Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments
Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

CONC1519 FOR
CIV041
ADMINISTRATION BUILDING Last Submission 5-Mar-23 only
aMessage 2-FEB-23
5-Apr-23
P02 WATER SUPPLY & SEWER DRAINAGE
ELE GROUND FLOOR JB1071-HAI-04-ZZ-DR-E-02014 Drainage &ONLY
ColdHVAC.
& Hot Water
aMessage SUBMIT WITH NEW TR#00275 & 00276
30-Jul-23 OPEN
PUBLIC ADDRESS SYSTEM LAYOUT Remaining HVAC 25-MAR- 13-02-23 24-May-23
JB-1071-HAI-TR-00173 CONC803 5-Feb-23 11-APR-23 aMessage aMessage
JB1071-HAI-TR-00317
CONC1256 2023
8-Mar-23 (CODE-2)
24-Mar-23
20-May-23 30-MAY-23
CONC1622 aMessage
ADMINISTRATION BUILDING Code-3 CODE-3
ELE FIRST FLOOR PLAN JB1071-HAI-04-ZZ-DR-E-02015 30-Jul-23 OPEN
PUBLIC ADDRESS SYSTEM LAYOUT
Admin Building Public
63 ADMIN BUILDING Address System 24-May-23
Layout aMessage
ELE PUBLIC ADDRESS SYSTEM (TOA) JB1071-HAI-04-ZZ-DR-E-02048 20-May-23 30-MAY-23
30-Jul-23 OPEN
SINGLE LINE DIAGRAM CODE-3

CONC1256
JB1071-HAI-TR-00317 CONC1622 ADMIN BUILDING GROUND & FIRST
FLOOR SOUND PRESSURE LEVEL (SPL) 24-May-23
aMessage
ELE SPEECH TRANSMISSION INDEX ( STI) JB1071-HAI-04-ZZ-RP-W-02014 20-May-23 30-MAY-23
30-Jul-23 OPEN
CABLE CALCULATION TABLE ZONE-1 & CODE-3
ZONE-2
Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

20-MAR-23
CONC993 MEDIUM VOLTAGE AND LOW aMessage 10-May-23
CONC1174
CONC1845
ELE
VOLTAGE CABLE ROUTING LAYOUT PLAN
JB1071-HAI-04-ZZ-DR-E-02034 P01 TR # 00191
15-Mar-23 3-APR-23 3-May-23 CODE-2 13-Sep-23 OPEN
CODE-3

MEDIUM VOLTAGE
MEDIUM VOLTAGE AND LOW AND LOW
CONC1174 10-May-23
86 JB1071-HAI-TR-00257 ELE JB1071-HAI-04-ZZ-DR-E-02040 VOLTAGE CABLE 3-May-23 13-Sep-23 OPEN
CONC1845 VOLTAGE CABLE SECTION & ISOMETRIC DETAIL ROUTING CODE-2
LAYOUT PLAN

CONC1845 ELE POWER CABLE PIT DETAIL JB1071-HAI-04-ZZ-DR-E-02170 13-Sep-23 OPEN


Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

CONC
CONC1458 ELE
Bagging Station Lighting System Layout JB1071-HAI-04-ZZ-DR-E-02055
P01 TR#181
3-JUNE-23
3-Jun-23
Approved
26-Jun-23
12-Jul-23 26-Jul-23 OPEN 2
CONC1610 Level ±0.00m
1292 CONC785
Schedule
not
Recieved
CONC1458 ELE
Bagging Station Lighting System Layout Level JB1071-HAI-04-ZZ-DR-E-02056 26-Jun-23 12-Jul-23 26-Jul-23 OPEN 2
CONC1610 +38.00m & +42.00m

Bagging Station
144 JB1071-HAI-TR-00384 CONC1458 ELE
Calculation Report for bagging JB1071-HAI-04-ZZ-RP-W-02055 Lighting 26-Jun-23 12-Jul-23 26-Jul-23 OPEN 2
CONC1610 station
Drawings

Bagging station
CONC1610 ELE Lighting system layout JB1071-HAI-04-ZZ-DR-E-02146 26-Jul-23 OPEN
LEVEL +5.5m & 8.5m

