FPU FIREMODE PROBLEM

Project Start: December 1, 2022


Description of Works:
Loop checking of FPU Fire Damper connections for Firemode Pressurization Display: Weekly

NOVEMBER DECEMBER JANUARY FEBRUARY MARCH


ITEM
ACTIVITY 27-
NO. 07-11 14-18 21-25 28-02 05-09 12-16 19-23 26-30 02-06 09-13 16-20 23-27 30-03 06-10 13-17 20-24
03
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Seg A Level 7 12 8
2 Seg A Level 5 24 8
3 Seg A Level 8 16
4 Seg A Level 9
5 Seg A Level 2 2
6 Seg A Level 1
7 Seg A Level 4 2 N
8 Seg A Basement 1
9 Seg C Level 1
10 Seg C Basement
11 Seg C Level 2

LEGEND

N Completed with actual N no. of hours rendered


N Ongoing with acutal N no. of hours rendered
N Target to Complete with N no. of hours

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
FPU FIREMODE PROBLEM
Project Start: December 1, 2022
Description of Works:
Loop checking of FPU Fire Damper connections for Firemode Pressurization Display: Weekly

NOVEMBER DECEMBER JANUARY FEBRUARY MARCH


ITEM
ACTIVITY 27- 13- 20- 27-
NO. 07-11 14-18 21-25 28-02 05-09 12-16 19-23 26-30 02-06 09-13 16-20 23-27 30-03 06-10 13-17 20-24
03
06-10
17 24 31
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Seg A Level 7 COMPLETED
2 Seg A Level 5 COMPLETED
3 Seg A Level 8 1 FPU motorized damper
4 Seg A Level 9 COMPLETED
5 Seg A Level 2 COMPLETED
6 Seg A Level 1 COMPLETED
7 Seg A Level 4 COMPLETED
8 Seg A Basement 1 COMPLETED
9 Seg C LG ongoing troubleshooting
10 Seg C Level 1 ongoing troubleshooting
11 Seg C Level 2 ongoing troubleshooting

LEGEND

Completed
Ongoing
Target

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
FPU FIRE MODE PROBLEM
REPORT EQPT DATE
FPU NAME LOCATION
NO. TYPE TESTED
2022-Q2-0415 TEC/FPU L9-FP-47 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0416 TEC/FPU L9-FP-48 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0420 TEC/FPU L9-FP-52 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0421 TEC/FPU L9-FP-53 SEGMENT A LEVEL 9 CORE 5 JUNE-8-2022
2022-Q2-0285 TEC/FPU L8-FP-46 SEGMENT A LEVEL 8 CORE 2 JUNE-10-2022

2022-Q2-0304 TEC/FPU L8-FP-56A SEGMENT A LEVEL 8 CORE 3 JUNE-14-2022

2022-Q2-0305 TEC/FPU L8-FP-56B SEGMENT A LEVEL 8 CORE 3 JUNE-14-2022

2022-Q2-0321 TEC/FPU L8-FP-47 SEGMENT A LEVEL 8 CORE 5 JUNE-16-2022


2022-Q2-0322 TEC/FPU L8-FP-49 SEGMENT A LEVEL 8 CORE 5 JUNE-16-2022
2022-Q2-0165 TEC/FPU L7-FP-02 SEGMENT A LEVEL 7 CORE 1 MAY-17-2022
2022-Q2-0166 TEC/FPU L7-FP-03 SEGMENT A LEVEL 7 CORE 1 MAY-17-2022
2022-Q2-0225 TEC/FPU L7-FP-67 SEGMENT A LEVEL 7 CORE 4 MAY-23-2022
2022-Q2-0230 TEC/FPU L7-FP-68 SEGMENT A LEVEL 7 CORE 5 MAY-26-2022
2022-Q2-0231 TEC/FPU L7-FP-69 SEGMENT A LEVEL 7 CORE 5 MAY-26-2022
2022-Q2-0232 TEC/FPU L7-FP-70 SEGMENT A LEVEL 7 CORE 5 MAY-26-2022
2022-Q2-0233 TEC/FPU L7-FP-71 SEGMENT A LEVEL 7 CORE 5 MAY-26-2022
2022-Q2-0234 TEC/FPU L7-FP-72 SEGMENT A LEVEL 7 CORE 5 MAY-26-2022

