You are on page 1of 33

Terjemahan kedalam kalimat

0.00 1 <=== Bahasa <1> Indonesia, <2> Inggris

= Err:502

=> satu dua tiga empat lim @ one two three four five six seven eight nine
ribu juta milyar triliyun @ thousand million billion
000000000000 @ ###
ssssssssssssssssssssssss =
c @ 1 ###
an @ 0 ###
a @ ###
@ 0 ###
@ 0
@ ### ###
@ Err:502 ###
@ ###
@ * kesatu
@ 2 ###
@ 0 ###
@ ###
@ 0 ###
@ 0
@ ### ###
@ Err:502
@ ###
@ ###
@ 3 * kesatu
@ 0 ###
@ ###
@ 0 ### 200
@ 0 ###
@ ### ### lulus
@ Err:502 ###
@ ### lulus
@ * kesatu
@ 4 ### @
@ 0 ###
@ ###
@ 0 ###
@ 0 ###
@ ### ###
@ Err:502 ###
@
@ 000 1
@ ###
@ ***###
@
@ ### 00
@ Err:502###
@ Err:502
@ Err:502
Terjemahan kedalam kalimat

198,919,292.70 1

terbilang = Seratus sembilan puluh delapan juta sembilan ratus sembilan belas

seven eight nine BASIC => satu dua tiga empat lima enam tujuh delapan sembila
ribu juta milyar triliyun
000198919292
@ @@@@@@@@@@@@@@@ @@@@@@ @@@@@@
basic @ 292 1
perhitungan @ 2 sembilan puluh
angka @ dua ratus dua belas
@ 9 dua
@ 2 sembilan puluh dua
@ sembilan puluh dua sembilan puluh dua
@ dua ratus sembilan puluh dua
@
@
@ 919 2
@ 9
@ sembilan ratus sembilan belas
@ 1 sembilan
@ 9 sembilan
@ sembilan belas sembilan belas
@ sembilan ratus sembilan belas ribu
@
@
@ 198 3
@ 1 sembilan puluh
1 @ seratus delapan belas
lulus @ 9 delapan
@ 8 sembilan puluh delapan
199 @ sembilan puluh delapan sembilan puluh delapan
@ seratus sembilan puluh delapan juta
@
@
3 @ 000 4
@ 0
@ sepuluh
@ 0
@ 0
@
@
@
@ 70 1
@ 70
@
@
@ 70/100 106 70
@ seratus sembilan puluh delapan jseratus sembilan puluh delapan juta sembilan r
@ seratus sembilan puluh delapan juta sembilan ratus sembilan belas ribu dua ratu
@ Seratus sembilan puluh delapan juta sembilan ratus sembilan belas ribu dua rat
<=== Bahasa <1> Indonesia, <2> Inggris

mbilan ratus sembilan belas ribu du

ujuh delapan sembila @@@@@@ one two three four five six seven eight nine
@@@@@@ thousand million billion
@@@@@@ #VALUE!
@@@@@@ @@@@@@ @@@@@@
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ * kesatu
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@
@@@@@@ #REF!
@@@@@@
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ * kesatu
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ * kesatu
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@ #REF!
@@@@@@
@@@@@@
@@@@@@ #REF!
*** #REF!

n puluh delapan juta sembilan ratus sembilan belas ribu dua ratus sembilan puluh dua
tus sembilan belas ribu dua ratus sembilan puluh dua 70/100
tus sembilan belas ribu dua ratus sembilan puluh dua 70/100 rupiah
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

PENYEDIA JASA : CV. AGUNG BANDUNG


PEKERJAAN : BELANJA PEMELIHARAAN BANGUNAN GEDUNG - BANGUNAN GEDUNG TEMPAT KERJA -
BANGUNAN GEDUNG KANTOR - PEMELIHARAAN ATAP GEDUNG KANTOR
LOKASI : KOTA BANDUNG, PROVINSI JAWA BARAT
TAHUN ANGGARAN : 2023

