You are on page 1of 107

CV.

SIOLA

Sketsa Potongan :
0.8 1.00
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

Galian

CL
1.00
0.8
Galian Drainase Kanan
Galian Drainase Kiri

0.80 0.80

0.80 0.80

CV. SIOLA
VOL. KONTRAK REALISASI
Err:509 M3 -410.40 M3
PANJANG LEBAR \ VOLUME
NO STATION
(M) (M) (M) (M3)
(1) (2) (3) (4) (4) (5) (6)
SEGMEN I (P1) :
1 0+000 - 0+100 50.00 1.00 0.98 49.00
2 0+100 - 0+100 50.00 1.10 0.98 53.90
3 0+100 - 0+150 50.00 1.20 0.90 54.00
4 0+150 - 0+200 50.00 1.10 0.90 49.50
5 0+200 - 0+250 50.00 1.10 0.80 44.00
6 0+250 - 0+300 50.00 1.00 0.80 40.00
7 0+300 - 0+350 50.00 1.00 0.80 40.00
8 0+350 - 0+400 50.00 1.00 0.80 40.00
9 0+400 - 0+450 50.00 1.00 0.80 40.00
JUMLAH 410.40

0.00 0
0.8 0. 8
0.00 0
CV. EWAKO ENGINEERING CV. SIOLA

KHAERUDDIN, ST. ANTO


0.00 0

0.00
0.00
DINAS PERHUBUNGAN
0.00

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

Galian
Sketsa Potongan :

1.00 1.00
Galian Drainase Kiri CL Galian Drainase Kanan

0.80 0.80

0.80 0.80

CV. SIOLA
VOL. KONTRAK REALISASI
Err:509 ### -470.40 ###
PANJANG LEBAR TINGGI VOLUME
NO STATION
(M) (M) (M) (M) (M3)
(1) (2) (3) (4) (4) (5) (6)
SEGMEN I (P1) :
1 0+450 - 0+500 50.00 1.20 0.98 58.80
2 0+500 - 0+550 50.00 1.20 0.98 58.80
3 0+550 - 0+600 50.00 1.20 0.98 58.80
4 0+600 - 0+650 50.00 1.20 0.98 58.80
5 0+650 - 0+700 50.00 1.20 0.98 58.80
6 0+700 - 0+750 50.00 1.20 0.98 58.80
7 0+750 - 0+800 50.00 1.20 0.98 58.80
8 0+800 - 0+850 50.00 1.20 0.98 58.80
JUMLAH 470.40

0.00 0
0.00 0
CV. EWAKO ENGINEERING CV. SIOLA

KHAERUDDIN, ST. ANTO


0.00 0

0.00
0.00
DINAS PERHUBUNGAN
0.00

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. INDO RAYA MANDIRI
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

PEKERJAAN GALIAN
Sketsa Potongan :

1.00 1.00
Galian Drainase Kiri CL Galian Drainase Kanan

0.80 0.80

0.80 0.80

CV. INDO RAYA MANDIRI


VOL. KONTRAK REALISASI
Err:509 ### -660.00 ###
PANJANG Ba Bb TINGGI VOLUME
NO STATION
(M) (M) (M) (M) (M3)
(1) (2) (3) (4) (4) (5) (6)
SEGMEN III (P3) :
1 0+850 - 0+900 50.00 1.00 1.20 0.80 88.00
2 0+900 - 1+000 50.00 1.00 1.10 0.80 84.00
3 1+000 - 1+050 50.00 1.00 1.10 0.80 84.00
4 1+050 - 1+100 50.00 1.00 1.10 0.80 84.00
5 1+100 - 1+150 50.00 1.00 1.00 0.80 80.00
6 1+150 - 1+200 50.00 1.00 1.00 0.80 80.00
7 1+200 - 1+250 50.00 1.00 1.00 0.80 80.00
8 1+250 - 1+300 50.00 1.00 1.00 0.80 80.00
JUMLAH 660.00

0.00 0
0.00 0
CV. EWAKO ENGINEERING CV. SIOLA

KHAERUDDIN, ST. ANTO


0.00 0

0.00
0.00
DINAS PERHUBUNGAN
0.00

MARLIN FEBRIYANDA, ST.


1.00
0.8
NA KEC. TOPOYO

Galian Drainase Kanan

0.80

0.80

SIOLA
SELISIH
Err:509 M3

KETERANGAN
(7)
0. 8
NA KEC. TOPOYO

1.00
Galian Drainase Kanan

0.80

0.80

SIOLA
SELISIH
Err:509 ###

KETERANGAN

(7)
DIRI

NA KEC. TOPOYO

1.00
Galian Drainase Kanan

0.80

0.80

RAYA MANDIRI
SELISIH
Err:509 ###

KETERANGAN

(7)

Volume Sudah
termasuk Galian
Kiri dan Kanan
RENCANA ANGGARA
NAMA PAKET : BELANJA MODAL PEMBANGUNAN TA
SATUAN KERJA : DINAS PERHUBUNGAN
LOKASI : BABANA
SUMBER DANA : APBD
NO. KONTRAK : 01/DISHUB/KONSTRUKSI/
TAHUN ANGGARAN : 2017

NOMOR
MATA PEKERJAAN & URAIAN SATUAN
PEMBAYAR
AN
1 2 3
I PEKERJAAN PERSIAPAN
1 Pemasangan dan pengukuran Bowplank m'
2 Mobilisasi dan Demobilisasi ls
3 Pembersihan dan perataan lahan m2
4 Pembuatan gudang m2
5 Pembuatan begeng pekerja m2

II PEKERJAAN TANAH
1 Galian tanah m3
2 Urugan kembali m3

III PEKERJAAN PONDASI/PANCANG


1 Pemancangan Manual m'
2 Tiang Pancang
2.1 Lahan produksi tebal 8 cm Beton 14,5 Mp m2
2.2 Bekisting Pracetak (10-12 kali pakai)
Pembuatan m2
Pemasangan dan membuka bh
2.3 Besi kg
2.4 Beton K-275 m3
Penuangan/menabur beton m3
3 Langsir Tiang Pancang ls/bh