2022-Q3-0001 TEC/FPU L5-FP-01 SEGMENT A LEVEL 5 CORE 1 08/17/2022

2022-Q3-0002 TEC/FPU L5-FP-02 SEGMENT A LEVEL 5 CORE 1 08/17/2022

2022-Q3-0003 TEC/FPU L5-FP-03 SEGMENT A LEVEL 5 CORE 1 08/17/2022

2022-Q3-0004 TEC/FPU L5-FP-04 SEGMENT A LEVEL 5 CORE 1 08/17/2022

2022-Q3-0005 TEC/FPU L5-FP-05 SEGMENT A LEVEL 5 CORE 1 08/17/2022

2022-Q3-0006 TEC/FPU L5-FP-06 SEGMENT A LEVEL 5 CORE 1 08/17/2022

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2022-Q3-0007 TEC/FPU L5-FP-07 SEGMENT A LEVEL 5 CORE 1 08/17/2022

2022-Q3-0012 TEC/FPU L5-FP-12 SEGMENT A LEVEL 5 CORE 1 08/17/2022

TEC/FPU L5-FP-13 SEGMENT A LEVEL 5 CORE 1

2022-Q3-0018 TEC/FPU L5-FP-17 SEGMENT A LEVEL 5 CORE 2 08/17/2022

2022-Q3-0125 TEC/FPU L4-FP-32 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0126 TEC/FPU L4-FP-33 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0129 TEC/FPU L4-FP-36 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0130 TEC/FPU L4-FP-37 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0131 TEC/FPU L4-FP-38 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0132 TEC/FPU L4-FP-39 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0133 TEC/FPU L4-FP-40 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0134 TEC/FPU L4-FP-41 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0135 TEC/FPU L4-FP-42 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0136 TEC/FPU L4-FP-43 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0137 TEC/FPU L4-FP-44 SEGMENT A LEVEL 4 CORE 3 09/19/2022

2022-Q3-0149 TEC/FPU L4-FP-85 SEGMENT A LEVEL 4 CORE 4 08/25/2022

2022-Q3-0338 TEC/FPU L2-FP-46 SEGMENT A LEVEL 2 CORE 5 10/14/2022

2022-Q3-0339 TEC/FPU L2-FP-47 SEGMENT A LEVEL 2 CORE 5 10/14/2022

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2022-Q3-0340 TEC/FPU L2-FP-48 SEGMENT A LEVEL 2 CORE 5 10/14/2022

2022-Q3-0344 TEC/FPU L2-FP-135 SEGMENT A LEVEL 2 CORE 5 10/14/2022

2020-Q4-0013 TEC/FPU L1-12A-FP SEGMENT A LEVEL 1 CORE 1 OCT-26-2021

2020-Q4-0058 TEC/FPU L1-43-FP SEGMENT A LEVEL 1 CORE 6 OCT-25-2021

2020-Q4-0062 TEC/FPU L1-47-FP SEGMENT A LEVEL 1 CORE 6 OCT-25-2021

2020-Q4-0063 TEC/FPU L1-48-FP SEGMENT A LEVEL 1 CORE 6 OCT-25-2021

2020-Q4-0067 TEC/FPU B1-03-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021

2020-Q4-0068 TEC/FPU B1-04-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021

2020-Q4-0069 TEC/FPU B1-04A-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021

2020-Q4-0070 TEC/FPU B1-04B-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021

2020-Q4-0071 TEC/FPU B1-04C-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021


2020-Q4-0072 TEC/FPU B1-05-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021
2020-Q4-0073 TEC/FPU B1-06-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021
2020-Q4-0074 TEC/FPU B1-6A-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021
2020-Q4-0076 TEC/FPU B1-08-FP SEGMENT A BASEMENT 1 CORE 4
2020-Q4-0080 TEC/FPU B1-12-FP SEGMENT A BASEMENT 1 CORE 4 NOV-02-2021
2020-Q4-0082 TEC/FPU B1-14-FP SEGMENT A BASEMENT 1 CORE 4 NOV-09-2021
2020-Q4-0083 TEC/FPU B1-14A-FP SEGMENT A BASEMENT 1 CORE 4 NOV-09-2021
2020-Q4-0091 TEC/FPU B1-21-FP SEGMENT A BASEMENT 1 CORE 5 NOV-17-2021
2020-Q4-0092 TEC/FPU B1-22-FP SEGMENT A BASEMENT 1 CORE 5 NOV-17-2021
2020-Q4-0094 TEC/FPU B1-24-FP SEGMENT A BASEMENT 1 CORE 5 NOV-17-2021
2020-Q4-0099 TEC/FPU B1-29-FP SEGMENT A BASEMENT 1 CORE 5 NOV-09-2021
2020-Q4-0106 TEC/FPU B1-20-FP SEGMENT A BASEMENT 1 CORE 6 NOV-16-2021
2020-Q4-0110 TEC/FPU B1-34-FP SEGMENT A BASEMENT 1 CORE 6 NOV-17-2021

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2020-Q4-0159 TEC/FPU B1-66-FP SEGEMENT C BASEMENT 1 EAST NOV-09-2021

