Pending Drawings For Electrical
Pending Drawings For Electrical
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
Design Drawings Submittal - Log Sheet
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
CONC1519 FOR
CIV041
ADMINISTRATION BUILDING Last Submission 5-Mar-23 only
aMessage 2-FEB-23
5-Apr-23
P02 WATER SUPPLY & SEWER DRAINAGE
ELE GROUND FLOOR JB1071-HAI-04-ZZ-DR-E-02014 Drainage &ONLY
ColdHVAC.
& Hot Water
aMessage SUBMIT WITH NEW TR#00275 & 00276
30-Jul-23 OPEN
PUBLIC ADDRESS SYSTEM LAYOUT Remaining HVAC 25-MAR- 13-02-23 24-May-23
JB-1071-HAI-TR-00173 CONC803 5-Feb-23 11-APR-23 aMessage aMessage
JB1071-HAI-TR-00317
CONC1256 2023
8-Mar-23 (CODE-2)
24-Mar-23
20-May-23 30-MAY-23
CONC1622 aMessage
ADMINISTRATION BUILDING Code-3 CODE-3
ELE FIRST FLOOR PLAN JB1071-HAI-04-ZZ-DR-E-02015 30-Jul-23 OPEN
PUBLIC ADDRESS SYSTEM LAYOUT
Admin Building Public
63 ADMIN BUILDING Address System 24-May-23
Layout aMessage
ELE PUBLIC ADDRESS SYSTEM (TOA) JB1071-HAI-04-ZZ-DR-E-02048 20-May-23 30-MAY-23
30-Jul-23 OPEN
SINGLE LINE DIAGRAM CODE-3
CONC1256
JB1071-HAI-TR-00317 CONC1622 ADMIN BUILDING GROUND & FIRST
FLOOR SOUND PRESSURE LEVEL (SPL) 24-May-23
aMessage
ELE SPEECH TRANSMISSION INDEX ( STI) JB1071-HAI-04-ZZ-RP-W-02014 20-May-23 30-MAY-23
30-Jul-23 OPEN
CABLE CALCULATION TABLE ZONE-1 & CODE-3
ZONE-2
Design Drawings Submittal - Log Sheet
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
20-MAR-23
CONC993 MEDIUM VOLTAGE AND LOW aMessage 10-May-23
CONC1174
CONC1845
ELE
VOLTAGE CABLE ROUTING LAYOUT PLAN
JB1071-HAI-04-ZZ-DR-E-02034 P01 TR # 00191
15-Mar-23 3-APR-23 3-May-23 CODE-2 13-Sep-23 OPEN
CODE-3
MEDIUM VOLTAGE
MEDIUM VOLTAGE AND LOW AND LOW
CONC1174 10-May-23
86 JB1071-HAI-TR-00257 ELE JB1071-HAI-04-ZZ-DR-E-02040 VOLTAGE CABLE 3-May-23 13-Sep-23 OPEN
CONC1845 VOLTAGE CABLE SECTION & ISOMETRIC DETAIL ROUTING CODE-2
LAYOUT PLAN
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
CONC
CONC1458 ELE
Bagging Station Lighting System Layout JB1071-HAI-04-ZZ-DR-E-02055
P01 TR#181
3-JUNE-23
3-Jun-23
Approved
26-Jun-23
12-Jul-23 26-Jul-23 OPEN 2
CONC1610 Level ±0.00m
1292 CONC785
Schedule
not
Recieved
CONC1458 ELE
Bagging Station Lighting System Layout Level JB1071-HAI-04-ZZ-DR-E-02056 26-Jun-23 12-Jul-23 26-Jul-23 OPEN 2
CONC1610 +38.00m & +42.00m
Bagging Station
144 JB1071-HAI-TR-00384 CONC1458 ELE
Calculation Report for bagging JB1071-HAI-04-ZZ-RP-W-02055 Lighting 26-Jun-23 12-Jul-23 26-Jul-23 OPEN 2
CONC1610 station
Drawings
Bagging station
CONC1610 ELE Lighting system layout JB1071-HAI-04-ZZ-DR-E-02146 26-Jul-23 OPEN
LEVEL +5.5m & 8.5m
Bagging Station
CONC1610 ELE Lighting system layout JB1071-HAI-04-ZZ-DR-E-02147 26-Jul-23 OPEN
LEVEL +31.50m
Bagging Station
CONC1460
CONC1612
ELE Roof Floor JB1071-HAI-04-ZZ-DR-E-02057 26-Jun-23 14-Jul-23 26-Jul-23 OPEN
Lightning Protection Bagging Station
145 JB1071-HAI-TR-00385 Lightning
Calculation Report for Protection
CONC1460
CONC1612
ELE Lightning Protection Bagging JB1071-HAI-04-ZZ-RP-W-02057 26-Jun-23 14-Jul-23 26-Jul-23 OPEN
Station
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
CONC1557 ELE
FLAT STORAGE JB1071-HAI-04-ZZ-DR-E-02062 17-Jul-23 1-Aug-23 12-Sep-23 OPEN
CONC1835 LIGHTING SYSTEM LAYOUT
FLAT STORAGE
171 JB1071-HAI-TR-00422
LIGHTING
SYSTEM
LAYOUT
CONC1557 ELE
Calculation Report for Flat JB1071-HAI-04-ZZ-RP-W-02062 17-Jul-23 1-Aug-23 12-Sep-23 OPEN
CONC1835 Storage
CONC1566 ELE
FLAT STORAGE ROOF JB1071-HAI-04-ZZ-DR-E-02063 17-Jul-23 3-Aug-23 21-Aug-23 OPEN
CONC1733 LIGHTNING PROTECTION
FLAT STORAGE
178 JB1071-HAI-TR-00429 LIGHTNING
Calculation Report for PROTECTION
CONC1566
CONC1733
ELE Lightning Protection Flat JB1071-HAI-04-ZZ-RP-W-02063 17-Jul-23 3-Aug-23 21-Aug-23 OPEN
Storage
HEAD HOUSE
CONC1568 ELE
BASEMENT, GROUND, 1ST & JB1071-HAI-04-ZZ-DR-E-02089 18-Jul-23 OPEN
2ND FLOORS
POWER SYSTEM LAYOUT
HEAD HOUSE
CONC1568 ELE 7TH & 8TH FLOORS JB1071-HAI-04-ZZ-DR-E-02091 18-Jul-23 OPEN
POWER SYSTEM LAYOUT
TRANSFER TOWER-1
GROUND, 1ST, 2ND,& 3RD
CONC1570 ELE FLOOR PLAN JB1071-HAI-04-ZZ-DR-E-02120 18-Jul-23 OPEN
SMALL POWER SYSTEM
LAYOUT TRANSFER TOWER-1
SMALL POWER
181 JB1071-HAI-TR-00432
SYSTEM
LAYOUT
TRANSFER TOWER-1
CONC1570 ELE
4TH, 5TH, & 6TH FLOOR PLAN JB1071-HAI-04-ZZ-DR-E-02121 18-Jul-23 OPEN
SMALL POWER SYSTEM
LAYOUT
SILO STORAGE
182 JB1071-HAI-TR-00433 CONC1571 ELE
SILO STORAGE JB1071-HAI-04-ZZ-DR-E-02124 SMALL POWER 18-Jul-23 OPEN
SMALL POWER LAYOUT LAYOUT
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
SUBSTATION BUILDING-02
CONC1638 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02135 1-Aug-23 OPEN
LAYOUT SUBSTATION
198 JB1071-HAI-TR-00455
BUILDING-02
ELECTRICAL
SYSTEMS
CONC1638 ELE
SUBSTATION#02 PANEL JB1071-HAI-04-ZZ-SH-W-02135 1-Aug-23 OPEN
BOARD SCHEDULE
SUBSTATION BUILDING-03
CONC1639 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02136 1-Aug-23 OPEN
LAYOUT SUBSTATION
199 JB1071-HAI-TR-00456
BUILDING-03
ELECTRICAL
SYSTEMS
CONC1639 ELE
SUBSTATION#03 PANEL JB1071-HAI-04-ZZ-SH-E-02136 1-Aug-23 OPEN
BOARD SCHEDULE
SUBSTATION BUILDING-04
CONC1640 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02137 1-Aug-23 OPEN
LAYOUT SUBSTATION
200 JB1071-HAI-TR-00457
BUILDING-04
ELECTRICAL
SYSTEMS
CONC1640 ELE
SUBSTATION#04 PANEL JB1071-HAI-04-ZZ-DR-E-02137 1-Aug-23 OPEN
BOARD SCHEDULE
SUBSTATION BUILDING-05
CONC1641 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02138 1-Aug-23 OPEN
LAYOUT SUBSTATION
201 JB1071-HAI-TR-00458
BUILDING-05
ELECTRICAL
SYSTEMS
CONC1641 ELE
SUBSTATION#05 PANEL JB1071-HAI-04-ZZ-DR-E-02138 1-Aug-23 OPEN
BOARD SCHEDULE
Design Drawings Submittal - Log Sheet
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
EARTHING
207 JB1071-HAI-TR-00471 CONC1679 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02153
SYSTEM FOR 9-Aug-23 OPEN
BAGGING STATION BAGGING
STATION
EARTHING
EARTHING SYSTEM FOR SYSTEM FOR
208 JB1071-HAI-TR-00472 CONC1680 ELE FIRE FIGHTING & WATER JB1071-HAI-04-ZZ-DR-E-02149 FIRE FIGHTING 9-Aug-23 OPEN
PUMP ROOM & WATER
PUMP ROOM
EARTHING
209 JB1071-HAI-TR-00473 CONC1681 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02148
SYSTEM FOR 9-Aug-23 OPEN
PRIMARY HEAD HOUSE PRIMARY HEAD
HOUSE
EARTHING
210 JB1071-HAI-TR-00474 CONC1682 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02150
SYSTEM FOR 9-Aug-23 OPEN
SECONDARY HEAD HOUSE SECONDARY
HEAD HOUSE
EARTHING
211 JB1071-HAI-TR-00475 CONC1683 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02152
SYSTEM FOR 9-Aug-23 OPEN
SERVICES BUILDING SERVICES
BUILDING
EARTHING
212 JB1071-HAI-TR-00476 CONC1684 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02151
SYSTEM FOR 9-Aug-23 OPEN
TRANSFER TOWER-1 TRANSFER
TOWER-1
SHIP INTAKE
BASEMENT, GROUND, 1ST , SHIP INTAKE
CONC1732 ELE 2ND & 3RD FLOORS JB1071-HAI-04-ZZ-DR-E-02131 PUBLIC 21-Aug-23 OPEN
PUBLIC ADDRESS SYSTEM ADDRESS
LAYOUT
FLAT STORAGE
FLAT STORAGE (TUNNEL) (TUNNEL)
223 JB1071-HAI-TR-00502 CONC1760 ELE EARTHING LAYOUT PLAN & JB1071-HAI-04-ZZ-DR-E-02159
EARTHING
26-Aug-23 OPEN
DETAIL LAYOUT PLAN
TRANSFER TOWER-1
CONC1761
CONC1843
ELE +0.00M, +6.00M & +28.00M JB1071-HAI-04-ZZ-DR-E-02158 27-Aug-23 29-Aug-23 13-Sep-23 OPEN
LEVEL'S ACCESS CONTROL SYSTEM
TRANSFER
TRANSFER TOWER-1 TOWER-1
225 JB1071-HAI-TR-00504 CONC1843 ELE +0.00M, +6.00M, +16.00M & +28.00M LEVEL'S JB1071-HAI-04-ZZ-DR-E-02166 ACCESS 13-Sep-23 OPEN
TT-1 ACCESS CONTROL SYSTEM SLD CONTROL
SYSTEM
CONC1843 ELE
DESIGN CRITERIA FOR ACCESS JB1071-HAI-04-ZZ-RP-W-00504 13-Sep-23 OPEN
CONTROL SYSTEM
TRANSFER TOWER – 02
CONC1762
CONC1844
ELE +0.00M, +5.50M, +21.50M & JB1071-HAI-04-ZZ-DR-E-02157 27-Aug-23 29-Aug-23 13-Sep-23 OPEN
+37.00M LEVEL'S ACCESS CONTROL SYSTEM
TRANSFER
TRANSFER TOWER – 02 TOWER-2
226 JB1071-HAI-TR-00505 CONC1844 ELE +0.00M, +5.50M, +21.50M & +37.00M LEVEL'S JB1071-HAI-04-ZZ-DR-E-02167 ACCESS 13-Sep-23 OPEN
TT-1 ACCESS CONTROL SYSTEM SLD CONTROL
SYSTEM
CONC1844 ELE
DESIGN CRITERIA FOR ACCESS JB1071-HAI-04-ZZ-RP-W-00505 13-Sep-23 OPEN
CONTROL SYSTEM
Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08
LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
227 JB1071-HAI-TR-00506
SHIP INTAKE
CONC1763 ELE
Lighting Calculation Report for JB1071-HAI-04-ZZ-RP-W-02125
LIGHTING 27-Aug-23 OPEN
Ship Intake SYSTEM
LAYOUT
EARTHING
230 JB1071-HAI-TR-00509 CONC1777 ELE EARTHING SYSTEM FOR SILOS JB1071-HAI-04-ZZ-DR-E-02162 SYSTEM FOR 30-Aug-23 OPEN
SILOS
EARTHING
231 JB1071-HAI-TR-00510 CONC1778 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02164
SYSTEM FOR 30-Aug-23 OPEN
DRIVER FACILITY DRIVER
FACILITY
ADMINISTRATION BUILDING
CONC1841 ELE GROUND FLOOR JB1071-HAI-04-ZZ-DR-E-02160 ADMIN 13-Sep-23 OPEN
ACCESS CONTROL SYSTEM BUILDING
244 JB1071-HAI-TR-00528
ACCESS
ADMINISTRATION BUILDING CONTROL
CONC1841 ELE SINGLE LINE DIAGRAM JB1071-HAI-04-ZZ-DR-E-02161 13-Sep-23 OPEN
ACCESS CONTROL SYSTEM
SHIP INTAKE
245 JB1071-HAI-TR-00529 CONC1842 ELE
SHIP INTAKE -0.70M & +4.30M LEVEL'S ACCESS JB1071-HAI-04-ZZ-DR-E-02169
ACCESS 13-Sep-23 OPEN
CONTROL SYSTEM CONTROL
SYSTEM
CONC1861 ELE
PUBLIC TOILET JB1071-HAI-04-ZZ-DR-E-02171 13-Sep-23 OPEN
ELECTRICAL PLAN & DETAILS
249 JB1071-HAI-TR-00535
PUBLIC TOILET
ELECTRICAL
CONC1861 ELE
LIGHTING DESIGN CALCULATION REPORT FOR JB1071-HAI-04-ZZ-RP-W-00535 OPEN
PUBLIC TOILET
Document Submittals - DCS- Log Sheet
2 Email Dated 21-May-22 ---- Resume CV of the HSE Manager 21-May-22 30-May-22 9 2 CLOSED RHDHV 2
3 Email Dated 26-May-22 ---- Resume Contractor's Key Personnel Project Control Manager 26-May-22 29-Jun-22 34 2 CLOSED RHDHV 2
5 JB1071-HAIF-ZZ-XX-LT-G-0001 ---- CCSE Calibration Certificate for Survey Equipment. 31-May-22 CLOSED FOR INFORMATION AND RECORD
6 JB1071-HAIF-04-XX-LT-W-0002 ---- CCP Contractor's Car Policy no. P/300/3601/22/000044 16-May-22 21-May-22 1-Jun-22 11 2-Jun-22 9-Jun-22 7 22-Jun-22 30-Jun-22 8 R&R 3
7 JB1071-HAIF-01-XX-SH-C-0002 ---- MS Submission of Milestone schedule 2-Jun-22 2-Jun-22 0 CLOSED FOR INFORMATION AND RECORD
8 JB1071-HAIF-ZZ-XX-HS-T-0001 JB1071-HAIF-ZZ-XX-HS-P-0001 CONC004 HSE HSE Management Plan 5-Jun-22 22-Jun-22 17 2 CLOSED RHDHV 2
9 JB1071-HAIF-00-XX-ER-Z-T-0001 ---- Catalogue Office Furniture Selection 8-Jun-22 9-Jun-22 1 2 CLOSED RHDHV 2
CONC019 19-June-22
10 JB1071-HAIF-04-ZZ-SH-W-0001 ----
CONC163
SCHEDULE Base Line Project Schedule 13-Jun-22 30-June-22 6 18-Jul-22 20-Jul-22 2 9-Aug-22 15-Aug-22 6 4-Sep-22 18-Sep-22 14 R&R 3
11 JB1071-HAIF-04-XX-LT-W-0003 ---- Resume Contractor's Key Personnel (Construction Manager) 13-Jun-22 20-Jun-22 7 2 CLOSED RHDHV 2
12 JB1071-HAIF-04-XX-LT-W-0004 ---- Resume Contractor's Key Personnel (QA / QC Manager) 20-Jun-22 22-Jun-22 2 2 CLOSED RHDHV 2
CONC006
JB1071-HAIF-01-ZZ-HS-P-T-0001 INFORMATION
13
JB1071-HAI-TR-00052
JB1071-HAIF-01-ZZ-HS-P-0001 CONC1175 (P03) HSE Emergency Response Plan 22-Jun-22 29-Jun-22 7 1-Sep-22 3-May-23 1-Aug-23 ONLY CLOSED 2
CONC1642
14 JB1071-HAIF-ZZ-XX-ER-LT-W-0002 ---- Transport For Engineer/ Employer. 29-Jun-22 4-Jul-22 5 2 CLOSED RHDHV 2
15 JB1071-HAI-TR-0020 JB1071-HAI-04-ZZ-HS-W-0020 HSE LIFTING PLAN FOR SITE OFFICE PORTA CABIN 24-Jul-22 25-Jul-22 1 R&R 3
16 JB1071-HAI-TR-0022 JB1071-HAI-04-ZZ-ER-W-0022 CONC034 Resume First Aid Personnel Resume 25-Jul-22 8-Sep-22 45 R&R 3
CONC050
17 JB1071-HAI-TR-0031 JB1071-HAI-04-ZZ-HS-W-0031 CONC312 HSE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN 28-Jul-22 3-Oct-22 67 16-Oct-22 25-Oct-22 9 1-Nov-22 12-Nov-22 11 22-Nov-22 29-Jan-23 68 CLOSED RHDHV 2
CONC483
18 JB1071-HAI-TR-00042 JB1071-HAI-04-ZZ-ER-W-00042 Resume Key Personnel Environmental Manager Resume 10-Aug-22 14-Aug-22 4 2 CLOSED RHDHV 2
Admin Bldg
19 JB1071-HAIF-ZZ-XX-ER-LT-W-0005 ----
Proposal Proposal for Administration Building 11-Aug-22 CLOSED FOR INFORMATION AND RECORD
CONC126
CONC372
20 JB1071-HAI-TR-00046 JB1071-HAI-04-ZZ-HS-W-00046
CONC588
HSE TRAFFIC MANAGEMENT PLAN 23-Aug-22 7-Sep-22 15 29-Oct-22 6-Nov-22 8 18-Dec-22 27-Dec-22 21-May-23 For Information 2 CLOSED RHDHV 2
CONC1260
JB1071-HAIF-01-XX-LT-W-1003
JB1071-HAI-TR-00047 CONC127
JB1071-HAIF-04-XX-LT-W-1033 'CONC430
JB1071-HAIF-04-XX-LT-W-1054 JB1071-HAI-04-ZZ-OC-W-00047 CHART ORGANIZATION CHART 28-Jul-22 7-Aug-22 10 23-Aug-22 10-Sep-22 18 16-Oct-22 23-Oct-22 7 10-Nov-22 21-Nov-22 11 27-Dec-22 OPEN
JB1071-HAI-TR-00047_P02 CONC631
21
JB1071-HAIF-04-XX-LT-W-1053 CONC429
CONC495
JB1071-HAI-04-ZZ-OC-W-01053 CHART QA/QC ORGANIZATION CHART 10-Nov-22 27-Nov-22 17 27-Dec-22 OPEN
JB1071-HAI-TR-00126_P01 CONC630
6-Sep-22
22 JB-1071-HAI-TR-00049 JB1071-HAI-04-ZZ-RP-S-00049 CONC147 REPORT GEOTECHNICAL SITE INVESTIGATION REPORT FOR SILOS AREA BY ACES 30-Aug-22 13 2 CLOSED RHDHV 2
12-Sep-22
24 JB1071-HAIF-04-XX-LT-W-1014 ---- CONC213 Resume Contractor's Key Personnel Design Coordinator CV 19-Sep-22 3-Oct-22 14 2 CLOSED RHDHV 2
10-Oct-22
25 JB1071-HAIF-04-XX-LT-W-1019 ------ CONC235 Buhler Process Equipment Documents for Approval (Buhler) 25-Sep-22 15 2 CLOSED RHDHV 2
27-Oct-22
26 JB1071-HAI-TR-00061 JB1071-HAI-04-ZZ-RP-S-00061 CONC251 REPORT GEOTECHNICAL SITE INVESTIGATION REPORT FOR ALL AREA BY ACES 29-Sep-22 4-Oct-22 5 2 CLOSED RHDHV 2
JB1071-HAIF-04-XX-LT-W-1029 27-DEC-22
CONC276
JB1071-HAIF-04-XX-LT-W-1036
27
JB1071-HAIF-04-XX-LT-W-1058
JB1071-HAIF-04-XX-RP-W-1029 CONC453 REPORT Concrete Durability Report 5-Oct-22 13-Oct-22 8 17-Oct-22 29-Oct-22 12 16-Nov-22 28-Nov-22 12 17-JAN-23 2-Feb-23 1 CLOSED RHDHV 1
CONC636
JB-1071-HAI-TR-00130
28 JB1071-HAIF-04-XX-LT-W-1032 ---- CONC298 Design Design Management Plan 11-Oct-22 26-Oct-22 15 2 CLOSED RHDHV 2
ENVIRONMEN
29 JB1071-HAI-TR-00067 JB1071-HAI-04-ZZ-HS-W-00067 CONC308
TAL ENVIRONMENTAL ASPECT & IMPACT REGISTER 15-Oct-22 25-Oct-22 15 1 CLOSED RHDHV 1
30 JB1071-HAI-TR-00082 JB1071-HAI-04-ZZ-RP-W-00082 CONC389 Report Coarse Aggregates and Fine Aggregates Samples Test Reports 1-Nov-22 5-Nov-22 4 R&R 3
CONC437
31 JB1071-HAI-TR-00091 JB1071-HAI-04-ZZ-HS-W-00091
CONC533
HSE Storage Management Plan 12-Nov-22 21-Nov-22 9 4-Dec-22 7-Dec-22 3 1 CLOSED RHDHV 1
33 JB1071-HAI-TR-00105 JB1071-HAI-04-ZZ-HS-W-00105 CONC496 HSE Security Management Plan 26-Nov-22 27-Dec-22 31 CLOSED RHDHV 1
34 JB1071-HAI-TR-00106 JB1071-HAI-04-ZZ-HS-W-00106 CONC497 QC List of Materials With Frequency of tests 27-Nov-22 CLOSED FOR INFORMATION AND RECORD
35 JB1071-HAIF-04-XX-LT-W-1068 JB1071-HAI-04-ZZ-HS-W-00109 CONC525 HSE NIGHT WORK ACTIVITY PLAN 1-Dec-22 OPEN
36 JB1071-HAI-TR-00110 JB1071-HAI-04-ZZ-RP-W-00110 CONC534 RP Preliminary Pile Load Test Report (Silos Area) 4-Dec-22 3-Jan-23 CLOSED
JB1071-HAIF-04-XX-LT-W-1075 CONC611
37
JB-1071-HAI-TR-00132
JB1071-HAI-04-ZZ-SH-W-01075
'CONC646
SH Revised Engineering & Design Schedule 22-Dec-22 27-Dec-22 5 29-Dec-22 19-Jan-23 CLOSED RHDHV 1