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rupiah)

A PEKERJAAN PERSIAPAN 4,182,288.00

B PEKERJAAN ATAP GEDUNG KANTOR SAMSAT 37,157,900.00

C PEKERJAAN ATAP BANGUNAN MASJID 20,817,952.00

D PEKERJAAN ATAP BANGUNAN KANTIN 83,634,695.00

E PEKERJAAN ATAP KANOPI CEK FISIK 4,369,740.00

F PEKERJAAN ATAP DRIVE THRU 3,148,464.00

G PEKERJAAN ATAP KANOPI GUDANG ARSIP 20,239,403.00

H PEKERJAAN ATAP KANOPI SEBELAH KIRI 5,656,128.00

JUMLAH 179,206,570.00
PPN 11% 19,712,722.70
TOTAL (JUMLAH + PPN) 198,919,292.70
TERBILANG

## SERATUS SEMBILAN PULUH DELAPAN JUTA SEMBILAN RATUS SEMBILAN BELAS RIBU DUA RATUS SEMBILAN PULUH DUA
70/100 RUPIAH ##
DAFTAR KUANTITAS DAN HARGA

PENYEDIA JASA : CV. AGUNG BANDUNG


PEKERJAAN : BELANJA PEMELIHARAAN BANGUNAN GEDUNG - BANGUNAN GEDUNG TEMPAT KERJA - BANGUNAN GEDUNG KANTOR -
PEMELIHARAAN ATAP GEDUNG KANTOR
LOKASI : KOTA BANDUNG, PROVINSI JAWA BARAT
TAHUN ANGGARAN : 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN KUANTITAS
(Rupiah) (Rupiah)

A PEKERJAAN PERSIAPAN
1 Mobilisasi ls 1.00 1,500,000.00 1,500,000.00
2 Pembuatan Steger / Perancah dari Bambu m2 4.32 620,900.00 2,682,288.00
JUMLAH A 4,182,288.00

B PEKERJAAN ATAP GEDUNG KANTOR SAMSAT


1 Pek. Screeding Dak Beton Atap m2 138.31 94,900.00 13,125,619.00
2 Pek. Waterproofing Dak Beton Atap (Setara Aquaproof) m2 172.89 62,900.00 10,874,781.00
3 Pek. Waterproofing Dak Beton Atap (Sika Top) m2 30.00 103,000.00 3,090,000.00
4 Pek. Screeding Dak Beton Atap Entrance Depan m2 22.00 94,900.00 2,087,800.00
5 Pek. Waterproofing Dak Beton Atap Entrance Depan (Setara Aquaproof) m2 22.00 62,900.00 1,383,800.00
6 Pek. Waterproofing Dak Beton Atap Entrance Depan (Sika Top) m2 22.00 103,000.00 2,266,000.00
7 Pek. Rangka Plafond Gypsum (Bagian Belakang) m2 17.00 182,300.00 3,099,100.00
8 Pek. Plafond Gypsum (Bagian Belakang) m2 17.00 72,400.00 1,230,800.00
JUMLAH B 37,157,900.00

C PEKERJAAN ATAP BANGUNAN MASJID


1 Pek. Bongkaran Atap Kanopi Existing m2 90.00 13,800.00 1,242,000.00
2 Pek. Pemasangan Atap Kanopi Alderon Type RS m2 90.00 199,800.00 17,982,000.00
3 Pek. Plafond Gypsum m2 2.88 72,400.00 208,512.00
4 Pek. Pipa Air Hujan PVC Ø4" m' 11.20 123,700.00 1,385,440.00
JUMLAH C 20,817,952.00