2020-Q4-0160 TEC/FPU B1-75-FP SEGEMENT C BASEMENT 1 EAST NOV-03-2021

2020-Q4-0161 TEC/FPU B1-76-FP SEGEMENT C BASEMENT 1 EAST NOV-03-2021

2020-Q4-0162 TEC/FPU B1-77-FP SEGEMENT C BASEMENT 1 EAST NOV-03-2021


2020-Q4-0163 TEC/FPU B1-78-FP SEGEMENT C BASEMENT 1 EAST NOV-04-2021
2020-Q4-0164 TEC/FPU B1-79-FP SEGEMENT C BASEMENT 1 EAST NOV-04-2021
2020-Q4-0170 TEC/FPU B1-67-FP SEGMENT C BASEMENT 1 WEST NOV-12-2021
2020-Q4-0171 TEC/FPU B1-68-FP SEGMENT C BASEMENT 1 WEST NOV-12-2021
2020-Q4-0185 TEC/FPU L1-71A-FP SEGMENT C LEVEL 1 EAST NOV-18-2021
2020-Q4-0186 TEC/FPU L1-71-FP SEGMENT C LEVEL 1 EAST NOV-18-2021
2020-Q4-0187 TEC/FPU L1-85-FP SEGMENT C LEVEL 1 EAST NOV-18-2021
2020-Q4-0192 TEC/FPU L1-76-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0194 TEC/FPU L1-73-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0197 TEC/FPU L1-93-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0198 TEC/FPU L1-92-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0199 TEC/FPU L1-77-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0200 TEC/FPU L1-79-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0202 TEC/FPU L1-78-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0203 TEC/FPU L1-81-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0207 TEC/FPU L1-91-FP SEGMENT C LEVEL 1 EAST NOV-15-2021
2020-Q4-0217 TEC/FPU L1-60-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0218 TEC/FPU L1-61-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0219 TEC/FPU L1-62-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0220 TEC/FPU L1-63-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0221 TEC/FPU L1-64-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0222 TEC/FPU L1-65-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0225 TEC/FPU L1-90-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0226 TEC/FPU L1-69-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0227 TEC/FPU L1-70-FP SEGMENT C LEVEL 1 WEST NOV-18-2021
2020-Q4-0229 TEC/FPU L1-52-FP SEGMENT C LEVEL 1 WEST NOV-19-2021
2020-Q4-0230 TEC/FPU L1-53-FP SEGMENT C LEVEL 1 WEST NOV-19-2021
2020-Q4-0252 TEC/FPU L2-85-FP SEGMENT C LEVEL 2 CENTRAL

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
2020-Q4-0277 TEC/FPU L2-16-FP SEGMENT C LEVEL 2 CENTRAL NOV-22-2021
2020-Q4-0279 TEC/FPU L2-125-FP SEGMENT C LEVEL 2 CENTRAL NOV-22-2021
2020-Q4-0281 TEC/FPU L2-124-FP SEGMENT C LEVEL 2 CENTRAL NOV-22-2021
2020-Q4-0303 TEC/FPU L2-87-FP SEGMENT C LEVEL 2 WEST NOV-22-2021

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
DE PROBLEM As of November 2022

REMARKS STATUS

NO FIRE MODE SIGNAL


NO FIRE MODE SIGNAL
NO FIRE MODE SIGNAL
NO FIRE MODE SIGNAL
NO FIRE MODE SIGNAL OK (12-01-22)
OLD FPU
NO FIRE MODE SIGNAL Need wiring, conduiting and relay installation
OLD FPU
NO FIRE MODE SIGNAL Need wiring, conduiting and relay installation
NO FIREMODE SIGNAL OK (12-01-22)
NO FIREMODE SIGNAL OK (12-01-22)
NO FIRE MODE SIGNAL OK (12-01-22)
NO FIRE MODE SIGNAL OK (12-01-22)
NO FIRE MODE SIGNAL OK (12-06-22)
NO FIRE MODE SIGNAL OK (12-06-22)
NO FIRE MODE SIGNAL OK (12-06-22)
NO FIRE MODE SIGNAL OK (12-06-22)
NO FIRE MODE SIGNAL OK (12-06-22)
NO FIRE MODE SIGNAL OK (12-06-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL OK (12-16-22)
NO FIRE MODE SIGNAL
OK (12-16-22)
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
DEFECTIVE VSD (MOTOR SIZE C10 1/3)
NO FIREMODE SIGNAL (FOR TROUBLESHOOTING) Need wiring and conduiting
NO FIRE MODE SIGNAL
Need wiring and conduiting
NO FIRE MODE SIGNAL
OK (12-21-22)
NO FIRE MODE SIGNAL
Dependent to contractor
NO FIRE MODE SIGNAL
Dependent to contractor

