You are on page 1of 3

PLANT - QUESTIONNAIRE FORM

COMPANY NAME

COMPANY ADDRESS

CONTACT PERSON DETAILS :


A) NAME
B) DESIGNATION
C) CONTACT NUMBER
D) E-MAIL ID
Project Type
1
(New/Extension/Upgradation/Others..)
2 Wastewater Source Details

3 Number of Wastewater Stream & Each Stream Qty

4 Total Wastewater Qty - m3/Day

5 Treated Water Usage Purpose

Wastewater Characteristics Details (Recent Analysis


6
Report to be attached Seperatly)

a) pH

b) Total Dissolved Solids- ppm

c) Total Suspended Solids- ppm

d) Turbidity - NTU

e) Oil & Grease - ppm

f) Sodium -ppm

g) Potassium - ppm

h) Calcium- ppm

i) Magnesium -ppm

j) Chloride - ppm

k) Sulphate - ppm

l) Chemical Oxygen Demand (COD) - ppm

m) Biological Oxygen Demand (BOD) - ppm

n) Any other Parameters

o) Color - Pt-Co
7 Desired Treated Water Quality Details

a) pH

b) Total Dissolved Solids- ppm

c) Total Suspended Solids- ppm

d) Turbidity - NTU

e) Oil & Grease - ppm

f) Sodium -ppm

g) Potassium - ppm

h) Calcium- ppm

i) Magnesium -ppm

j) Chloride - ppm

k) Sulphate - ppm

l) Chemical Oxygen Demand (COD) - ppm

m) Biological Oxygen Demand (BOD) - ppm

n) Color - Pt-Co

o) Any other Parameters

Existing Collection Water Storage Facility Details


8
(Dimension & Location)
Product Water Storage Facility Details (Dimension &
9 Location)

10 Inlet Wastewater Battery Limit

11 Product Water Battery Limit

12 Reject / Backwash Water Battery Limit

13 Plant Fresh Water Availability & Battery Limit

14 Instrument Air Availability & Battery Limit

15 Plant Sludge Disposal Proposal

16 Zero Liquid Discharge is Required or Not?

Steam Generator for ZLD System is available? If


17 available please share the Boiler outlet Steam
Specification

17 Incomming Power Voltage & Frequency Details

18 Scope of Civil Work


19 Any Other Details

You might also like