D PEKERJAAN ATAP BANGUNAN KANTIN


1 Pek. Acian Dak Beton Bagian Dalam (Selasar & Dalam Area Kantin) m2 56.60 62,600.00 3,543,160.00
2 Pek. Screeding Dak Beton Atap m2 323.41 94,900.00 30,691,609.00
3 Pek. Waterproofing Dak Beton Atap (Sika Top) m2 323.41 103,000.00 33,311,230.00
4 Pek. Rangka Plafond Gypsum m2 34.22 182,300.00 6,238,306.00
5 Pek. Plafond Gypsum m2 34.22 72,400.00 2,477,528.00
6 Pek. Partisi Gypsum + Rangka m2 8.18 210,400.00 1,721,072.00
7 Pek. Bongkaran Beton untuk Lubang Angin m3 0.22 348,800.00 76,736.00
8 Pek. Penggantian Kaca tebal 8 mm m2 1.06 295,900.00 313,654.00
9 Titik Lampu bh 6.00 125,200.00 751,200.00
10 Stop Kontak bh 2.00 77,100.00 154,200.00
11 Exhaust Fan bh 4.00 1,089,000.00 4,356,000.00
JUMLAH D 83,634,695.00

E PEKERJAAN ATAP KANOPI CEK FISIK


1 Pek. Talang Plat m' 19.10 196,400.00 3,751,240.00
2 Pek. Pipa Air Hujan PVC Ø4" m' 5.00 123,700.00 618,500.00
JUMLAH E 4,369,740.00

F PEKERJAAN ATAP RIDE THRU


1 Pek. Bongkaran Atap Kanopi Existing m2 14.74 13,800.00 203,412.00
2 Pek. Pemasangan Atap Kanopi Alderon Type RS m2 14.74 199,800.00 2,945,052.00
JUMLAH F 3,148,464.00

G PEKERJAAN ATAP KANOPI GUDANG ARSIP


1 Bongkaran Penutup Kanopi Existing m2 46.80 13,800.00 645,840.00
2 Galian Tanah (Untuk Tiang Kanopi) m3 0.11 125,300.00 13,783.00
3 Pemasangan Tiang Kanopi (Penambahan Panjang) Unit 1.00 1,142,100.00 1,142,100.00
4 Pemasangan Rangka Kanopi Tambahan (Penambahan Panjang) m2 11.20 346,400.00 3,879,680.00
5 Pek. Pemasangan Atap Kanopi Alderon Type RS m2 58.00 199,800.00 11,588,400.00
6 Pengecatan Rangka & Tiang Kanopi m2 58.00 51,200.00 2,969,600.00
JUMLAH G 20,239,403.00

H PEKERJAAN ATAP KANOPI SEBELAH KIRI


1 Bongkaran Penutup Kanopi Existing m2 26.48 13,800.00 365,424.00
2 Pek. Pemasangan Atap Kanopi Alderon Type RS m2 26.48 199,800.00 5,290,704.00
JUMLAH H 5,656,128.00

JUMLAH 179,206,570.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN KUANTITAS
(Rupiah) (Rupiah)
PPN 11% 19,712,722.70
JUMLAH + PPN 198,919,292.70
REKAPITULASI ANALISA HARGA SATUAN

HARGA SATUAN
NO. URAIAN
(RP.)

1 A.1.1.1.11. Pembuatan 1 m2 Steger/Perancah dari Bambu s.d. Tinggi 6 meter 620,900.00


2 A.2.2.1.13 Pembongkaran 1 m3 beton bertulang 348,800.00
3 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 125,300.00
4 A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 1,915,800.00
5 - Pembongkaran Penutup Kanopi Existing 13,800.00
7 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 40 x 40, modul 60 x 60 cm, plafond 182,300.00
8 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi 138,000.00
9 A.4.5.1.7. Pemasangan 1 m2 gypsum board ukuran ( 120 x 240 x 9) mm, tebal 9 mm 72,400.00
11 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 295,900.00
12 - 1 m2 Water proofing 2x lapis (sekualitas Aqua Proof) 62,900.00
13 - 1 m2 Water proofing 2x lapis (degan Sika Top 107) 103,000.00
14 - 1 m2 Screeding Tebal 3 cm 94,900.00
15 A.4.4.2.27. Pemasangan 1 m2 acian. 62,600.00
16 A.4.2.1.18. Pemasangan 1 m’ talang datar plat 196,400.00
17 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe D diameter 4” 123,700.00
18 - Pemasangan 1 m2 atap alderon type RS 199,800.00
19 - 1 Unit Pemasangan Tiang Kanopi Gudang Arsip 1,142,100.00
20 - 1 m2 Pemasangan Rangka Kanopi Gudang Arsip 346,400.00
21 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 51,200.00
22 - Pemasangan 1 Unit Lampu LED 14 W + Fitting 125,200.00
23 - Pemasangan 1 Unit Stop Kontak 77,100.00
24 - Pemasangan 1 Unit Exhaust Fan 1,089,000.00
DAFTAR ANALISA HARGA SATUAN