39 JB1071-HAI-04-ZZ-TR-W-00123 JB1071-HAI-04-ZZ-RP-W-00123 CONC627 RP Concrete Durability Tests Reports (GAC and Saudi Read Mix) 26-Dec-22 CLOSED FOR INFORMATION AND RECORD
27-Dec-22
18--JAN-23
41 JB-1071-HAI-TR-00137 JB1071-HAI-04-ZZ-RP-W-00137 CONC658 RP Concrete Durability Tests Reports (Saudi Read Mix Concrete) 2-Jan-23 CLOSED FOR INFORMATION AND RECORD
REPLY TO WIR-
42 attached with WIR JB1071-HAI-04-ZZ-WIR-W-00077 JB1071-HAI-04-ZZ-RP-W-00077
W-00077
RP Soil Samples Tests Reports (Admin Building and Silos Area) 5-Jan-23 CLOSED FOR INFORMATION AND RECORD
43 JB-1071-HAI-TR-00142 JB1071-HAI-04-ZZ-RP-W-00142 CONC679 RP Concrete Durability Tests Report (GAC Read Mix Concrete) 7-Jan-23 CLOSED FOR INFORMATION AND RECORD
44 JB-1071-HAI-TR-00143 JB1071-HAI-04-ZZ-RP-W-00143 CONC682 RP Soil Samples Tests Reports (Silos Area) 7-Jan-23 CLOSED FOR INFORMATION AND RECORD
45 JB-1071-HAI-TR-00144 JB1071-HAI-04-ZZ-RP-W-00144 CONC685 RP Soil Samples Tests Reports (Admin Building) 7-Jan-23 CLOSED FOR INFORMATION AND RECORD
47 JB1071-HAI-TR-00170 JB1071-HAI-04-ZZ-HS-W-00170 CONC764 HSE LOCK OUT TAG OUT PROCEDURE 28-Jan-23 CLOSED FOR INFORMATION AND RECORD
48 JB1071-HAI-TR-00183 JB1071-HAI-04-ZZ-MA-W-00183 CONC771 RP PILE INTEGRITY TEST REPORT SILO # 6 & SILO # 12 29-Jan-23 CLOSED FOR INFORMATION AND RECORD
49 JB1071-HAI-TR-00184 JB1071-HAI-04-ZZ-MA-W-00184 CONC772 RP Loading Test Report for Non-Working pile (Test Pile # 2) 30-Jan-23 CLOSED FOR INFORMATION AND RECORD
50 JB1071-HAI-TR-00229 JB1071-HAI-04-ZZ-MA-W-00229 CONC908 RP Symaga's Descriptive memory of the silo calculation for Flat bottom silos 27-Feb-23 CLOSED FOR INFORMATION AND RECORD
M/s NEUERO
53 JB1071-HAIF-04-XX-LT-W-1108 JB1071-HAIF-04-XX-LT-W-1108 CONC966
Profile Ship Unloader Approval 9-Mar-23 13-Mar-23 CLOSED RHDHV 1
54 JB-1071-HAI-TR-00252 JB1071-HAI-04-ZZ-RP-W-00252 CONC979 RP Loading Test Report for working pile (Pile # SP12-1) 12-Mar-23 CLOSED FOR INFORMATION AND RECORD
20-MAR-23 14-JUN-23
11-June-23
CONC991 aMessage aMessage
56 JB-1071-HAI-TR-00255 JB1071-HAI-04-ZZ-RP-W-01077
CONC1385
RP Stability check report- Berth no 11 15-Mar-23 3-APR-23
24-June-23
03-JUL-23 CLOSED RHDHV 1
aMessage
CODE-3 CODE-1
57 JB1071-HAI-TR-00258 JB1071-HAI-04-ZZ-RP-W-00258 CONC996 RP PILE INTEGRITY TEST REPORT SILO # 3, 4 & SILO # 10 15-Mar-23 CLOSED FOR INFORMATION AND RECORD
59 JB1071-HAI-TR-00274 JB1071-HAI-04-ZZ-RP-W-00274 CONC1073 RP PILE INTEGRITY TEST REPORT SILO # 5 AND # 11 4-Apr-23 CLOSED FOR INFORMATION AND RECORD
60 JB1071-HAI-TR-00280 JB1071-HAI-04-ZZ-RP-W-00280 CONC1103 RP STATIC PILE LOAD TEST REPORT FOR WORKING PILE (SP3- 1) 9-Apr-23 CLOSED FOR INFORMATION AND RECORD
61 JB1071-HAI-TR-00281 JB1071-HAI-04-ZZ-RP-W-00281
CONC1118
RP
Estimation for Portable water storage capacity & Septic tank storage capacity 12-Apr-23 19-Apr-23 27-Apr-23 16-May-23 R&R
CONC1149 calculations
62 JB1071-HAI-TR-00288 JB1071-HAI-04-ZZ-RP-W-00288 CONC1160 RP PILE INTEGRITY TEST REPORT SILOS 1, 2 & 9 30-Apr-23 CLOSED FOR INFORMATION AND RECORD
64 JB1071-HAI-TR-00319 JB1071-HAI-04-ZZ-RP-W-00319 CONC1269 RP Haif Batching Plant Calibration Report 22-May-23 CLOSED FOR INFORMATION AND RECORD
CONC1306
65 JB1071-HAI-TR-00334 JB1071-HAI-04-ZZ-RP-W-00334
CONC1443
RP Portable Water Pump Calculation 30-May-23 12-Jun-23 13 22-Jun-23 17-Jul-23 CLOSED 2
66 JB1071-HAI-TR-00348 JB1071-HAI-04-ZZ-RP-W-00348 CONC1360 RP
BUHLER DELIVERY NOTE PACKING LIST NO 2016010526 6-Jun-23 18-Jul-23 CLOSED FOR INFORMATION AND RECORD
(Shipment N0. 1)
67 JB1071-HAI-TR-00350 JB1071-HAI-04-ZZ- IE -W-00350 CONC1362 IE Process Equipment InstallationCompany Detail (REMORA) 6-Jun-23 20-Jun-23 CLOSED FOR INFORMATION AND RECORD
69 JB-1071-HAI-TR-00368 JB1071-HAI-04-ZZ-RP-W-00368 CONC1408 RP BUHLER DELIVERY NOTE PACKING LIST NO 2016010757 14-Jun-23 18-Jul-23 CLOSED FOR INFORMATION AND RECORD
73 JB1071-HAI-TR-00445 JB1071-HAI-04-ZZ-RP-W-00445 CONC1594 RP BUHLER DELIVERY NOTE PACKING LIST NO 2016010919. (Shipment # 4) 23-Jul-23 CLOSED FOR INFORMATION AND RECORD
74 JB1071-HAIF-04-ZZ-LT-W-1192 JB1071-HAIF-04-ZZ-LT-W-1192 CONC1637 RP Project Mitigation Plan & Recovery Schedule 1-Aug-23 15-Aug-23 CLOSED RHDHV 2
75 JB1071-HAI-TR-00469 JB1071-HAI-04-ZZ-RP-W-00469 CONC1672 RP Initial Check List for Silos Erection 8-Aug-23 CLOSED FOR INFORMATION AND RECORD
JB1071-HAIF-02-XX-RS-S- Investigation
1
0002 ------ CIVIL Service
----- Aces PQ Documents Soil Investigation Services (+966) 12 6641 422 6-Apr-22 12-Apr-22 6 1 CLOSED RHDHV 1
2 Email Dated -8 May 22 ------ General Design ----- Designer M/s Cosmos ------ 8-May-22 4-Jul-22 57 2 CLOSED RHDHV 2
JB1071-HAIF-03-ZZ-QC-C-
3
0001 ------ CIVIL Supplier CONC002 Prequalification of Ready mix Concrete Suppliers. CONCRETE SUPPLIER (SAUDI Readymix) 31-May-22 11-Jun-22 11 1 CLOSED RHDHV 1
4
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC015
Prequalification of Steel Rebar Company (Al Rajhi STEEL INDUSTRIES 5-Jun-22 7-Jun-22 2 20-Jun-22 23-Jun-22 3 2 CLOSED RHDHV 2
0001 Industries)
5
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC016
Prequalification of Steel Rebar Company (Saudi STEEL INDUSTRIES 5-Jun-22 7-Jun-22 2 20-Jun-22 23-Jun-22 3 2 CLOSED RHDHV 2
0002 Iron & Steel Company HADEED)
6
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC017
Prequalification of Steel Rebar Company (Ittefaq & STEEL INDUSTRIES 5-Jun-22 7-Jun-22 2 2 CLOSED
Apprived with BRC 2
0003 Steel) Transmittal # 0063
7
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC018
Prequalification of Construction Chemicals FOSAM CONSTRUCTION CHEMICALS 25-Jun-22 27-Jun-22 2 2 CLOSED RHDHV 2
0004 COMPANY
18 JB1071-HAI-TR-0034 JB1071-HAI-04-ZZ-PQ-W-0034 CIVIL Supplier CONC058 Prequalification for Piling Work (Delta Co.) Civil & Foundation Work. +966 13 849 1613 31-Jul-22 2-Aug-22 2 2 CLOSED RHDHV 2
21 JB1071-HAI-TR-00044 JB1071-HAI-04-ZZ-PQ-W-00044 CIVIL Supplier CONC108 Prequalification of Gulf Engineering House (GEH) Third Party Lab Test. 011 453 7171 17-Aug-22 31-Aug-22 14 R&R
22 JB1071-HAI-TR-00048 JB1071-HAI-04-ZZ-PQ-W-00048 MECH Supplier CONC132 Prequalification of Zamil Air-Conditioner Mechanial 011 472 5555 25-Aug-22 8-Sep-22 14 1 CLOSED RHDHV 1
CONC267 1
25 JB1071-HAI-TR-00064 JB1071-HAI-04-ZZ-PQ-W-00064 CIVIL Supplier Saudi Anfal Co. for project Ltd. Automatic Doors and System 96612447788 4-Oct-22 17-Oct-22 13 7-Feb-23 9-Feb-23 2 1 CLOSED RHDHV
CONC817
30 JB1071-HAI-TR-00071 JB1071-HAI-04-ZZ-PQ-W-00071 MECH Supplier CONC327 Elevator System Contracting Company (ESCCO) Elevator Supplier +966 12 2631907 20-Oct-22 27-Oct-22 7 R&R
31 JB1071-HAI-TR-00072 JB1071-HAI-04-ZZ-PQ-W-00072 MECH Supplier CONC328 Fire Fighting Equipments (SAFECO) Fire Fighting Equipments 011 2650070 20-Oct-22 25-Oct-22 5 1 CLOSED RHDHV 1
Sub Contractor-(Prequalification) - PQA-Log Sheet
32 JB1071-HAI-TR-00073 JB1071-HAI-04-ZZ-PQ-W-00073 CIVIL Supplier CONC332 Saudi Paint Company Ltd. (Paintco) Paint Industries 114465555 20-Oct-22 25-Oct-22 5 R&R
33 JB1071-HAI-TR-00074 JB1071-HAI-04-ZZ-PQ-W-00074 CIVIL Supplier CONC334 General Agencies and Contracting (GAC) Supply of Ready Mix Concrete 014 3962810 22-Oct-22 23-Oct-22 1 2 CLOSED RHDHV 2
34 JB1071-HAI-TR-00076 JB1071-HAI-04-ZZ-PQ-W-00076 CIVIL Supplier CONC346 Al Rashed Cement Company Cement Trading and Distribution +13 887 9405 24-Oct-22 30-Oct-22 6 2 CLOSED RHDHV 2
35 JB1071-HAI-TR-00077 JB1071-HAI-04-ZZ-PQ-W-00077 ELE Supplier CONC349 Pre-Qualification for Al Ashoury Industries Cable Management System +112650630 24-Oct-22 27-Oct-22 3 1 CLOSED RHDHV 1
36 JB1071-HAI-TR-00078 JB1071-HAI-04-ZZ-PQ-W-00078 ELE Supplier CONC350 Pre-Qualification for Power Solution industries Cable Management System +966 11 2422511 24-Oct-22 1-Nov-22 8 R&R
37 JB1071-HAI-TR-00079 JB1071-HAI-04-ZZ-PQ-W-00079 CIVIL Supplier CONC353 Pre-Qualification for Hamdan alshobhi Cement Trading and Distribution +143324444 25-Oct-22 30-Oct-22 5 2 CLOSED RHDHV 2
38 JB1071-HAI-TR-00081 JB1071-HAI-04-ZZ-PQ-W-00081 ELE Supplier CONC363 Radya International from EATON Electrical MaterialsTrading 011 4966667 27-Oct-22 1-Nov-22 5 1 CLOSED RHDHV 1
40 JB1071-HAI-TR-00084 JB1071-HAI-04-ZZ-PQ-W-00084 CIVIL Supplier CONC401 Mahmood Saeed Steel Industries Co. Ltd. (MSSI) Steel Structure 12 288 0717 5-Nov-22 7-Nov-22 2 2 CLOSED RHDHV 2
CONC447
45 JB1071-HAI-TR-00094 JB1071-HAI-04-ZZ-PQ-W-00094 ELE Supplier CONC515 Alkhorayef Commercial Company. Supply & Installation of Power Generators 11 265 1124 14-Nov-22 26-Nov-22 12 30-Nov-22 7-Dec-22 7 16-Jan-23 2-Feb-23 R&R
CONC721
46 JB1071-HAI-TR-00095 JB1071-HAI-04-ZZ-PQ-W-00095 ELE Supplier CONC448 Saudi Arabian Services Company (SASCOM) Supply & Installation of Power Generators 13 857 6550 14-Nov-22 21-Nov-22 7 R&R
47 JB1071-HAI-TR-00102 JB1071-HAI-04-ZZ-PQ-W-00102 ELE Supplier CONC475 Alfanar Company Supply & Installation of Transformer 800-124-1333 21-Nov-22 3-Dec-22 12 2 CLOSED RHDHV 2
48 JB1071-HAI-TR-00103 JB1071-HAI-04-ZZ-PQ-W-00103 ELE Supplier CONC476 The Saudi Transformers Company LTD. (STC) Supply & Installation of Transformer 011 460 0525 21-Nov-22 3-Dec-22 12 2 CLOSED RHDHV 2
49 JB1071-HAI-TR-00138 JB1071-HAI-04-ZZ-PQ-W-00138 CIVIL Supplier CONC660 GANTREX Supply and Installation of Rail track 050 4336398 2-Jan-23 3-Jan-23 1 1 CLOSED RHDHV 1
50 JB1071-HAI-TR-00152 JB1071-HAI-04-ZZ-PQ-W-00152 ELE Supplier CONC703 Alfanar Company MV and LV cables, wires, and control cables 800-124-1333 11-Jan-23 11-Jan-23 0 2 CLOSED RHDHV 2
51 JB1071-HAI-TR-00154 JB1071-HAI-04-ZZ-PQ-W-00154 ELE Supplier CONC706 Riyadh Cable MV and LV cables, wires, and control cables +966 11 265 0850 12-Jan-23 22-Jan-23 CLOSED RHDHV 1
52 JB1071-HAI-TR-00156 JB1071-HAI-04-ZZ-PQ-W-00156 CIVIL Supplier CONC714 Saudi Anfal Co. for project Ltd. Supply of Sliding , Swing Gate and Arm Barrier System 96612447788 15-Jan-23 23-Jan-23 1 CLOSED RHDHV 1
53 JB1071-HAI-TR-00157 JB1071-HAI-04-ZZ-PQ-W-00157 ELE Supplier CONC715 Red Sea Cables Company Supply of MV and LV cables, wires, and control cables 966 2886303 Ext 120 15-Jan-23 22-Jan-23 1 CLOSED RHDHV 1
Supply of Concrete
54 JB1071-HAI-TR-00192 JB1071-HAI-04-ZZ-PQ-W-00192 CIVIL Supplier CONC784 Rawafed Trading Company (RTCO) Admixtures for Haif Manufacturing and trading of Building Material +966122367519 2-Feb-23 12-Feb-23 10 R&R RHDHV 3
Batching Plant
Supply of
1. FU- MECH FIRE VALVES supplying fittings and valves and mechanical
2. FU- MECH FIRE materials
55 JB1071-HAI-TR-00199 JB1071-HAI-04-ZZ-PQ-W-00199 MECH Supplier CONC815 Future Mechanics Trading Co. (Fu-Mech) HYDRANTS.
+966 114784242 7-Feb-23 12-Feb-23 5 R&R RHDHV 3
3. FU -MECH GROOVE & and fire protection equipment
THREADED COUPLINGS
Supply of Workshop
56 JB1071-HAI-TR-00200 JB1071-HAI-04-ZZ-PQ-W-00200 MECH Supplier CONC816 Al Bawardi Tools & Hardware Equipment Supplying of Tools & Hardware 13 833 5555 7-Feb-23 12-Feb-23 5 1 CLOSED RHDHV 1
61 JB1071-HAI-TR-00205 JB1071-HAI-04-ZZ-PQ-W-00205 MECH Supplier CONC825 Riyadh Foundry Company MANHOLE COVER Manufacturing Cast and Ductile Iron Products +966 114784242 7-Feb-23 16-Feb-23 R&R
Sub Contractor-(Prequalification) - PQA-Log Sheet
Supply of Aluminum
68 JB1071-HAI-TR-00233 JB1071-HAI-04-ZZ-PQ-W-00233 CIVIL Supplier CONC915 Sanabel Aluminium Company doors ,windows and Manufacture of Aluminium Products +966-11-2651958 27-Feb-23 8-Mar-23 1 CLOSED RHDHV 1
aluminum claddings
Supply of Reinforcement
70 JB1071-HAI-TR-00242 JB1071-HAI-04-ZZ-PQ-W-00242 CIVIL Supplier CONC938 Dextra Group Couplers Manufacture of Reinforcement Couplers +966 56 123 2777 4-Mar-23 5-Mar-23 1 CLOSED RHDHV 1
78 JB1071-HAI-TR-00307 JB1071-HAI-04-ZZ-PQ-W-00307 MECH Supplier CON1216 INFINAIR ARABIA CO. Supply of Exhaust fans Manufacturer of ventilation fans 569752674 10-May-23 14-May-23 R&R 3
86 JB1071-HAI-TR-00344 JB1071-HAI-04-ZZ-PQ-W-00344 MECH Supplier CONC1343 Rabie Al- Takyeef Factory (RTF)
Supply of AIR OUTLETS & Manufacturer of Air Conditioning outlets and duct 114982414 3-Jun-23 15-Jun-23 CLOSED RHDHV 1
DUCT ACCESSORIES accessories
Supply of Aluminum
87 JB1071-HAI-TR-00352 JB1071-HAI-04-ZZ-PQ-W-00352 CIVIL Supplier CONC1364 Continual Facades Aluminum Factory (CFF) doors ,windows and Manufacture of Aluminum and Glass Products 534190847 6-Jun-23 14-Jun-23 CLOSED RHDHV 1
aluminum claddings
88 JB1071-HAI-TR-00354 JB1071-HAI-04-ZZ-PQ-W-00354 CIVIL Supplier CONC1378 Al Rasheed Marble & Granite Factory (RMG) Supply of Marble & Granite Manufacture and Supply of Marble & Granite +966 50 00 73502 8-Jun-23 13-Jun-23 CLOSED RHDHV 2
CONC1470 Aldrees Industrial & Trading Co. (ALITCO) Supply and installation of Fuel
91 JB1071-HAI-TR-00389 JB1071-HAI-04-ZZ-PQ-W-00389 MECH Supplier
System
Supply of Oil and Gas Equipment (Fuel System) 011 4489646 2-Jul-23 13-Jul-23 CLOSED RHDHV 2
94 JB1071-HAI-TR-00398 JB1071-HAI-04-ZZ-PQ-W-00398 MECH Supplier CONC1521 Sharqawi Air Distribution System Co. Factory Supply of Duct, Fittings, Manufacturer and Fabrication of Duct and its 0126380683 13-Jul-23 19-Jul-23 R&R RHDHV 3
dampers & louvers Accessories
CONC1671 Aldrees Industrial & Trading Co (ALITCO) Supply of Wooden and Metal
99 JB1071-HAI-TR-00468 JB1071-HAI-04-ZZ-PQ-W-00468 CIVIL Supplier
Doors
Manufacturing of Wooden and Metal Doors +966 11 295 0025 7-Aug-23 30-Aug-23 CLOSED RHDHV 1
Supply of Aluminum
CONC1717 Advanced International Trading Co. doors ,windows , claddings,
102 JB1071-HAI-TR-00487 JB1071-HAI-04-ZZ-PQ-W-00487 CIVIL Supplier
curtain wall and
Manufacture of Aluminium Products ,+966-11-2651958 16-Aug-23 30-Aug-23 R&R 3
accessories (ALUPCO System)
CONC1752 BRM Machinery and Equipment Rental L.L.C Supply of Slip Form Machinery
104 JB1071-HAI-TR-00499 JB1071-HAI-04-ZZ-PQ-W-00499 CIVIL Supplier
and Equipment
Slip Form Equipment 97143366112 23-Aug-23 24-Aug-23 CLOSED RHDHV 1
105 JB1071-HAI-TR-00536 JB1071-HAI-04-ZZ-PQ-W-00536 ELE Supplier CONC1854 Al Aamedah Modern Poles Co Supply of External Lighting Manufacturing of lighting poles, lights and 114480501 13-Sep-23 OPEN
Poles, lights with accessories accessories
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Material Submittal - MTS - Log Sheet
2 JB1071-HAI-TR-0019 ----- CONC030 MTS CIVIL Concure WB309-Clear Curing Compound Fosam --- 24-Jul-22 25-Jul-22 1 1 CLOSED RHDHV 1
3 JB1071-HAI-TR-0035 JB1071-HAI-04-ZZ-MA-W-0035 CONC059 MTS CIVIL POLYETHYLENE SHEET UNITECH --- 1-Aug-22 4-Aug-22 3 2 CLOSED RHDHV 2
4 JB1071-HAI-TR-0036 JB1071-HAI-04-ZZ-MA-W-0036 CONC061 MTS CIVIL Concrete Mix Design Saudi Redimex --- 1-Aug-22 2-Aug-22 1 2 CLOSED RHDHV 2
5 JB1071-HAI-TR-00039 JB1071-HAI-04-ZZ-MA-W-00039 CONC080 MTS CIVIL Nitoproof 10, Bitumen Emulsion Protective Coating (DampProofing)Fosam Company Fosam --- 7-Aug-22 22-Aug-22 15 27-Sep-22 3-Oct-22 6 1 CLOSED RHDHV 1
CONC242 Limited.