IV PEKERJAAN BETON
BALOK
1 B1
1.1 Bekisting m2
1.2 Besi kg
1.3 Beton m3
2 B2
2.1 Bekisting m2
2.2 Besi kg
2.3 Beton m3
3 B3
3.1 Bekisting m2
3.2 Besi kg
3.3 Beton m3
4 Balok Melintang m3
4.1 Serutan m2
4.2 Pemasangan m3
5 Balok Memanjang m3
5.1 Serutan m2
5.2 Pemasangan m3
6 Pelat Lantai Papan m3
6.1 Serutan m2
6.2 Pemasangan m3
7 Papan Jepit m3
7.1 Serutan m2
7.2 Pemasangan m3
V PEKERJAAN ARSITEKTURAL
1 Pembuatan Pondok
1.1 Kolom kayu kelas II 15/15 m3
1.1.1 Serutan m2
1.1.2 Pemasangan m3
1.1.3 Pengecatan m2
1.2 Balok Gelagar m3
1.2.1 Serutan m2
1.2.2 Pemasangan m3
1.2.3 Pengecatan m2
1.3 Pekerjaan Atap
1.3.1 Pemasangan Kuda-kuda m3
1.3.2 Pemasangan Gording m3
1.3.3 Pemasangan Atap m2
1.3.4 Pemasangan Nok m'
1.3.5 Pemasangan Listplank m'
2 Kursi kayu kelas II m3
2.1 Serutan m2
2.2 Pemasangan m3
2.3 Pengecatan m2
3 Patok Tambat Besi Pipa 1,5" tebal 2 mm
3.1 Pemasangan kg
3.2 Perakitan kg
3.3 Pengelasan cm
4 Fender Elastomer m3
4.1 Pemasangan m3

Total Anggaran
Pajak Pertambahan Nilai ( PPN)
Total Anggaran
Pembulatan
NA ANGGARAN BIAYA (RAB)
PEMBANGUNAN TAMBATAN PERAHU DESA BABANA KEC. BUDONG-BUDONG
UBUNGAN

KONSTRUKSI/VII/2017

KUANTITAS HARGA SATUAN

4 5

92 Rp 69,081
1 Rp 11,500,000
24 Rp 14,950
12 Rp 1,191,696
12 Rp 1,235,902
SUB TOTAL

7.80 Rp 71,875
0.80 Rp 51,750
SUB TOTAL

108.00 Rp 196,880

36.00 Rp 96,830
108.00 Rp 55,825
18.00 Rp 9,867
526.42 Rp 35,640
6.75 Rp 1,348,025
6.75 Rp 56,327
18.00 Rp 500,000
SUB TOTAL

58.70 Rp 363,952
408.22 Rp 35,640
4.23 Rp 1,348,025

3.00 Rp 363,952
17.94 Rp 35,640
0.21 Rp 1,348,025

20.80 Rp 363,952
137.56 Rp 35,640
1.44 Rp 1,348,025
0.97 Rp 3,365,000
41.58 Rp 19,021
0.97 Rp 614,750
0.95 Rp 3,365,000
39.42 Rp 19,021
0.95 Rp 614,750
3.94 Rp 3,365,000
303.40 Rp 19,021
3.94 Rp 614,750
0.29 Rp 3,365,000
31.60 Rp 19,021
0.29 Rp 614,750
SUB TOTAL
1.57 Rp 3,365,000
45.88 Rp 19,021
1.57 Rp 614,750
45.88 Rp 69,033
1.61 Rp 3,365,000
78.80 Rp 19,021
1.61 Rp 614,750
78.80 Rp 69,033

3.22 Rp 6,892,180
4.08 Rp 8,114,975
271.00 Rp 96,904
30.50 Rp 79,948
10.80 Rp 63,032
0.53 Rp 3,365,000
39.56 Rp 19,021
0.53 Rp 614,750
39.56 Rp 69,033

8.47 Rp 45,002
8.47 Rp 1,561
82.43 Rp 13,919
0.35 Rp 65,000,000
0.35 Rp 614,750
SUB TOTAL
SUB TOTAL
NA KEC. BUDONG-BUDONG

TOTAL
HARGA

Rp 6,355,406
Rp 11,500,000
Rp 358,800
Rp 14,300,354
Rp 14,830,826
Rp 47,345,385.00

560,625
41,400
Rp 602,025.00

Rp 21,263,040

Rp 3,485,874
Rp 6,029,115
Rp 177,606
Rp 18,761,433
Rp 9,099,172
Rp 380,207
Rp 9,000,000
Rp 68,196,448.00

Rp 21,363,982
Rp 14,548,757
Rp 5,702,148

Rp 1,091,856
Rp 639,226
Rp 287,129

Rp 7,570,202
Rp 4,902,801
Rp 1,941,157
Rp 3,270,780
Rp 790,893
Rp 597,537
Rp 3,179,925
Rp 749,808
Rp 580,939
Rp 13,244,640
Rp 5,770,971
Rp 2,419,655
Rp 975,850
Rp 601,064
Rp 178,277
Rp 90,407,596.63
Rp 5,297,856
Rp 872,683
Rp 967,862
Rp 3,167,212
Rp 5,404,190
Rp 1,498,855
Rp 987,288
Rp 5,439,763

Rp 22,209,361
Rp 33,092,868
Rp 26,260,876
Rp 2,438,414
Rp 680,740
Rp 1,798,593
Rp 752,414
Rp 328,584
Rp 2,730,719

Rp 381,324
Rp 13,230
Rp 1,147,301
Rp 22,750,000
Rp 215,162
Rp 138,435,294.55
Rp 344,986,749
Rp 344,986,749
Rp 34,498,675
Rp 379,485,424
Rp 379,000,000
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

Pemasangan & Pengukuran Bowplank


Sketsa Gambar :

CV. SIOLA
VOL. KONTRAK
92.00 m'
PANJANG JUMLAH TOTAL PANJANG
NO URAIAN
(M) (M)
(1) (2) (3) (4) (5)

1 Arah Memanjang 11.25 2.00 22.50


4.05 6.00 24.30
2 Arah Melintang 27.80 2.00 55.60
4.27 2.00 8.54

JUMLAH 110.94

Diperiksa oleh, Dibuat oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. EWAKO ENGINEERING CV. SIOLA
KHAERUDDIN, ST.
Inspektor Pelaksana Lapangan

Disetujui oleh, Diketahui oleh,


Pejabat Pelaksana Teknis kegiatan (PPTK) Pengawas Kecamatan
Dinas Perhubungan Dinas Perhubungan
Kab. Mamuju Tengah Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd. MARLIN FEBRIYANDA, ST.