A.1.1.1.11. Pembuatan 1 m2 Steger/Perancah dari Bambu s.d. Tinggi 6 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 1.000 139,510.00 139,510.00
2 Tukang L.02 OH 2.000 167,410.00 334,820.00
3 Kepala Tukang L.03 OH 0.200 174,390.00 34,878.00
4 Mandor L.04 OH 0.050 176,190.00 8,809.50

JUMLAH TENAGA KERJA 518,017.50


B BAHAN
1 Bambu Ø 7 - 10 Batang 1.250 12,360.00 15,450.00
2 Ijuk Kg 0.186 34,880.00 6,487.68

JUMLAH HARGA BAHAN 21,937.68


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 539,955.18
E Overhead & Profit 15% 80,993.28
F Harga Satuan Pekerjaan (D+E) 620,948.46
G Dibulatkan 620,900.00

A.2.2.1.13 Pembongkaran 1 m3 beton bertulang

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 1.333 139,510.00 186,022.63
2 Mandor L.04 OH 0.666 176,190.00 117,342.54

JUMLAH TENAGA KERJA 303,365.17


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 303,365.17
E Overhead & Profit 15% 45,504.78
F Harga Satuan Pekerjaan (D+E) 348,869.95
G Dibulatkan 348,800.00
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.750 139,510.00 104,632.50
2 Mandor L.04 OH 0.025 176,190.00 4,404.75

JUMLAH TENAGA KERJA 109,037.25


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 109,037.25
E Overhead & Profit 15% 16,355.59
F Harga Satuan Pekerjaan (D+E) 125,392.84
G Dibulatkan 125,300.00

A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 1.650 139,510.00 230,191.50
2 Tukang L.02 OH 0.275 167,410.00 46,037.75
3 Kepala Tukang L.03 OH 0.028 174,390.00 4,882.92
4 Mandor L.04 OH 0.083 176,190.00 14,623.77

JUMLAH TENAGA KERJA 295,735.94


B BAHAN
1 Semen portland kg 371.000 1,960.00 727,160.00
2 Pasir Beton m3 0.598 298,950.00 178,857.51
3 Batu pecah mesin 2-3 cm m3 0.931 383,250.00 356,678.00
4 Air Liter 215.000 500.00 107,500.00

JUMLAH HARGA BAHAN 1,370,195.51


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,665,931.45
E Overhead & Profit 15% 249,889.72
F Harga Satuan Pekerjaan (D+E) 1,915,821.17
G Dibulatkan 1,915,800.00
- Pembongkaran Penutup Kanopi Existing

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.050 139,510.00 6,975.50
2 Tukang L.02 OH 0.025 167,410.00 4,185.25
3 Kepala Tukang L.03 OH 0.003 174,390.00 435.98
4 Mandor L.04 OH 0.003 176,190.00 440.48

JUMLAH TENAGA KERJA 12,037.20


B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 12,037.20
E Overhead & Profit 15% 1,805.58
F Harga Satuan Pekerjaan (D+E) 13,842.78
G Dibulatkan 13,800.00

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 40 x 40, modul 60 x 60 cm, plafond