6 JB1071-HAI-TR-00040 JB1071-HAI-04-ZZ-MA-W-00040 CONC084 MTS CIVIL Concrete Curing Compound DON Construction Products (DCP). DCP --- 8-Aug-22 30-Aug-22 22 R&R
DURAR Masagh Trading
7 JB1071-HAI-TR-00041 JB1071-HAI-04-ZZ-MA-W-00041 CONC088 MTS CIVIL POLYETHYLENE SHEET
Company
--- 9-Aug-22 27-Aug-22 18 R&R
8 JB1071-HAI-TR-00043 JB1071-HAI-04-ZZ-MA-W-00043 CONC097 MTS CIVIL Bitucell (Bitumen impregnated Fibre Board) Fosam Company Limited --- 11-Aug-22 23-Aug-22 12 2 CLOSED RHDHV 2
9 JB1071-HAI-TR-00045 JB1071-HAI-04-ZZ-MA-W-00045 CONC112 MTS CIVIL RENDEROC TG XTRA, Concrete Repair Mortar Fosam Company Limited --- 17-Aug-22 23-Aug-22 6 2 CLOSED RHDHV 2
CONC175
10 JB1071-HAI-TR-00055 JB1071-HAI-04-ZZ-MA-W-00055 CONC370 MTS CIVIL Fiprocide, Termite Control Spray,HIT Pest Control HIT Pest Control --- 7-Sep-22 13-Oct-22 36 29-Oct-22 11-Nov-22 13 26-Nov-22 8-Dec-22 12 1 CLOSED 1
CONC494
11 JB1071-HAI-TR-00056 JB1071-HAI-04-ZZ-MA-W-00056 CONC179 MTS CIVIL Material Submittal,Concrete Design Mix 40MPa with Silica Fume. Saudi Ready Mix Concrete --- 8-Sep-22 22-Sep-22 14 2 CLOSED RHDHV 2
12 JB1071-HAI-TR-00058 JB1071-HAI-04-ZZ-MA-W-00058 CONC227 MTS CIVIL Nitomortar TC2000, Epoxy based Concrete Repair Mortar Fossam --- 22-Sep-22 15-Oct-22 23 R&R
13 JB1071-HAI-TR-00059 JB1071-HAI-04-ZZ-MA-W-00059 CONC230 MTS CIVIL Nitoflor Hardtop (Monolithic surface hardening compound for fresh concrete floors) Fossam --- 24-Sep-22 16-Oct-22 R&R
14 JB1071-HAI-TR-00060 JB1071-HAI-04-ZZ-MA-W-00060 CONC245 MTS CIVIL SUPERCAST PVC (Centrally and externally placed PVC waterstops) Fossam --- 28-Sep-22 27-Oct-22 29 1 CLOSED 1
16 JB1071-HAI-TR-00065 JB1071-HAI-04-ZZ-MA-W-00065 CONC286 MTS CIVIL Setseal A, Concrete Curing Compound DCP --- 9-Oct-22 18-Oct-22 9 2 CLOSED RHDHV 2
Flocrete SP129, Hyperplast PC261, Flocrete RPC9. Concrete Admixtures for Haif
17 JB1071-HAI-TR-00087 JB1071-HAI-04-ZZ-MA-W-00087 CONC410 MTS CIVIL
Batching Plant
DCP --- 6-Nov-22 8-Nov-22 2 R&R
18 JB1071-HAI-TR-00090 JB1071-HAI-04-ZZ-MA-W-00090 CONC432 MTS CIVIL Concrete Design Mix 40MPa with Silica Fume, from GAC Batching Plant GAC --- 12-Nov-22 21-Nov-22 9 2 CLOSED RHDHV 2
CONC538
14-Dec-22 21-DEC-22
19 JB1071-HAI-TR-00111 JB1071-HAI-04-ZZ-MA-W-00111 CONC545 MTS CIVIL Concrete Design Mixes 40MPa with Silica Fume from HAIF Batching Plant HAIF Batching Plant --- 5-Dec-22 6-Dec-22 22-Aug-23 CLOSED
25-JUL-23
aMessage
CONC575
20 JB1071-HAI-TR-00118 JB1071-HAI-04-ZZ-MA-W-00118 CONC576 MTS CIVIL MasterRheobuild 945, MasterPozzolith 327 - Concrete Admixtures Master Builders Soolutions --- 14-Dec-22 15-Dec-22 1 1 CLOSED RHDHV 1
21 JB1071-HAI-TR-00131 JB1071-HAI-04-ZZ-MA-W-00131 CONC640 MTS CIVIL Fosroc Brushbond Protective Coating for Blinding of Process Building Fosam Saudi Arabia --- 29-Dec-22 1-Jan-23 3 5-Jan-23 1 CLOSED RHDHV 1
22 JB1071-HAI-TR-00139 JB1071-HAI-04-ZZ-MA-W-00139 CONC667 MTS CIVIL Concrete Design Mix 40MPa Mix with GGBS Saudi Ready Mix Concrete --- 3-Jan-23 24-Aug-23 CLOSED 1
23 JB1071-HAI-TR-00140 JB1071-HAI-04-ZZ-MA-W-00140 CONC668 MTS CIVIL Concrete Design Mix 15 Mpa for Blinding from HAIF Batching Plant HAIF Batching Plant --- 3-Jan-23 7-Jan-23 OPEN
CONC684
8-JAN-23
3-01-23 Amessage
24 JB1071-HAI-TR-00141 JB1071-HAI-04-ZZ-MA-W-00141 CONC669 MTS MECH. Pit less Weigh Bridge from Mettler Toledo Mettler Toledo --- 29-01-23 15-02-23 2 CLOSED RHDHV 2
aMessage ECOM267
19-02-23
25 JB1071-HAI-TR-00146 JB1071-HAI-04-ZZ-MA-W-00146 CONC689 MTS ELE PVC, \UPVC Conduits and Fittings DECODUCT --- 8-Jan-23 13-Feb-23 36 2 CLOSED RHDHV 2
26 JB1071-HAI-TR-00149 JB1071-HAI-04-ZZ-MA-W-00149 CONC696 MTS CIVIL SikaSwell A Volclay Waterstop for Pile Cap Sika Saudi Arabia Co. Ltd --- 9-Jan-23 11-Jan-23 2 CLOSED RHDHV 1
Sika Saudi Arabia Co. Ltd
27 JB1071-HAI-TR-00150 JB1071-HAI-04-ZZ-MA-W-00150 CONC700 MTS CIVIL Supercast SW30, Volclay Waterstop for Pile Cap FOSAM Saudi Co. Ltd. --- 10-Jan-23 27-Feb-23 48 1 CLOSED RHDHV 1
28 JB1071-HAI-TR-00151 JB1071-HAI-04-ZZ-MA-W-00151 CONC701 MTS CIVIL MasterSeal 910, Volclay Waterstop for Pile Cap BASF (Master Builders --- 10-Jan-23 12-Jan-23 2 1 CLOSED RHDHV 1
Solutions)
29 JB1071-HAI-TR-00163 JB1071-HAI-04-ZZ-MA-W-00163 CONC740 MTS CIVIL Setseal AW309, Concrete Curing Compound DON Construction Products --- 22-Jan-23 23-Jan-23 1 1 CLOSED RHDHV 1
(DCP).
30 JB1071-HAI-TR-00164 JB1071-HAI-04-ZZ-MA-W-00164 CONC741 MTS CIVIL Setseal B, Water proofing Cementitious Coating for Blinding of Silos Foundations Don Construction Products --- 22-Jan-23 23-Jan-23 1 1 CLOSED RHDHV 1
(DCP).
Hypersel DP-2010H, Volclay Waterstop for Pile Cap Alternate of Sikaswell & Don Construction Products
31 JB1071-HAI-TR-00165 JB1071-HAI-04-ZZ-MA-W-00165 CONC745 MTS CIVIL
Masterseal 910 (DCP)
--- 23-Jan-23 14-Feb-23 22 1 R&R RHDHV 3
32 JB1071-HAI-TR-00166 JB1071-HAI-04-ZZ-MA-W-00166 CONC748 MTS CIVIL SikaTop Seal 107, Water proofing Cementitious Coating for Blinding of Silos Sika Saudi Arabia Co. Ltd --- 23-Jan-23 14-Feb-23 22 2 CLOSED RHDHV 2
Foundations (Alternator of Brushbond Fosroc)
33 JB1071-HAI-TR-00181 JB1071-HAI-04-ZZ-MA-W-00181 CONC769 MTS CIVIL NITOBOND AR Concrete Bonding Agent for fresh concrete with old Concrete Fosam Company Limited --- 29-Jan-23 16-Feb-23 18 1 CLOSED RHDHV 1
34 JB1071-HAI-TR-00182 JB1071-HAI-04-ZZ-MA-W-00182 CONC770 MTS CIVIL Screed Concrete Design Mix 15 MPA for Protection of Cementitious Water proofing Saudi Ready Mix Concrete --- 29-Jan-23 CLOSED
35 JB1071-HAI-TR-00186 JB1071-HAI-04-ZZ-MA-W-00186 CONC779 MTS CIVIL Concrete Design Mix 15 Mpa Screed (for cementitious waterproofing Protection) from --- 31-Jan-23 OPEN
HAIF Batching Plant HAIF Batching Plant
36 JB1071-HAI-TR-00187 JB1071-HAI-04-ZZ-MA-W-00187 CONC780 MTS CIVIL Fiberboard / Fillerboard (Bitumen impregnated Fibre Board) for Expansion and --- 31-Jan-23 14-Feb-23 14 1 CLOSED RHDHV 1
Isolation Joints DCP
37 JB1071-HAI-TR-00198 JB1071-HAI-04-ZZ-MA-W-00198 CONC813 MTS ELE Earthing and Lightning Protection System Supplier SESCO, Brand ABB --- 6-Feb-23 14-Feb-23 1 CLOSED RHDHV 1
Furse
38 JB1071-HAI-TR-00207 JB1071-HAI-04-ZZ-MA-W-00207 CONC831 MTS MECH. Workshop Equipments Al Bawardi Tools and Hardware --- 8-Feb-23 19-Feb-23 1 CLOSED RHDHV 1
39 JB1071-HAI-TR-00211 JB1071-HAI-04-ZZ-MA-W-00211 CONC841 MTS MECH. BOBCAT/SKID LOADER (2 Nos.) Abdullah Abunayyan Trading --- 9-Feb-23 aMessage Amessage 19-Feb-23 1 CLOSED RHDHV 1
Corp. (JCB) 16-2-23 18-02-23
40 JB1071-HAI-TR-00214 JB1071-HAI-04-ZZ-MA-W-00214 CONC858 MTS MECH. Black Seamless Steel Pipe for Above Ground (Inside Building) Fire Water Pipe Interpipe / Al Othman Industrial --- 13-Feb-23 27-Feb-23 14 1 CLOSED RHDHV 1
Marketing Co.
41 JB1071-HAI-TR-00216 JB1071-HAI-04-ZZ-MA-W-00216 CONC862 MTS MECH. HDPE Pipes and Fittings for External Underground Water Supply Network Neproplast (National Marketing --- 14-Feb-23 28-Feb-23 14 1 CLOSED RHDHV 1
Est. Co. Ltd)
42 JB1071-HAI-TR-00217 JB1071-HAI-04-ZZ-MA-W-00217 CONC863 MTS MECH. One Wheel Loader from JCB Abdullah Abunayyan Trading --- 15-Feb-23 20-Feb-23 26-Jul-23 OPEN
CONC1617 Corp. (JCB)
43 JB1071-HAI-TR-00218 JB1071-HAI-04-ZZ-MA-W-00218 CONC869 MTS MECH. HDPE Pipes and Fittings for External Underground Fire Fighting Network Neproplast (National Marketing --- 16-Feb-23 28-Feb-23 12 1 CLOSED RHDHV 2
Est. Co. Ltd)
CONC874 UPVC Pipes and Fittings for above and underground (Internal and external) Sewer 19-Feb-23 8-Mar-23
44 JB1071-HAI-TR-00219 JB1071-HAI-04-ZZ-MA-W-00219 MTS MECH. Neproplast (National Marketing --- 05-Apr-23 9-Apr-23 9-Apr-23 2 CLOSED 2
CONC1098 drainage, Waste and Vents Network Est. Co. Ltd) aMessage
aMessage
45 JB1071-HAI-TR-00221 JB1071-HAI-04-ZZ-MA-W-00221 CONC878 MTS MECH. UPVC Pipes and Fittings for above and underground (Internal and external) Storm Neproplast (National Marketing --- 19-Feb-23 1-Mar-23 14-Aug-23 OPEN
CONC1702 Network Est. Co. Ltd)
46 JB1071-HAI-TR-00222 JB1071-HAI-04-ZZ-MA-W-00222 CONC879 MTS CIVIL Concrete Mix Designs 40 MPa (OPC+GGBS) and 25 MPa (OPC+SF) --- 20-Feb-23 31-Aug-23 CLOSED RHDHV 1
from HAIF Batching Plant HAIF Batching Plant
47 JB1071-HAI-TR-00225 JB1071-HAI-04-ZZ-MA-W-00225 CONC888 MTS CIVIL GGBS for HAIF Batching Plant Super Cement Manufacturing --- 21-Feb-23 27-Feb-23 1 CLOSED RHDHV 1
Company L.L.C.
48 JB1071-HAI-TR-00228 JB1071-HAI-04-ZZ-MA-W-00228 CONC898 MTS CIVIL Plasti Board (Protection Board for Waterproofing Coating Paint) DCP --- 25-Feb-23 27-Feb-23 2 1 CLOSED RHDHV 1
49 JB1071-HAI-TR-00234 JB1071-HAI-04-ZZ-MA-W-00234 CONC922 MTS MECH. One Dockage Carter and Complete set of Sieves Suitable for Grain and Maize Carter Day International, Inc. --- 1-Mar-23 14-Mar-23 1 CLOSED RHDHV 1
CONC923
CONC995 4-MAR-23 4-Apr-23 27-Apr-23
50 JB1071-HAI-TR-00235 JB1071-HAI-04-ZZ-MA-W-00235
CONC1135
MTS ELE Steel Back Boxes Steel City / Supplier SESCO --- 1-Mar-23
aMessage
12-Mar-23
aMessage 08-May-23 14-May-23 2 CLOSED RHDHV 2
CONC1154 supersede
51 JB1071-HAI-TR-00244 JB1071-HAI-04-ZZ-MA-W-00244 CONC948 MTS CIVIL Rebar Coupler (Repair Grip) for 25mm Rebar from Dextra Group Dextra Group --- 6-Mar-23 7-Mar-23 1 1 CLOSED RHDHV 1
16-MAR-23
Prime Diesel Generators for Substation #3, #4 and #5. 19-Mar-23
53 JB1071-HAI-TR-00251 JB1071-HAI-04-ZZ-MA-W-00251 CONC971 MTS ELE (16-Mar-23) Attacged Track Record --- 12-Mar-23 aMessage 2 CLOSED 2
(19-Mar-23) Attched Reference List for CUMMINS DG Set Model C1250D6 & CUMMINS-UK
22-Mar-23
C1000D6B aMessage
54 JB1071-HAI-TR-00253 JB1071-HAI-04-ZZ-MA-W-00253 CONC985 MTS MECH. PPR Pipes and Fittings for Hot & Cold Water supply --- 14-Mar-23 9-Apr-23 10-Apr-23 1 CLOSED RHDHV 1
CONC1099 Tahweel Pipes
JB1071-HAI-04-ZZ-RP-W-00266
Steel Plates for Primary Members Paint (ZAMIL) 17-May-23 29-May-23 CLOSED
(P03_CONC1247)
Single skin Panels for Sheeting & Color (ZAMIL)_P01 & P02
JB1071-HAI-04-ZZ-RP-W-00268 1-External Single Skin Panels (Type ‘‘S‘‘/ Color: Frost White)_P03 6-Jun-23 15-Jun-23 CLOSED
2-Carbon Steel & Stainless-Steel Fasteners_P03 (LTR#1162)
CONC1357
JB1071-HAI-TR-00325 JB1071-HAI-04-ZZ-MA-W-00325 CONC1277 MTS Steel Flooring Systems (ZAMIL) ZAMIL -- 23-May-23 7-Jun-23 CLOSED 2
56 JB1071-HAI-TR-00279 JB1071-HAI-04-ZZ-RP-W-00279 CONC 1095 MTS ELE PVC, UPVC conduits & accessories Bahra Cables Company --- 8-Apr-23 16-Apr-23 CLOSED 1
CONC1152 aMessage
57 JB1071-HAI-TR-00285 JB1071-HAI-04-ZZ-MA-W-00285 CONC1217 MTS ELE Prime Diesel Generators for Substation #3, #4 and #5. CUMMINS-UK --- 27-Apr-23
30-April-23
11-May-23 14-May-23 18-May-23 CLOSED 2
CONC1230
58 JB1071-HAI-TR-00286 JB1071-HAI-04-ZZ-MA-W-00286 CONC1153 MTS MECH. Laboratory Equipment Sieves ISO 5223 (20 to 29) Carter Day International, Inc. --- 27-Apr-23 7-May-23 CLOSED 1
Laboratory Equipment
3- Two Sensitive Weighers 3- Ohaus™
6- Two Sample Dividers 8-MAY-23
59 JB1071-HAI-TR-00306 JB1071-HAI-04-ZZ-MA-W-00306 CONC1209 MTS MECH. 6- Perten Instruments --- 20-MAY-23 21-May-23 CLOSED 1
12- RIFFLE DIVIDER (divided in 2 parts the meets the 12- Seedburo USA Sepersede
international association for seed tests) 16- Memmert
16- ATMOSPHERIC OVEN)
60 JB1071-HAI-TR-00328 JB1071-HAI-04-ZZ-MA-W-00328 CONC1290 MTS CIVIL Bituminous Waterproofing Membrane (PY 40200 E, 4mm thick) Arabian Waterproofing --- 27-May-23 29-May-23 CLOSED 1
industries Co. (Awazel)
CONC1342 03-JUL-23
61 JB1071-HAI-TR-00343 JB1071-HAI-04-ZZ-MA-W-00343 CONC1469 MTS MECH. Electric Monorail Hoist for HH1 and TT2 GH Crane Components/Etihad --- 3-Jun-23 6-Jun-23 2-Jul-23 eMessage 3-Aug-23 10-Aug-23 CLOSED 1
CONC1650 Cranes Company 10-AUG-23
62 JB1071-HAI-TR-00355 JB1071-HAI-04-ZZ-MA-W-00355 COC1382 MTS ELE 13.8KV Ring Main Unit (RMU) Schneider / Rawabi Electric --- 10-Jun-23 14-Jun-23 CLOSED 2
Floor Drain
Clean-out 1
Clean-out 2
Vent Cap
63 JB1071-HAI-TR-00356 JB1071-HAI-04-ZZ-MA-W-00356 CONC1386 MTS MECH. Roof drain --- 11-Jun-23 14-Jun-23 CLOSED RHDHV 2
Roof drain - Scupper Saudi Cast
Downspout Nozzle
Manhole cover - Heavy duty
Manhole cover - Heavy duty
Catch basin Cover
64 JB1071-HAI-TR-00357 JB1071-HAI-04-ZZ-MA-W-00357 CONC1387 MTS CIVIL Gate Barrier System (CAME – G6000) Saudi Anfal --- 11-Jun-23 14-Jun-23 CLOSED RHDHV 1
65 JB1071-HAI-TR-00358 JB1071-HAI-04-ZZ-MA-W-00358 CONC1388 MTS CIVIL Steel Rolling Shutters Doors JX (J&G) Motor Saudi Anfal --- 11-Jun-23 14-Jun-23 CLOSED RHDHV 1
66 JB1071-HAI-TR-00359 JB1071-HAI-04-ZZ-MA-W-00359 CONC1390 MTS CIVIL Swing Gate System (CAME – ATI 3000 - 5024) Saudi Anfal --- 11-Jun-23 17-Jun-23 R&R 3
Laboratory Equipment
68 JB1071-HAI-TR-00361 JB1071-HAI-04-ZZ-MA-W-00361 CONC1393 MTS MECH. 1- Five sample picking pens Seedburo USA --- 12-Jun-23 14-Jun-23 CLOSED RHDHV 1
14- Two - RKS Aluminum Probe (length 2,00 m x Ø 30 mm - Aluminum)
69 JB1071-HAI-TR-00362 JB1071-HAI-04-ZZ-MA-W-00362 CONC1396 MTS MECH. Fuel Tank , Fuel Pumps and Accessories list attached. Delta Plus --- 12-Jun-23 18-Jun-23 R&R RHDHV 3
70 JB1071-HAI-TR-00363 JB1071-HAI-04-ZZ-MA-W-00363 CONC1398 MTS ELE Oil type MV (13.8 - 0.4KV) Transformers (Aluminium winding) The Saudi Transformers Co. --- 13-Jun-23 20-Jun-23 CLOSED 1
LTD (STC)
18-June-23
aMessage
72 JB1071-HAI-TR-00369 JB1071-HAI-04-ZZ-MA-W-00369 CONC1411 MTS ELE Material Submittal for EMT Conduits & Fittings ITCC / Ultimate Solution --- 15-Jun-23 03-Jul-23 CLOSED 2
Trading Co. aMessage
6-Jul-23
CONC1411
73 JB1071-HAI-TR-00370 JB1071-HAI-04-ZZ-MA-W-00370 CONC1412 MTS MECH. Material Submittal for Plumbing, Ducting Supports and Ducting Accessories (List Mariam Trading Co. & Partners --- 15-Jun-23 3-Jul-23 CLOSED 1
Attached) (MTC)
74 JB1071-HAI-TR-00371 JB1071-HAI-04-ZZ-MA-W-00371 CONC1414 MTS MECH. GENERAL DUTY VALVES & SPECIALTIES WATER METER FOR PLUMBING PIPING WATTS / SHAMS Eastern --- 15-Jun-23 6-Jul-23 CLOSED 1
Province Trading Est
76 JB1071-HAI-TR-00388 JB1071-HAI-04-ZZ-MA-W-00388 CONC1463 MTS CIVIL Material Submittal for underground using double layers of SBS Bituminous --- 26-Jun-23 REF TO TR#00391 CLOSED REF TO TR#00391
Waterproofing Membrane and Accoesiros. Awazel / BMC
2-JULY-23
77 JB1071-HAIF-04-XX-LT-W- JB1071-HAI-04-ZZ-MA-W-00390 CONC1474 MTS STEEL Material Submittal for Micro Rib Rockwool Sandwich Panels (Zamil) --- Amessage 10-JUL-23 CLOSED RHDHV 1
1179 CONC1593 STRUCTURE ZAMIL 17-july-23 23-JUL-23
23-JUL-23
CONC1475 Material Submittal for underground using double layers of SBS Bituminous 2-JUL-23 3-JUL-23
78 JB1071-HAI-TR-00391 JB1071-HAI-04-ZZ-MA-W-00391 MTS CIVIL Awazel / BMC --- 4-JUL-23 4-Jul-23 4-Jul-23 CLOSED RHDHV 1
CONC1481 Waterproofing Membrane and Accessories aMessage
aMessage
79 JB1071-HAI-TR-00400 JB1071-HAI-04-ZZ-MA-W-00400 CONC1528 MTS ELE Material Submittal for 13.8KV Ring Main Unit (RMU) --- 15-Jul-23 23-Jul-23 26-Aug-23 OPEN
CONC1759 Alfanar Company