NIP.196307151992031013 NIP. 198302072015041002
A PATULANA KEC. TOPOYO

plank

CV. SIOLA
REALISASI SELISIH
110.94 m' 18.94 m'
TOTAL PANJANG KETERANG
(M) AN
(5) (6)

22.50
24.30
55.60
8.54

110.94

Dibuat oleh,
Kontraktor Pelaksana
CV. SIOLA
ANTO
Pelaksana Lapangan

Diketahui oleh,
Pengawas Kecamatan
Dinas Perhubungan
Kab. Mamuju Tengah

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC

Pemancangan Manual
Sketsa Gambar :

CV. SIO
VOL. KONTRAK
108.00
PANJANG JUMLAH TOTAL PANJANG
NO URAIAN
(M) (BATANG) (M)
(1) (2) (3) (4) (5)

1 Err:509 6.00 18.00 108.00

JUMLAH 108.00

Diperiksa oleh,
Konsultan Pengawas Kontraktor Pel
CV. EWAKO ENGINEERING

KHAERUDDIN, ST.
Inspektor Pelaksana Lap

Disetujui oleh,
Pejabat Pelaksana Teknis kegiatan (PPTK) Pengawas Keca
Dinas Perhubungan Dinas Perhubu
Kab. Mamuju Tengah Kab. Mamuju T

M. ARIFIN NUR, S.Pd. MARLIN FEBRIYA


NIP.196307151992031013 NIP. 19830207201
ESA PATULANA KEC. TOPOYO

CV. SIOLA
OL. KONTRAK REALISASI SELISIH
m' 108.00 m' 0.00 m'
TOTAL PANJANG
KETERANGAN
(M)
(5) (6)

108.00

108.00

Dibuat oleh,
Kontraktor Pelaksana
CV. SIOLA

ANTO
Pelaksana Lapangan

Diketahui oleh,
Pengawas Kecamatan
Dinas Perhubungan
Kab. Mamuju Tengah

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC

Pekerjaan Beton
Sketsa Gambar :

PANJANG LEBAR TINGGI JUMLAH


NO URAIAN
(M) (M) (M) (BATANG)
(1) (2) (3) (4)
PEKERJAAN PONDASI/PANCANG
Tiang Pancang 6.00 0.25 0.25 18

PEKERJAAN STRUKTUR
1 B1 3.97 0.25 0.30 15
2 B2 4.27 0.25 0.30 1
3 B3 3.75 0.25 0.30 8
JUMLAH
Diperiksa oleh, Dibuat ole
Konsultan Pengawas Kontraktor Pela
CV. EWAKO ENGINEERING

KHAERUDDIN, ST.
Inspektor Pelaksana Lap

Disetujui oleh, Diketahui ole


Pejabat Pelaksana Teknis kegiatan (PPTK) Pengawas Keca
Dinas Perhubungan Dinas Perhubu
Kab. Mamuju Tengah Kab. Mamuju Te

M. ARIFIN NUR, S.Pd. MARLIN FEBRIYA


NIP.196307151992031013 NIP. 19830207201
ULANA KEC. TOPOYO

CV. SIOLA
REALISASI KONTRAK SELISIH
(M3) (M3) (M3)
(5) (6)

6.75 6.75 0.00

4.47 4.23 0.24


0.32 0.21 0.11
2.25 1.44 0.81
13.79 12.63 1.16
Dibuat oleh,
ontraktor Pelaksana
CV. SIOLA

ANTO
Pelaksana Lapangan

Diketahui oleh,
Pengawas Kecamatan
Dinas Perhubungan
Kab. Mamuju Tengah

RLIN FEBRIYANDA, ST.


P. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY
PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA K
Pengadaan dan Pemasangan Material Kayu
Sketsa Gambar :

PANJANG LEBAR TINGGI


NO URAIAN
(M) (M) (M)
(1) (2) (3)
PEKERJAAN STRUKTUR

1 Pelat Lantai Papan


Memanjang 4.05 0.03 0.25
Melintang 4.27 0.03 0.25
2 Papan Jepit 78.10 0.03 0.20
3 Balok Gelagar 8/12 cm
Memanjang 35.00 0.08 0.12
Melintang 4.16 0.08 0.12
PEKERJAAN ARSITEKTURAL
1 Pembuatan Pondok
1.1 1.1.1 Kolom kayu kelas II 15/15 4.00 0.15 0.15
1.1.2 Kolom Pagar Kayu kelas II 15/15 1.00 0.08 0.12
1.2 Balok Gelagar
1.2.1 Gelagar Atap 27.80 0.06 0.12
1.2.2 Gelagar Kursi 1.20 0.06 0.12
1.2.3 Gelagar Pagar 37.93 0.07 0.05
1.3 Pekerjaan Atap
1.3.1 Pemasangan Kuda-kuda 0.40
1.3.2 Pemasangan Gording 27.80 0.08 0.12
2 Kursi kayu kelas II 23.53 0.03 0.25
JUMLAH
Diperiksa oleh,
Konsultan Pengawas
CV. EWAKO ENGINEERING

KHAERUDDIN, ST.
Inspektor

Disetujui oleh,
Pejabat Pelaksana Teknis kegiatan (PPTK)
Dinas Perhubungan
Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
SA PATULANA KEC. TOPOYO
l Kayu

CV. SIOLA
JUMLAH REALISASI KONTRAK SELISIH
(BATANG) (M3) (M3) (M3)
(4) (5) (6)

108 3.28
41 1.31 3.94 0.66
1 0.39 0.29 0.10

3 1.01 0.95
42 1.68 0.77
0.97

16 1.44
14 0.13 1.57 0.00

4 0.80
16 0.14 1.61 -0.27
1.61 -0.27
3 0.40

8 3.22 3.22 0.00


10 2.67 4.08 -1.41
2 0.35 0.53 -0.18
JUMLAH 16.83 17.16 -0.33
Dibuat oleh,
Kontraktor Pelaksana
CV. SIOLA

ANTO
Pelaksana Lapangan

Diketahui oleh,
Pengawas Kecamatan
Dinas Perhubungan
Kab. Mamuju Tengah

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY
PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA K
Pekerjaan Serutan Kayu
Sketsa Gambar :

PANJANG LEBAR TINGGI


NO URAIAN
(M) (M) (M)
(1) (2) (3)
PEKERJAAN STRUKTUR

1 Pelat Lantai Papan


Memanjang 4.05 0.03 0.25
Melintang 4.27 0.03 0.25
2 Papan Jepit 78.10 0.03 0.20
3 Balok Gelagar 8/12 cm
Memanjang 35.00 0.08 0.12
Melintang 4.16 0.08 0.12
PEKERJAAN ARSITEKTURAL
1 Pembuatan Pondok
1.1 1.1.1 Kolom kayu kelas II 15/15 4.00 0.15 0.15
1.1.2 Kolom Pagar Kayu kelas II 15/15 1.00 0.08 0.12
1.2 Balok Gelagar
1.2.1 Gelagar Atap 27.80 0.06 0.12
1.2.2 Gelagar Kursi 1.20 0.06 0.12
1.2.3 Gelagar Pagar 37.93 0.07 0.05
2 Kursi kayu kelas II 23.53 0.03 0.25
JUMLAH
Diperiksa oleh,
Konsultan Pengawas
CV. EWAKO ENGINEERING