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja oh 0.350 139,510.00 48,828.50
2 Tukang oh 0.350 167,410.00 58,593.50
3 Kepala tukang oh 0.035 174,390.00 6,103.65
4 Mandor oh 0.018 176,190.00 3,171.42

JUMLAH TENAGA KERJA 116,697.07


B BAHAN
1 Holow 4 × 4 Tebal 0.5 mm m 4.000 9,970.00 39,880.00
2 Assesoris (perkuatan, las dll) Ls 1.000 1,994.00 1,994.00

JUMLAH HARGA BAHAN 41,874.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 158,571.07
E Overhead & Profit 15% 23,785.66
F Harga Satuan Pekerjaan (D+E) 182,356.73
G Dibulatkan 182,300.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja oh 0.250 139,510.00 34,877.50
2 Tukang oh 0.250 167,410.00 41,852.50
3 Kepala tukang oh 0.025 174,390.00 4,359.75
4 Mandor oh 0.013 176,190.00 2,290.47

JUMLAH TENAGA KERJA 83,380.22


B BAHAN
1 Holow 4 × 4 Tebal 0.5 mm m 3.500 9,970.00 34,895.00
2 Assesoris (perkuatan, las dll) Ls 1.000 1,744.75 1,744.75

JUMLAH HARGA BAHAN 36,639.75


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 120,019.97
E Overhead & Profit 15% 18,003.00
F Harga Satuan Pekerjaan (D+E) 138,022.97
G Dibulatkan 138,000.00

A.4.5.1.7. Pemasangan 1 m2 gypsum board ukuran ( 120 x 240 x 9) mm, tebal 9 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja oh 0.100 139,510.00 13,951.00
2 Tukang oh 0.050 167,410.00 8,370.50
3 Kepala tukang oh 0.005 174,390.00 871.95
4 Mandor oh 0.005 176,190.00 880.95

JUMLAH TENAGA KERJA 24,074.40


B BAHAN
1 Gypsum board 120 x 240 x 9 mm Lembar 0.364 64,770.00 23,576.28
2 Paku skrup kg 0.110 139,510.00 15,346.10

JUMLAH HARGA BAHAN 38,922.38


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 62,996.78
E Overhead & Profit 15% 9,449.52
F Harga Satuan Pekerjaan (D+E) 72,446.30
G Dibulatkan 72,400.00
A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja oh 0.017 139,510.00 2,371.67
2 Tukang oh 0.170 167,410.00 28,459.70
3 Kepala tukang oh 0.017 174,390.00 2,964.63
4 Mandor oh 0.001 176,190.00 158.57

JUMLAH TENAGA KERJA 33,954.57


B BAHAN
1 Kaca bening tebal 8 mm m2 1.100 199,300.00 219,230.00
2 Sealant Kg 0.070 59,790.00 4,185.30

JUMLAH HARGA BAHAN 223,415.30


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 257,369.87
E Overhead & Profit 15% 38,605.48
F Harga Satuan Pekerjaan (D+E) 295,975.35
G Dibulatkan 295,900.00

- 1 m2 Water proofing 2x lapis (sekualitas Aqua Proof)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.020 139,510.00 2,790.20
2 Tukang L.02 OH 0.063 167,410.00 10,546.83
3 Kepala tukang L.03 OH 0.006 174,390.00 1,098.66
4 Mandor L.04 OH 0.003 176,190.00 440.48

JUMLAH TENAGA KERJA 14,876.16


B BAHAN
1 Elastic Waterproof kg 1.000 24,910.00 24,910.00
2 Fiber m² 1.000 14,950.00 14,950.00

JUMLAH HARGA BAHAN 39,860.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 54,736.16
E Overhead & Profit 15% 8,210.42
F Harga Satuan Pekerjaan (D+E) 62,946.59
G Dibulatkan 62,900.00
- 1 m2 Water proofing 2x lapis (degan Sika Top 107)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.020 139,510.00 2,790.20
2 Tukang L.02 OH 0.063 167,410.00 10,546.83
3 Kepala tukang L.03 OH 0.006 174,390.00 1,098.66
4 Mandor L.04 OH 0.003 176,190.00 440.48

