MSBP Assignment 1 Brief - SEM 1 - 2023-2024
MSBP Assignment 1 Brief - SEM 1 - 2023-2024
HIGHER NATIONALS
BTEC HIGHER NATIONAL DIPLOMA IN BUSINESS (RQF)
Unit Code, Number and Title D/618/5039– Unit 6: Managing a Successful Business Project
Unit Assessor(s) Nguyen Van Dai/Nguyen Ngoc Hien/Le Thi Hong Phuong
Issue Date
IV Date
Student name
Plagiarism is a particular form of cheating. Plagiarism must be avoided at all costs and students who
break the rules, however innocently, may be penalised. It is your responsibility to ensure that you
understand correct referencing practices. As a university level student, you are expected to use
appropriate references throughout and keep carefully detailed notes of all your sources of materials for
material you have used in your work, including any material downloaded from the Internet. Please
consult the relevant unit lecturer or your course tutor if you need any further advice.
1
Student name / Signature Date:
Full copies of questionnaires, all other instrumentation, and an Excel file containing all your data
are to be included in your research report (in the Appendix).
All documents and your research report should contain in-text references and a list of any
references used.
Use the Harvard referencing system. Please refer to Reference guide on Moodle.
Plagiarism is unacceptable. Students must cite all sources and input the information by
paraphrasing, summarising or using direct quotes. If you are caught plagiarizing, University
policies and procedures will apply. A Referral Grade is given when Plagiarism is identified in your
work. There are no exceptions.
You must submit only a soft-copy of your research report before deadline via Moodle/Turnitin.
Late assignments WILL NOT be accepted.
Read ALL Instructions on this Page and review the Pass, Merit and Distinction criteria carefully. To
pass the assignment, you must achieve ALL the Pass Criteria outlined in the marking sheet. To
achieve a Merit, you must achieve ALL the Merit criteria (and therefore the Pass criteria). To
achieve a Distinction, you must achieve ALL the Distinction criteria (and therefore the Pass and
Merit criteria).
2
LO1: Explain the key stages of the project lifecycle that should be considered when project managing
LO2: Produce a Project Management Plan (PMP) for a business project using primary and secondary
research methods
LO3: Implement the Project Management Plan (PMP) to communicate results from the research and make
conclusions from the evidence of findings
LO4: Reflect on the value gained from implementing the project and the project management process
This is an individual work and you are required to submit a Project Management Plan on the following
topic:
Corporate Social Responsibility is the continuing commitment by business to behave ethically and
contribute to economic development while improving the quality of life of the workforce and their
families as well as of the local community and society at large.’ (World Business Council for
Sustainable Development).
Businesses worldwide have increasingly embraced the concept of Corporate Social Responsibility
(CSR) as a means to develop and adopt sustainable practices and approaches in their business
operations. It is a multifaceted concept that encompasses many different aspects ranging from
philanthropy, ethical responsibilities and environmental considerations. Most recently, in response to
maximising stakeholder value and expectations, the strategic benefits of CSR have seen many
companies having a competitive advantage.
Together with the rise of globalisation, companies now employ CSR managers, experts and consultants
to produce comprehensive CSR policies and programmes, to give them a competitive edge and build
stakeholder trust and loyalty.
Gaining knowledge and skills on business research, gaining knowledge in the chosen topic, and
delivering a professional report is not only challenging but it seems like an overwhelming task for you.
The only way to succeed at this challenge is managing the project in a professional manner.
ASSIGNMENT 1:
Project Management Plan will include Scope (including aims and objectives), Milestones, WBS and
GANTT chart, Resources and Costs, Quality and Risk Management plan, and, finally Communication
plan.
Then, you also need to provide an overview of research methods that informs your primary research.
Because it is an overview, you need to provide the theoretical contents.
INSTRUCTIONS:
Your assignment 1 should not exceed 3000 words (excluding references and any Appendix).
It is compulsory to specify the wordcount below the title of assignment 1.
Note: the similarity rate for this module is 25%. You need to submit the work via Moodle.
Late work: You cannot submit your work later than the assigned date.
Recommended Resources
1. DINSMORE, P. and CABANIS-BREWIN, J. (2018). The AMA Handbook of Project Management. 5th
Ed. AMACON.
3
2. FLICK, U. (2020) Introducing Research Methodology: A Beginner’s Guide to Doing a Research
Project. 3rd Ed. London: SAGE.
3. GRAY, D. (2017) Doing Research in the Real World. 4th Ed. London: SAGE.
4. MAYLOR, H. (2021) Project Management. 5th Ed. Harlow: Pearson.
5. SAUNDERS, M., LEWIS, P. and THORNHILL, A. (2019) Research Methods for Business Students.
8th Ed. Harlow: Pearson
Supplemenatory Resources: Articles provided on Moodle
Learning Outcomes and Assessment Criteria
4
P5 Produce a
work breakdown
structure and a
schedule to
provide
timeframes and
stages for
completion.
Action Plan
5
Summative Feedback: Assessor to Student
Re-submission Feedback:
* Please note that grades are provisional. They are only confirmed once internal and external verifiers
have taken place, and the final decisions have been agreed by the assessment board.
* This grade only reflects the result of this assignment, not for the whole Unit.