KHAERUDDIN, ST.
Inspektor

Disetujui oleh,
Pejabat Pelaksana Teknis kegiatan (PPTK)
Dinas Perhubungan
Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
SA PATULANA KEC. TOPOYO

CV. SIOLA
JUMLAH REALISASI KONTRAK SELISIH
(BATANG) (M3) (M3) (M3)
(4) (5) (6)

108 244.94
41 98.04 303.40 39.58
1 35.15 31.60 3.55

3 42.00 39.42
42 69.89 30.89
41.58

16 38.40
14 5.60 45.88 -1.88

4 40.03
16 6.91 78.80 -4.55
78.80 -4.55
3 27.31
2 26.35 0.53 25.82
JUMLAH 634.62 541.21 93.41
Dibuat oleh,
Kontraktor Pelaksana
CV. SIOLA

ANTO
Pelaksana Lapangan

Diketahui oleh,
Pengawas Kecamatan
Dinas Perhubungan
Kab. Mamuju Tengah

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY
PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA K
Pekerjaan Pengecatan
Sketsa Gambar :

PANJANG LEBAR TINGGI


NO URAIAN
(M) (M) (M)
(1) (2) (3)
PEKERJAAN ARSITEKTURAL
1 Pembuatan Pondok
1.1 1.1.1 Kolom kayu kelas II 15/15 4.00 0.15 0.15
1.1.2 Kolom Pagar Kayu kelas II 15/15 1.00 0.08 0.12
1.2 Balok Gelagar
1.2.1 Gelagar Atap 27.80 0.06 0.12
1.2.2 Gelagar Kursi 1.20 0.06 0.12
1.2.3 Gelagar Pagar 37.93 0.07 0.05
2 Kursi kayu kelas II 23.53 0.03 0.25
JUMLAH

Diperiksa oleh,
Konsultan Pengawas
CV. EWAKO ENGINEERING
KHAERUDDIN, ST.
Inspektor

Disetujui oleh,
Pejabat Pelaksana Teknis kegiatan (PPTK)
Dinas Perhubungan
Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
SA PATULANA KEC. TOPOYO

CV. SIOLA
JUMLAH REALISASI KONTRAK SELISIH
(BATANG) (M3) (M3) (M3)
(4) (5) (6)

16 38.40
14 5.60 45.88 -1.88

4 40.03
16 6.91 78.80 -4.55
3 27.31
2 26.35 0.53 25.82
JUMLAH 144.61 125.21 19.39

Dibuat oleh,
Kontraktor Pelaksana
CV. SIOLA
ANTO
Pelaksana Lapangan

Diketahui oleh,
Pengawas Kecamatan
Dinas Perhubungan
Kab. Mamuju Tengah

MARLIN FEBRIYANDA, ST.


NIP. 198302072015041002
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

Pengadaan Patok Tambat


Sketsa Gambar :

CV. SIOLA
REALISASI KONTRAK
NO URAIAN
(unit) (unit)
(1) (2) (5)
PEKERJAAN ARSITEKTURAL
1 Patok Tambat Besi Pipa 1,5" tebal 2 mm 7.00 7.00

Diperiksa oleh, Dibuat oleh,


Konsultan Pengawas Kontraktor Pelaksana
CV. EWAKO ENGINEERING CV. SIOLA

KHAERUDDIN, ST. ANTO


Inspektor Pelaksana Lapangan

Disetujui oleh, Diketahui oleh,


Pejabat Pelaksana Teknis kegiatan (PPTK) Pengawas Kecamatan
Dinas Perhubungan Dinas Perhubungan
Kab. Mamuju Tengah Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd. MARLIN FEBRIYANDA, ST.


NIP.196307151992031013 NIP. 198302072015041002
A KEC. TOPOYO

CV. SIOLA
SELISIH
(unit)
(6)

0.00

aktor Pelaksana

sana Lapangan

ketahui oleh,
awas Kecamatan
s Perhubungan
Mamuju Tengah

FEBRIYANDA, ST.
302072015041002
CV. SIOLA
BACK UP DATA QUANTITY
PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC.
PENGADAAN DAN PEMASANGAN FENDER
Sketsa Gambar :

CV.
PANJANG LEBAR TEBAL REALISASI
NO URAIAN
(M) (M) (M) (M3)
(1) (2) (3) (5)
PEKERJAAN ARSITEKTURAL

1 Fender Elastomer 27.80 0.25 0.05 0.35

JUMLAH 0.35
Diperiksa oleh, Dibuat oleh,
Konsultan Pengawas Kontraktor Pelaksana
CV. EWAKO ENGINEERING CV. SIOLA
KHAERUDDIN, ST. ANTO
Inspektor Pelaksana Lapangan

Disetujui oleh, Diketahui oleh,


Pejabat Pelaksana Teknis kegiatan (PPTK) Pengawas Kecamatan
Dinas Perhubungan Dinas Perhubungan
Kab. Mamuju Tengah Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd. MARLIN FEBRIYANDA,


NIP.196307151992031013 NIP. 19830207201504100
KEC. TOPOYO

CV. SIOLA
KONTRAK SELISIH
(M3) (M3)
(5) (6)

0.35 0.00

0.35 0.00

elaksana
apangan

oleh,
ecamatan
bungan
u Tengah

YANDA, ST.
015041002
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
SATUAN KERJA DINAS PERHUBUNGAN
NO KONTRAK 04/SP/DISHUB/KONSTRUKSI/VII/2017
TANGGAL KONTRAK 18-Jul-17
NILAI KONTRAK Rp 379,000,000
JANGKA WAKTU PELAKSANAAN 90
PELAKSANAAN 18-Jul-17
SELESAI PEKERJAAN 16-Oct-17
SUMBER DANA APBD
TAHUN ANGGARAN 2017
PENYEDIA CV. SIOLA
Dusun Kire Utara Desa Kire Kec. Budong-Budong
Kab. Mamuju Tengah
CV. EWAKO ENGINEERING
DIREKSI M. ARIFIN NUR, S.Pd.
INSPEKTOR KHAERUDDIN, ST. ANDI NUR ICHSAN, ST
PELAKSANA LAPANGAN ANTO
PENGAWAS KEC MARLIN FEBRIYANDA, ST.
NIP. 198302072015041002
PPTK M. ARIFIN NUR, S.Pd. HARIYANTO, ST., MT.
NIP NIP.196307151992031013 MUH. YAHYA SALEH ST M.Eng

DIREKTUR MUHIDDIN S
RAHU DESA PATULANA KEC. TOPOYO

Site Engineer

NIP.
HYA SALEH ST M.Eng NIP.196092191987031007
0.8 0.8
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