JUMLAH TENAGA KERJA 14,876.16


B BAHAN
1 Sika Top 107 kg 2.500 29,900.00 74,750.00

JUMLAH HARGA BAHAN 74,750.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 89,626.16
E Overhead & Profit 15% 13,443.92
F Harga Satuan Pekerjaan (D+E) 103,070.09
G Dibulatkan 103,000.00

- 1 m2 Screeding Tebal 3 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.200 139,510.00 27,902.00
2 Tukang L.02 OH 0.100 167,410.00 16,741.00
3 Kepala Tukang L.03 OH 0.010 174,390.00 1,743.90
4 Mandor L.04 OH 0.001 176,190.00 176.19

JUMLAH TENAGA KERJA 46,563.09


B BAHAN
1 Semen portland kg 14.400 1,960.00 28,224.00
2 Pasir Beton m3 0.026 298,950.00 7,772.70

JUMLAH HARGA BAHAN 35,996.70


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 82,559.79
E Overhead & Profit 15% 12,383.97
F Harga Satuan Pekerjaan (D+E) 94,943.76
G Dibulatkan 94,900.00
A.4.4.2.27. Pemasangan 1 m2 acian.

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.200 139,510.00 27,902.00
2 Tukang L.02 OH 0.100 167,410.00 16,741.00
3 Kepala Tukang L.03 OH 0.010 174,390.00 1,743.90
4 Mandor L.04 OH 0.010 176,190.00 1,761.90

JUMLAH TENAGA KERJA 48,148.80


B BAHAN
1 Semen portland kg 3.250 1,960.00 6,370.00

JUMLAH HARGA BAHAN 6,370.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 54,518.80
E Overhead & Profit 15% 8,177.82
F Harga Satuan Pekerjaan (D+E) 62,696.62
G Dibulatkan 62,600.00

A.4.2.1.18. Pemasangan 1 m’ talang datar plat

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.200 139,510.00 27,902.00
2 Tukang L.02 OH 0.200 167,410.00 33,482.00
3 Kepala Tukang L.03 OH 0.020 174,390.00 3,487.80
4 Mandor L.04 OH 0.001 176,190.00 176.19

JUMLAH TENAGA KERJA 65,047.99


B BAHAN
1 Seng Plat BJLS 30 lebar 90 cm m' 1.167 77,730.00 90,685.00
2 Paku Skrup kg 0.015 139,510.00 2,092.65
3 Plat Strip 2.5 cm m' 1.045 12,460.00 13,020.70

JUMLAH HARGA BAHAN 105,798.35


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 170,846.34
E Overhead & Profit 15% 25,626.95
F Harga Satuan Pekerjaan (D+E) 196,473.29
G Dibulatkan 196,400.00
A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe D diameter 4”

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.081 139,510.00 11,300.31
2 Tukang L.02 OH 0.135 167,410.00 22,600.35
3 Kepala Tukang L.03 OH 0.014 174,390.00 2,354.27
4 Mandor L.04 OH 0.004 176,190.00 704.76

JUMLAH TENAGA KERJA 36,959.69


B BAHAN
1 Pipa PVC Ø 4" Type D M 1.200 43,600.00 52,320.00
2 Perlengkapan % 35.000 18,312.00

JUMLAH HARGA BAHAN 70,632.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 107,591.69
E Overhead & Profit 15% 16,138.75
F Harga Satuan Pekerjaan (D+E) 123,730.44
G Dibulatkan 123,700.00

- Pemasangan 1 m2 atap alderon type RS

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.120 139,510.00 16,741.20
2 Tukang L.02 OH 0.060 167,410.00 10,044.60
3 Kepala Tukang L.03 OH 0.006 174,390.00 1,046.34
4 Mandor L.04 OH 0.006 176,190.00 1,057.14