80 JB1071-HAI-TR-00446 JB1071-HAI-04-ZZ-MA-W-00446 CONC1615 MTS CIVIL Conbextra TS Grout for Steel Silos Anchors Bolts Fosam Company Limited --- 26-Jul-23 1-Aug-23 CLOSED RHDHV 1
83 JB1071-HAI-TR-00449 JB1071-HAI-04-ZZ-MA-W-00449 CONC1625 MTS MECH. Material Submittal for Workshop Equipments Daesan Korea, GoldArc,Fini --- 30-Jul-23 7-Aug-23 R&R 3
Compressor
84 JB1071-HAI-TR-00459 JB1071-HAI-04-ZZ-MA-W-00459 CONC1645 MTS MECH. Material Submittal for One Passenger Lift / Elevator for Admin Building OTIS --- 1-Aug-23 20-Aug-23 CLOSED RHDHV 1
Laboratory Equipment
85 JB1071-HAI-TR-00462 JB1071-HAI-04-ZZ-MA-W-00462 CONC1658 MTS MECH. 5 - Two fast moisture measuring equipment (digital with computer and printer) Perten Instruments --- 5-Aug-23 10-Aug-23 CLOSED 1
10 - One cereals Infraneo
86 JB1071-HAI-TR-00466 JB1071-HAI-04-ZZ-MA-W-00466 CONC1670 MTS ELE Material Submittal for MV(13.8KV) 3Cx500mm² AL/XLPE/LLDPE Cable Riyadh Cables --- 7-Aug-23 17-Aug-23 CLOSED 1
87 JB1071-HAI-TR-00467 JB1071-HAI-04-ZZ-MA-W-00467 CONC1669 MTS CIVIL Material Submital for Rebar Coupler (O-Type) for 25mm Rebar from MRC Modern Tools Establishment --- 7-Aug-23 10-Aug-23 CLOSED 1
88 JB1071-HAI-TR-00478 JB1071-HAI-04-ZZ-MA-W-00478 CONC1692 MTS CIVIL Material Submittal for Door Hardware, Material List Attached Saudi Etqaan Co. / Simplex --- 12-Aug-23 31-Aug-23 CLOSED RHDHV 2
89 JB1071-HAI-TR-00479 JB1071-HAI-04-ZZ-MA-W-00479 CONC1694 MTS CIVIL Material Submital for Steel Rebar Anchoring (Sika AnchorFix®-2+ Tropical) Sika --- 12-Aug-23 OPEN
90 JB1071-HAI-TR-00488 JB1071-HAI-04-ZZ-MA-W-00488 CONC1718 MTS CIVIL Material Submittal for Door Hardware, Material List Attached Leading Agent Trading Co. / --- 16-Aug-23 31-Aug-23 CLOSED RHDHV 1
BASI
91 JB1071-HAI-TR-00497 JB1071-HAI-04-ZZ-MA-W-00497 CON1746 MTS CIVIL Material Submital Conplast SP415 and Conplast RP265. Concrete Admixtures for Haif --- 22-Aug-23 23-Aug-23 CLOSED RHDHV 1
Batching Plant Fosam
Material Submittal of 40 Mpa Concrete Mix Design with Silica Fume for Slip Form work
92 JB1071-HAI-TR-00498 JB1071-HAI-04-ZZ-MA-W-00498 CONC1747 MTS CIVIL at Flat HAIF Batching Plant --- 22-Aug-23 24-Aug-23 R&R 3
Storage from HAIF Batching Plant
93 JB1071-HAI-TR-00500 JB1071-HAI-04-ZZ-MA-W-00500 CONC1756 MTS CIVIL Material Submittal for Plaster and Block Work Accoesiros. Unitech Building & construction --- 26-Aug-23 30-Aug-23 CLOSED RHDHV 1
materials Supplier
94 JB1071-HAI-TR-00501 JB1071-HAI-04-ZZ-MA-W-00501 CONC1757 MTS ELE Material Submittal for Oil type MV (13.8 - 0.4KV) Transformers (Aluminium winding) Alfanar --- 26-Aug-23 OPEN
95 JB1071-HAI-TR-00511 JB1071-HAI-04-ZZ-MA-W-00511 CONC1781 MTS ELE Material Submittal for LV Cables Red Sea Cables Company --- 30-Aug-23 OPEN
96 JB1071-HAI-TR-00515 JB1071-HAI-04-ZZ-MA-W-00515 CONC1791 MTS CIVIL Material Submittal for Concrete Masonry Unit (CMU) for all buildings as per attached Suliman Abdul Rehman --- 3-Sep-23 7-Sep-23 CLOSED RHDHV 2
Data Sheets Namlah Factory (SANCO)
5-Sep-23
98 JB1071-HAI-TR-00518 JB1071-HAI-04-ZZ-MA-W-00518 CONC1802 MTS MECH. Material Submittal for Fire Pumps (Electrical, Diesel and Jockey Pumps) XYLEM (ITT)/ Tawreed --- 10-Sep-23 OPEN
Company LLC (aMessage)
100 JB1071-HAI-TR-00525 JB1071-HAI-04-ZZ-MA-W-00525 CONC1833 MTS MECH. Material Submittal for Potable (Booster) Pumps (2duty + 1Standby) XYLEM (ITT)/ Tawreed --- 11-Sep-23 OPEN
Company LLC
101 JB1071-HAI-TR-00527 JB1071-HAI-04-ZZ-MA-W-00527 CONC1839 MTS MECH. Material Submittal for Air Outlets and Duct Accessories Rabie Al- Takyeef Factory --- 12-Sep-23 OPEN
(RTF)
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proce
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Invoice Submittal - Log Sheet
2 JB1071-HAIF-ZZ-XX-IN-LT-Q-0002 INVOICE Advance Payment Invoice AP01 16-Jun-22 18-Jun-22 2 19-Jun-22 CLOSED
6 JB1071-HAIF-04-ZZ-IV-W-1039 AFP002 APPLICATION Application for Intrim Payment Certificate No 1 20-Oct-22 21-Nov-22 32 CLOSED 1
8 JB1071-HAIF-04-ZZ-IV-W-1084 AFP005 APPLICATION Application for Intrim Payment Certificate No 2 21-Jan-23 22-Jan-23 CLOSED 1
10 JB1071-HAIF-04-ZZ-IV-W-1097 AFP003 APPLICATION Application for Intrim Payment Certificate No 3 13-Feb-23 6-Mar-23 CLOSED
11 JB1071-HAIF-04-ZZ-IV-W-1106 Email & INVOICE-04 Interim Payment Certificate No-03 7-Mar-23 CLOSED
CONC965
12 JB1071-HAIF-04-ZZ-IV-W-1122 CONC1029 APPLICATION-4 Application for Intrim Payment Certificate No 4 22-Mar-23 CLOSED
13 JB1071-HAIF-04-ZZ-IV-W-1125 Email & INVOICE-04 Interim Payment Certificate No-04 28-Mar-23 CLOSED
CONC965
14 JB1071-HAIF-04-ZZ-IV-W-1141 CONC1144 APPLICATION-5 Application for Intrim Payment Certificate No 5 26-Apr-23 30-Apr-23 CLOSED
15 JB1071-HAIF-04-ZZ-IV-W-1143 CONC 1162 INVOICE-05 Invoice for Interm Payment Certificate No-5 1-May-23
16 JB1071-HAIF-04-ZZ-IV-W-1156 CONC1311 APPLICATION-6 Application for Intrim Payment Certificate No 6 30-May-23 5-Jun-23 CLOSED
17 JB1071-HAIF-04-ZZ-IV-W-1161 CONC1356 INVOICE-06 Invoice for Interm Payment Certificate No-6 6-Jun-23
18 JB1071-HAIF-04-ZZ-IV-W-1175 CONC1447 APPLICATION-7 Application for Intrim Payment Certificate No 7 22-Jun-23 10-Jul-23
19 JB1071-HAIF-04-ZZ-IV-W-1183 CONC1503 INVOICE-07 Invoice for Interm Payment Certificate No-7 10-Jul-23
21 JB1071-HAIF-04-ZZ-IV-W-1193 CONC1646 INVOICE-08 Invoice for Interm Payment Certificate No-8 2-Aug-23
23 JB1071-HAIF-04-ZZ-IV-W-1200 CONC1808 INVOICE-09 Invoice for Interm Payment Certificate No-9 6-Sep-23
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
3 JB1071-HAI-04-ZZ-WIR-W-00003 CVL
Concrete Compressive Strength Test at 14 days for Trial Mixes samples of RGF 24-Aug-22 OPEN
35MPA and 40MPA.
5 JB1071-HAI-04-ZZ-WIR-W-00005 CONC146 CVL Concrete Trial Mixes of 15MPA and 30MPA design mixes. Saudi Ready Mix 30-Aug-22 4-Sep-22 5 2 CLOSED RHDHV 2
6 JB1071-HAI-04-ZZ-WIR-W-00006 CONC152 CVL Concrete Trial Mixes of 40MPA design mixes. Saudi Ready Mix 31-Aug-22 4-Sep-22 4 2 CLOSED RHDHV 2
10 JB1071-HAI-04-ZZ-WIR-W-00010 CONC225 CVL Inspection request for Setting out of preliminary Piles At Site 22-Sep-22 OPEN
12 JB1071-HAI-04-ZZ-WIR-W-00012 CONC279 CVL Steel reinforcement Cage for Preliminary Pile Near to Silos Area 6-Oct-22 10-Oct-22 4 2 CLOSED RHDHV 2
13 JB1071-HAI-04-ZZ-WIR-W-00013 CONC310 CVL Concrete Pouring for Pile#1 Near to Silos Area 15-Oct-22 OPEN
Concrete Compressive Strength Test at 07 days for Reaction Pile # 4, Design Riyadh Geotechnique &
14 JB1071-HAI-04-ZZ-WIR-W-00014 CONC333 CVL Foundation 20-Oct-22 OPEN
Mix sample 40Mpa. Company Laboratory (RGF).
Concrete Compressive Strength Test at 07 days for Test Pile # 1, Design Mix ARAB COMPANY FOR
15 JB1071-HAI-04-ZZ-WIR-W-00015 CONC344 CVL LABORATORIES AND SOIL 22-Oct-22 OPEN
sample 40Mpa. (ACES)
16 JB1071-HAI-04-ZZ-WIR-W-00016 CONC342 CVL Concrete Pouring for Preliminary test Pile -2 Near to Silos Area 23-Oct-22 OPEN
Concrete Compressive Strength Test at 14 days for Reaction Pile # 4, Design Riyadh Geotechnique &
CONC367
19 JB1071-HAI-04-ZZ-WIR-W-00019 CVL Foundation 27-Oct-22 30-Oct-22 OPEN
CONC378 Mix sample 40Mpa. Company Laboratory (RGF)
Concrete Compressive Strength Test at 14 days for Reaction Pile # 3 and at 7 Riyadh Geotechnique &
20 JB1071-HAI-04-ZZ-WIR-W-00020 CONC382 CVL Foundations 31-Oct-22 OPEN
days for Test Pile # 2. Design Mix sample 40Mpa. (RGF)
Concrete Compressive Strength Test at 14 days for Reaction Pile # 2 and at 7 Riyadh Geotechnique &
21 JB1071-HAI-04-ZZ-WIR-W-00021 CONC385 CVL Foundations 1-Nov-22 OPEN
days for Reaction Pile # 6 (RGF)
Concrete Compressive Strength Test at 7 days for Reaction Pile # 8 (Silos Riyadh Geotechnique &
22 JB1071-HAI-04-ZZ-WIR-W-00022 INS005 CVL Foundations 2-Nov-22 OPEN
Area).Design Mix sample 40Mpa. (RGF)
Concrete Compressive Strength Test at 14 days for Reaction Pile # 1 and at 7 Riyadh Geotechnique &
23 JB1071-HAI-04-ZZ-WIR-W-00023 INS006 CVL FosrocFoundations
Brushbond Protective Coating for Blinding of Process Building OPEN
days for Reaction Pile # 5, Design Mix sample 40Mpa. (RGF)
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Concrete Compressive Strength Test at 14 days for Test Pile # 2. Design Mix Riyadh Geotechnique &
24 JB1071-HAI-04-ZZ-WIR-W-00024 INS008 CVL Foundations 7-Nov-22 OPEN
sample 40Mpa. (RGF)
Concrete Trial Mix of 40MPA mix design with silica fume at GAC Batching General Agencies & Con.
27 JB1071-HAI-04-ZZ-WIR-W-00027 INS011 CVL (GAC) 8-Nov-22 OPEN
Plant Batchin Plant
Concrete Compressive Strength Test at 28 days for Reaction Pile # 4 and at 14 Riyadh Geotechnique &
30 JB1071-HAI-04-ZZ-WIR-W-00030 INS015 CVL Foundation 10-Nov-22 OPEN
days for Reaction Pile # 5- Design Mix sample 40Mpa. Company Laboratory (RGF).
Concrete Compressive Strength Test at 28 days for Test Pile # 1, Design Mix Riyadh Geotechnique &
31 JB1071-HAI-04-ZZ-WIR-W-00031 INS016 CVL Foundation 12-Nov-22 OPEN
sample 40Mpa. Company Laboratory (RGF).
32 JB1071-HAI-04-ZZ-WIR-W-00032 INS017 CVL Inspection request for Pile Load Testing for Test Pile # 1 of silos area Silos Area Test Pile # 1 13-Nov-22 OPEN
Concrete Compressive Strength Test at 07 days for Trial Mix 40 Mpa with Riyadh Geotechnique &
33 JB1071-HAI-04-ZZ-WIR-W-00033 INS019 CVL Foundations 14-Nov-22 OPEN
Silica Fume. (RGF)
Concrete Compressive Strength Test at 28 days for Reaction Pile # 3. Design Riyadh Geotechnique &
34 JB1071-HAI-04-ZZ-WIR-W-00034 INS020 CVL Foundations 14-Nov-22 OPEN
Mix sample 40Mpa. (RGF)
Concrete Compressive Strength Test at 28 days for Reaction Pile # 2 (Silos Riyadh Geotechnique &
35 JB1071-HAI-04-ZZ-WIR-W-00035 INS023 CVL Foundations 15-Nov-22 OPEN
Area). Design Mix sample 40Mpa. (RGF)
Compressive Strength of Concrete at 7 days for Trial Mix of 40MPA mix design Riyadh Geotechnique &
36 JB1071-HAI-04-ZZ-WIR-W-00036 INS024 CVL Foundations 15-Nov-22 OPEN
with silica fume from GAC ready mix concrete (RGF)
37 JB1071-HAI-04-ZZ-WIR-W-00037 INS025 CVL Pile Steel Cage and Pre Pour for Pile # SP6-24 Silos Area 15-Nov-22 OPEN
Concrete Compressive Strength Test at 28 days for Reaction Pile # 1 and at 7 Riyadh Geotechnique &
38 JB1071-HAI-04-ZZ-WIR-W-00038 INS026 CVL Foundations 17-Nov-22 OPEN
days for Reaction Pile # 7, Design Mix sample 40Mpa. (RGF)
Concrete Compressive Strength Test at 28 days for Test Pile # 2. Design Mix Riyadh Geotechnique &
39 JB1071-HAI-04-ZZ-WIR-W-00039 INS027 CVL Foundations 21-Nov-22 OPEN
sample 40Mpa. (RGF)
Concrete Compressive Strength Test at 14 days for Trial Mix 40 Mpa with Riyadh Geotechnique &
40 JB1071-HAI-04-ZZ-WIR-W-00040 INS028 CVL Foundations 21-Nov-22 OPEN
Silica Fume. (Saudi Ready Mix Concrete) (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP6-24 with Silica Riyadh Geotechnique &
41 JB1071-HAI-04-ZZ-WIR-W-00041 INS029 CVL Foundations 22-Nov-22 OPEN
Fume. (Saudi Ready Mix Concrete) (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP6-22 with Silica Riyadh Geotechnique &
42 JB1071-HAI-04-ZZ-WIR-W-00042 INS030 CVL Foundations 23-Nov-22 OPEN
Fume. (Saudi Ready Mix Concrete) (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP6-18, SP6-20 & Riyadh Geotechnique &
43 JB1071-HAI-04-ZZ-WIR-W-00043 INS031 CVL Foundations 24-Nov-22 OPEN
SP6-25 with Silica Fume. (Saudi Ready Mix Concrete) (RGF)
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-9, SP6-12, Riyadh Geotechnique &
45 JB1071-HAI-04-ZZ-WIR-W-00045 INS033 CVL Foundations 27-Nov-22 OPEN
SP6-19 and SP6-21. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-23, SP6-26 Riyadh Geotechnique &
46 JB1071-HAI-04-ZZ-WIR-W-00046 INS035 CVL Foundations 28-Nov-22 OPEN
and SP6-28. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-8, SP6-11, Riyadh Geotechnique &
47 JB1071-HAI-04-ZZ-WIR-W-00047 INS037 CVL Foundations 30-Nov-22 OPEN
SP6-13 and SP6-36. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-3, SP6-5, Riyadh Geotechnique &
48 JB1071-HAI-04-ZZ-WIR-W-00048 INS038 CVL Foundations 1-Dec-22 OPEN
SP6-29, SP6-35 and SP12-22 (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-2, SP6-4, Riyadh Geotechnique &
49 JB1071-HAI-04-ZZ-WIR-W-00049 INS039 CVL Foundations 3-Dec-22 OPEN
SP6-17, SP6-30 and SP12-20 (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-1, SP6-14, Riyadh Geotechnique &
50 JB1071-HAI-04-ZZ-WIR-W-00050 INS040 CVL Foundations 4-Dec-22 OPEN
SP12-21, SP12-24 and SP5-24. (RGF)
Concrete Compressive Strength Test at 28 days for Trial Mix 40 Mpa with Riyadh Geotechnique &
51 JB1071-HAI-04-ZZ-WIR-W-00051 INS041 CVL Foundations 5-Dec-22 OPEN
Silica Fume. (Saudi Ready Mix Concrete) (RGF)
INS042
52 JB1071-HAI-04-ZZ-WIR-W-00052 INS043
CVL Concrete Trial Mixes of 40MPA mix design with silica fume at Haif Batch Plant. Haif Batch Plant 6-Dec-22 OPEN
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-6, SP6-18 Riyadh Geotechnique &
53 JB1071-HAI-04-ZZ-WIR-W-00053 INS044 CVL Foundations 6-Dec-22 OPEN
and SP6-31. (RGF)
Compressive Strength of Concrete at 28 days for Trial Mix of 40MPA mix Riyadh Geotechnique &
54 JB1071-HAI-04-ZZ-WIR-W-00054 INS045 CVL Foundations 6-Dec-22 OPEN
design with silica fume from GAC ready mix concrete (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-7, SP6-15 Riyadh Geotechnique &
55 JB1071-HAI-04-ZZ-WIR-W-00055 INS046 CVL Foundations 7-Dec-22 OPEN
and SP12-9, SP12-23. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-16, SP6-32 Riyadh Geotechnique &
56 JB1071-HAI-04-ZZ-WIR-W-00056 INS048 CVL Foundations 8-Dec-22 OPEN
and SP12-19, SP12-36. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-33, SP12-11 Riyadh Geotechnique &
57 JB1071-HAI-04-ZZ-WIR-W-00057 INS049 CVL Foundations 10-Dec-22 OPEN
and SP12-17, SP12-34. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-34, SP12-10 Riyadh Geotechnique &
58 JB1071-HAI-04-ZZ-WIR-W-00058 INS050 CVL Foundations 11-Dec-22 OPEN
and SP12-26, SP12-35. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP12-4, SP12-8 Riyadh Geotechnique &
59 JB1071-HAI-04-ZZ-WIR-W-00059 INS051 CVL Foundations 12-Dec-22 OPEN
and SP12-16, SP12-37. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP12-3, SP12-7 Riyadh Geotechnique &
60 JB1071-HAI-04-ZZ-WIR-W-00060 INS052 CVL Foundations 13-Dec-22 OPEN
and SP12-25, SP5-20. (RGF)
Compressive Strength Concrete at 7 days of Trial Mixes of 40MPA mix design Riyadh Geotechnique &
62 JB1071-HAI-04-ZZ-WIR-W-00062 INS054 CVL Foundations 13-Dec-22 OPEN
with silica fume for Haif Batch Plant. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP12-2, SP12-33 Riyadh Geotechnique &
63 JB1071-HAI-04-ZZ-WIR-W-00063 INS055 CVL Foundations 14-Dec-22 OPEN
and SP5-18, SP5-22, SP5-25. (RGF)
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
65 JB1071-HAI-04-ZZ-WIR-W-00065 INS057 CVL Concrete Trial Mixes of 40MPA mix design with silica fume at Haif Batch Plant. Haif Batch Plant 14-Dec-22 OPEN
Compressive Strength Test at 7 days for Silo Pile # SP12-1, SP12-21 and SP12- Riyadh Geotechnique &