PEKERJAAN GALIAN
Sketsa Potongan :

1.00 1.00
Galian Drainase Kiri C
L Galian Drainase Kanan

0.80 0.80

0.80 0.80

CV. SIOLA
VOL. KONTRAK REALISASI
6,853.50 ### 570.00 ###
PANJANG Ba Bb TINGGI VOLUME
NO STATION
(M) (M) (M) (M) (M3)
(1) (2) (3) (4) (4) (5) (6)
SEGMEN I (P1) :
1 0+000 -0+050 50.00 1.00 0.90 0.60 57.00
2 0+050 -0+100 50.00 1.00 0.90 0.60 57.00
3 0+100 -0+150 50.00 1.00 0.90 0.60 57.00
4 0+150 -0+200 50.00 1.00 0.90 0.60 57.00
5 0+200 -0+250 50.00 1.00 0.90 0.60 57.00
6 0+250 -0+300 50.00 1.00 0.90 0.60 57.00
7 0+300 -0+350 50.00 1.00 0.90 0.60 57.00
8 0+350 -0+400 50.00 1.00 0.90 0.60 57.00
9 0+400 0+450 50.00 1.00 0.90 0.60 57.00
10 0+450 - 0+500 50.00 1.00 0.90 0.60 57.00
JUMLAH 570.00

0.8 0. 8
0.00 0
0.00 0
CV. EWAKO ENGINEERING CV. SIOLA
0.8
KHAERUDDIN, ST.
0.00

0.00
Pejabat Pelaksana Teknis Kegiatan
00. 8
ANTO

DINAS PERHUBUNGAN
0.00

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

PEKERJAAN GALIAN
Sketsa Potongan :

1.00 1.00
Galian Drainase Kiri CL Galian Drainase Kanan

0.80 0.80

0.80 0.80

CV. SIOLA
VOL. KONTRAK REALISASI
6,283.50 ### 570.00 ###
PANJANG Ba Bb TINGGI VOLUME
NO STATION
(M) (M) (M) (M) (M3)
(1) (2) (3) (4) (4) (5) (6)
SEGMEN I (P1) :
1 0+500 - 0+550 50.00 1.00 0.90 0.60 57.00
2 0+550 - 0+600 50.00 1.00 0.90 0.60 57.00
3 0+600 - 0+650 50.00 1.00 0.90 0.60 57.00
4 0+650 - 0+700 50.00 1.00 0.90 0.60 57.00
5 0+700 - 0+750 50.00 1.00 0.90 0.60 57.00
6 0+750 - 0+800 50.00 1.00 0.90 0.60 57.00
7 0+800 - 0+850 50.00 1.00 0.90 0.60 57.00
8 0+850 - 0+900 50.00 1.00 0.90 0.60 57.00
9 0+900 - 0+950 50.00 1.00 0.90 0.60 57.00
10 0+950 - 0+1000 50.00 1.00 0.90 0.60 57.00
JUMLAH 570.00

0.00 0
0.00 0
CV. EWAKO ENGINEERING CV. SIOLA
KHAERUDDIN, ST. ANTO
0.00 0

0.00
Pejabat Pelaksana Teknis Kegiatan
DINAS PERHUBUNGAN
0.00

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
CV. SIOLA
BACK UP DATA QUANTITY

PAKET PEKERJAAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

PEKERJAAN GALIAN
Sketsa Potongan :

1.00 1.00
Galian Drainase Kiri CL Galian Drainase Kanan

0.80 0.80

0.80 0.80

CV. SIOLA
VOL. KONTRAK REALISASI
5,713.50 ### 570.00 ###
PANJANG Ba Bb TINGGI VOLUME
NO STATION
(M) (M) (M) (M) (M3)
(1) (2) (3) (4) (4) (5) (6)
SEGMEN III (P3) :
1 0+000 - 0+050 50.00 1.00 0.90 0.60 57.00
2 0+050 - 0+100 50.00 1.00 0.90 0.60 57.00
3 0+100 - 0+150 50.00 1.00 0.90 0.60 57.00
4 0+150 - 0+200 50.00 1.00 0.90 0.60 57.00
5 0+200 - 0+250 50.00 1.00 0.90 0.60 57.00
6 0+250 - 0+300 50.00 1.00 0.90 0.60 57.00
7 0+300 - 0+350 50.00 1.00 0.90 0.60 57.00
8 0+350 - 0+400 50.00 1.00 0.90 0.60 57.00
9 0+400 - 0+450 50.00 1.00 0.90 0.60 57.00
10 0+450 - 0+400 50.00 1.00 0.90 0.60 57.00
JUMLAH 570.00

0.00 0
0.00 0
CV. EWAKO ENGINEERING CV. SIOLA
KHAERUDDIN, ST. ANTO
0.00 0

0.00
Pejabat Pelaksana Teknis Kegiatan
DINAS PERHUBUNGAN
0.00

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
0.8
LANA KEC. TOPOYO

1.00
Galian Drainase Kanan

0.80

0.80

SIOLA
SELISIH
-6283.50 ###

KETERANGAN
(7)

0. 8
0. 8
LANA KEC. TOPOYO

1.00
Galian Drainase Kanan

0.80

0.80

SIOLA
SELISIH
-5713.50 ###

KETERANGAN

(7)

Volume Sudah
termasuk Galian
Kiri dan Kanan
LANA KEC. TOPOYO

1.00
Galian Drainase Kanan

0.80

0.80

SIOLA
SELISIH
-5143.50 ###

KETERANGAN

(7)

Volume Sudah
termasuk Galian
Kiri dan Kanan
REAL TIME SC
NAMA PEKERJAAN : BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DES
LOKASI : Kab. Mamuju Tengah
INSTANSI : DINAS PERHUBUNGAN
TAHUN ANGGARAN : 2014
KONTRAKTOR PELAKSANA : CV. SIOLA
KONSULTAN PENGAWAS : CV. EWAKO ENGINEERING
NILAI KONTRAK : Rp 379,000,000.00

BULAN 1
NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT
1

1. DIVISI 1. UMUM Rp 8,550,000 6.33 0.79

2 DIVISI 5. PERKERASAN BERBUTIR Rp - 0.00

JUMLAH Rp 135,143,272 100%

BOBOT RENCANA 0.791


BOBOT KOMULATIF RENCANA 0.791
BOBOT REALISASI 34.52
BOBOT KUMULATIF REALISASI 34.52
BOBOT DEVIASI 33.73

KETERANGAN WARNA :
Disetujui Oleh,
Kurva "S" Realisasi Pejabat Pelaksana Teknik Kegiat
DINAS PERHUBUNGA
Kurva "S" Rencana Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd.