Bagging Station
CONC1610 ELE Lighting system layout JB1071-HAI-04-ZZ-DR-E-02147 26-Jul-23 OPEN
LEVEL +31.50m

Bagging Station
CONC1460
CONC1612
ELE Roof Floor JB1071-HAI-04-ZZ-DR-E-02057 26-Jun-23 14-Jul-23 26-Jul-23 OPEN
Lightning Protection Bagging Station
145 JB1071-HAI-TR-00385 Lightning
Calculation Report for Protection
CONC1460
CONC1612
ELE Lightning Protection Bagging JB1071-HAI-04-ZZ-RP-W-02057 26-Jun-23 14-Jul-23 26-Jul-23 OPEN
Station

Bagging Station Bagging Station


CONC1461
146 JB1071-HAI-TR-00386 CONC1613
ELE
Panel Board Schedule
JB1071-HAI-04-ZZ-DR-E-02058 Panel Board 26-Jun-23 14-Jul-23 26-Jul-23 OPEN
Schedule
Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

CONC1557 ELE
FLAT STORAGE JB1071-HAI-04-ZZ-DR-E-02062 17-Jul-23 1-Aug-23 12-Sep-23 OPEN
CONC1835 LIGHTING SYSTEM LAYOUT
FLAT STORAGE
171 JB1071-HAI-TR-00422
LIGHTING
SYSTEM
LAYOUT
CONC1557 ELE
Calculation Report for Flat JB1071-HAI-04-ZZ-RP-W-02062 17-Jul-23 1-Aug-23 12-Sep-23 OPEN
CONC1835 Storage

CONC1566 ELE
FLAT STORAGE ROOF JB1071-HAI-04-ZZ-DR-E-02063 17-Jul-23 3-Aug-23 21-Aug-23 OPEN
CONC1733 LIGHTNING PROTECTION
FLAT STORAGE
178 JB1071-HAI-TR-00429 LIGHTNING
Calculation Report for PROTECTION
CONC1566
CONC1733
ELE Lightning Protection Flat JB1071-HAI-04-ZZ-RP-W-02063 17-Jul-23 3-Aug-23 21-Aug-23 OPEN
Storage

HEAD HOUSE
CONC1568 ELE
BASEMENT, GROUND, 1ST & JB1071-HAI-04-ZZ-DR-E-02089 18-Jul-23 OPEN
2ND FLOORS
POWER SYSTEM LAYOUT

HEAD HOUSE HEAD HOUSE


179 JB1071-HAI-TR-00430 CONC1568 ELE 3RD, 4TH, 5TH & 6TH FLOORS JB1071-HAI-04-ZZ-DR-E-02090 POWER SYSTEM 18-Jul-23 OPEN
POWER SYSTEM LAYOUT LAYOUT

HEAD HOUSE
CONC1568 ELE 7TH & 8TH FLOORS JB1071-HAI-04-ZZ-DR-E-02091 18-Jul-23 OPEN
POWER SYSTEM LAYOUT

SECONDARY HEAD HOUSE


BASEMENT, GROUND, 1ST &
CONC1569 ELE 2ND FLOORS JB1071-HAI-04-ZZ-DR-E-02105 18-Jul-23 OPEN
SMALL POWER SYSTEM
LAYOUT SECONDARY HEAD
HOUSE
180 JB1071-HAI-TR-00431 SMALL POWER
SYSTEM
SECONDARY HEAD HOUSE LAYOUT
3RD,4TH,5TH,6TH & 7TH
CONC1569 ELE FLOOR JB1071-HAI-04-ZZ-DR-E-02106 18-Jul-23 OPEN
SMALL POWER SYSTEM
LAYOUT