JUMLAH TENAGA KERJA 28,889.28


B BAHAN
1 Atap Alderon RS 78 x 100 m' 1.346 79,720.00 107,315.38
2 Aksesoris ls 1.000 37,560.38 37,560.38

JUMLAH HARGA BAHAN 144,875.77


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 173,765.05
E Overhead & Profit 15% 26,064.76
F Harga Satuan Pekerjaan (D+E) 199,829.81
G Dibulatkan 199,800.00
- 1 Unit Pemasangan Tiang Kanopi Gudang Arsip

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Setting & Upah ls 1.000 257,493.52 257,493.52

JUMLAH TENAGA KERJA 257,493.52


B BAHAN
1 Beton K-225 m3 0.120 1,665,931.45 199,911.77
2 Siku 30 x 30 x 3 m' 1.200 12,460.00 14,952.00
3 Holow 10 x 5 tebal 1.5 mm m' 6.400 81,380.00 520,832.00

JUMLAH HARGA BAHAN 735,695.77


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 993,189.30
E Overhead & Profit 15% 148,978.39
F Harga Satuan Pekerjaan (D+E) 1,142,167.69
G Dibulatkan 1,142,100.00

- 1 m2 Pemasangan Rangka Kanopi Gudang Arsip

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Setting & Upah ls 1.000 78,106.51 78,106.51

JUMLAH TENAGA KERJA 78,106.51


B BAHAN
1 Holow 10 x 5 tebal 1.5 mm m' 1.579 81,380.00 128,515.30
2 Holow 3 x 3 Tebal 1.2 mm m' 2.923 22,420.00 65,538.14
3 Alat Bantu ls 1.000 29,108.02 29,108.02

JUMLAH HARGA BAHAN 223,161.46


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 301,267.97
E Overhead & Profit 15% 45,190.19
F Harga Satuan Pekerjaan (D+E) 346,458.16
G Dibulatkan 346,400.00
A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.020 139,510.00 2,790.20
Tukang L.02 OH 0.200 167,410.00 33,482.00
Kepala Tukang L.03 OH 0.020 174,390.00 3,487.80
Mandor L.04 OH 0.003 176,190.00 440.48

JUMLAH TENAGA KERJA 40,200.48


B BAHAN
1 Meni Besi Kg 0.100 42,850.00 4,285.00
2 Kuas cat 3" Buah 0.010 3,990.00 39.90
3 Thinner B L 0.010 648.73 6.49

JUMLAH HARGA BAHAN 4,331.39


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 44,531.86
E Overhead & Profit 15% 6,679.78
F Harga Satuan Pekerjaan (D+E) 51,211.64
G Dibulatkan 51,200.00

- Pemasangan 1 Unit Lampu LED 14 W + Fitting

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Tukang L.01 OH 0.094 167,410.00 15,694.69
2 Pekerja L.02 OH 0.094 139,510.00 13,079.06
3 Mandor L.04 OH 0.009 176,190.00 1,651.78

JUMLAH TENAGA KERJA 30,425.53


B BAHAN
1 Lampu LED 14 W + Fitting Buah 1.000 74,740.00 74,740.00
2 Alat Bantu ls 1.000 3,737.00 3,737.00

JUMLAH HARGA BAHAN 78,477.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 108,902.53
E Overhead & Profit 15% 16,335.38
F Harga Satuan Pekerjaan (D+E) 125,237.91
G Dibulatkan 125,200.00
- Pemasangan 1 Unit Stop Kontak

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Tukang L.01 OH 0.094 167,410.00 15,694.69
2 Pekerja L.02 OH 0.094 139,510.00 13,079.06
3 Mandor L.04 OH 0.009 176,190.00 1,651.78

JUMLAH TENAGA KERJA 30,425.53


B BAHAN
1 Stop Kontak Buah 1.000 34,880.00 34,880.00
2 Alat Bantu ls 1.000 1,744.00 1,744.00