66 JB1071-HAI-04-ZZ-WIR-W-00066 INS058 CVL Foundations 15-Dec-22 CLOSED
23. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP12-1, SP5-21 Riyadh Geotechnique &
67 JB1071-HAI-04-ZZ-WIR-W-00067 INS059 CVL Foundations 15-Dec-22 OPEN
and SP5-23. (RGF)
Concrete Compressive Strength Test at 28 days for Silo Pile # SP6 – 18, SP6- Riyadh Geotechnique &
68 JB1071-HAI-04-ZZ-WIR-W-00068 INS060 CVL 20 and SP6-25 Foundations 15-Dec-22 OPEN
(RGF)
69 JB1071-HAI-04-ZZ-WIR-W-00069 INS061 CVL Pile Load Testing for Test Pile # 2 of silos area. Silos Area Test Pile # 2 15-Dec-22 OPEN
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-10, SP6- Riyadh Geotechnique &
70 JB1071-HAI-04-ZZ-WIR-W-00070 INS062 CVL Foundations 17-Dec-22 OPEN
27, SP6-37. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 15, SP12- Riyadh Geotechnique &
71 JB1071-HAI-04-ZZ-WIR-W-00071 INS063 CVL 32 and SP5-19, SP5-26 Foundations 17-Dec-22 OPEN
(RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-9, SP6-12, Riyadh Geotechnique &
72 JB1071-HAI-04-ZZ-WIR-W-00072 INS064 CVL Foundations 18-Dec-22 OPEN
SP6-19 and SP6-21. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 6, SP12- Riyadh Geotechnique &
73 JB1071-HAI-04-ZZ-WIR-W-00073 INS065 CVL 12, SP12-31 and SP5-9, SP5-12, SP5-36 Foundations 18-Dec-22 OPEN
(RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-23, SP6-26 Riyadh Geotechnique &
74 JB1071-HAI-04-ZZ-WIR-W-00074 INS066 CVL Foundations 19-Dec-22 OPEN
and SP6-28. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 5, SP12- Riyadh Geotechnique &
75 JB1071-HAI-04-ZZ-WIR-W-00075 INS067 CVL Foundations 19-Dec-22 OPEN
27, SP12-30 and SP5-8, SP5-10, SP5-27, SP5-35 (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 14, SP12- Riyadh Geotechnique &
76 JB1071-HAI-04-ZZ-WIR-W-00076 INS068 CVL Foundations 20-Dec-22 OPEN
28, and SP5-3, SP5-11, SP5-28, SP5-37 (RGF)
Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 13, and Riyadh Geotechnique &
78 JB1071-HAI-04-ZZ-WIR-W-00078 INS070 CVL Foundations 21-Dec-22 OPEN
SP5-4, SP5-13, SP5-17 and SP11-34, SP11-37 (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-8, SP6-11, Riyadh Geotechnique &
80 JB1071-HAI-04-ZZ-WIR-W-00080 INS072 CVL Foundations 21-Dec-22 OPEN
SP6-13 and SP6-36. (RGF)
81 JB1071-HAI-04-ZZ-WIR-W-00081 INS073 CVL Coordinates for Admin Building. Admin Building 22-Dec-22 OPEN
82 JB1071-HAI-04-ZZ-WIR-W-00082 INS074 CVL Coordinates of Piling for Silo Number 4. Silos Area 22-Dec-22 OPEN
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-3, SP6-5, Riyadh Geotechnique &
83 JB1071-HAI-04-ZZ-WIR-W-00083 INS075 CVL Foundations 22-Dec-22 OPEN
SP6-29, SP6-35 and SP12-22. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-2, SP5-5, Riyadh Geotechnique &
84 JB1071-HAI-04-ZZ-WIR-W-00084 INS076 CVL Foundations 22-Dec-22 OPEN
SP11-36, SP11-21 and SP12-29. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-1, SP5-29, Riyadh Geotechnique &
85 JB1071-HAI-04-ZZ-WIR-W-00085 INS077 CVL Foundations 24-Dec-22 OPEN
SP11-19, SP11-24 and SP11-35. (RGF)
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-2, SP6-4, Riyadh Geotechnique &
86 JB1071-HAI-04-ZZ-WIR-W-00086 INS078 CVL Foundations 24-Dec-22 OPEN
SP6-17, SP6-30 and SP12-20. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-6, SP5-16, Riyadh Geotechnique &
87 JB1071-HAI-04-ZZ-WIR-W-00087 INS079 CVL Foundations 25-Dec-22 OPEN
SP5-30, SP11-17, SP11-18, SP11-20, SP11-22, SP11-23 and SP11-33. (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-1, SP6-14, Riyadh Geotechnique &
88 JB1071-HAI-04-ZZ-WIR-W-00088 INS080 CVL Foundations 25-Dec-22 27-Dec-22 2 CLOSED RHDHV
SP12-21, SP12-24 and SP5-24. (RGF)
89 JB1071-HAI-04-ZZ-WIR-W-00089 INS081 CVL Setting Out Coordinates of Piling for Silo Number 10. Silos Area 25-Dec-22 OPEN
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-7, SP5-14, Riyadh Geotechnique &
90 JB1071-HAI-04-ZZ-WIR-W-00090 INS084 CVL Foundations 26-Dec-22 OPEN
SP5-34, SP11-8, SP11-11, SP11-9, SP11-16, SP11-32 and SP4-18. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-15, SP5-33, Riyadh Geotechnique &
91 JB1071-HAI-04-ZZ-WIR-W-00091 INS085 CVL Foundations 27-Dec-22 OPEN
SP4-20, SP11-10, SP11-25, SP11-2, SP11-12, SP11-15. (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-6, SP6-18 Riyadh Geotechnique &
92 JB1071-HAI-04-ZZ-WIR-W-00092 INS086 CVL Foundations 27-Dec-22 OPEN
and SP6-31. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-31, SP11- Riyadh Geotechnique &
93 JB1071-HAI-04-ZZ-WIR-W-00093 INS087 CVL Foundations 28-Dec-22 OPEN
31, SP11-37, SP11-26, SP4-22, SP4-19 and SP4-25 (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-7, SP6-15, Riyadh Geotechnique &
94 JB1071-HAI-04-ZZ-WIR-W-00094 INS088 CVL Foundations 28-Dec-22 OPEN
SP12-9 and SP12-23. (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-16, SP6-32 Riyadh Geotechnique &
95 JB1071-HAI-04-ZZ-WIR-W-00095 INS089 CVL Foundations 29-Dec-22 OPEN
and SP12-19, SP12-36. (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-32, SP4-21, Riyadh Geotechnique &
96 JB1071-HAI-04-ZZ-WIR-W-00096 INS090 CVL SP4-24, SP4-8, SP4-23, SP4-27, SP11-4, SP11-30, SP11-1 and SP10-34, SP10- Foundations 29-Dec-22 OPEN
37 (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP4-26, SP4-36, Riyadh Geotechnique &
97 JB1071-HAI-04-ZZ-WIR-W-00097 INS091 CVL SP4-9, SP4-11, SP4-37, SP4-10, SP10-18, SP10-36, SP10-33, SP11-05, SP11-06 Foundations 31-Dec-22 OPEN
& SP11-27 (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-33, SP12- Riyadh Geotechnique &
98 JB1071-HAI-04-ZZ-WIR-W-00098 INS092 CVL Foundations 31-Dec-22 OPEN
11 and SP12-17, SP12-34 (RGF)
Concrete Compressive Strength Test at 7 days for Silo Piles # SP4-12, SP4-17, Riyadh Geotechnique &
99 JB1071-HAI-04-ZZ-WIR-W-00099 INS093 CVL SP4-28, SP4-3, SP4-13, SP4-35, SP11-13, SP11-14, SP10-32, SP10-35, SP10-8, Foundations 1-Jan-23 OPEN
SP10-16 (RGF)
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-34, SP12- Riyadh Geotechnique &
100 JB1071-HAI-04-ZZ-WIR-W-00100 INS094 CVL Foundations 1-Jan-23 OPEN
10 and SP12-26, SP12-3 (RGF)
101 JB1071-HAI-04-ZZ-WIR-W-00101 INS095 CVL witness of Collecting Sub-Base sample from Abdullah Oqbi Crusher. Abdullah Oqbi Crusher. 2-Jan-23 OPEN
Concrete Compressive Strength Test at 7 days for Silo Piles # SP4-4, SP4-2,
Riyadh Geotechnique &
102 JB1071-HAI-04-ZZ-WIR-W-00102 INS096 CVL SP4-34, SP4-1, SP11-28, SP10-31, SP10-17, SP10-15, SP10-2, SP10-21, SP10- Foundations (RGF)
2-Jan-23 OPEN
30.
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Concrete Compressive Strength Test at 7 days for Silo Piles SP4-31, SP4-32,
Riyadh Geotechnique &
108 JB1071-HAI-04-ZZ-WIR-W-00108 INS102 CVL SP4-33, SP10-29, SP10-10, SP10-24, SP10-3, SP10-11, SP3-21, SP3-25, SP3-18 Foundations (RGF)
5-Jan-23 OPEN
& SP3-22
113 JB1071-HAI-04-ZZ-WIR-W-00113 INS107 CVL Inspection request for Trial Mix 15 Mpa Mix Design at Haif Batch Plant. Haif Batching Plant 7-Jan-23 OPEN
Concrete Compressive Strength Test at 7 days for Silo Piles SP10-5, SP10-27,
Riyadh Geotechnique &
114 JB1071-HAI-04-ZZ-WIR-W-00114 INS108 CVL SP10-12, SP3-3, SP3-4, SP3-8, SP3-9, SP3-11, SP3-26, SP3-36, SP9-21 & SP9- Foundations (RGF)
8-Jan-23 OPEN
37
Concrete Compressive Strength Test at 7 days for Silo Piles SP10-13, SP10-28,
Riyadh Geotechnique &
117 JB1071-HAI-04-ZZ-WIR-W-00117 INS111 CVL SP3-12, SP3-5, SP3-17, SP3-27, SP3-34, SP9-34, SP9-36, SP9-8, SP9-35 & SP9- Foundations (RGF)
9-Jan-23 OPEN
19
Concrete Compressive Strength Test at 7 days for Silo Piles SP3-1, SP3-2, SP3-
Riyadh Geotechnique &
120 JB1071-HAI-04-ZZ-WIR-W-00120 INS116 CVL 7, SP3-13, SP3-28, SP3-35, SP9-2, SP9-3, SP9-9, SP9-17, SP9-20, SP9-22 & SP9- Foundations (RGF)
10-Jan-23 OPEN
33
Inspection request for Elevation and Compaction Test (FDT) under the
123 JB1071-HAI-04-ZZ-WIR-W-00123 INS119 CVL blinding for Silo # 6 and Haif Batching Plant 11-Jan-23 OPEN
Silo # 12 at Silos Area.
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
131 JB1071-HAI-04-ZZ-WIR-W-00131 INS127 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 6. Silo # 6, Silos Area 14-Jan-23 OPEN
Concrete Compressive Strength Test at 7 days for Silo Piles SP3-32, SP3-31,
133 JB1071-HAI-04-ZZ-WIR-W-00133 INS131 CVL SP9-31, SP9-5, SP9-26, SP9-14, SP2-20, SP2-18, SP2-22, SP2-19, SP2-37, SP8- Haif Batching Plant 14-Jan-23 OPEN
37 & SP8-35
137 JB1071-HAI-04-ZZ-WIR-W-00137 INS135 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 12. Silo # 12, Silos Area 15-Jan-23 OPEN
140 JB1071-HAI-04-ZZ-WIR-W-00140 INS138 CVL Inspection request for Termites Control Spray at Admin Building Foundation. Admin Building 17-Jan-23 OPEN
Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-26, SP4-
Riyadh Geotechnique &
149 JB1071-HAI-04-ZZ-WIR-W-00149 INS148 CVL 36, SP4-9, SP4-11, SP4-37, SP4-10, SP10-18, SP10-36, SP10-33, SP11-5, SP11- Foundations (RGF)
21-Jan-23 OPEN
6, SP11-27
Concrete Compressive Strength Test at 28 days for Silo Piles # SP11-13, SP11-
Riyadh Geotechnique &
150 JB1071-HAI-04-ZZ-WIR-W-00150 INS149 CVL 14, SP4-12, SP4-17, SP4-28, SP4-3, SP4-13, SP4-35, SP10-32, SP10-35, SP10-8 Foundations (RGF)
22-Jan-23 OPEN
& SP10-16
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Concrete Compressive Strength Test at 28 days for Silo Piles # SP11-28, SP10-
Riyadh Geotechnique &
153 JB1071-HAI-04-ZZ-WIR-W-00153 INS152 CVL 31, SP10-17, SP10-15, SP10-2, SP10-21, SP10-30, SP4-4, SP4-2, SP4-34 & SP4- Foundations (RGF)
23-Jan-23 OPEN
1
156 JB1071-HAI-04-ZZ-WIR-W-00156 INS156 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 11. Silo # 5, Silos Area 24-Jan-23 OPEN
Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-16, SP4-
Riyadh Geotechnique &
160 JB1071-HAI-04-ZZ-WIR-W-00160 INS160 CVL 15, SP4-30, SP10-22, SP10-6, SP10-14, SP10-25, SP10-1 SP10-9, SP3-20, SP3- Foundations (RGF)
25-Jan-23 OPEN
23.
161 JB1071-HAI-04-ZZ-WIR-W-00161 INS161 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 5. Silo # 5, Silos Area 25-Jan-23 OPEN
Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-31, SP4-
Riyadh Geotechnique &
164 JB1071-HAI-04-ZZ-WIR-W-00164 INS164 CVL 32, SP4-33, SP10-29, SP10-10, SP10-24, SP10-3, SP10-11, SP3-21, SP3-25, Foundations (RGF)
26-Jan-23 OPEN
SP3-18 & SP3-22
Concrete Compressive Strength Test at 28 days for Silo Piles # SP3-1, SP3-2,
Riyadh Geotechnique &
172 JB1071-HAI-04-ZZ-WIR-W-00172 INS177 CVL SP3-7, SP3-13, SP3-28, SP3-35, SP9-2, SP9-3, SP9-9, SP9-17, SP9-20, SP9-22, Foundations (RGF)
31-Jan-23 OPEN
SP9-33
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
178 JB1071-HAI-04-ZZ-WIR-W-00178 INS185 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 6. Silo # 6, Silos Area 2-Feb-23 OPEN
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-
179 JB1071-HAI-04-ZZ-WIR-W-00179 INS187 CVL 289, FP1-193,FP1-337,FP1-145. Haif Batching Plant 2-Feb-23 OPEN
182 JB1071-HAI-04-ZZ-WIR-W-00182 INS190 CVL Inspection request for Steel Reinforcement of Admin Building Foundation Admin Building 4-Feb-23 OPEN
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-49,
186 JB1071-HAI-04-ZZ-WIR-W-00186 INS194 CVL FP1-338, FP1-386, FP1-147, FP1-4, FP1-2, FP1-5, FP1-99, FP1-195, FP1-243, Haif Batching Plant 5-Feb-23 OPEN
FP1-339 & FP1-50
188 JB1071-HAI-04-ZZ-WIR-W-00188 INS196 CVL Inspection request for Concrete Pouring of Admin Building Raft Foundation Admin Building 5-Feb-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
194 JB1071-HAI-04-ZZ-WIR-W-00194 INS203 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 4. SILOS AREA 7-Feb-23 OPEN
195 JB1071-HAI-04-ZZ-WIR-W-00195 INS204 CVL Integrity test of Piles for Silo # 5, Silo # 11 at Silos area. SILOS AREA 7-Feb-23 OPEN
196 JB1071-HAI-04-ZZ-WIR-W-00196 INS205 CVL Concrete Pouring of Admin Building Raft Foundation Remaining Part Admin Building 7-Feb-23 OPEN
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-388
204 JB1071-HAI-04-ZZ-WIR-W-00204 INS215 CVL FP1-149,FP1-197,FP1-245,FP1-54,FP1-7,FP1-293,FP1-150,FP1-102,FP1- Haif Batching Plant 9-Feb-23 OPEN
341,FP1-198,FP1-55.
206 JB1071-HAI-04-ZZ-WIR-W-00206 INS219 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 5. Silo # 5, Silos Area 11-Feb-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Inspection request for Concrete Compressive Strength Test at 7 days for Flat
219 JB1071-HAI-04-ZZ-WIR-W-00219 INS234 CVL Storage Piles # FP1 - 484, 485, 486, 487, 440, 488, 392, 441, 344, 200, 248, Haif Batching Plant 14-Feb-23 OPEN
296, 8.
221 JB1071-HAI-04-ZZ-WIR-W-00221 INS237 CVL Inspection request for Pouring Blinding at Silo # 3 Foundation at silos area. Haif Batching Plant 14-Feb-23 OPEN
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-104
225 JB1071-HAI-04-ZZ-WIR-W-00225 INS241 CVL FP1-152,FP1-393,FP1-345,FP1-297,FP1-489,FP1-9,FP1-8,FP1-249,FP1- Haif Batching Plant 15-Feb-23 OPEN
153,FP1-56,FP1-265,FP2-9.
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-
226 JB1071-HAI-04-ZZ-WIR-W-00226 INS242 CVL 250FP1-201,FP1-57,FP1-10,FP1-154,FP1-105,FP1-11,FP1-106,FP1-202,FP1- Haif Batching Plant 16-Feb-23 OPEN
155,FP1-59,FP1-217,FP1-457.
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-156
231 JB1071-HAI-04-ZZ-WIR-W-00231 INS247 CVL FP1-346,FP1-394,FP1-61,FP1-14,FP1-347,FP1-361,FP1-299,FP1-109,FP1- Haif Batching Plant 19-Feb-23 OPEN
395,FP1-157,FP1-62,FP1-205,FP1-253,FP1-314.
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
233 JB1071-HAI-04-ZZ-WIR-W-00233 INS249 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 12. SILOS AREA # 12 19-Feb-23 OPEN
Inspection request for Concrete Compressive Strength Test at 28 days for Silo
240 JB1071-HAI-04-ZZ-WIR-W-00240 INS256 CVL Piles # SP1-33,SP1-6, Haif Batching Plant 20-Feb-23 OPEN
SP1-26,SP1-15,SP1-5,SP1-27,SP1-32,SP7-11, SP7-9,SP7-16,SP7-3.
Inspection request for Concrete Compressive Strength Test at 7 days for Flat
241 JB1071-HAI-04-ZZ-WIR-W-00241 INS257 CVL
Storage Piles # FP1-300 Haif Batching Plant 20-Feb-23 OPEN
FP1-301,FP1-348,FP1-158,FP1-110,FP1-206,FP1-254,FP1-111,FP1-15,FP1-
349,FP1-159,FP1-207,FP1-410,FP1-218,FP1-458.
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-256
244 JB1071-HAI-04-ZZ-WIR-W-00244 INS260 CVL FP1-303,FP1-16,FP1-302,FP1-63,FP1-255,FP1-160,FP1-266,FP1-73,FP1- Haif Batching Plant 21-Feb-23 OPEN
112,FP1-208,FP1-304,FP1-350,FP1-351,FP1-352,FP1-396,FP1-362,FP1-169.
245 JB1071-HAI-04-ZZ-WIR-W-00245 INS261 CVL Inspection request for Pouring Blinding at Silo # 10 Foundation at silos area. Silo # 10, Silos Area 21-Feb-23 OPEN
Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-399
247 JB1071-HAI-04-ZZ-WIR-W-00247 INS264 CVL FP1-400,FP1-397,FP1-209,FP1-305,FP1-257,FP1-161,FP1-219,FP1-267,FP1- Haif Batching Plant 22-Feb-23 OPEN
401,FP1-353,FP1-113,FP1-17,FP1-258,FP1-210,FP1-162,FP1-114,FP1-170.