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIRE MODE SIGNAL
Dependent to contractor
NO FIRE MODE SIGNAL
Dependent to contractor
ADDITIONAL FPU - NO FIREMODE CABLE INSTALLED
OK (12-28-22)
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING

NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING

NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING

NO FIREMODE SIGNAL - FOR TROUBLESHOOTING

NO FIREMODE SIGNAL - FOR TROUBLESHOOTING

NO FIREMODE SIGNAL - FOR TROUBLESHOOTING

NO FIREMODE SIGNAL - FOR TROUBLESHOOTING

NO FIREMODE SIGNAL - FOR TROUBLESHOOTING


NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
DEFECTIVE VSD - MOTOR SIZE D10 1/2
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
MISSING TEMP SENSOR - NEED TO INSTALL NEW ONE
DAMPER IS OKAY BUT NO FLOW - NEED TO CHECK AIR DUCT
NO FIRE MODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO CONNECTION FOR FIREMODE
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROBLESHOOTING

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
NO FIEMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
NO FIREMODE SIGNAL - FOR TROUBLESHOOTING
AIR DUCT IS STILL NOT CONNECTED

# INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of December 2022
Total Number of %
Actual No. of Total Number of Total Number of %
Item No. Activity Start Date End Date FPU's Completed Accomplishment Remarks
Days Completed FPU FPU's Completed Accomplishment
(Previous) (Previous)
1 Seg A Level 9 12/12/2022 12/13/2022 2 4 0 4 0.00% 100.00%
2 Seg A Level 8 12/14/2022 12/16/2022 3 5 0 5 0.00% 100.00%
3 Seg A Level 7 1/12/2022 6/12/2022 3 8 0 8 0.00% 100.00%
4 Seg A Level 5 9 0 0 0.00% 0.00%
5 Seg A Level 4 12 0 0 0.00% 0.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 0 0.00% 0.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 100


Total Completed: 17
Overall Percentage
Completion: 17.00%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 10
Percentage: 16.13%

3.4323333333E+19

INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of December 19, 2022
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 0 3 0.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 12 0 0 0.00% 0.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 0 0.00% 0.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 101


Total Completed: 21
Overall Percentage
Completion: 20.79%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 10
Percentage: 16.13%

INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of December 26, 2022
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 0 3 0.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 12 0 1 0.00% 8.33%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 0 0.00% 0.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 101


Total Completed: 22
Overall Percentage
Completion: 21.78%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 15
Percentage: 24.19%

INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of January 2, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 12 1 1 8.33% 8.33%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 0 1 0.00% 25.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 101


Total Completed: 23
Overall Percentage
Completion: 22.77%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 20
Percentage: 32.26%

INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
As of January 9, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 5 12 1 12 8.33% 100.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 4 1 1 25.00% 25.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 101


Total Completed: 34
Overall Percentage
Completion: 33.66%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 25
Percentage: 40.32%

INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
Accomplishment As of January 16, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 6 12 1 12 8.33% 100.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 5 4 1 4 25.00% 100.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 0 0.00% 0.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 101


Total Completed: 37
Overall Percentage
Completion: 36.63%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 30
Percentage: 48.39%

INTERNAL. This information is accessible to ADB Management and staff. It may be shared outside ADB with appropriate permission.
#
FPU FIREMODE PROBLEM WORK ACCOMPLISHMENT
Target As of January 23, 2023
Total Number of Total Number of %
Actual No. of Total Number of %
Item No. Activity FPU's Completed FPU's Completed Accomplishment Remarks
Days Completed FPU Accomplishment
(Previous) (To Date) (Previous)
1 Seg A Level 9 4 0 0 0.00% 0.00%
2 Seg A Level 8 5 3 3 60.00% 60.00%
3 Seg A Level 7 4 8 0 8 0.00% 100.00%
4 Seg A Level 5 5 10 0 10 0.00% 100.00%
5 Seg A Level 4 6 12 1 12 8.33% 100.00%
6 Seg A Level 2 4 0 0 0.00% 0.00%
7 Seg A Level 1 5 4 1 4 25.00% 100.00%
8 Seg A Basement 1 18 0 0 0.00% 0.00%
9 Seg C Basement 1 8 0 8 0.00% 100.00%
10 Seg C Level 1 23 0 0 0.00% 0.00%
11 Seg C Level 2 5 0 0 0.00% 0.00%

Total FPU: 101


Total Completed: 45
Overall Percentage
Completion: 44.55%

Total Working Days


(February 28, 2023): 62
Total Used (To Date): 35
Percentage: 56.45%