You are on page 1of 1
bees eet. ef ren Cammaretimcrgeain aeel ji Farias a otyy gy ake Government of Dubai Trakhees pages Completion Certificate jL—4! dLy—_ Bee Ref.: JP031-JVC1SDVIL004-eBCC6052-110547-13-PR Doc Ref: 11092013 Lessor Jumeirah Village LLC Location : Jumeirah Village Circle Plot no. JVC16DVIL004 Details of Project : (Ground+1) Villa & Pump room + U/G tank Building Usage : Residential Building Permit Ref. : JP031/VC2VS16D04/804806/29760/088P Consultant +: Dee Dynamic Engineering Consultant Contractor : Arabtec Construction LLC. Date of Inspection 2 19/Jun/2013 Notes: a, The Civil Engineering Department is satisfied that the building is fit for ‘occupation as intended. b, ‘The lessor and or the lease (as the case may be) shall undertake to maintain the premises regularly both internally and externally within plot limits by the written approval of Trakhees. ¢. _ No modifications, additions and change of Building Usage shall be carried ‘out without the written approval of Trakhees. d. __Trakhees assumes no responsibility or liability what-so-ever with regard to safety of personnel or property of the lessee by the issuance of this, Certificate and attention is drawn to all Civil Engineering Division regulations regarding ongoing responsibilities. . This Completion Certificate is issued upon the completion of the project in accordance to Trakhees procedures and based on amended Building Permit Reference JP031/JVC16DVIL004/SNO23871/BP93779/12-MAS Dated 09 Jan 2012, without Ii ity et adie, te rights of the third parties. . heed Bi ipletion Section Tl Ri -CD Qe ono Facilitating Growth...deittt @ cs

You might also like