NIP.19630715199203101
REAL TIME SCHEDULE
N TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

BULAN 1 BULAN 2 BULAN 3


2 3 4 5 6 7 8 9 10 11

0.79 0.79 0.79 0.79 0.79 0.79 0.79

0.00 0.00 0.00 0.00 0.00 0.00 0.00

TARGET WAKTU PELAKSANAAN SELAMA 60 HARI

0.791 47.628 47.628 0.791 0.791 0.791 0.791 0.000 0.000 0.000
1.582 49.209 96.837 97.628 98.418 99.209 100.000 100.000 100.000 100.000
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Disetujui Oleh, Diperiksa oleh,


abat Pelaksana Teknik Kegiatan (PPTK) Konsultan Pengawas
DINAS PERHUBUNGAN 0.00
Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013 Supervisor Engineer
AKSANAAN SELAMA 60 HARI
PROSENTASE
PELAKSANAAN 60 Hari Kerja
KET

PEKERJAAN
LAPORAN HARIA
HARI/TANGGAL : SENIN / 16 November 2015
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
Kab. Mamuju Tengah

A. PEKERJAAN B. MATERIAL, P

No. Jenis Pekerjaan Volume Satuan No.

1 Pekerjaan Persiapan 0.50 LS 1 Skop

2 Pekerjaan Tanah 2 Skop

Galian Biasa 375.42 M3 3 Linggis


Pembersihan dan Pengupasan Lahan 441.08 M3
M2 4 Alat Pertukan
-
5 Excavator

C. JUMLAH PEKERJA/PERSONIL D. MATERIAL, P


No. Jenis Pekerjaan Jmlh Org Satuan No.

1 Pelaksana Lapangan 1.00 Org

2 Pengawas Lapangan 1.00 Org

3 Operator Excavator 1.00 Org


E. Cuaca/bencana Alam Kejadian Penghambat Pekerjaan
Jam
06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00
Jenis
Hujan
Gerimis
Mendung
Cerah

F. Usul/Pengajuan/Saran/Instruksi/Kesepakatan/Pelaporan

Unsur Uraian

Koordinator Pengawas
Dinas Pertanian Perikanan
Peternakan Perkebunan &
Kehutanan

Konsultan Pengawas
PT SAGA BANGUN
PERSADA

Pelaksana Kegiatan
CV. PERMATA MARYAM
Pelaksana Kegiatan
CV. PERMATA MARYAM
LAPORAN HARIA
HARI/TANGGAL : SELASA / 17 November 2015
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
Kab. Mamuju Tengah

A. PEKERJAAN B. MATERIAL, P

No. Jenis Pekerjaan Volume Satuan No.

1 Pekerjaan Persiapan 0.00 0 1 Skop

2 Pekerjaan Tanah 2 Skop

Galian Biasa 383.42 M3 3 Linggis


Pembersihan dan Pengupasan Lahan 449.08 M3
4 Alat Pertukan

5 Excavator

C. JUMLAH PEKERJA/PERSONIL D. MATERIAL, P


No. Jenis Pekerjaan Jmlh Org Satuan No.

1 Pelaksana Lapangan 1.00 Org

2 Pengawas Lapangan 1.00 Org

3 Operator Excavator 1.00 Org


E. Cuaca/bencana Alam Kejadian Penghambat Pekerjaan
Jam
06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00
Jenis
Hujan
Gerimis
Mendung
Cerah

F. Usul/Pengajuan/Saran/Instruksi/Kesepakatan/Pelaporan

Unsur Uraian

Koordinator Pengawas
Dinas Pertanian Perikanan
Peternakan Perkebunan &
Kehutanan

Konsultan Pengawas
PT SAGA BANGUN
PERSADA

Pelaksana Kegiatan
CV. PERMATA MARYAM
Pelaksana Kegiatan
CV. PERMATA MARYAM
LAPORAN HARIA
HARI/TANGGAL : RABU / 18 November 2015
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
Kab. Mamuju Tengah

A. PEKERJAAN B. MATERIAL, P

No. Jenis Pekerjaan Volume Satuan No.

1 Pekerjaan Persiapan 0.00 0 1 Skop

2 Pekerjaan Tanah 2 Skop

Galian Biasa 384.42 M3 3 Linggis


Pembersihan dan Pengupasan Lahan 450.08 M3
4 Alat Pertukan

5 Excavtor

C. JUMLAH PEKERJA/PERSONIL D. MATERIAL, P


No. Jenis Pekerjaan Jmlh Org Satuan No.

1 Pelaksana Lapangan 1.00 Org

2 Pengawas Lapangan 1.00 Org

3 Operator Excavator 1.00 Org


E. Cuaca/bencana Alam Kejadian Penghambat Pekerjaan
Jam
06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00
Jenis
Hujan
Gerimis
Mendung
Cerah

F. Usul/Pengajuan/Saran/Instruksi/Kesepakatan/Pelaporan

Unsur Uraian

Koordinator Pengawas
Dinas Pertanian Perikanan
Peternakan Perkebunan &
Kehutanan

Konsultan Pengawas
PT SAGA BANGUN
PERSADA

Pelaksana Kegiatan
CV. PERMATA MARYAM
Pelaksana Kegiatan
CV. PERMATA MARYAM
LAPORAN HARIA
HARI/TANGGAL : KAMIS / 19 November 2015
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
Kab. Mamuju Tengah

A. PEKERJAAN B. MATERIAL, P

No. Jenis Pekerjaan Volume Satuan No.

1 Pekerjaan Persiapan 0.00 0 1 Skop

2 Pekerjaan Tanah 2 Skop

Galian Biasa 385.42 M3 3 Linggis


Pembersihan dan Pengupasan Lahan 451.08 M3
4 Alat Pertukan

5 Excavator

C. JUMLAH PEKERJA/PERSONIL D. MATERIAL, P


No. Jenis Pekerjaan Jmlh Org Satuan No.

1 Pelaksana Lapangan 1.00 Org

2 Pengawas Lapangan 1.00 Org

3 Operator Excavator 1.00 Org


E. Cuaca/bencana Alam Kejadian Penghambat Pekerjaan
Jam
06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00
Jenis
Hujan
Gerimis
Mendung
Cerah

F. Usul/Pengajuan/Saran/Instruksi/Kesepakatan/Pelaporan

Unsur Uraian

Koordinator Pengawas
Dinas Pertanian Perikanan
Peternakan Perkebunan &
Kehutanan

Konsultan Pengawas
PT SAGA BANGUN
PERSADA

Pelaksana Kegiatan
CV. PERMATA MARYAM
Pelaksana Kegiatan
CV. PERMATA MARYAM
LAPORAN HARIA
HARI/TANGGAL : JUMAT / 20 November 2015
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
Kab. Mamuju Tengah

A. PEKERJAAN B. MATERIAL, P

No. Jenis Pekerjaan Volume Satuan No.