TRANSFER TOWER-1
GROUND, 1ST, 2ND,& 3RD
CONC1570 ELE FLOOR PLAN JB1071-HAI-04-ZZ-DR-E-02120 18-Jul-23 OPEN
SMALL POWER SYSTEM
LAYOUT TRANSFER TOWER-1
SMALL POWER
181 JB1071-HAI-TR-00432
SYSTEM
LAYOUT
TRANSFER TOWER-1
CONC1570 ELE
4TH, 5TH, & 6TH FLOOR PLAN JB1071-HAI-04-ZZ-DR-E-02121 18-Jul-23 OPEN
SMALL POWER SYSTEM
LAYOUT

SILO STORAGE
182 JB1071-HAI-TR-00433 CONC1571 ELE
SILO STORAGE JB1071-HAI-04-ZZ-DR-E-02124 SMALL POWER 18-Jul-23 OPEN
SMALL POWER LAYOUT LAYOUT

FLAT STORAGE FLAT STORAGE 7-Aug-23


CONC1578
189 JB1071-HAI-TR-00440 CONC1748
ELE
PANEL SCHEDULE
JB1071-HAI-04-ZZ-DR-E-02064 PANEL 18-Jul-23 CODE-2
23-Aug-23 OPEN
SCHEDULE
Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

SUBSTATION BUILDING-02
CONC1638 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02135 1-Aug-23 OPEN
LAYOUT SUBSTATION
198 JB1071-HAI-TR-00455
BUILDING-02
ELECTRICAL
SYSTEMS
CONC1638 ELE
SUBSTATION#02 PANEL JB1071-HAI-04-ZZ-SH-W-02135 1-Aug-23 OPEN
BOARD SCHEDULE

SUBSTATION BUILDING-03
CONC1639 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02136 1-Aug-23 OPEN
LAYOUT SUBSTATION
199 JB1071-HAI-TR-00456
BUILDING-03
ELECTRICAL
SYSTEMS
CONC1639 ELE
SUBSTATION#03 PANEL JB1071-HAI-04-ZZ-SH-E-02136 1-Aug-23 OPEN
BOARD SCHEDULE

SUBSTATION BUILDING-04
CONC1640 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02137 1-Aug-23 OPEN
LAYOUT SUBSTATION
200 JB1071-HAI-TR-00457
BUILDING-04
ELECTRICAL
SYSTEMS
CONC1640 ELE
SUBSTATION#04 PANEL JB1071-HAI-04-ZZ-DR-E-02137 1-Aug-23 OPEN
BOARD SCHEDULE

SUBSTATION BUILDING-05
CONC1641 ELE ELECTRICAL SYSTEMS JB1071-HAI-04-ZZ-DR-E-02138 1-Aug-23 OPEN
LAYOUT SUBSTATION
201 JB1071-HAI-TR-00458
BUILDING-05
ELECTRICAL
SYSTEMS
CONC1641 ELE
SUBSTATION#05 PANEL JB1071-HAI-04-ZZ-DR-E-02138 1-Aug-23 OPEN
BOARD SCHEDULE
Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

EARTHING
207 JB1071-HAI-TR-00471 CONC1679 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02153
SYSTEM FOR 9-Aug-23 OPEN
BAGGING STATION BAGGING
STATION

EARTHING
EARTHING SYSTEM FOR SYSTEM FOR
208 JB1071-HAI-TR-00472 CONC1680 ELE FIRE FIGHTING & WATER JB1071-HAI-04-ZZ-DR-E-02149 FIRE FIGHTING 9-Aug-23 OPEN
PUMP ROOM & WATER
PUMP ROOM

EARTHING
209 JB1071-HAI-TR-00473 CONC1681 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02148
SYSTEM FOR 9-Aug-23 OPEN
PRIMARY HEAD HOUSE PRIMARY HEAD
HOUSE

EARTHING
210 JB1071-HAI-TR-00474 CONC1682 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02150
SYSTEM FOR 9-Aug-23 OPEN
SECONDARY HEAD HOUSE SECONDARY
HEAD HOUSE

EARTHING
211 JB1071-HAI-TR-00475 CONC1683 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02152
SYSTEM FOR 9-Aug-23 OPEN
SERVICES BUILDING SERVICES
BUILDING

EARTHING
212 JB1071-HAI-TR-00476 CONC1684 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02151
SYSTEM FOR 9-Aug-23 OPEN
TRANSFER TOWER-1 TRANSFER
TOWER-1

