Contoh Skema RAB Event

The document is an itemized budget for an event including costs for production stage installation, showcases, banners, name tags, consumption, documentation, transportation, and a total budget of 27.4 million. Key expenses include 1 million for stage rental, 5 million for sound system, 1.5 million for band equipment, 1.85 million for hollow steel, 700 thousand for crew name tags, 1.2 million for crew consumption, 500 thousand for the MC, and 2 million for main crew transportation.

Uploaded by

MahendraBima
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
900 views1 page

Contoh Skema RAB Event

The document is an itemized budget for an event including costs for production stage installation, showcases, banners, name tags, consumption, documentation, transportation, and a total budget of 27.4 million. Key expenses include 1 million for stage rental, 5 million for sound system, 1.5 million for band equipment, 1.85 million for hollow steel, 700 thousand for crew name tags, 1.2 million for crew consumption, 500 thousand for the MC, and 2 million for main crew transportation.

Uploaded by

MahendraBima
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ITEM PRICE QUANTITY FREQUENCY AMOUNT SUB TOTAL

PRODUCTION
STAGE INSTALATION (INSTALASI PANGGUNG)
A. SEWA TEMPAT 1.000.000 AKSES & FASILITAS PUBLIK 1 HARI 1.000.000
B. SOUND SYSTEM 5.000.000 FULL SET 1 HARI 5.000.000
C. BAND EQUIPMENT 1.500.000 FULL SET 1 HARI 1.500.000
D. LIGHTING FOR STAGE (PARLED) 250.000 4 PCS 1 HARI 1.000.000
E. BACKDROP STAND 5X3 M 500.000 1 SET 1 HARI 500.000
F. STAGE PROPERTY 500.000 FULL SET 1 HARI 500.000
G. INFOCUS 500.000 1 SET 1 HARI 500.000
SHOWCASE & OPEN GATE INSTALATION (INSTALASI TEMPAT PAMERAN & PINTU MASUK)
A. BESI HOLLOW 4 X 4 X 1,6 MM 185.000 10 BATANG - 1.850.000
B. KAWAT JARING 1 INCH 350.000 2 ROLL - 750.000
C. TRIPLEK PARTIKEL BOARD 9MM 80.000 4 LEMBAR - 320.000
D. AIBON GLUE 375.000 2,5 KG - 375.000
1 E. LIGHTING FOR SHOWCASE (RGB NEON) 350.000 10 PCS - 750.000
F. WELDER SERVICE (UPAH JASA LAS) 500.000 JASA INSTALASI - 500.000
BANNER NOTIFICATION (SPANDUK PEMBERITAHUAN)
A. 3 X 2 M 35.000 4 SET (TOTAL 24 M) 1 MINGGU PRA ACARA 840.000
B. 2 X 2 M 35.000 4 SET (TOTAL 16M) 1 MINGGU PRA ACARA 560.000
C. RENG KAYU 20.000 36 BATANG 1 MINGGU PRA ACARA 720.000
D. PAKU 200.000 - 1 MINGGU PRA ACARA 200.000
E. STAPLES TEMBAK 150.000 1 PCS 1 MINGGU PRA ACARA 150.000
EVENT PARTICIPANT
NAME TAG (ID CARD) + STICKER
A. LANYARD + HOLDER (CREW & MAIN CREW) 35.000 20 PCS - 700.000
B. LANYARD + HOLDER (TALENT) 15.000 35 PCS - 525.000
C. EVENT STICKER 1.000 1000 PCS - 1.000.000
CONSUMPTION
A. CREW & MAIN CREW (3X/HARI) 10.000 20 ORANG 2 HARI PRA ACARA 1.200.000
B. TALENT (2X/HARI) 10.000 35 ORANG 1 HARI 1.050.000
C. SPECIAL INVITATION (1X/HARI) 15.000 20 ORANG 1 HARI 300.000
D. SOUND ENGINEER (3XHARI) 10.000 6 ORANG 2 HARI PRA ACARA 360.000
MAESTRO OF CEREMONIES
2 A. MC 500.000 1 ORANG 1 HARI 500.000
DOCUMENTATION
A. PHOTO 500.000 1 ORANG 1 HARI 500.000
B. VIDEO 350.000 2 ORANG 1 HARI 750.000
TRANSPORTATION
A. MAIN CREW 400.000 5 ORANG 4 HARI PRA ACARA 2.000.000
3 B. SEWA MOBIL 350.000 1 BUAH 4 HARI PRA ACARA 1.500.000

TOTAL: 27.400.000