] JUMLAH RIL COST


[B] PPN 10 % (PAJAK PERTAMBAHAN NILAI)
[C] JUMLAH TOTAL SETELAH DITAMBH (10 %)
[D] JUMLAH TOTAL DIBULATKAN

Page 2
ANGGARAN BIAYA (RAB )

HARGA SATUAN JUMLAH


VOLUME SATUAN PEKERJAAN (HSP) HARGA
(Rp.) (Rp.)
4 5 6 7

1.00 bh 1,047,219.00 1,047,219.00


1.00 Ls 36,462,187.50 36,462,187.50
8.00 M' 3,036.00 24,288.00
2.00 Set 1,684,750.00 3,369,500.00
200.00 Bh 20,424.00 4,084,800.00
100.00 Bh 14,249.08 1,424,908.00
1.431.00 M' 40,986.00 40,986.00

JUMLAH HARGA 1 46,453,888.50

413.64 M3 47,910.00 19,817,492.40


498.40 M3 28,080.00 13,995,072.00

JUMLAH HARGA 2 33,812,564.40

1,420.88 M3 1,029,158.00 1,462,310,019.04


1,227.50 M2 52,790.00 64,799,725.00
2,620.00 M2 52,660.00 137,969,200.00
90.00 M3 201,990.00 18,179,100.00

JUMLAH HARGA 3

46.80 M3 1,317,130.00 61,641,684.00

1,099.20 M2 74,129.00 81,482,596.80


1,099.20 M2 2,127.00 2,337,998.40

Page 3
ANGGARAN BIAYA (RAB )

HARGA SATUAN JUMLAH


VOLUME SATUAN PEKERJAAN (HSP) HARGA
(Rp.) (Rp.)
4 5 6 7
33.28 M3 950,072.00 31,618,396.16
12.05 M3 18,074.00 217,791.70
60.00 M3 374,440.00 22,466,400.00
123.40 M' 160,750.00 19,836,550.00
14.65 M2 137,800.00 2,018,770.00
213.00 Set 80,020.00 17,044,260.00

JUMLAH HARGA 4