FONDATION PRINCIPALE
DEVIS
DESIGNQTION TyPE NBRE LONGUEUR LARGEUR HAUTEUR UNITE QTITE PU
fouille 1 1 106.91 0.6 0.95 m3 60.9387 40.00
bitumede 3mm y
compris enduit 1 104.62 2.4 1 251.088 160.00
PT
2,437.55
-
7,312.64
-
6,256.80
543.13
4,345.00
1,303.50
434.50
521.40
1,042.80
1,738.00
-
6,342.60
3,141.60
4,209.98
6,388.80
2,112.00
-
1,952.00
13,420.00
47,580.00
1,350.00
6,000.00
716.76
3,875.52
1,122.00
1,995.84
128,095.68
-
8,369.60
40,174.08
302,781.77
STE MESS PTN
DEVIS
19,211.96
51,998.63
687.30
4,779.90
15,618.48
1,944.72
46,410.00
10,920.00
15,015.00
11,731.50
543.13
4,345.00
1,303.50
434.50
521.40
2,406.25
1,386.00
-
2,816.00
-
54,870.00
43,896.00
-
13,245.87
4,312.44
739.20
3,026.10
6,911.52
4,474.80
2,145.00
1,277.10
2,604.80
620.40
413.60
924.00
1,161.60
2,310.00
7,920.00
-
1,026.00
1,440.00
3,078.00
86,790.00
38,823.75
21544.95
3616.2
10577.7
6906.9
1575
14227.2
3994.56
536,525.95
STE MESS PTN
DEVIS
GROS OEUVRE ETAGE