Professional Documents
Culture Documents
163oc - Psv-Lifting Autoclave
163oc - Psv-Lifting Autoclave
1. To install end flange and isolate PSV/TSV for calibration at Produced Water Area Area-Oil Center
2. To remove safety valves for calibration and re-install at Produced Water Area Area-Oil Center
3.
Task:
10
Overall Risk Rating Before Mitigations H
Perceived Hazard Consequence Probability Risk
Page 1 / 3
Task Risk Assessment Worksheet
11
12
13
14
15
Overall Risk Rating After Mitigations L
Actions / Precautions / Mitigations Consequences Probability Risk
Select as appropriate
Actions Implemented: C o n s e q u e nP cr eo sb a b i l i t y
1 1 2 3 4 5 Consequences:
2 1 1 2 3 4 5 1. Negligible
3 Probability:
2. Minor
2 2 4 6 Risk 8
Low 10 1 to 63. Significant
4 Medium Risk 8 to 12
1. Highly
5 3 3 6 9 Risk12 15 15 to4. SevereUnlikely
High 2.25Catastrophic
5. Unlikely
6 4 4 8 12 16 20 3. Likely, will occur in time
7 4. Probable
8 5 5 10 15 20 25 5. Frequent
9
10
11 Page 2 / 3
12
Hard Hat Ear Protection Eye Protection Face Mask Filtered Mask Face Mask
Safety Shoes Coveralls Welding Mask Fall Protection High Visibility Vest Hand Gloves
REMARKS:
Page 3 / 3