1 Pekerjaan Persiapan 0.00 0 1 Skop

2 Pekerjaan Tanah 2 Skop

Galian Biasa 382.82 M3 3 Linggis


Pembersihan dan Pengupasan Lahan 448.48 M3
4 Alat Pertukan
-
5 Excavator

C. JUMLAH PEKERJA/PERSONIL D. MATERIAL, P


No. Jenis Pekerjaan Jmlh Org Satuan No.

1 Pelaksana Lapangan 1.00 Org

2 Pengawas Lapangan 1.00 Org

3 Operator Excavator 1.00 Org


E. Cuaca/bencana Alam Kejadian Penghambat Pekerjaan
Jam
06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00
Jenis
Hujan
Gerimis
Mendung
Cerah

F. Usul/Pengajuan/Saran/Instruksi/Kesepakatan/Pelaporan

Unsur Uraian

Koordinator Pengawas
Dinas Pertanian Perikanan
Peternakan Perkebunan &
Kehutanan

Konsultan Pengawas
PT SAGA BANGUN
PERSADA

Pelaksana Kegiatan
CV. PERMATA MARYAM
Pelaksana Kegiatan
CV. PERMATA MARYAM
LAPORAN HARIA
HARI/TANGGAL : SABTU / 21 November 2015
NAMA PAKET BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC
Kab. Mamuju Tengah

A. PEKERJAAN B. MATERIAL, P

No. Jenis Pekerjaan Volume Satuan No.

1 Pekerjaan Persiapan 0.00 0 1 Skop

2 Pekerjaan Tanah 2 Skop

Galian Biasa 383.02 M3 3 Linggis


Pembersihan dan Pengupasan Lahan 448.68 M3
4 Alat Pertukan

5 Excavator

C. JUMLAH PEKERJA/PERSONIL D. MATERIAL, P


No. Jenis Pekerjaan Jmlh Org Satuan No.

1 Pelaksana Lapangan 1.00 Org

2 Pengawas Lapangan 1.00 Org

3 Operator Excavator 1.00 Org


E. Cuaca/bencana Alam Kejadian Penghambat Pekerjaan
Jam
06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00
Jenis
Hujan
Gerimis
Mendung
Cerah

F. Usul/Pengajuan/Saran/Instruksi/Kesepakatan/Pelaporan

Unsur Uraian

Koordinator Pengawas
Dinas Pertanian Perikanan
Peternakan Perkebunan &
Kehutanan

Konsultan Pengawas
PT SAGA BANGUN
PERSADA

Pelaksana Kegiatan
CV. PERMATA MARYAM
Pelaksana Kegiatan
CV. PERMATA MARYAM
RAN HARIAN
KONTRAKTOR CV. SIOLA
DESA PATULANA KEC. TOPOYO KONSULTAN CV. EWAKO ENGINEERING

B. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG MASUK

Jenis Volume Satuan Keterangan

1.00 Unit

2.00 Unit

Linggis 2.00 Unit

Alat Pertukangan 2.00 Set

Excavator 1.00 unit

D. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG DIGUNAKAN


Jenis Volume Satuan Keterangan
20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 Akibat

Uraian Tanda Tangan

M. ARIFIN NUR, S.Pd.


Direksi

KHAERUDDIN, ST.
Inspektor

ANTO
Pelaksana Lapangan
RAN HARIAN
KONTRAKTOR CV. SIOLA
DESA PATULANA KEC. TOPOYO KONSULTAN CV. EWAKO ENGINEERING

B. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG MASUK

Jenis Volume Satuan Keterangan

1.00 Unit

2.00 Unit

Linggis 2.00 Unit

Alat Pertukangan 2.00 Set

Excavator 1.00 unit

D. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG DIGUNAKAN


Jenis Volume Satuan Keterangan
20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 Akibat

Uraian Tanda Tangan

M. ARIFIN NUR, S.Pd.


Direksi

KHAERUDDIN, ST.
Inspektor

ANTO
Pelaksana Lapangan
RAN HARIAN
KONTRAKTOR CV. SIOLA
DESA PATULANA KEC. TOPOYO KONSULTAN CV. EWAKO ENGINEERING

B. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG MASUK

Jenis Volume Satuan Keterangan

1.00 Unit

2.00 Unit

Linggis 2.00 Unit

Alat Pertukangan 2.00 Set

Excavtor 1.00 unit

D. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG DIGUNAKAN


Jenis Volume Satuan Keterangan
20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 Akibat

Uraian Tanda Tangan

M. ARIFIN NUR, S.Pd.


Direksi

KHAERUDDIN, ST.
Inspektor
ANTO
Pelaksana Lapangan
RAN HARIAN
KONTRAKTOR CV. SIOLA
DESA PATULANA KEC. TOPOYO KONSULTAN CV. EWAKO ENGINEERING

B. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG MASUK

Jenis Volume Satuan Keterangan

1.00 Unit

2.00 Unit

Linggis 2.00 Unit

Alat Pertukangan 2.00 Set

Excavator 1.00 unit

D. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG DIGUNAKAN


Jenis Volume Satuan Keterangan
20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 Akibat

Uraian Tanda Tangan

M. ARIFIN NUR, S.Pd.


Direksi

KHAERUDDIN, ST.
Inspektor

ANTO
Pelaksana Lapangan
RAN HARIAN
KONTRAKTOR CV. SIOLA
DESA PATULANA KEC. TOPOYO KONSULTAN CV. EWAKO ENGINEERING

B. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG MASUK

Jenis Volume Satuan Keterangan

1.00 Unit

2.00 Unit

Linggis 2.00 Unit

Alat Pertukangan 2.00 Set

Excavator 1.00 unit

D. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG DIGUNAKAN


Jenis Volume Satuan Keterangan
20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 Akibat

Uraian Tanda Tangan

M. ARIFIN NUR, S.Pd.


Direksi

KHAERUDDIN, ST.
Inspektor

ANTO
Pelaksana Lapangan
RAN HARIAN
KONTRAKTOR CV. SIOLA
DESA PATULANA KEC. TOPOYO KONSULTAN CV. EWAKO ENGINEERING

B. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG MASUK

Jenis Volume Satuan Keterangan

1.00 Unit

2.00 Unit LIBUR LEBARAN

Linggis 2.00 Unit

Alat Pertukangan 2.00 Set

Excavator 1.00 unit

D. MATERIAL, PERALATAN, DAN BAHAN KONSTRUKSI YANG DIGUNAKAN


Jenis Volume Satuan Keterangan
20.00 21.00 22.00 23.00 24.00 01.00 02.00 03.00 04.00 05.00 Akibat