251 JB1071-HAI-04-ZZ-WIR-W-00251 INS268 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 4. Silo # 4, Silos Area 23-Feb-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
270 JB1071-HAI-04-ZZ-WIR-W-00270 INS290 CVL Inspection request for Formwork of Silo # 6 Foundations at Silos Area. Silo # 6, Silos Area 1-Mar-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
275 JB1071-HAI-04-ZZ-WIR-W-00275 INS295 CVL Inspection request for Pouring Concrete of Silo # 6 Foundations at Silos Area. Silo # 6, Silos Area 4-Mar-23 OPEN
276 JB1071-HAI-04-ZZ-WIR-W-00276 INS297 CVL Pouring Concrete of Columns Neck (11 No.) at Admin Building. Admin Building 5-Mar-23 OPEN
277 JB1071-HAI-04-ZZ-WIR-W-00277 INS298 CVL Inspection request for collecting Soil Sample from Silo Area. Silos Area 6-Mar-23 OPEN
280 JB1071-HAI-04-ZZ-WIR-W-00280 INS301 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 2. Silo # 2, Silos Area 8-Mar-23 OPEN
281 JB1071-HAI-04-ZZ-WIR-W-00281 INS303 CVL Inspection request for Formwork of Silo # 5 Foundations at Silos Area. Silo # 5, Silos Area 9-Mar-23 OPEN
284 JB1071-HAI-04-ZZ-WIR-W-00284 INS306 CVL Inspection request for Working Pile Load test of Silo# 3 Silos Area # 3 11-Mar-23 OPEN
286 JB1071-HAI-04-ZZ-WIR-W-00286 INS309 CVL Inspection request for Pouring Concrete of Silo # 5 Foundations at Silos Area. Silo # 5, Silo Area 12-Mar-23 OPEN
292 JB1071-HAI-04-ZZ-WIR-W-00292 INS316 CVL Inspection request for Formwork of Silo # 11 Foundations at Silos Area. Silo # 11, Silo Area 15-Mar-23 OPEN
295 JB1071-HAI-04-ZZ-WIR-W-00295 INS320 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 3. Silo # 3, Silos Area 16-Mar-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
299 JB1071-HAI-04-ZZ-WIR-W-00299 INS324 CVL Inspection request for Pouring Blinding at Silo # 09 Foundation at silos area. Silo # 09, Silos Area 16-Mar-23 OPEN
305 JB1071-HAI-04-ZZ-WIR-W-00305 INS332 CVL Inspection request for Formwork of Silo # 4 Foundations at Silos Area. Silo # 4, Silos Area 18-Mar-23 OPEN
308 JB1071-HAI-04-ZZ-WIR-W-00308 INS339 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 09. Silo # 9, Silos Area 20-Mar-23 OPEN
309 JB1071-HAI-04-ZZ-WIR-W-00309 INS340 CVL Inspection request for Pouring Concrete of Silo # 4 Foundations at Silos Area. Silo # 4, Silos Area 20-Mar-23 OPEN
316 JB1071-HAI-04-ZZ-WIR-W-00316 INS351 CVL Inspection request for Formwork of Silo # 12 Foundations at Silos Area. Silo # 12, RAFT Silo Area 22-Mar-23 OPEN
319 JB1071-HAI-04-ZZ-WIR-W-00319 INS357 CVL Inspection request for 1st. layer backfilling . Admin Building 23-Mar-23 OPEN
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Inspection request for Installation of Polythene Sheet at Silo # 8 under the 26-Mar-23
326 JB1071-HAI-04-ZZ-WIR-W-00326 INS364 CVL Silo # 8, Silos Area 4-May-23 OPEN
blinding of Foundation at silos area Secondary file
327 JB1071-HAI-04-ZZ-WIR-W-00327 INS365 CVL nspection request for Pouring Blinding at Silo # 8 Foundation at silos area Silo # 8, Silos Area 26-Mar-23 OPEN
329 JB1071-HAI-04-ZZ-WIR-W-00329 INS367 CVL Inspection request for pouring screed for Pile Cap of Silo # 10. Silo # 10, Silos Area 27-Mar-23 OPEN
330 JB1071-HAI-04-ZZ-WIR-W-00330 INS369 CVL Inspection request for 2nd. Layer of backfilling. Admin Building 28-Mar-23 OPEN
340 JB1071-HAI-04-ZZ-WIR-W-00340 INS387 CVL Inspection request for 3rd. Layer of backfilling. Admin Building 1-Apr-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
351 JB1071-HAI-04-ZZ-WIR-W-00351 INS398 CVL Inspection request for Formwork of one Column of Silo # 6 (18) at Silos Area. Silo # 6 4-Apr-23 OPEN
358 JB1071-HAI-04-ZZ-WIR-W-00358 INS405 CVL Inspection request for Formwork of Silo # 3 Foundations (Raft) at Silos Area Silo # 3, Silos Area 6-Apr-23 OPEN
361 JB1071-HAI-04-ZZ-WIR-W-00361 INS408 CVL Inspection request for 4th. Layer of infill at admin building Admin Building 6-Apr-23 OPEN
8-Apr-23
Inspection request for Sample of Aeration Pipe for Silos slab. 500mm 4-May-23
364 JB1071-HAI-04-ZZ-WIR-W-00364 INS411 MECH Silso Area Secondry File 9-Apr-23 CLOSED
diameter and 3mm thick. 9-May-23
aMessage
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
372 JB1071-HAI-04-ZZ-WIR-W-00372 INS419 CVL Inspection request for Formwork of Silo # 9 Foundations (Raft) at Silos Area Silo # 9 9-Apr-23 OPEN
375 JB1071-HAI-04-ZZ-WIR-W-00375 INS422 CVL Inspection request for 5th. Layer of infill at admin building. Admin Building 10-Apr-23 OPEN
384 JB1071-HAI-04-ZZ-WIR-W-00384 INS432 CVL Inspection request for 6th. Layer of infill at admin building. Admin Building 12-Apr-23 OPEN
386 JB1071-HAI-04-ZZ-WIR-W-00386 INS434 CVL Inspection request for 7th. Layer of infill at admin building Admin Building 13-Apr-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
392 JB1071-HAI-04-ZZ-WIR-W-00392 INS440 CVL Inspection request for Steel Reinforcement of Silo # 6 Wall (W1) at Silos Area. Silo # 6, Silos Area 15-Apr-23 OPEN
399 JB1071-HAI-04-ZZ-WIR-W-00399 INS447 CVL Inspection request for collecting Soil Sample from Silo Area. (Silo # 1 and 7) Silo # 1 & 7 .Silos Area 17-Apr-23 OPEN
406 JB1071-HAI-04-ZZ-WIR-W-00406 INS455 CVL Inspection request for Pouring Blinding at Silo # 7 Foundation at silos area. Silo # 7 Area 17-Apr-23 OPEN
411 JB1071-HAI-04-ZZ-WIR-W-00411 INS460 CVL Inspection request for pouring screed for Pile Cap of Silo # 8. Silo # 8, Silos Area 18-Apr-23 OPEN
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
419 JB1071-HAI-04-ZZ-WIR-W-00419 INS468 CVL Inspection request for Last Layer of infill at admin building. Admin Building 25-Apr-23 OPEN
420 JB1071-HAI-04-ZZ-WIR-W-00420 INS469 CVL Inspection request for 1st Layer of backfilling of Silo # 2 at Silos Area. Silo # 2. Silos Area 25-Apr-23 OPEN
425 JB1071-HAI-04-ZZ-WIR-W-00425 INS474 CVL Inspection request for Collecting soil sample from Bagging Station. Bagging Station 26-Apr-23 OPEN
427 JB1071-HAI-04-ZZ-WIR-W-00427 INS476 CVL Inspection request for formwork of Silo # 10 Foundations (Raft) at Silos Area. Silo # 10, Silos Area 27-Apr-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
439 JB1071-HAI-04-ZZ-WIR-W-00439 INS488 CVL Inspection request for Steel Reinforcement of Silo # 5 Wall (W1) at Silos Area. Silo # 5, Silos Area 29-Apr-23 OPEN
442 JB1071-HAI-04-ZZ-WIR-W-00442 INS491 CVL Inspection request for Steel Reinforcement of Silo # 3 Wall (W1) at Silos Area. Silo # 3, Silos Area 30-Apr-23 OPEN
446 JB1071-HAI-04-ZZ-WIR-W-00446 INS495 CVL Inspection request for Steel Reinforcement of Silo # 4 Wall (W1) at Silos Area. Silo # 4, Silos Area 1-May-23 OPEN
452 JB1071-HAI-04-ZZ-WIR-W-00452 INS501 CVL Inspection request for pouring screed for Pile Cap of Silo # 7 Silo # 7, Silos Area 2-May-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
INS516 Inspection request for Formwork of wall (Highlighted part on drawing) of silo
466 JB1071-HAI-04-ZZ-WIR-W-00466 INS520 CVL Silo # 5, Silos Area 3-May-23 4-May-23 6-May-23 OPEN
INS535 # 4 at Silos Area.
INS517 Inspection request for Concrete Pouring of wall (Highlighted part on drawing)
467 JB1071-HAI-04-ZZ-WIR-W-00467 INS521 CVL Silo # 5, Silos Area 3-May-23 4-May-23 6-May-23 OPEN
INS534 of silo # 4 at Silos Area.
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
484 JB1071-HAI-04-ZZ-WIR-W-00484 INS539 CVL Inspection request for Steel Reinforcement of Silo # 2 Wall (W1) at Silos Area. Silo # 02 7-May-23 OPEN
490 JB1071-HAI-04-ZZ-WIR-W-00490 INS545 CVL Inspection request for Pile Integrity Test at bagging station. BAGGING STATION 8-May-23 OPEN
495 JB1071-HAI-04-ZZ-WIR-W-00495 INS551 CVL Inspection request for Formwork of Silo # 8 Foundations (Raft) at Silos Area. Silo # 08 9-May-23 OPEN
499 JB1071-HAI-04-ZZ-WIR-W-00499 INS555 CVL Inspection request for Pouring Blinding for foundations at Transfer Tower 1. TRANSFER TOWER-1 9-May-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
515 JB1071-HAI-04-ZZ-WIR-W-00515 INS572 CVL Inspection request for Formwork of Silo # 2 Wall (W1) at Silos Area Silo # 02, Silos Area 13-May-23 OPEN
516 JB1071-HAI-04-ZZ-WIR-W-00516 INS573 CVL Inspection request for Concrete Pouring of Silo # 2 Wall (W1) at Silos Area. Silo # 02, Silos Area 13-May-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
546 JB1071-HAI-04-ZZ-WIR-W-00546 INS603 CVL Inspection request for Pile Integrity test for Transfer Tower 1 Piling. Transfer Tower 1 21-May-23 OPEN
547 JB1071-HAI-04-ZZ-WIR-W-00547 INS604 CVL Inspection request for Pile Integrity Test at bagging station. Bagging Station 21-May-23 OPEN
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
558 JB1071-HAI-04-ZZ-WIR-W-00558 INS616 CVL Inspection request for Steel Reinforcement of Silo # 9 Wall (W1) at Silos Area. Silo # 9 25-May-23 OPEN
565 JB1071-HAI-04-ZZ-WIR-W-00565 INS625 CVL Inspection request for Formwork of Silo # 7 Foundations (Raft) at Silos Area. Silo # 7 28-May-23 OPEN
569 JB1071-HAI-04-ZZ-WIR-W-00569 INS631 CVL Inspection request for 1st Layer of backfilling around of Silo # 8 at Silos Area. Silo # 08 30-May-23 OPEN
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Inspection request for embedded item tests dry penetration, sand blasting
579 JB1071-HAI-04-ZZ-WIR-W-00579 INS642 MECH and dry film thickness test for Aeration Pipes and Angles Frames for Silos slab. (Silo # 5, 6 , 11 and 12) 3-Jun-23 OPEN
(Silo # 5, 6 , 11 and 12)
580 JB1071-HAI-04-ZZ-WIR-W-00580 INS643 CVL Inspection request for 2nd Layer of backfilling around of Silo # 8 at Silos Area. Silo # 08 3-Jun-23 OPEN
588 JB1071-HAI-04-ZZ-WIR-W-00588 INS659 CVL Inspection request for Slab Reinforcement of Silo # 6. Silo # 06 7-Jun-23 OPEN
589 JB1071-HAI-04-ZZ-WIR-W-00589 INS660 CVL Inspection request for Slab Formwork of Silo # 6. Silo # 06 8-Jun-23 OPEN
590 JB1071-HAI-04-ZZ-WIR-W-00590 INS661 CVL Inspection request for Pouring Concrete of the Slab of Silo # 6. Silo # 06 8-Jun-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
609 JB1071-HAI-04-ZZ-WIR-W-00609 INS686 CVL Inspection request for Steel Reinforcement of Silo # 8 Wall (W1) at Silos Area. Silo # 08 14-Jun-23 OPEN
610 JB1071-HAI-04-ZZ-WIR-W-00610 INS687 CVL Inspection request for Slab Reinforcement of Silo # 12. Silo # 12 15-Jun-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
615 JB1071-HAI-04-ZZ-WIR-W-00615 INS692 CVL Inspection request for Slab Formwork of Silo # 12. Silo # 12 17-Jun-23 OPEN
616 JB1071-HAI-04-ZZ-WIR-W-00616 INS693 CVL Inspection request for Pouring Concrete of the Slab of Silo # 12 Silo # 12 17-Jun-23 OPEN
620 JB1071-HAI-04-ZZ-WIR-W-00620 INS697 CVL Inspection request for Slab Reinforcement of Silo # 5. Silo # 05 18-Jun-23 OPEN
625 JB1071-HAI-04-ZZ-WIR-W-00625 INS702 CVL Inspection request for Slab Formwork of Silo # 5. Silo # 05 19-Jun-23 OPEN
626 JB1071-HAI-04-ZZ-WIR-W-00626 INS703 CVL Inspection request for Pouring Concrete of the Slab of Silo # 5. Silo # 05 19-Jun-23 OPEN
Inspection request for Compaction Test (FDT) under the blinding for
631 JB1071-HAI-04-ZZ-WIR-W-00631 INS710 CVL foundations at Flat Storage. Silo # 08 21-Jun-23 OPEN
(Axis 1 to 5, Highlighted area in Drawing)
INS712
633 JB1071-HAI-04-ZZ-WIR-W-00633 INS720
CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 21-Jun-23 22-Jun-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
637 JB1071-HAI-04-ZZ-WIR-W-00637 INS716 CVL Inspection request for Steel Reinforcement of Silo # 7 Wall (W1) at Silos Area. Silo # 7. 22-Jun-23 OPEN
642 JB1071-HAI-04-ZZ-WIR-W-00642 INS724 CVL Inspection request for Slab Reinforcement of Silo # 11. Silo # 11. 24-Jun-23 OPEN
643 JB1071-HAI-04-ZZ-WIR-W-00643 INS725 CVL Inspection request for Slab Formwork of Silo # 11. Silo # 11. 24-Jun-23 OPEN
645 JB1071-HAI-04-ZZ-WIR-W-00645 INS727 CVL Inspection request for Pouring Concrete of the Slab of Silo # 11. Silo # 11. 24-Jun-23 OPEN
INS732
649 JB1071-HAI-04-ZZ-WIR-W-00649 INS750
CVL Inspection request for Pile Integrity Test at Head House 1. Head House-1 25-Jun-23 6-Jul-23 OPEN
655 JB1071-HAI-04-ZZ-WIR-W-00655 INS738 CVL Inspection request for Slab Reinforcement of Silo # 4. Silo # 4 3-Jul-23 OPEN
657 JB1071-HAI-04-ZZ-WIR-W-00657 INS740 CVL Inspection request for 3rd Layer of backfilling around of Silo # 8 at Silos Area. Silo # 8 3-Jul-23 OPEN
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
661 JB1071-HAI-04-ZZ-WIR-W-00661 INS744 CVL Inspection request for Slab Formwork of Silo # 4. Silo # 4. 4-Jul-23 OPEN
662 JB1071-HAI-04-ZZ-WIR-W-00662 INS745 CVL Inspection request for Pouring Concrete of the Slab of Silo # 4. Silo # 4. 4-Jul-23 OPEN
Inspection request for Compaction Test (FDT) under the blinding for
667 JB1071-HAI-04-ZZ-WIR-W-00667 INS751 CVL foundations at Flat Storage. Flat Storage Area 6-Jul-23 OPEN
(Axis 7 to 13 & B to I1, Highlighted area in Drawing)
668 JB1071-HAI-04-ZZ-WIR-W-00668 INS752 CVL Inspection request for collecting soil sample from Flat Storage. Flat Storage Area 6-Jul-23 OPEN
670 JB1071-HAI-04-ZZ-WIR-W-00670 INS754 CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 8-Jul-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
680 JB1071-HAI-04-ZZ-WIR-W-00680 INS768 CVL Inspection request for Slab Reinforcement of Silo # 10. Silo # 10. 10-Jul-23 OPEN
682 JB1071-HAI-04-ZZ-WIR-W-00682 INS770 CVL Inspection request for Slab Formwork of Silo # 10. Silo # 10. 10-Jul-23 OPEN
683 JB1071-HAI-04-ZZ-WIR-W-00683 INS771 CVL Inspection request for Pouring Concrete of the Slab of Silo # 10. Silo # 10. 10-Jul-23 OPEN
686 JB1071-HAI-04-ZZ-WIR-W-00686 INS775 CVL Inspection request for steel reinforcement of foundations at Transfer Tower 1. Transfer Tower 1. 11-Jul-23 OPEN
687 JB1071-HAI-04-ZZ-WIR-W-00687 INS776 CVL Inspection request for installation of Anchor Boult at Transfer Tower 1. Transfer Tower 1. 11-Jul-23 OPEN
688 JB1071-HAI-04-ZZ-WIR-W-00688 INS777 CVL Inspection request for formwork of foundations at Transfer Tower 1. Transfer Tower 1. 11-Jul-23 OPEN
690 JB1071-HAI-04-ZZ-WIR-W-00690 INS779 CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 12-Jul-23 OPEN
Inspection request for Compaction Test (FDT) under the blinding for
691 JB1071-HAI-04-ZZ-WIR-W-00691 INS780 CVL foundations at Flat Storage. Flat Storage Area 12-Jul-23 OPEN
(Axis 13 to 21 & B to I1, Highlighted area in Drawing)
696 JB1071-HAI-04-ZZ-WIR-W-00696 INS785 CVL Inspection request for pouring Concrete on foundation at Transfer Tower 1 Transfer Tower 1. 12-Jul-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
716 JB1071-HAI-04-ZZ-WIR-W-00716 INS806 CVL Inspection request for Slab Reinforcement of Silo # 3. Silo # 3. 16-Jul-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
718 JB1071-HAI-04-ZZ-WIR-W-00718 INS809 CVL Inspection request for Slab Formwork of Silo # 3. Silo # 3. 17-Jul-23 OPEN
719 JB1071-HAI-04-ZZ-WIR-W-00719 INS810 CVL Inspection request for Pouring Concrete of the Slab of Silo # 3. Silo # 3. 17-Jul-23 OPEN
722 JB1071-HAI-04-ZZ-WIR-W-00722 INS813 CVL Inspection request for formwork of columns Pedestals at Transfer Tower 1. Transfer Tower 1. 18-Jul-23 OPEN
Inspection request for Compaction Test (FDT) under the blinding for
735 JB1071-HAI-04-ZZ-WIR-W-00735 INS827 CVL foundations at Flat Storage. Flat Storage Area 20-Jul-23 OPEN
(Axis 36 to 9A & B to I1, Highlighted area in Drawing)
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
740 JB1071-HAI-04-ZZ-WIR-W-00740 INS832 CVL Inspection request for steel reinforcement for Foundation at Head House 1. Head House-1 20-Jul-23 OPEN
741 JB1071-HAI-04-ZZ-WIR-W-00741 INS833 CVL Inspection request for Formwork of Foundation at Head House 1. Head House-1 20-Jul-23 OPEN
743 JB1071-HAI-04-ZZ-WIR-W-00743 INS835 CVL Inspection request for pouring concrete for Foundation at Head House 1. Head House-1 22-Jul-23 OPEN
746 JB1071-HAI-04-ZZ-WIR-W-00746 INS838 CVL Inspection request for Slab Reinforcement of Silo # 9. Silo # 9. 23-Jul-23 OPEN
752 JB1071-HAI-04-ZZ-WIR-W-00752 INS844 CVL Inspection request for Slab Formwork of Silo # 9. Silo # 9. 24-Jul-23 OPEN
755 JB1071-HAI-04-ZZ-WIR-W-00755 INS847 CVL Inspection request for Pouring Concrete of the Slab of Silo # 9. Silo # 9. 24-Jul-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Inspection request for Compaction Test (FDT) under the blinding for
759 JB1071-HAI-04-ZZ-WIR-W-00759 INS851 CVL foundations at Flat Storage. Flat Storage Area 26-Jul-23 OPEN
(Axis 28 to 36 & B to I1, Highlighted area in Drawing)
763 JB1071-HAI-04-ZZ-WIR-W-00763 INS856 CVL Inspection request for Slab Reinforcement of Silo # 8. Silo # 8. 30-Jul-23 OPEN
764 JB1071-HAI-04-ZZ-WIR-W-00764 INS857 CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 30-Jul-23 OPEN
766 JB1071-HAI-04-ZZ-WIR-W-00766 INS859 CVL Inspection request for Slab Formwork of Silo # 8. Silo # 8. 30-Jul-23 OPEN
772 JB1071-HAI-04-ZZ-WIR-W-00772 INS865 CVL Inspection request for Pouring Concrete of the Slab of Silo # 8. Silo # 8. 30-Jul-23 OPEN
773 JB1071-HAI-04-ZZ-WIR-W-00773 INS873 CVL Inspection request for collecting Sub Base sample from Site Stock Pile. Sub Base sample f 31-Jul-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
780 JB1071-HAI-04-ZZ-WIR-W-00780 INS885 CVL Inspection request for setting out (Survey) of foundation at driver facilities. Driver Facilities 5-Aug-23 OPEN
784 JB1071-HAI-04-ZZ-WIR-W-00784 INS889 CVL Inspection request for concrete pouring of 2 Columns at Head House 1. Head House-1 5-Aug-23 OPEN
788 JB1071-HAI-04-ZZ-WIR-W-00788 INS893 CVL Inspection request for Slab Reinforcement of Silo # 2. Silo # 2. 6-Aug-23 OPEN
790 JB1071-HAI-04-ZZ-WIR-W-00791 INS896 CVL Inspection request for Slab Formwork of Silo # 2. Silo # 2. 7-Aug-23 OPEN
792 JB1071-HAI-04-ZZ-WIR-W-00792 INS897 CVL Inspection request for Pouring Concrete of the Slab of Silo # 2. Silo # 2. 7-Aug-23 OPEN
Inspection request for Compaction Test (FDT) under the blinding for
793 JB1071-HAI-04-ZZ-WIR-W-00793 INS898 CVL foundations at Flat Storage. Flat Storage Area 8-Aug-23 OPEN
(Axis 21 to 28 & B to I1, Highlighted area in Drawing)
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
800 JB1071-HAI-04-ZZ-WIR-W-00800 INS905 CVL Inspection request for Erection (Steel Structure) of Silo # 6 prior to lifting. Silo # 6 8-Aug-23 OPEN
801 JB1071-HAI-04-ZZ-WIR-W-00801 INS906 CVL Inspection request for Water test of Silo # 6 prior to lifting. Silo # 6 8-Aug-23 OPEN
803 JB1071-HAI-04-ZZ-WIR-W-00803 INS908 MECH Inspection request for Erection (Steel Structure) of Silo # 12 prior to lifting. Silo # 12 10-Aug-23 OPEN
804 JB1071-HAI-04-ZZ-WIR-W-00804 INS909 MECH Inspection request for Water test of Silo # 12 prior to lifting. Silo # 12 10-Aug-23 OPEN
812 JB1071-HAI-04-ZZ-WIR-W-00812 INS917 CVL Inspection request for pouring blinding of foundation at Driver Facilities. Driver Facilities. 10-Aug-23 OPEN
INS921
816 JB1071-HAI-04-ZZ-WIR-W-00816 INS923
MECH Inspection request for Water test of body sheet of Silo # 6 prior to lifting. Silo # 6 10-Aug-23 12-Aug-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
823 JB1071-HAI-04-ZZ-WIR-W-00823 INS930 MECH Inspection request for Erection (Steel Structure) of Silo # 5 prior to lifting. Silo # 5 13-Aug-23 OPEN
824 JB1071-HAI-04-ZZ-WIR-W-00824 INS931 MECH Inspection request for Water test (Roof) of Silo # 5 prior to lifting. Silo # 5 13-Aug-23 OPEN
825 JB1071-HAI-04-ZZ-WIR-W-00825 INS932 MECH Inspection request for Erection (Steel Structure) of Silo # 11 prior to lifting. Silo # 11 13-Aug-23 OPEN
826 JB1071-HAI-04-ZZ-WIR-W-00826 INS933 MECH Inspection request for Water test (Roof) of Silo # 11 prior to lifting. Silo # 11 13-Aug-23 OPEN
835 JB1071-HAI-04-ZZ-WIR-W-00835 INS943 CVL Inspection request for steel reinforcement of wall (W 1) at Head House 1. Head House-1 15-Aug-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
INS988 Inspection request for Steel Reinforcement and Formwork of Foundation from
868 JB1071-HAI-04-ZZ-WIR-W-00868 INS1041 CVL FLAT STORAGE 23-Aug-23 31-Aug-23 OPEN
CONC1073 Axis 23 to 45 at Flat Storage Tunnel.
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
892 JB1071-HAI-04-ZZ-WIR-W-00892 INS1014 CVL Inspection request for concrete pouring of foundation at driver facilities. Driver Facilities. 28-Aug-23 OPEN
893 JB1071-HAI-04-ZZ-WIR-W-00893 INS1015 CVL Inspection request for formwork of intake Foundation at Head House 1. Head House 1 28-Aug-23 OPEN
INS1017 Inspection request for concrete pouring of intake Foundation at Head House
895 JB1071-HAI-04-ZZ-WIR-W-00895 INS1027 CVL Head House 1 28-Aug-23 31-Aug-23 OPEN
CONC1038 1.
