FPU FIREMODE PROBLEM
Project Start: December 1, 2022
Description of Works:
Loop checking of FPU Fire Damper connections for Firemode Pressurization Display: Weekly
LEGEND
Completed
Ongoing
Target
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
FPU FIRE MODE PROBLEM
REPORT EQPT DATE
FPU NAME LOCATION
NO. TYPE TESTED
2022-Q2-0415 TEC/FPU L9-FP-47 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0416 TEC/FPU L9-FP-48 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0420 TEC/FPU L9-FP-52 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0421 TEC/FPU L9-FP-53 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0285 TEC/FPU L8-FP-46 SEGMENT A LEVEL 8 CORE 2 JUNE-10-2022
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2022-Q3-0007 TEC/FPU L5-FP-07 SEGMENT A LEVEL 5 CORE 1 08/17/2022
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2022-Q3-0340 TEC/FPU L2-FP-48 SEGMENT A LEVEL 2 CORE 5 10/14/2022
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2020-Q4-0159 TEC/FPU B1-66-FP SEGEMENT C BASEMENT 1 EAST NOV-09-2021
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2020-Q4-0277 TEC/FPU L2-16-FP SEGMENT C LEVEL 2 CENTRAL NOV-22-2021
2020-Q4-0279 TEC/FPU L2-125-FP SEGMENT C LEVEL 2 CENTRAL NOV-22-2021
2020-Q4-0281 TEC/FPU L2-124-FP SEGMENT C LEVEL 2 CENTRAL NOV-22-2021
2020-Q4-0303 TEC/FPU L2-87-FP SEGMENT C LEVEL 2 WEST NOV-22-2021
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
DE PROBLEM As of November 2022
REMARKS STATUS
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
DEFECTIVE VSD (MOTOR SIZE C10 1/3)
NO FIREMODE SIGNAL (FOR TROUBLESHOOTING) Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
OK (12-21-22)
NO FIRE MODE SIGNAL
Dependent to contractor
NO FIRE MODE SIGNAL
Dependent to contractor
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIRE MODE SIGNAL
Dependent to contractor
NO FIRE MODE SIGNAL
Dependent to contractor
ADDITIONAL FPU - NO FIREMODE CABLE INSTALLED
OK (12-28-22)
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
MISSING TEMP SENSOR - NEED TO INSTALL NEW ONE
DAMPER IS OKAY BUT NO FLOW - NEED TO CHECK AIR DUCT
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO CONNECTION FOR FIREMODE
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROBLESHOOTING
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIEMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
AIR DUCT IS STILL NOT CONNECTED
# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of December 2022
Total Number of %
Actual No. of Total Number of Total Number of %
Item No. Activity Start Date End Date FPU's Completed Accomplishment Remarks
Days Completed FPU FPU's Completed Accomplishment
(Previous) (Previous)
1 Seg A Level 9 12/12/2022 12/13/2022 2 4 0 4 0.00% 100.00%
2 Seg A Level 8 12/14/2022 12/16/2022 3 5 0 5 0.00% 100.00%
3 Seg A Level 7 1/12/2022 6/12/2022 3 8 0 8 0.00% 100.00%
4 Seg A Level 5 9 0 0 0.00% 0.00%
5 Seg A Level 4 12 0 0 0.00% 0.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 0 0.00% 0.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
3.4323333333E+19
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of December 19, 2022
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 0 3 0.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 12 0 0 0.00% 0.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 0 0.00% 0.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of December 26, 2022
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 0 3 0.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 12 0 1 0.00% 8.33%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 0 0.00% 0.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of January 2, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 12 1 1 8.33% 8.33%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 1 0.00% 25.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of January 9, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 5 12 1 12 8.33% 100.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 1 1 25.00% 25.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
Accomplishment As of January 16, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 6 12 1 12 8.33% 100.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 5 4 1 4 25.00% 100.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
Target As of January 23, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 6 12 1 12 8.33% 100.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 5 4 1 4 25.00% 100.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 8 0.00% 100.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%
INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#