Table of Contents
Related Content 11
A version indicates the revision level of a document and provides the user with an overview of the various
changes that may have been made in the course of time.
Only if such a requisition is changed through transaction (ME52N) does the system generate a version. It
cannot then be changed again through requirements planning.
First the Version active should box should be checked which will activeate the version manaement for PR
document. If you have selected this indicator, version ‘0’, which is generated automatically when a
purchase requisition or external purchasing document is created, is automatically flagged by the system as
completed. From fields selection we can select which field need to be optional, mandatory for version.
Here too its in the similar way as purchase requisition. The version management is active for document
type NB for purchase organisation 1000.
The reason for change can also be defined in customizing which could be entered in PR or PO document.
During initial creation of the PR the version 0 will automatically appear based on custimizing. Save the
PR. The PR number 4400000033 gets generated.
Now go to transaction ME52N for the same PR number and change the quantity of PR from 100 to 200. A
different version 1 appears.
The status is RED as the reason for rejection is configured as Mandatory so once this is entered the
document will be complete.
Put the reason for version change “Z2- Change in quantity” and click on completed. This shows this
version is complete. So now the PR document is complete with all the version change it underwent.
Go to ME22N transaction and make changes to PO price from 1 to 30 EUR. A different version gets
generated “version 1”.
Put the reason for version change “Z1- Change in price” and click on completed. This shows this version is
complete. So now the PO document is complete with all the version change it underwent.
Related Content
http://help.sap.com
Hello everyone,
This document explains the steps required to configure Version Management for Purchase Order in
Materials Management module.
Also select the Field Selection as maintained below. For Reason we will make it as Required Entry.
Now we will define Reason for Change. It is located in the same area in SPRO
Two reasons have been maintained apart from standard available reasons
Now we will set up change displays
Here I have used the required Purchasing Document Type with table EKET and Field name as EINDT
Which is basically Delivery date in EKET table
Now we create a purchase order, you can see version 0 has been created
After adding the new version, we do a change in the Delivery date
Here you can see the old value of the date delivery date is 29.01.2020 and the new value is 31.01.2020
This can also be done for the management of any changes in order value, quantity and any other important
fields depending on the scenario.