218 JB1071-HAI-TR-494 CONC1731 ELE


EARTHING SYSTEM FOR FLAT JB1071-HAI-04-ZZ-DR-E-02155
FLAT STORAGE 21-Aug-23 OPEN
STORAGE EARTHING

SHIP INTAKE
BASEMENT, GROUND, 1ST , SHIP INTAKE
CONC1732 ELE 2ND & 3RD FLOORS JB1071-HAI-04-ZZ-DR-E-02131 PUBLIC 21-Aug-23 OPEN
PUBLIC ADDRESS SYSTEM ADDRESS
LAYOUT

219 JB1071-HAI-TR-495 SHIP INTAKE SHIP INTAKE


CONC1732 ELE PUBLIC ADDRESS SYSTEM JB1071-HAI-04-ZZ-DR-E-02139 PUBLIC 21-Aug-23 OPEN
SINGLE LINE DIAGRAM ADDRESS

SPL, BACKUP BATTERY & SHIP INTAKE


CONC1732 ELE CABLE Calculations for Ship JB1071-HAI-04-ZZ-RP-W-02131 PUBLIC 21-Aug-23 OPEN
Intake ADDRESS

FLAT STORAGE
FLAT STORAGE (TUNNEL) (TUNNEL)
223 JB1071-HAI-TR-00502 CONC1760 ELE EARTHING LAYOUT PLAN & JB1071-HAI-04-ZZ-DR-E-02159
EARTHING
26-Aug-23 OPEN
DETAIL LAYOUT PLAN

HEAD HOUSE -01


CONC1764
CONC1825
ELE +0.00M, +6.00M & +10.00M LEVEL'S JB1071-HAI-04-ZZ-DR-E-02156
HEAD HOUSE -
27-Aug-23 29-Aug-23 10-Sep-23 OPEN
ACCESS CONTROL SYSTEM 01
224 JB1071-HAI-TR-00503 ACCESS
HEAD HOUSE -01 CONTROL
CONC1825 ELE +0.00M, +6.00M, +10.00M & +34.00M LEVEL'S JB1071-HAI-04-ZZ-DR-E-02168 SYSTEM 10-Sep-23 OPEN
ACCESS CONTROL SYSTEM SLD

TRANSFER TOWER-1
CONC1761
CONC1843
ELE +0.00M, +6.00M & +28.00M JB1071-HAI-04-ZZ-DR-E-02158 27-Aug-23 29-Aug-23 13-Sep-23 OPEN
LEVEL'S ACCESS CONTROL SYSTEM
TRANSFER
TRANSFER TOWER-1 TOWER-1
225 JB1071-HAI-TR-00504 CONC1843 ELE +0.00M, +6.00M, +16.00M & +28.00M LEVEL'S JB1071-HAI-04-ZZ-DR-E-02166 ACCESS 13-Sep-23 OPEN
TT-1 ACCESS CONTROL SYSTEM SLD CONTROL
SYSTEM

CONC1843 ELE
DESIGN CRITERIA FOR ACCESS JB1071-HAI-04-ZZ-RP-W-00504 13-Sep-23 OPEN
CONTROL SYSTEM

TRANSFER TOWER – 02
CONC1762
CONC1844
ELE +0.00M, +5.50M, +21.50M & JB1071-HAI-04-ZZ-DR-E-02157 27-Aug-23 29-Aug-23 13-Sep-23 OPEN
+37.00M LEVEL'S ACCESS CONTROL SYSTEM

TRANSFER
TRANSFER TOWER – 02 TOWER-2
226 JB1071-HAI-TR-00505 CONC1844 ELE +0.00M, +5.50M, +21.50M & +37.00M LEVEL'S JB1071-HAI-04-ZZ-DR-E-02167 ACCESS 13-Sep-23 OPEN
TT-1 ACCESS CONTROL SYSTEM SLD CONTROL
SYSTEM

