You are on page 1of 1

20500 10000

11500 7500 2500


500 4500 4000 2000 2000 4000 3500
500 1209 1124 1167 1167 1533 800

GL. 123.000
GL. 122.000

GL. 124.000
B BOUNDARY WALL FINISH
TEXTURE PAINT

GL. 121.000
SECTION
OTHER LAND
DANPALON CANOPY STAFF / SERVICES ACCES
REFLECTED GREY COLOR - FFL - 4.465

STAFF / SERVICES ACCES


- FFL - 4.465

1536
AFL +3.000 MM HIGH WALL
DOWN TO FINISH TEXTURE PAINT
GRASS ROOF SP VEHICLE LOADING

3077
FFL - 4.315
LANDSCAPE ROOF
FFL - 0.515

5075
FEMALE TOILET MALE TOILET
5575

STAFF / SERVICES ACCES


F4 FFL - 0.465 F4 FFL - 0.465

2175
- FFL - 4.465
UPPER FLOOR LINE

648
HK HK
CIRCLE STEEL POST AS EXISTING HIDROLIC
HAND RAILING AS EXISTING LIFT SHRINE COURT

1350
450 375
FFL - 0.300

825

500
2000
11575

12075
A AFL +1.000 MM HIGH WALL
A
SECTION FINISH TEXTURE PAINT SECTION

SANDWASH BLACK
LAWN WALL FINISH

WALL FINISH
FFL - 6.465 SANDWASH BLACK
6000

6000
7000
DINNING AREA SP
F5 FFL - 0.465 BLACK GARDEN
FFL - 3.815
ELEVATION
WEST

GL. 124.000

500
N LAND
OTHER DOWN TO

2600
BASEMENT STORAGE DOWN TO
SP
ALFRESCO PARTY AREA ALFRESCO PARTY AREA
- FFL - 4.265
CONNECTING BRIDGE

GL. 123.000
GL. 122.000

F3 FFL - 0.465
00

LAWN
1.0

W E
. 12

FFL - 4.465
GL

S
B
SECTION

4500 4000 2000 4500 4500


19500

Scale 1 :100

Project : No. Descriptions Sign Drawing Title :

HOT & COLD WATER PIPE INSTALLATION


BUKIT - BALI UPPER FLOOR
CONSTRUCTION DRAWING Location :
Client LEGEND Scale : Dwg No : Page No :
1 : 100 / A2 MEP - PL - HC.01 14 ARCHITREND
TIRTHA BRIDAL Revision :
Approved : Checked : Drawn : Date :
IMA MADE 23/05/2016 R.2