JUMLAH HARGA BAHAN 36,624.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 67,049.53
E Overhead & Profit 15% 10,057.43
F Harga Satuan Pekerjaan (D+E) 77,106.96
G Dibulatkan 77,100.00

- Pemasangan 1 Unit Exhaust Fan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Tukang L.01 OH 0.500 167,410.00 83,705.00
2 Pekerja L.02 OH 0.500 139,510.00 69,755.00
3 Mandor L.04 OH 0.050 176,190.00 8,809.50

JUMLAH TENAGA KERJA 162,269.50


B BAHAN
1 Exhaust Fan Buah 1.000 747,380.00 747,380.00
2 Alat Bantu ls 1.000 37,369.00 37,369.00

JUMLAH HARGA BAHAN 784,749.00


C PERALATAN
-

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 947,018.50
E Overhead & Profit 15% 142,052.78
F Harga Satuan Pekerjaan (D+E) 1,089,071.28
G Dibulatkan 1,089,000.00
DAFTAR HARGA UPAH & BAHAN

NO. URAIAN SATUAN HARGA SATUAN SPESIFIKASI

A HARGA UPAH
1 Pekerja OH 139,510.00
2 Tukang OH 167,410.00
3 Kepala tukang OH 174,390.00
4 Mandor OH 176,190.00

B BAHAN
BAHAN KAYU
1 Bambu Ø 7 - 10 bh 12,360.00

BAHAN TIMBUNAN, BETON & PASANGAN


2 Pasir Urug m3 247,430.00
3 Pasir Pasang m3 247,630.00
4 Tanah Urug m3 191,830.00
5 Batu belah 15/20 m3 287,490.00
6 Pasir Beton m3 298,950.00
7 Batu pecah mesin 2-3 cm m3 383,250.00
8 Semen portland kg 1,960.00 Tiga Roda / Setara
9 Air Liter 500.00

BAHAN BESI & ALUMINIUM


10 Holow 4 × 4 Tebal 0.5 mm m 9,970.00
11 Holow 3 x 3 Tebal 1.2 mm m 22,420.00
12 Holow 10 x 5 tebal 1.5 mm m 81,380.00
13 Paku Skrup kg 139,510.00
14 Siku 30 x 30 x 3 m' 12,460.00
15 Seng Plat BJLS 30 lebar 90 cm m' 77,730.00
16 Plat Strip 2.5 cm m' 12,460.00

BAHAN PENUTUP LANTAI, DINDING & PLAFOND


17 Gypsum board 120 x 240 x 9 mm lbr 64,770.00 Jayaboard / Setara
18 List Gypsum profil 10 cm m 21,920.00
19 Tepung gypsum kg 3,240.00
20 Paku screw bh 200.00

BAHAN CAT & MINYAK


21 Kuas cat 3" Buah 3,990.00
22 Meni Besi Kg 42,850.00 Seiv / Setara
23 Cat Warna Kg 74,740.00 Avian / Setara
24 Thinner B Kg 27,900.00
25 Amplas Lbr 8,570.00
26 Minyak Bekisting Liter 66,270.00 Sika / Setara
27 Elastic Waterproof kg 24,910.00 Aquaproof / Setara
28 Fiber m² 14,950.00
29 Sika Top 107 kg 29,900.00 Sika Top 107 / Setara

BAHAN LAIN-LAIN
30 Ijuk kg 34,880.00
31 Atap Alderon RS 78 x 100 m' 79,720.00 Alderon RS 78 x 100
32 Atap Alderon RS Twinwall 83 x 100 m' 189,340.00 Alderon RS Twinwall 83 x 100
33 Pipa PVC Ø 4" Type D m' 43,600.00 Wavin / Setara
34 Kaca bening tebal 8 mm m2 199,300.00 Mulia Glass / Setara
35 Sealant kg 59,790.00
36 Lampu LED 14 W + Fitting Buah 74,740.00 Phillip / Setara
37 Stop Kontak Buah 34,880.00 Brocco / Setara
38 Exhaust Fan Buah 747,380.00