Uraian Tanda Tangan

M. ARIFIN NUR, S.Pd.


Direksi

KHAERUDDIN, ST.
Inspektor

ANTO
Pelaksana Lapangan
CV LIGA PUTRA KIRE
LAPO

NAMA PEKERJAAN : BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA


LOKASI : Kab. Mamuju Tengah
INSTANSI : DINAS PERHUBUNGAN
TAHUN ANGGARAN : 2017
KONTRAKTOR PELAKSANA : CV. SIOLA
KONSULTAN PENGAWAS : CV. EWAKO ENGINEERING
NILAI KONTRAK : Rp 379,000,000

KONTRAK AWAL
NO URAIAN PEKERJAAN SAT
HARGA SATUAN
KUANTITAS
(Rp)
a b c e f
I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 Rp 8,550,000.00
Jumlah Harga
III DIVISI 3. PEKERJAAN TANAH
3.1.1 Galian Tanah Menggunakan Alat (Mekanis) M3 6,853.5 Rp 14,391.14
3.2.1 Pembersihan dan Pengupasan Lahan M3 8,035.4 Rp 3,480.05
Jumlah Harga
Jumlah Harga
Jumlah
Dibulatkan
Progres Minggu lalu : - %
Progres Minggu ini : 34.52 %
Progres sampai Minggu ini : 34.52 %

Disetujui Oleh,
Pejabat Pelaksana Teknis Kegiatan
DINAS PERHUBUNGAN
Kab. Mamuju Tengah

M. ARIFIN NUR, S.Pd.


NIP.196307151992031013
CV LIGA PUTRA KIRE
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN
(16 November 2015 - 22 November 2015)
RAHU DESA PATULANA KEC. TOPOYO

KONTRAK AWAL PERUBAHAN KONTRAK


S/D MINGGU LALU
JUMLAH HARGA HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT
KUANTITAS KUANTITAS
(Rp) (Rp) (Rp) (Rp) %
g g f h h i

Rp 8,550,000.00 1.00 Rp 8,550,000.00 Rp 8,550,000.00 - Rp - -


Rp 8,550,000.00 Rp 8,550,000.00 Rp - -

Rp 98,629,677.99 6,853.50 Rp 14,391.14 Rp 98,629,677.99 - Rp - -


Rp 27,963,593.77 8,035.40 Rp 3,480.05 Rp 27,963,593.77 - Rp - -
Rp 126,593,271.76 Rp 126,593,271.76 Rp - -
Rp - Rp - Rp - -
Rp 135,143,271.76 Rp 135,143,271.76 Rp - -
Rp 135,143,000.00 Rp 135,143,000.00 Rp -

Diperiksa oleh,
Konsultan Pengawas

KHAERUDDIN, ST.
Inspector
CV LIGA PUTRA KIRE
N

MINGGU : 1 (SATU)

KEMAJUAN FISIK
MINGGU INI S/D MINGGU INI
JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT
KUANTITAS KUANTITAS
(Rp) % (Rp) %
h i h i

0.50 Rp 4,275,000.00 3.16 0.50 Rp 4,275,000.00 3.16


Rp 4,275,000.00 3.16 Rp 4,275,000.00 3.16

2,294.5 Rp 33,020,470.73 24.43 2,294.50 Rp 33,020,470.73 24.43


2,688.5 Rp 9,355,998.42 6.92 2,688.47 Rp 9,355,998.42 6.92
Rp 42,376,469.15 31.36 Rp 42,376,469.15 31.36
Rp - - Rp - -
Rp 46,651,469.15 34.52 Rp 46,651,469.15 34.52
Rp 46,651,000.00 Rp 46,651,000.00

TOPOYO, 22 November 2015

Dibuat Oleh :
Kontraktor Pelaksana
CV. SIOLA

ANTO
Pelaksana Lapangan
CV. DAMBUESE JAYA

R E K A P I TU L A S I
LAPORAN MINGGUAN
BELANJA MODAL PEMBANGUNAN TAMBATAN PERAHU DESA PATULANA KEC. TOP

MINGGU KE
KONSULTAN CV. EWAKO ENGINEERING KONTRAKTOR
NO. KONTRAK :- NO. KONTRAK

REALI
BOBOT
NO Jumlah S/D MINGGU LALU
URAIAN PEKERJAAN
DIVISI Harga (Rp) % Jumlah Bobot
Harga (Rp) (%)

I DIVISI 1. UMUM 8,550,000.00 6.327 Rp - 0.00

III DIVISI 5. PERKERASAN BERBUTIR 0.00 0.000 Rp - 0.00


A REAL COSH 135,143,271.76 100.000 Rp - 0.00
B PPN 10 % 13,514,327.18 Bobot Rencana =
C TOTAL HARGA 148,657,598.94 Bobot Realisasi =
D DIBULATKAN 148,650,000.00 Deviasi =
Terbilang : Terbilang :
SERATUS EMPAT PULUH SEMBILAN JUTA SEMBILAN RATUS
TUJUH BEL
TIGA PULUH RIBU RUPIAH

Disetujui Oleh, Diperiksa oleh,


Pejabat Pelaksana Teknik Kegiatan (PPTK) Konsultan Pengawas
DINAS PERHUBUNGAN Rp -
Kab. Mamuju Tengah

MARLIN FEBRIYANDA, ST. KHAERUDDIN, ST.


NIP.196307151992031013 Supervisor Engineer
CV. DAMBUESE JAYA

A P I TU L A S I
LAPORAN MINGGUAN
AN TAMBATAN PERAHU DESA PATULANA KEC. TOPOYO

: SATU
CV. SIOLA
04/SP/DISHUB/KONSTRUKSI/VII/2017

REALISASI PEKERJAAN
MINGGU INI S/D MINGGU INI
Jumlah Bobot Jumlah Bobot
Harga (Rp) (%) Harga (Rp) (%)

Rp 4,275,000.00 3.16 Rp 4,275,000.00 3.16

Rp (0.00) 0.00 Rp (0.00) 0.00


Rp 46,651,469.15 34.52 Rp 46,651,469.15 34.52
0.791 (%) Rp 4,665,146.91
34.520 (%) Rp 51,316,616.06
33.729 (%) Rp 51,310,000.00

TUJUH BELAS JUTA EMPAT PULUH RIBU RUPIAH

TOPOYO, 22 November 2015

Dibuat Oleh :
Kontraktor Pelaksana
CV. SIOLA

MUHIDDIN S
Direktur