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
907 JB1071-HAI-04-ZZ-WIR-W-00907 INS1032 MECH Inspection request for Erection (Steel Structure) of Silo # 04 prior to lifting. Silo # 04 30-Aug-23 OPEN
908 JB1071-HAI-04-ZZ-WIR-W-00908 INS1033 MECH Inspection request for Water test (Roof) of Silo # 4 prior to lifting. Silo # 04 30-Aug-23 OPEN
909 JB1071-HAI-04-ZZ-WIR-W-00909 INS1034 MECH Inspection request for Erection (Steel Structure) of Silo # 10 prior to lifting. Silo # 10 30-Aug-23 OPEN
910 JB1071-HAI-04-ZZ-WIR-W-00910 INS1035 MECH Inspection request for Water test (Roof) of Silo # 10 prior to lifting. Silo # 10 30-Aug-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
920 JB1071-HAI-04-ZZ-WIR-W-00920 INS1050 CVL Inspection request for formwork of columns neck at driver facilities. Driver Facilities. 3-Sep-23 OPEN
921 JB1071-HAI-04-ZZ-WIR-W-00921 INS1051 CVL Inspection request for concrete pouring of columns neck at driver facilities. Driver Facilities. 3-Sep-23 OPEN
929 JB1071-HAI-04-ZZ-WIR-W-00929 INS1059 CVL Inspection request for pouring concrete of 1st floor Slab at Admin Building. Admin Building. 4-Sep-23 OPEN
934 JB1071-HAI-04-ZZ-WIR-W-00934 INS1064 CVL Inspection request for anchor bolt (93 Nos) prior to grout at Silo # 6. Silo # 6. 5-Sep-23 OPEN
935 JB1071-HAI-04-ZZ-WIR-W-00935 INS1065 CVL Inspection request for anchor bolt (93 Nos) grouting at Silo # 6. Silo # 6. 5-Sep-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
940 JB1071-HAI-04-ZZ-WIR-W-00940 INS1070 CVL Inspection request for anchor bolt (93 Nos) prior to grout at Silo # 11. Silo # 11. 6-Sep-23 OPEN
941 JB1071-HAI-04-ZZ-WIR-W-00941 INS1071 CVL Inspection request for anchor bolt (93 Nos) grouting at Silo # 11. Silo # 11. 6-Sep-23 OPEN
956 JB1071-HAI-04-ZZ-WIR-W-00956 INS1091 CVL Inspection request for anchor bolt (93 Nos) prior to grout at Silo # 5. Silo # 5. 10-Sep-23 OPEN
957 JB1071-HAI-04-ZZ-WIR-W-00957 INS1092 CVL Inspection request for anchor bolt (93 Nos) grouting at Silo # 5. Silo # 5. 10-Sep-23 OPEN
Work Inspection Request - WIR - Log Sheet
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
958 JB1071-HAI-04-ZZ-WIR-W-00958 INS1093 MECH Inspection request for Erection (Steel Structure) of Silo # 3 prior to lifting. Silo # 3 10-Sep-23 OPEN
959 JB1071-HAI-04-ZZ-WIR-W-00959 INS1094 MECH Inspection request for Water test (Roof) of Silo # 3 prior to lifting. Silo # 3 10-Sep-23 OPEN
Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s
978 JB1071-HAI-04-ZZ-WIR-W-00978 INS1113 CVL Inspection request for pouring blinding for foundations at Scale Building. SCALE BUILDING 13-Sep-23 OPEN
980 JB1071-HAI-04-ZZ-WIR-W-00980 INS1115 CVL Inspection request for Slab Reinforcement of Silo # 7. Silo # 7. 13-Sep-23 OPEN
981 JB1071-HAI-04-ZZ-WIR-W-00981 INS1116 CVL Inspection request for Slab Formwork of Silo # 7. Silo # 7. 13-Sep-23 OPEN
982 JB1071-HAI-04-ZZ-WIR-W-00982 INS1117 CVL Inspection request for Pouring Concrete of the Slab of Silo # 7. Silo # 7. 13-Sep-23 OPEN
990 JB1071-HAI-04-ZZ-WIR-W-00990 INS1126 MECH Inspection request for Water test (Roof) of Silo # 9 prior to lifting. Silo # 9 14-Sep-23 OPEN
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with th
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Material Inspection Request - MIR - Log Sheet
SN MIR Ref. Number DISCIPLINE ID CODE Title Issued Date Received Date Time Laps Issued Date Received Date Time Issued Date Received Date Time Laps Status Doc. Status Eng.Res Comments
Laps
1 JB1071-HAI-04-ZZ-MA-W-00001 CVL INS001 ReinforcementSteel Bars.Diameter.10mm, 16mm, 20mm,25mm (Al-Rajhi) 7-Sep-22 20-Sep-22 13 29-Oct-22 OPEN
INS004
2 JB1071-HAI-04-ZZ-MA-W-00002 CVL INS002 ReinforcementSteel Bars.Diameter.10mm,20mm, 25mm 18-Oct-22 20-Oct-22 2 2 CLOSED RHDHV 2
3 JB1071-HAI-04-ZZ-MA-W-00003 CVL INS007 Reinforcement Steel Bars. Diameter.10mm, 25mm 3-Nov-22 OPEN
5 JB1071-HAI-04-ZZ-MA-W-00005 CVL INS018 Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 13-Nov-22 OPEN
6 JB1071-HAI-04-ZZ-MA-W-00006 CVL INS021 Reinforcement Steel Bars. Diameter.20mm, 25mm 15-Nov-22 OPEN
7 JB1071-HAI-04-ZZ-MA-W-00007 CVL INS022 Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 15-Nov-22 OPEN
8 JB1071-HAI-04-ZZ-MA-W-00008 CVL INS034 Reinforcement Steel Bars. Diameter 25mm 28-Nov-22 OPEN
9 JB1071-HAI-04-ZZ-MA-W-00009 CVL INS036 Coarse Aggregates 10mm, 20mm Fine Aggregates (Sand) 28-Nov-22 28-Nov-22 0 R&R
10 JB1071-HAI-04-ZZ-MA-W-00010 CVL INS047 Reinforcement Steel Bars. Diameter. 10mm, 20mm, 25mm 8-Dec-22 OPEN
12 JB1071-HAI-04-ZZ-MA-W-00012 CVL INS113 Reinforcement Steel Bars. Diameter 10mm, 10mm, 20mm 9-Jan-23 OPEN
13 JB1071-HAI-04-ZZ-MA-W-00013 CVL INS114 POLYETHYLENE SHEET 250 micron 10-Jan-23 12-Jan-23 2 1 CLOSED RHDHV 1
15 JB1071-HAI-04-ZZ-MA-W-00015 CVL INS129 POLYETHYLENE SHEET 250 micron (100 ROLLS) 14-Jan-23 OPEN
16 JB1071-HAI-04-ZZ-MA-W-00016 CVL INS146 Reinforcement Steel Bars. Diameter 25mm 22-Jan-23 OPEN
17 JB1071-HAI-04-ZZ-MA-W-00017 CVL INS153 Reinforcement Steel Bars. Diameter 10mm, 20mm 23-Jan-23 OPEN
18 JB1071-HAI-04-ZZ-MA-W-00018 CVL INS165 SikaSwell-A 2010 Red, Sikaflex Constr 28-Jan-23 OPEN
19 JB1071-HAI-04-ZZ-MA-W-00019 CVL INS170 Reinforcement Steel Bars. Diameter 14mm, 20mm, 25mm 30-Jan-23 OPEN
20 JB1071-HAI-04-ZZ-MA-W-00020 CVL INS171 NITOPROOF 10, (10 Drum each 200ML) 30-Jan-23 OPEN
21 JB1071-HAI-04-ZZ-MA-W-00021 CVL INS174 SikaSwell-A 2010 Red, 330 Rolls 31-Jan-23 OPEN
22 JB1071-HAI-04-ZZ-MA-W-00022 CVL INS175 Reinforcement Steel Bars. Diameter 10mm Cut and Bend Steel , 16mm, 20mm, 25mm Rebar 31-Jan-23 OPEN
23 JB1071-HAI-04-ZZ-MA-W-00023 CVL INS178 Setseal B Cementitious Waterproofing (100 bags) 1-Feb-23 18-Mar-23 CLOSED RHDHV 1
25 JB1071-HAI-04-ZZ-MA-W-00025 CVL INS186 Brushbond. Cementitious Water Proofing (19 Bags) 2-Feb-23 OPEN
26 JB1071-HAI-04-ZZ-MA-W-00026 CVL INS197 Reinforcement Steel Bars. Diameter 20mm, 25mm, 14mm Rebar 6-Feb-23 OPEN
27 JB1071-HAI-04-ZZ-MA-W-00027 CVL INS208 Brushbond. Cementitious Water Proofing (300 Bags) 8-Feb-23 OPEN
28 JB1071-HAI-04-ZZ-MA-W-00028 CVL INS209 Reinforcement Steel Bars. Diameter 20mm, 25mm Rebar 8-Feb-23 OPEN
29 JB1071-HAI-04-ZZ-MA-W-00029 CVL INS216 Concure WB309 Curing Compound (10 Drum) 9-Feb-23 OPEN
30 JB1071-HAI-04-ZZ-MA-W-00030 CVL INS217 Reinforcement Steel. Cut and Bend Steel 10 mm 11-Feb-23 OPEN
31 JB1071-HAI-04-ZZ-MA-W-00031 CVL INS222 Reinforcement Steel. Cut and Bend Steel 10 mm 12-Feb-23 OPEN
33 JB1071-HAI-04-ZZ-MA-W-00033 CVL INS236 Reinforcement Steel. Cut and Bend Steel 10 mm 14-Feb-23 OPEN
34 JB1071-HAI-04-ZZ-MA-W-00034 CVL INS262 U Bolt Rod Clamp (80 Pieces) 22-Feb-23 4-Mar-23 CLOSED RHDHV 1
26-FEB-23
35 JB1071-HAI-04-ZZ-MA-W-00035 ELE INS271 Bare Copper Conductor 120 mm2 (105 m) 25-Feb-23 Amessage CLOSED RHDHV 1
6-MAR-23
39 JB1071-HAI-04-ZZ-MA-W-00039 CVL INS302 Reinforcement Steel. Rebar Dia 10 & 20 mm 9-Mar-23 OPEN
40 JB1071-HAI-04-ZZ-MA-W-00040 CVL INS307 Reinforcement Steel. Rebar Dia 10 & 20 mm 12-Mar-23 OPEN
42 JB1071-HAI-04-ZZ-MA-W-00042 ELE INS327 Earthing cable( Bare Copper Conductor 120 mm2 1000m 16-Mar-23 18-Mar-23 CLOSED RHDHV 1
43 JB1071-HAI-04-ZZ-MA-W-00043 CVL INS328 Reinforcement Steel. Rebar Dia 16 &20 mm 16-Mar-23 OPEN
44 JB1071-HAI-04-ZZ-MA-W-00044 CVL INS334 Reinforcement Steel. Rebar Dia 10 CUT & BEND 18-Mar-23 OPEN
45 JB1071-HAI-04-ZZ-MA-W-00045 CVL INS335 U BOLT ROD CLAMP( TYP GLV) – NOMINAL RO 18-Mar-23 19-Mar-23 OPEN
aMessage
46 JB1071-HAI-04-ZZ-MA-W-00046 CVL INS336 CONDUITPVC32MM2.9METER LENGTH HEAVY GAUGE BLACK 2, COUPLINGPVC32mm HEAVY 19-Mar-23 OPEN
GAUGE BLACK
47 JB1071-HAI-04-ZZ-MA-W-00047 CVL INS337 Reinforcement Steel. Rebar Dia 10 & 20mm CUT & BEND 20-Mar-23 OPEN
48 JB1071-HAI-04-ZZ-MA-W-00048 CVL INS344 Reinforcement Steel. Rebar Dia 16 & 20mm 20-Mar-23 OPEN
50 JB1071-HAI-04-ZZ-MA-W-00050 CVL INS348 Rebar Coupler (Repair Grip) for 25mm Rebar from Dextra Group 22-Mar-23 CLOSED RHDHV 1
51 JB1071-HAI-04-ZZ-MA-W-00051 CVL INS349 Plasti Board (Protection Board for Waterproofing Coating Paint)2m*1m*4mm thick. 22-Mar-23 OPEN
52 JB1071-HAI-04-ZZ-MA-W-00052 CVL INS354 Reinforcement Steel. Rebar Dia 10 mmCUTAND BEND &16 mm 22-Mar-23 OPEN
56 JB1071-HAI-04-ZZ-MA-W-00056 CVL INS374 Rebar Coupler (Repair Grip) for 25mm Rebar from Dextra Group 30-Mar-23 OPEN
57 JB1071-HAI-04-ZZ-MA-W-00057 CVL INS386 NITOPROOF 10, (15 Drum each 200ML) 1-Apr-23 OPEN
58 JB1071-HAI-04-ZZ-MA-W-00058 CVL INS509 UPVC/PVC Pipes, Fittings and Pipe Lubricant 3-May-23 OPEN
60 JB1071-HAI-04-ZZ-MA-W-00060 MECH INS565 Penguard Primer Comp A Penguard Comp B 10-May-23 OPEN
Epoxy primer (Internal and External coat) for Aeration Pipe embedded in Silo Slab.
61 JB1071-HAI-04-ZZ-MA-W-00061 MECH INS610 Steel Plate 3mm and 6mm for Aeration Pipe in Silos 23-May-23 OPEN
64 JB1071-HAI-04-ZZ-MA-W-00064 CVL INS629 Reinforcement Steel. Rebar Dia 10 mm, 25mm 29-May-23 OPEN
65 JB1071-HAI-04-ZZ-MA-W-00065 MECH INS630 PPR Pipes and Test Plugs for hot and cold water supply 29-May-23 OPEN
66 JB1071-HAI-04-ZZ-MA-W-00066 MECH INS641 Penguard Primer Comp A Penguard Comp B 1-Jun-23 OPEN
69 JB1071-HAI-04-ZZ-MA-W-00069 CVL INS656 Jotun Thinner No. 17 for Epoxy Primer 6-Jun-23 OPEN
70 JB1071-HAI-04-ZZ-MA-W-00070 CVL INS677 Reinforcement Steel. Rebar Dia 14 mm, 25mm 13-Jun-23 OPEN
71 JB1071-HAI-04-ZZ-MA-W-00071 CVL INS681 Reinforcement Steel. Rebar Dia 14 mm, 25mm 14-Jun-23 OPEN
72 JB1071-HAI-04-ZZ-MA-W-00072 CVL INS683 SUPERCAST PVC Watafoil 250XHD Water stop 40 Roll 14-Jun-23 OPEN
73 JB1071-HAI-04-ZZ-MA-W-00073 CVL INS684 Curing Compound WB309. (10 Drum) Renderoc TG Xtra.(100 Bags) 14-Jun-23 OPEN
75 JB1071-HAI-04-ZZ-MA-W-00075 MECH INS706 SILOS as per attached Packing Lists, (Included FAT) 20-Jun-23 OPEN
76 JB1071-HAI-04-ZZ-MA-W-00076 ELE INS707 Steel Back Boxes as per DN, FILT GUN RFURSE WELD 20-Jun-23 OPEN
77 JB1071-HAI-04-ZZ-MA-W-00077 MECH INS731 PPR Plumbing Accessories as per attached DN 25-Jun-23 OPEN
78 JB1071-HAI-04-ZZ-MA-W-00078 ELE INS761 Earthing cable (Bare Copper Conductor 120 mm2 2000m) 9-Jul-23 OPEN
79 JB1071-HAI-04-ZZ-MA-W-00079 MECH INS762 Anchor Bolts, Nuts and Washers as per Packing List 9-Jul-23 OPEN
80 JB1071-HAI-04-ZZ-MA-W-00080 MECH INS772 Awazel Primer D41, Waterproofing Membrane PY 40200L. 11-Jul-23 OPEN
81 JB1071-HAI-04-ZZ-MA-W-00081 CVL INS786 Waterproofing Membrane PY 40200L, Mattex Geomat Geotextile. Conbextra HF, Conbextra EP150 12-Jul-23 OPEN
83 JB1071-HAI-04-ZZ-MA-W-00083 CVL INS819 POLYETHYLENE SHEET 250 micron (150 ROLLS) 19-Jul-23 OPEN
85 JB1071-HAI-04-ZZ-MA-W-00085 CVL INS869 Waterproofing Membrane PY 40200L, Awazel MS 40 Protection Board, Awazel Primer D41 30-Jul-23 OPEN
88 JB1071-HAI-04-ZZ-MA-W-00088 CVL INS872 Curing Compound WB309. (10 Drum) 31-Jul-23 OPEN
Brushbond.(39 Bags)
89 JB1071-HAI-04-ZZ-MA-W-00089 CVL INS879 Plasti Board (Protection Board for Waterproofing Coating Paint)2m*1m*4mm thick. (2000 Nos.) 2-Aug-23 OPEN
91 JB1071-HAI-04-ZZ-MA-W-00091 CVL INS881 Reinforcement Steel. Rebar Dia 14 mm as per DN 3-Aug-23 OPEN
94 JB1071-HAI-04-ZZ-MA-W-00094 CVL INS965 Reinforcement Steel. Rebar Dia 12 mm, 25mm as per DN 19-Aug-23 OPEN
95 JB1071-HAI-04-ZZ-MA-W-00095 CVL INS975 MRC O –Type Rebar Coupler for 25 mm Rebar as per DN 21-Aug-23 OPEN
96 JB1071-HAI-04-ZZ-MA-W-00096 CVL INS976 Reinforcement Steel. Rebar Dia 12 mm, 20mm and 25mm as per DN 21-Aug-23 OPEN
98 JB1071-HAI-04-ZZ-MA-W-00098 CVL INS1036 Reinforcement Steel. Rebar Dia 12 mm and 14 mm as per DN 30-Aug-23 OPEN
99 JB1071-HAI-04-ZZ-MA-W-00099 CVL INS1037 Grout Conbextra TS.170 bags 30-Aug-23 OPEN
100 JB1071-HAI-04-ZZ-MA-W-00100 MECH INS1118 Anchor Bolts, Nuts and Washers as per Packing List 14-Sep-23 OPEN
Submittals Statuse
3 JB1071-RHD-04-XX-QC-Z-0003 REC003 CVL Fine Aggregates Arrived on-site Without any 3-Dec-22 18-Dec-22
Delivery Documents
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV com
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot
Code 4: For information’.
Site Instruction Request -SI - Log
Project JB1071
SN Number DISCIPLINE Title Issued Date Close Date Issued by Eng. Remarks
1 HAIF EMAIL DATED 30-05-22 GENERAL 00 SITE LAYOUT CORDINATES 30-May-22 1-Jun-22 R&R
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
As Built Drawing Submital - AB - Log Sheet
SN Sub. Ref. Number DISCIPLINE Title DWG Number Ref. Shop DWG Number Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Status Doc. Status Eng. Rev Final status/Comments
Days
SN Submittal Ref. Number DISCIPLINE ID CODE DOCUMENTS Number Title Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Status Doc. Status Eng.Rev Final Statuse/Remarks
CONC190
REF. THRU EMAIL 6/22/2022
1 CVL CONC398 JB1071-HAI-COS-04-ZZ-MS-W-0030 DESIGN METHOD OF STATEMENT 14-May-22 39 28-Jul-22 8-Aug-22 11 12-Sep-22 27-Sep-22 15 3-Nov-22 12-Nov-22 9 5-Jan-23 20-Jan-23 15 2 CLOSED RHDHV 2
JB1071-HAI-TR-0030 6/28/2022 NEED COMMENTS
CONC674 LETTER
JB-1071-HAIF-02-ZZ-LT-S-0001
2 JB1071-HAIF-02-XX-LT-S-0003 CVL CONC009 ------ METHOD OF STATEMENT FOR BOREHOLE. 28-May-22 20-Jun-22 2 CLOSED RHDHV 2
4 JB-1071-HAI-TR-0005 CVL CONC192 ------ METHOD OF STATEMENT FOR CONCRETE WORK 3-Jul-22 15-Jul-22 12 13-Sep-22 9-Oct-22 26 2 CLOSED RHDHV 2
CONC151
5 JB1071-HAI-TR-00050 CVL CONC206 JB1071-HAI-04-ZZ-MS-W-00050 METHOD STATEMENT OF BORED CAST IN SITU PILES (STROMEK) 31-Aug-22 8-Sep-22 8 18-Sep-22 27-Sep-22 9 2 CLOSED RHDHV 2
CONC168
6 JB1071-HAI-TR-00054 CVL CONC202 JB1071-HAI-04-ZZ-MS-W-00054 METHOD STATEMENT OF BORED CAST IN SITU PILES (JEDDDAH ) 5-Sep-22 10-Sep-22 5 17-Sep-22 20-Sep-22 3 2 CLOSED RHDHV 2
JB1071-HAIF-04-XX-LT-W-1030 CONC275
7 JB1071-HAIF-04-XX-LT-W-1047 CVL CONC388 JB1071-HAIF-04-XX-MS-W-1030 METHOD STATEMENT FOR PILE LOAD TEST (NON-WORKING PILE) 5-Oct-22 8-Oct-22 3 1-Nov-22 29-Dec-22 58 1 CLOSED RHDHV 1
8 JB-1071-HAI-TR-00112 CVL CONC551 JB1071-HAI-04-XX-MS-W-00112 METHOD STATEMENT FOR PILE INTEGRITY TEST 8-Dec-22 18-Dec-22 10 1 CLOSED RHDHV 1
9 JB-1071-HAI-TR-00120 CVL CONC599 JB1071-HAI-04-XX-MS-W-00120 METHOD STATEMENT FOR PILE LOAD TEST OF WORKING PILE 20-Dec-22 24-Dec-22 4 1 CLOSED RHDHV 1
10 JB-1071-HAI-TR-00121 CVL CONC603 JB1071-HAI-04-XX-MS-W-00121 METHOD STATEMENT FOR PILE HEAD BREAKING 20-Dec-22 27-Dec-22 7 1 CLOSED RHDHV 1
11 JB-1071-HAI-TR-00122 CVL CONC618 JB1071-HAI-04-XX-MS-W-00122 METHOD STATEMENT FOR TERMITE CONTROL 26-Dec-22 4-Jan-23 9 1 CLOSED RHDHV 1
14 JB1071-HAI-TR-00188 CVL CONC781 JB1071-HAI-04-XX-MS-W-00188 METHOD STATEMENT FOR STATIC LOAD TEST [WORKING PILE]. 31-Jan-23 18-Mar-23 1 CLOSED RHDHV 1
15 JB1071-HAI-TR-00196 CVL CONC810 JB1071-HAI-04-XX-MS-W-00196 Method Statement for Liquid Applied Bituminous Damp Proofing 6-Feb-23 OPEN
CONC958 14-Mar-23
9-Apr-23
15-Apr-23
CONC1105 aMessage aMessage
16 JB1071-HAI-TR-00249 CVL CONC1318 JB1071-HAI-04-XX-MS-W-00249 Method Statement for Dewatering Works 8-Mar-23
27-MAR-23
aMessage
14-May-23
1-Jun-23 21-Jun-23 R&R 3
18-Apr-23
CONC1334 CODE-3 CODE-3
18 JB1071-HAI-TR-00329 ELE CONC1291 JB1071-HAI-04-XX-MS-W-00329 Method of Statement for Installation of PVC Conduit 28-May-23 4-Jun-23 CLOSED RHDHV 2
Process Method Statement and Risk Assessment for Assembly & Installation of 21-JUNE-23
21 JB1071-HAI-TR-00349 Building CONC1362 JB1071-HAI-04-XX-MS-W-00349 Storage Silos, Cat Walk and Bagging Bins.
6-Jun-23 20-Jun-23
aMessage
OPEN
Method Statement and Risk Assessment for Static Pile Load Test
22 JB1071-HAI-TR-00364 CVL CONC1401 JB1071-HAI-04-XX-MS-W-00364 at Flat Storage (Working Pile)
13-Jun-23 21-Jun-23 CLOSED 1
Method Statement and Risk Assessment for Concrete works and 25-June-23
02-JULY-23
23 JB1071-HAI-TR-00381 CVL COCN1453 JB1071-HAI-04-XX-MS-W-00381 Application of Bituminous Waterproofing Membrane at below 16-July-23
Amessage
OPEN
ground level of Head House 1, Transfer Tower 2 and Flat Storage aMessage
24 JB1071-HAI-TR-00396 CVL CONC1516 JB1071-HAI-04-XX-MS-W-00396 Method Statement for Steel Erection Works (Zamil) 12-Jul-23 23-Jul-23 CLOSED 2
25 JB1071-HAI-TR-00408 CVL CONC1543 JB1071-HAI-04-XX-MS-W-00408 MS and RA for Flat Storage Dewatering 17-Jul-23 21-Aug-23 CLOSED 1
26 JB1071-HAI-TR-00463 CVL CONC1659 JB1071-HAI-04-XX-MS-W-00463 Method Statement and Risk Assessment for Water Test on Silos 5-Aug-23 OPEN
Method Statement and Risk Assessment for 14-Sep-23
27 JB1071-HAI-TR-00526 CVL CONC1835 JB1071-HAI-04-XX-MS-W-00526 Construction of Flat Storage Tunnel
12-Sep-23
aMessage
OPEN
28 JB1071-HAI-TR-00533 CVL CONC1849 JB1071-HAI-04-XX-MS-W-00533 Method Statement and Risk Assessment for Flat Storage Walls Slipform 13-Sep-23 14-Sep-23 CLOSED 2
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-16, SP6-32 and SP12-19, SP12-36.