CONC1844 ELE
DESIGN CRITERIA FOR ACCESS JB1071-HAI-04-ZZ-RP-W-00505 13-Sep-23 OPEN
CONTROL SYSTEM

SHIP INTAKE SHIP INTAKE


CONC1763 ELE
BASEMENT, GROUND, 1ST , JB1071-HAI-04-ZZ-DR-E-02125
LIGHTING 27-Aug-23 OPEN
2ND & 3RD FLOORS SYSTEM
LIGHTING SYSTEM LAYOUT LAYOUT
227 JB1071-HAI-TR-00506
Design Drawings Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04 Rev.P05 Rev.P06 Rev.P07 Rev.P08 Rev.P08

LOCATION Days Days Days Days Response Days Response Days Issued Date Response Days Issued Date Response Days
SN Sub. Ref. Number ID CODE DISCIPLINE Title DWG Number
NAME
Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date Response Date
Open
Issued Date
Date Open
Issued Date
Date Open Date Open Date Open
Status Doc. Status Eng. Rev Final status/Comments

227 JB1071-HAI-TR-00506

SHIP INTAKE
CONC1763 ELE
Lighting Calculation Report for JB1071-HAI-04-ZZ-RP-W-02125
LIGHTING 27-Aug-23 OPEN
Ship Intake SYSTEM
LAYOUT

EARTHING
230 JB1071-HAI-TR-00509 CONC1777 ELE EARTHING SYSTEM FOR SILOS JB1071-HAI-04-ZZ-DR-E-02162 SYSTEM FOR 30-Aug-23 OPEN
SILOS

EARTHING
231 JB1071-HAI-TR-00510 CONC1778 ELE
EARTHING SYSTEM FOR JB1071-HAI-04-ZZ-DR-E-02164
SYSTEM FOR 30-Aug-23 OPEN
DRIVER FACILITY DRIVER
FACILITY

ADMINISTRATION BUILDING
CONC1841 ELE GROUND FLOOR JB1071-HAI-04-ZZ-DR-E-02160 ADMIN 13-Sep-23 OPEN
ACCESS CONTROL SYSTEM BUILDING
244 JB1071-HAI-TR-00528
ACCESS
ADMINISTRATION BUILDING CONTROL
CONC1841 ELE SINGLE LINE DIAGRAM JB1071-HAI-04-ZZ-DR-E-02161 13-Sep-23 OPEN
ACCESS CONTROL SYSTEM

SHIP INTAKE
245 JB1071-HAI-TR-00529 CONC1842 ELE
SHIP INTAKE -0.70M & +4.30M LEVEL'S ACCESS JB1071-HAI-04-ZZ-DR-E-02169
ACCESS 13-Sep-23 OPEN
CONTROL SYSTEM CONTROL
SYSTEM

CONC1861 ELE
PUBLIC TOILET JB1071-HAI-04-ZZ-DR-E-02171 13-Sep-23 OPEN
ELECTRICAL PLAN & DETAILS

249 JB1071-HAI-TR-00535
PUBLIC TOILET
ELECTRICAL

CONC1861 ELE
LIGHTING DESIGN CALCULATION REPORT FOR JB1071-HAI-04-ZZ-RP-W-00535 OPEN
PUBLIC TOILET
Document Submittals - DCS- Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION


T T
Project JB1071 Rev.P01 O Rev.P02 O Rev.P03 Rev.P04 Rev.P05
D D
A A
Y Y Response
SN Submittal Ref. Number Documents Number ID CODE Item Title Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Status Doc. Status Eng.Rev Final status/Comments
D D
A A
T T
E E 6-Sep-22
CONC013
1 JB1071-HAIF-COS-00-ZZ-BIM-Z-T-0001 JB1071-HAIF-COS-00-ZZ-BIM-Z-0001 DRS (ECOM033) BEP Bim Execution Plan 19-May-22 30-May-22 11 25-Jun-22 8-Aug-22 44 28-Nov-22 6 2 CLOSED RHDHV 2
CONC484
22-Nov-22

2 Email Dated 21-May-22 ---- Resume CV of the HSE Manager 21-May-22 30-May-22 9 2 CLOSED RHDHV 2

3 Email Dated 26-May-22 ---- Resume Contractor's Key Personnel Project Control Manager 26-May-22 29-Jun-22 34 2 CLOSED RHDHV 2

