Professional Documents
Culture Documents
PROJECT
1.A 1.B 1.C 1.D 1.E 1.F 1.G 1.H 1.J
WATERFRONT
AFF 2400 INTEGRATED
A C551
1.11 RESORT
AFF 2400
BSL comments: As per comments on previous
revision, Ceiling C823 for Exhibition hall (room C551 CLIENT
NOTES: 1.08.503/4) tag should be C823B as per HKN-
1. FACADE LINING WALL LED LIGHTING TO BE INSTALLED FIRST TO MATCH THE MSB-ID-0264. This is to avoid confusion with
Access panels marked in sav-spd-av-10901
A3
POSITION OF FLOOR, CEILING AND OPPOSITE WALL LED LIGHTING. other finishes e.g B1 L07 ceiling and finishes in
2. SPD / MOCK-UP FOR ITEM 1 ABOVE WILL BE SUBMITTED SEPARATELY. shall be included
upper levels.
3. DUE TO THE SLANTING CEILING, UPON DETERMINED THE CEILING LEVEL AT EACH
STEEL COLUMN STRUCTURE AREA, RESPECTIVE COVE INTERFACING AT COLUMN
John
WILL BE ADJUSTED AT SITE AND WITH THE ASSURANCE THAT THE STEEL COLUMN Keells
WILL PENETRATE THRU THE COVE. Group
BSL comments: Refer to outcome of ongoing
discussion with Contractor regarding 1.08.504C /
U96 black out blinds in HKN-RFI-ID-00471 DESIGN CONSULTANT
CANI-RFI-IM-00080 and corresponding email
thread "RE: (WF-046333) HKN-RFI-ID-00471
PS1
FE
FH
B B2.L5A light fittings are
Building 1 Level 08 Exhibition W612 Bolon Wall
PS1
FH
missing. Refer E-210126
FE
(CANI-RFI-IM-00080) Finish"
www.balmondstudio.com
Registered in England & Wales No. 7225351
A3
A3 A3 A3 A3 1.10
KEY PLAN
A3
BSL comments: Finishes to A3
AP
Doest not match with ACMV SPD A3
be coordinated with lighting, 09
e.g in HKN-MSB-ID-0200 for
FN-01226-05
AFF 7000
6
carpet floor finish.
PS2
PS2
PS2
PS2
PS2
PS2
PS5
PS5
PS2
PS2
PS2
PS2
PS2
PS2
PS2
All mechanical services shall be
coordinated with relevant SPDs
A3 C827 4 5
A3 WiFi provision is missing.
WiFi provision is missing. Refer E-AV-209403
Refer E-AV-209403 2
3 1
U96 MOTORIZED
C GREY OUT BLINDS
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
N
(BY OTHERS)
AFF 7000
PS2
PS2
PS2
PS2
PS2
PS2
PS5
PS5
PS2
PS2
PS2
PS2
PS2
PS2
PS2
A3 KEY ELEVATION
C827
Projector location shall be coordinated
PS2
Location was not confirmed Emergency lighting module with SAV-SPD-AV-10901 1.9
through HKN-RFI-AR-01239_A. is missing. Refer E-210226
AFF 7000 AFF 7000
To be coordinated. AFF 6500 AFF 6500
03
C823 C827 03
C823 C827
Projector, screen and
PS2
PS2
PS2
PS2
PS2
PS2
PS5
PS5
PS2
PS2
PS2
PS2
PS2
PS2
PS2
AP locations to be
Emergency lighting
module is missing. A3
Refer E-210226 updated in AV SPD.
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
STORAGE ROOM REFERENCE NUMBERS STATUS REFERENCE NUMBERS STATUS
CEILING IN BLACK A3
01 HKN-SPD-EL-LT-21108E1; 21108E2 MVCC-DWG-IH-I-125201
PAINTED FINISH 10 HKN-SPD-EL-EM-21108E1; 21108E2 01 MVCC-DWG-IH-I-125202
A3 FN-108503-40
D 02 11 HKN-SPD-EL-SA-11108-5; 6 MVCC-DWG-IH-I-127201
A3 FN-108503-40
02 MVCC-DWG-IH-I-127202
A3 A3 12 SAV-SPD-AV-10901 BSC-EI-HKN-DC-2020-089
SAV-SPD-AV-10804 03
PS2
PS2
PS2
PS2
PS2
PS2
PS5
PS5
PS2
PS2
PS2
PS2
PS2
PS2
PS2
13 HKN-SPD-ID-FN-01226-05 HKN-SPD-ME-FP-11109-1/2
04 HKN-SPD-ME-FP-11110-1/2
AFF 7000 08 HKN-SPD-ME-AC-10109-1/2
14 SAVP-GC-000115 (AV Projector Opening) 05 HKN-SPD-ME-AC-10110-1/2
C827 15 06
HKN-SPD-FA-FC-1CO4001 to 4007
HKN-SPD-ST-CF-S-11014
1.8 Comments on reference SPDs BSC-GC-056097
16 07
PS2
are yet to be addressed. ASK_ID-5013
17 08
HKN-RFI-AR-01239 (AV Projector)
HD
HKN-RFI-EL-00364 (AV Items)
18 09 HKN-SPD-ID-FN-108503-14 & 40
PS2
PS2
PS2
PS2
PS2
PS2
PS5
PS5
PS2
PS2
PS2
PS2
PS2
PS2
PS2
06
PS2
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
HD
05 108503-14
108503-14
Smoke detectors locations shall
E be coordinated with E-210523
A3
AFF 7000
PS2
A3 29-01-22 FOR APPROVAL
Sprinkler type to be mentioned
PS2
PS2
PS2
PS2
PS2
PS2
PS5
PS5
PS2
PS2
PS2
PS2
PS2
PS2
PS2
(Example only) A3 C827 A2 25-09-21 FOR APPROVAL
BSL comments: CCTV 10
FN-01226-05
location to align with ceiling A3
A1 15-02-20 FOR APPROVAL
A3
fitting grid. A3 A3
A3
A3 A3
A3
A3
ISSUE
REV. DATE
FOR APPROVAL
AP
AP
AP
AP
AP
A3 A3 A3 A3 03 04
AFF 7000
S2
S2
S2
S2
S2
S2
PS5
108503-14 108503-14
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
02 A3
PL1.8
S2
108503-14
C802
PS5
DRAWING TITLE
01
BUILDING 1 - L08
PS5
108503-14
F
EXHIBITION HALL BALLROOM &
ALIGNED
PS5
A3 A3
A3 PRE-FUNCTION
PS5
PS5
A3
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
PS5
A3
PS5
PS5
S2
PS5
1:100 29-01-2022
PS5
SCALE DATE
AFF 6500
PS5
AFF 3500
S2
A3
PS5
PS5
S2
DRAWN BY NANA
C802 AFF 3000 C802
S2
PS5
PS5
CHECKED BY KHALIL
PS5
C802
PS5
S2
PS5
PS5
PS5
PS5
Smoke detectors to
ALIGNED
S2
HKN-SPD-ID-CL-108503-01 A3
S2
CI-219
SUB CONTRACTOR
C
N
IA
TE
N
R
IO
-IO
T
R
F
-IU
S
TDN
BHD
m
a,a
U
tg
ni laPte,3/1S P
Jn alaJ ,1N O .
BSL comments: CCTV and aisyaM
la,n
7
aE
sh luD
8038
730
6
raro
+ : xF
g
naS
a 7
le,ayaJg
855 8
ni laP
73 0
6
te0
5
+ : lT
1
6
4
e
emergency light location to
JOB NO.
mocy.. i@
s-n
actcejorp : lE
mia