INSPECTION AND TEST PLAN ( ITP) LOG SHEET
Days
SN Submittal Ref. Number Ducoments Ref. Number ID CODE Title Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Status Doc. Status Eng.Rev Final status/Comments
Open
1 JB1071-HAI-TR-0012 JB1071-HAI-04-XX-QC-C-0012 CONC073 Cast In Situ Concrete Works 14-Jul-22 30-Jul-22 16 6-Aug-22 26-Aug-22 20 2 CLOSED RHDHV 2
21-Jul-22 26-Jul-22
2 JB1071-HAI-TR-0013 JB1071-HAI-04-XX-QC-C-0013 ECOM019 Excavation & Backfilling 14-Jul-22 7 26-Aug-22 R&R
25-Jul-22 7-Aug-22
3 JB1071-HAI-TR-00075 JB1071-HAI-04-XX-QC-C-00075 CONC345 BORE PILE CONSTRUCTION 24-Oct-22 30-Oct-22 6 20-Nov-22 3-Dec-22 13 R&R
CONC468
SUPERSEDE
4 JB1071-HAIF-04-XX-LT-W-1051 JB1071-HAIF-04-XX-QC-C-1051 CONC412 List of ITP's Covering whole of the Work's 7-Nov-22 OPEN
5 JB1071-HAI-TR-00366 JB1071-HAIF-04-XX-QC-C-00366 CONC1407 ITP for AREATION TUBE and ANGLE FRAMES 14-Jun-23 OPEN
6 JB1071-HAI-TR-00367 JB1071-HAIF-04-XX-QC-C-00367 CONC1406 ITP for EARTHING and LIGHTNING PROTECTION SYSTEM 14-Jun-23 OPEN
7 JB1071-HAI-TR-00379 JB1071-HAIF-04-XX-QC-C-00379 CONC1449 ITP for CONCEAL PVC CONDUIT & 22-Jun-23 12-Jul-23 OPEN
CONC1508 FITTINGS INSTALLATION
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
SITE OBSERVATION - Log Sheet
1 JB1071-RHD-04-XX-SO-Z-0001 CVL Trail Mix Design v/s Working Piles - 7 Days 5-Dec-22
Concrete Compression Results
8
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV com
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot
Code 4: For information’.
YGT LOG SUMMARY
Submission
Sr.No. Transmittal DISCIPLINE Description Approval Date Status FINAL STATUS Remarks
Date
JB1071-HAIF-04-XX-LT-W-1038 (P13) GENERAL GENERAL LAYOUT MASTER PLAN P13 19-Oct-22 9-Nov-22 CLOSED CODE-1
3
JB1071-HAI-TR-00092_(P14) GENERAL PROPOSED SCALE BUILDING LOCATION _P14 13-Nov-22 16-Nov-22 R&R CODE-3
6 Email Dated 21 May 22 Rev.00 GENERAL REVISE SITE LAYOUT (LAND BOUNDARY LINE) 21-May-22 22-May-22 CLOSED CODE-1
8 JB1071-HAI-TR-0009 ARC GUARD ROOM (PLANS,ELEVATION & SECTION) 2-Nov-22 7-Nov-22 CLOSED CODE-2
9 JB1071-HAI-TR-0010 ARC MAIN TRUCK GATE (PLANS, ELEVATIONS & SECTION) 2-Nov-22 5-Nov-22 CLOSED CODE-2
10 JB1071-HAI-TR-0023 ARC MOSQUE & CANTEEN (PLAN, ELEVATION & SECTION) 25-Jul-22 28-Jul-22 R&R CODE-3
11 JB1071-HAI-TR-0024 ARC DRIVER FACILITIES (PLAN, ELEVATION & SECTION) 26-Dec-22 31-Dec-22 CLOSED CODE-1
12 JB1071-HAI-TR-0025 ARC WORKSHOP & SPARE PARTS (PLAN, ELEVATION & SECTION) 29-Dec-22 1-Jan-23 CLOSED CODE-1
JB1071-HAI-TR-0026
13 ARC SCALE BUILDING (PLANS, ELEVATION & SECTION) 17-Oct-22 11-Nov-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1034
JB1071-HAI-TR-0027
14 ARC PUBLIC TOILETS (PLANS, ELEVATION & SECTION) 17-Oct-22 12-Nov-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1034
16 -------------- ARC PROPOSAL FOR ADMINSTRATION COMPLEX 3-Oct-22 5-Oct-22 CLOSED CODE-2
17 JB1071-HAI-TR-00051 STR SILOS PILE LAYOUT & DETAILS 9-Nov-22 15-Nov-22 CLOSED CODE-2
19 JB1071-HAI-TR-00088 ELE MEDIUM VOLTAGE POWER SINGLE LINE DIAGRAM 1-Dec-22 6-Dec-22 R&R CODE-3
JB1071-HAIF-04-XX-LT-W-1062
Process PLO CONCEPT TRUCK INTAKE / HEAD HOUSE1, TT1 & TT2 _P01
21 JB1071-HAI-TR-00097 Equipment 6-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing 'PLO DESIGN DRAWING TRUCK INTAKE / HEAD HOUSE1, TT1 & TT2 _P02
Process
22 JB1071-HAI-TR-00098 Equipment PLO TRUCK LOADING / BAGGING 6-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing
Process
23 JB-1071-HAI-TR-00099 Equipment STEEL SILOS & DOCUMENTS 19-Nov-22 11-Dec-22 CLOSED CODE-2
Drawing
26 JB1071-HAI-TR-00107 STR MAIN TRUCK GATE STR 29-Nov-22 7-Dec-22 CLOSED CODE-2
Process
28 JB1071-HAI-TR-00109 Equipment CIV HEAD HOUSE, TRUCK INTAKE & TRANSFER TOWER 1 & 2 6-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing
Process
29 JB1071-HAI-TR-00113 Equipment CIV Bagging Station 10-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing
Process
30 JB1071-HAI-TR-00114 Equipment CIV Silos Storage 10-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing
Process
PLO DESIGN
33 JB-1071-HAI-TR-00117 Equipment 14-Dec-22 15-Dec-22 CLOSED CODE-1
BAGGING STATION
Drawing
Process
PLO DESIGN DRAWING
34 JB1071-HAI-TR-00118 Equipment 20-Dec-22 20-Dec-22 CLOSED CODE-1
SHIP INTAKE
Drawing
Process
CIV DESIGN DRAWINGS
35 JB1071-HAI-TR-00119 Equipment 20-Dec-22 20-Dec-22 CLOSED CODE-1
SHIP INTAKE
Drawing
Process
36 JB1071-HAI-TR-00124 Equipment CIV DESIGN DRAWING FLAT STORAGE 26-Dec-22 CLOSED
Drawing
Process
37 JB1071-HAI-TR-00125 Equipment PLO DESIGN DRAWING FLAT STORAGE 26-Dec-22 CLOSED
Drawing
POWER SLD
38 JB1071-HAI-TR-00127 ELE 27-Dec-22 CLOSED
SS2, SS3 & SS4 & SS5
28-Dec-23
39 JB1071-HAI-TR-00129 STR SILOS FOUNDATION & SLAB CLOSED
8-Feb-23 (aMessage)
1-JAN-23
CONC653
13-FEB-23
41 JB-1071-HAI-TR-00133 MECH. ADMIN BLDG. HVAC drawings CLOSED
aMessage
05-MAR-23
aMessage
1-JAN-23
JB1071-HAI-TR-00135_P01
43 MECH. SCALE BUILDING MECHANICAL 2-FEB-23 CLOSED
JB1071-HAI-TR-00312_P02
aMessage
46 JB1071-HAI-TR-00147 CVL GENERAL NOTES & DETAILS FOR CIVIL WORK 9-Jan-23 CLOSED
2 Email Dated 21-May-22 CV OF THE HSE MANAGER 21-May-22 30-May-22 CLOSED CODE-2
6 JB1071-HAIF-04-XX-LT-W-0002 CONTRACTOR'S CAR POLICY NO. P/300/3601/22/000044 22-Jun-22 30-Jun-22 R&R CODE-3
11 JB1071-HAIF-04-XX-LT-W-0003 CONTRACTOR'S KEY PERSONNEL (CONSTRUCTION MANAGER) 13-Jun-22 20-Jun-22 CLOSED CODE-2
12 JB1071-HAIF-04-XX-LT-W-0004 CONTRACTOR'S KEY PERSONNEL (QA / QC MANAGER) 20-Jun-22 22-Jun-22 CLOSED CODE-2
JB1071-HAIF-01-ZZ-HS-P-T-0001
13 EMERGENCY RESPOSE PLAN 1-Sep-22 CLOSED
JB1071-HAI-TR-00052
14 JB1071-HAIF-ZZ-XX-ER-LT-W-0002 TRANSPORT FOR ENGINEER/ EMPLOYER. 29-Jun-22 4-Jul-22 CLOSED CODE-2
15 JB1071-HAI-TR-0020 LIFTING PLAN FOR SITE OFFICE PORTA CABIN 24-Jul-22 25-Jul-22 R&R CODE-3
18 JB1071-HAI-TR-00042 KEY PERSONNEL ENVIRONMENTAL MANAGER RESUME 10-Aug-22 14-Aug-22 CLOSED CODE-2
JB1071-HAIF-01-XX-LT-W-1003
JB1071-HAI-TR-00047
ORGANIZATION CHART 10-Nov-22 21-Nov-22 OPEN CODE-3
JB1071-HAIF-04-XX-LT-W-1033
21 JB1071-HAIF-04-XX-LT-W-1054
24 JB1071-HAIF-04-XX-LT-W-1014 CONTRACTOR'S KEY PERSONNEL DESIGN COORDINATOR CV 19-Sep-22 3-Oct-22 CLOSED CODE-2
25 JB1071-HAIF-04-XX-LT-W-1019 PROCESS EQUIPMENT DOCUMENTS FOR APPROVAL (BUHLER) 25-Sep-22 27-Oct-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1029
JB1071-HAIF-04-XX-LT-W-1036
27 CONCRETE DURABILITY REPORT 16-Nov-22 28-Nov-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1058
JB-1071-HAI-TR-00130
29 JB1071-HAI-TR-00067 ENVIRONMENTAL ASPECT & IMPACT REGISTER 15-Oct-22 25-Oct-22 CLOSED CODE-1
FOR
34 JB1071-HAI-TR-00106 LIST OF MATERIALS WITH FREQUENCY OF TESTS 27-Nov-22 CLOSED INFORMATION
AND RECORD
36 JB1071-HAI-TR-00110 PRELIMINARY PILE LOAD TEST REPORT (SILOS AREA) 4-Dec-22 CLOSED
JB1071-HAIF-04-XX-LT-W-1075
37 REVISED ENGINEERING & DESIGN SCHEDULE 22-Dec-22 CLOSED
JB-1071-HAI-TR-00132
39 JB1071-HAI-04-ZZ-TR-W-00123 Concrete Durability Tests Reports (GAC and Saudi Read Mix) 26-Dec-22 CLOSED
JB1071-HAIF-04-XX-LT-W-1023
40 Scope Delivery Responsibility Matrix 2-Oct-22 CLOSED
JB-1071-HAI-TR-00128
FOR
41 JB-1071-HAI-TR-00137 Concrete Durability Tests Reports (Saudi Read Mix Concrete) 2-Jan-23 CLOSED INFORMATION
AND RECORD
FOR
attached with WIR JB1071-HAI-04-ZZ-WIR-W-
42 Soil Samples Tests Reports (Admin Building and Silos Area) 5-Jan-23 CLOSED INFORMATION
00077
AND RECORD
FOR
43 JB-1071-HAI-TR-00142 Concrete Durability Tests Report (GAC Read Mix Concrete) 7-Jan-23 CLOSED INFORMATION
AND RECORD
FOR
44 JB-1071-HAI-TR-00143 Soil Samples Tests Reports (Silos Area) 7-Jan-23 CLOSED INFORMATION
AND RECORD
FOR
45 JB-1071-HAI-TR-00144 Soil Samples Tests Reports (Admin Building) 7-Jan-23 CLOSED INFORMATION
AND RECORD
Sub Contractor-(Prequalification) - PQA-Log Sheet
1 JB1071-HAIF-02-XX-RS-S-0002 CIVIL ACES PQ DOCUMENTS 6-Apr-22 12-Apr-22 CLOSED CODE-1
2 Email Dated -8 May 22 General DESIGNER M/S COSMOS 8-May-22 4-Jul-22 CLOSED CODE-2
3 JB1071-HAIF-03-ZZ-QC-C-0001 CIVIL PREQUALIFICATION OF READY MIX CONCRETE SUPPLIERS. 31-May-22 11-Jun-22 CLOSED CODE-1
18 JB1071-HAI-TR-0034 CIVIL PREQUALIFICATION FOR PILING WORK (DELTA CO.) 31-Jul-22 2-Aug-22 CLOSED CODE-2
21 JB1071-HAI-TR-00044 CIVIL PREQUALIFICATION OF GULF ENGINEERING HOUSE (GEH) 17-Aug-22 31-Aug-22 R&R CODE-3
25 JB1071-HAI-TR-00064 CIVIL SAUDI ANFAL CO. FOR PROJECT LTD. 4-Oct-22 17-Oct-22 CLOSED CODE-3
30 JB1071-HAI-TR-00071 MECH ELEVATOR SYSTEM CONTRACTING COMPANY (ESCCO) 20-Oct-22 27-Oct-22 R&R CODE-3
31 JB1071-HAI-TR-00072 MECH FIRE FIGHTING EQUIPMENTS (SAFECO) 20-Oct-22 25-Oct-22 CLOSED CODE-1
32 JB1071-HAI-TR-00073 CIVIL SAUDI PAINT COMPANY LTD. (PAINTCO) 20-Oct-22 25-Oct-22 R&R CODE-3
33 JB1071-HAI-TR-00074 CIVIL GENERAL AGENCIES AND CONTRACTING (GAC) 22-Oct-22 23-Oct-22 CLOSED CODE-2
35 JB1071-HAI-TR-00077 ELE PRE-QUALIFICATION FOR AL ASHOURY INDUSTRIES 24-Oct-22 27-Oct-22 CLOSED CODE-1
36 JB1071-HAI-TR-00078 ELE PRE-QUALIFICATION FOR POWER SOLUTION INDUSTRIES 24-Oct-22 1-Nov-22 R&R CODE-3
37 JB1071-HAI-TR-00079 CIVIL PRE-QUALIFICATION FOR HAMDAN ALSHOBHI 25-Oct-22 30-Oct-22 CLOSED CODE-2
38 JB1071-HAI-TR-00081 ELE RADYA INTERNATIONAL FROM EATON 27-Oct-22 1-Nov-22 CLOSED CODE-1
39 JB1071-HAI-TR-00083 CIVIL INTERNATIONAL BUILDING SYSTEM FACTORY CO. LTD. (IBSF) 13-Dec-22 14-Dec-22 CLOSED CODE-1
40 JB1071-HAI-TR-00084 CIVIL MAHMOOD SAEED STEEL INDUSTRIES CO. LTD. (MSSI) 5-Nov-22 7-Nov-22 CLOSED CODE-2
41 JB1071-HAI-TR-00085 CIVIL INSULATION AND WRAPPING PRODUCTS CO. LTD. (INSUWRAP) 5-Nov-22 9-Nov-22 CLOSED CODE-1
46 JB1071-HAI-TR-00095 ELE SAUDI ARABIAN SERVICES COMPANY (SASCOM) 14-Nov-22 21-Nov-22 R&R CODE-3
48 JB1071-HAI-TR-00103 ELE THE SAUDI TRANSFORMERS COMPANY LTD. (STC) 21-Nov-22 3-Dec-22 CLOSED CODE-2
8 JB1071-HAI-TR-00043 CIVIL BITUCELL (BITUMEN IMPREGNATED FIBRE BOARD) 11-Aug-22 23-Aug-22 CLOSED
9 JB1071-HAI-TR-00045 CIVIL RENDEROC TG XTRA, CONCRETE REPAIR MORTAR 17-Aug-22 23-Aug-22 CLOSED
10 JB1071-HAI-TR-00055 CIVIL FIPROCIDE, TERMITE CONTROL SPRAY,HIT PEST CONTROL 26-Nov-22 8-Dec-22 CLOSED
15 JB1071-HAI-TR-00062 CIVIL CONCRETE DESIGN MIX 40MPA WITH SILICA FUME FOR PILING 3-Oct-22 31-Oct-22 CLOSED
5 JB1071-HAI-04-ZZ-WIR-W-00005 CVL Concrete Trial Mixes of 15MPA and 30MPA design mixes. 30-Aug-22 4-Sep-22 CLOSED
6 JB1071-HAI-04-ZZ-WIR-W-00006 CVL Concrete Trial Mixes of 40MPA design mixes. 31-Aug-22 4-Sep-22 CLOSED
10 JB1071-HAI-04-ZZ-WIR-W-00010 CVL Inspection request for Setting out of preliminary Piles 22-Sep-22 OPEN
Compressive Strength Test at 28days forTrial Mixessamples of
11 JB1071-HAI-04-ZZ-WIR-W-00011 CVL 28-Sep-22 5-Oct-22 CLOSED
15Mpa, 30Mpaand 40Mpa.
12 JB1071-HAI-04-ZZ-WIR-W-00012 CVL Steel reinforcement Cage for Preliminary Pile 6-Oct-22 10-Oct-22 CLOSED
16 JB1071-HAI-04-ZZ-WIR-W-00016 CVL Concrete Pouring for Preliminary test Pile -2 23-Oct-22 OPEN
Inspection request for Pile Load Testing for Test Pile # 1 of silos
32 JB1071-HAI-04-ZZ-WIR-W-00032 CVL 13-Nov-22 OPEN
area
37 JB1071-HAI-04-ZZ-WIR-W-00037 CVL Pile Steel Cage and Pre Pour for Pile # SP6-24 15-Nov-22 OPEN
69 JB1071-HAI-04-ZZ-WIR-W-00069 CVL Pile Load Testing for Test Pile # 2 of silos area. 15-Dec-22 OPEN
5 JB1071-HAI-04-ZZ-MA-W-00005 CIVIL Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 13-Nov-22 OPEN
7 JB1071-HAI-04-ZZ-MA-W-00007 CIVIL Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 15-Nov-22 OPEN
9 JB1071-HAI-04-ZZ-MA-W-00009 CIVIL Coarse Aggregates 10mm, 20mm Fine Aggregates (Sand) 28-Nov-22 28-Nov-22 R&R
10 JB1071-HAI-04-ZZ-MA-W-00010 CIVIL Reinforcement Steel Bars. Diameter. 10mm, 20mm, 25mm 8-Dec-22 OPEN
JB-1071-HAIF-02-ZZ-LT-S-0001
2 CVL METHOD OF STATEMENT FOR BOREHOLE. 20-Jun-22 CLOSED
JB1071-HAIF-02-XX-LT-S-0003
4 JB-1071-HAI-TR-0005 CVL METHOD OF STATEMENT FOR CONCRETE WORK 13-Sep-22 9-Oct-22 CLOSED
8 JB-1071-HAI-TR-00112 CVL METHOD STATEMENT FOR PILE INTEGRITY TEST 8-Dec-22 18-Dec-22 CLOSED
9 JB-1071-HAI-TR-00120 CVL METHOD STATEMENT FOR PILE LOAD TEST OF WORKING PILE 20-Dec-22 24-Dec-22 CLOSED
10 JB-1071-HAI-TR-00121 CVL METHOD STATEMENT FOR PILE HEAD BREAKING 20-Dec-22 CLOSED
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DWG
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
DOCUMENTS
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
PQA
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
MATERIALS
WIR
100
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR MISTAKE
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
WIR
MIR
MIR
MIR
MIR
MIR
MIR
MIR
MIR
MIR
MIR
MIR
MOS
MOS
MOS
MOS
MOS
MOS
MOS
MOS
MOS
ITP
ITP
ITP
ITP
ITP