JB1071-HAIF-01 -ZZ-QC-C-00001 CONC001 Quality Management Plan


4 JB1071-HAIF-01-ZZ-LT-C-0001 QMP
JB-1071-HAI-04-XX-QC-C-0006 CONC005 30-May-22 20-Jun-22 21 4-Jul-22 21-Jul-22 17 3-Aug-22 11-Sep-22 39 19-Sep-22 10-Oct-22 21 24-Nov-22 2 OPEN RHDHV 2
JB-1071-HAI-TR-0006
JB1071-RHD-04-XX-IE-W-29009 CONC212 Quality Management Plan (DRS)

5 JB1071-HAIF-ZZ-XX-LT-G-0001 ---- CCSE Calibration Certificate for Survey Equipment. 31-May-22 CLOSED FOR INFORMATION AND RECORD

6 JB1071-HAIF-04-XX-LT-W-0002 ---- CCP Contractor's Car Policy no. P/300/3601/22/000044 16-May-22 21-May-22 1-Jun-22 11 2-Jun-22 9-Jun-22 7 22-Jun-22 30-Jun-22 8 R&R 3

7 JB1071-HAIF-01-XX-SH-C-0002 ---- MS Submission of Milestone schedule 2-Jun-22 2-Jun-22 0 CLOSED FOR INFORMATION AND RECORD

8 JB1071-HAIF-ZZ-XX-HS-T-0001 JB1071-HAIF-ZZ-XX-HS-P-0001 CONC004 HSE HSE Management Plan 5-Jun-22 22-Jun-22 17 2 CLOSED RHDHV 2

9 JB1071-HAIF-00-XX-ER-Z-T-0001 ---- Catalogue Office Furniture Selection 8-Jun-22 9-Jun-22 1 2 CLOSED RHDHV 2

CONC019 19-June-22
10 JB1071-HAIF-04-ZZ-SH-W-0001 ----
CONC163
SCHEDULE Base Line Project Schedule 13-Jun-22 30-June-22 6 18-Jul-22 20-Jul-22 2 9-Aug-22 15-Aug-22 6 4-Sep-22 18-Sep-22 14 R&R 3

11 JB1071-HAIF-04-XX-LT-W-0003 ---- Resume Contractor's Key Personnel (Construction Manager) 13-Jun-22 20-Jun-22 7 2 CLOSED RHDHV 2

12 JB1071-HAIF-04-XX-LT-W-0004 ---- Resume Contractor's Key Personnel (QA / QC Manager) 20-Jun-22 22-Jun-22 2 2 CLOSED RHDHV 2

CONC006
JB1071-HAIF-01-ZZ-HS-P-T-0001 INFORMATION
13
JB1071-HAI-TR-00052
JB1071-HAIF-01-ZZ-HS-P-0001 CONC1175 (P03) HSE Emergency Response Plan 22-Jun-22 29-Jun-22 7 1-Sep-22 3-May-23 1-Aug-23 ONLY CLOSED 2
CONC1642

14 JB1071-HAIF-ZZ-XX-ER-LT-W-0002 ---- Transport For Engineer/ Employer. 29-Jun-22 4-Jul-22 5 2 CLOSED RHDHV 2

15 JB1071-HAI-TR-0020 JB1071-HAI-04-ZZ-HS-W-0020 HSE LIFTING PLAN FOR SITE OFFICE PORTA CABIN 24-Jul-22 25-Jul-22 1 R&R 3

16 JB1071-HAI-TR-0022 JB1071-HAI-04-ZZ-ER-W-0022 CONC034 Resume First Aid Personnel Resume 25-Jul-22 8-Sep-22 45 R&R 3

CONC050
17 JB1071-HAI-TR-0031 JB1071-HAI-04-ZZ-HS-W-0031 CONC312 HSE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN 28-Jul-22 3-Oct-22 67 16-Oct-22 25-Oct-22 9 1-Nov-22 12-Nov-22 11 22-Nov-22 29-Jan-23 68 CLOSED RHDHV 2
CONC483

