No Item Pekerjaan Vol Satuan

I PEKERJAAN PERSIAPAN
1 As Plan Drawing 1.00 ls
2 Transportasi Team to Site ( Berau ) 12.00 ls
3 Medical Check Up 12.00 ls
4 Standby Team For Waiting Permit 7 days 12.00 ls
5 Transportasi / LV Onsite 1.00 ls
6 Pembuatan Direksi Kit 1.00 ls

II Pekejaan Pondasi Tower


1 Bowplank 1.00 ls
2 Pondasi Beton K250 47.00 m3

III PEKERJAAN TOWER 72 M


1 Material Tower Onsite 24,841.00 kg
2 Sortir Tower 72 M 24,841.00 kg
3 Pengecatan Tower 72 M 24,841.00 kg
4 Proses Pengurusan Ijin Ketinggian 1.00 ls
5 Erection Tower 72 M 24,841.00 kg

IV PEKERJAAN ME ( Mechanical & Electrical )


1 Material ME Onsite 1.00 ls
2 Install Grounding Ring Perimater 1.00 ls
3 Install Penangkal Petir 1.00 ls
4 Intall Lampu Tower & Lampu Taman 1.00 ls
5 Install Bak Kontrol 1.00 ls
6 Install Panel ACPDB & Panel KWH 2.00 unit

V PEKERJAAN PONDASI RBS


1 Pekerjaan Pondasi RBS 3,5 X 2,1 ( Telkomsel ) 1.00 unit

VI PEKERJAAN PAGAR DAN HALAMAN


1 Material Pagar Onsite 1.00 ls
2 Pasang Pagar Harmonika 15 x 15 M 1.00 ls
3 Hampar Gravel 1.00 ls

VII TRANSPORTASI
1 Mobil 4WD 3.00 Month

VIII SERAH TERIMA PEKERJAAN


1 Verticality Tower 1.00 ls
2 Test Uji Fungsi 1.00 ls
3 BA SERAH TERIMA PEKERJAAN 1.00 ls

TOTAL
Summary

Harga Total No

I
II
III
IV
V
VI
VII
VIII
- TOTAL
Item Pekerjaan Harga

PEKERJAAN PERSIAPAN
Pekejaan Pondasi Tower
PEKERJAAN TOWER 72 M
PEKERJAAN ME ( Mechanical & Electrical )
PEKERJAAN PONDASI RBS
PEKERJAAN PAGAR DAN HALAMAN
TRANSPORTASI
SERAH TERIMA PEKERJAAN
TOTAL