18 JB1071-HAI-TR-00042 JB1071-HAI-04-ZZ-ER-W-00042 Resume Key Personnel Environmental Manager Resume 10-Aug-22 14-Aug-22 4 2 CLOSED RHDHV 2

Admin Bldg
19 JB1071-HAIF-ZZ-XX-ER-LT-W-0005 ----
Proposal Proposal for Administration Building 11-Aug-22 CLOSED FOR INFORMATION AND RECORD

CONC126
CONC372
20 JB1071-HAI-TR-00046 JB1071-HAI-04-ZZ-HS-W-00046
CONC588
HSE TRAFFIC MANAGEMENT PLAN 23-Aug-22 7-Sep-22 15 29-Oct-22 6-Nov-22 8 18-Dec-22 27-Dec-22 21-May-23 For Information 2 CLOSED RHDHV 2
CONC1260

JB1071-HAIF-01-XX-LT-W-1003
JB1071-HAI-TR-00047 CONC127
JB1071-HAIF-04-XX-LT-W-1033 'CONC430
JB1071-HAIF-04-XX-LT-W-1054 JB1071-HAI-04-ZZ-OC-W-00047 CHART ORGANIZATION CHART 28-Jul-22 7-Aug-22 10 23-Aug-22 10-Sep-22 18 16-Oct-22 23-Oct-22 7 10-Nov-22 21-Nov-22 11 27-Dec-22 OPEN

JB1071-HAI-TR-00047_P02 CONC631
21

JB1071-HAIF-04-XX-LT-W-1053 CONC429
CONC495
JB1071-HAI-04-ZZ-OC-W-01053 CHART QA/QC ORGANIZATION CHART 10-Nov-22 27-Nov-22 17 27-Dec-22 OPEN
JB1071-HAI-TR-00126_P01 CONC630

6-Sep-22
22 JB-1071-HAI-TR-00049 JB1071-HAI-04-ZZ-RP-S-00049 CONC147 REPORT GEOTECHNICAL SITE INVESTIGATION REPORT FOR SILOS AREA BY ACES 30-Aug-22 13 2 CLOSED RHDHV 2
12-Sep-22

JB1071-HAI-04-ZZ-HS-W- CONC184 HSE 10-Sep-22 16-Sep-22 6


00057a,b,c,d,e,f & g
23 JB1071-HAI-TR-00057 Risk Assessment Matrix CLOSED FOR INFORMATION AND RECORD
JB1071-HAI-04-ZZ-HS-W-80057 CONC418 HSE 8-Nov-22
JB1071-HAI-04-ZZ-HS-W-90057 CONC435

24 JB1071-HAIF-04-XX-LT-W-1014 ---- CONC213 Resume Contractor's Key Personnel Design Coordinator CV 19-Sep-22 3-Oct-22 14 2 CLOSED RHDHV 2

10-Oct-22
25 JB1071-HAIF-04-XX-LT-W-1019 ------ CONC235 Buhler Process Equipment Documents for Approval (Buhler) 25-Sep-22 15 2 CLOSED RHDHV 2
27-Oct-22

26 JB1071-HAI-TR-00061 JB1071-HAI-04-ZZ-RP-S-00061 CONC251 REPORT GEOTECHNICAL SITE INVESTIGATION REPORT FOR ALL AREA BY ACES 29-Sep-22 4-Oct-22 5 2 CLOSED RHDHV 2

JB1071-HAIF-04-XX-LT-W-1029 27-DEC-22
CONC276
JB1071-HAIF-04-XX-LT-W-1036
27
JB1071-HAIF-04-XX-LT-W-1058
JB1071-HAIF-04-XX-RP-W-1029 CONC453 REPORT Concrete Durability Report 5-Oct-22 13-Oct-22 8 17-Oct-22 29-Oct-22 12 16-Nov-22 28-Nov-22 12 17-JAN-23 2-Feb-23 1 CLOSED RHDHV 1
CONC636
JB-1071-HAI-TR-00130

28 JB1071-HAIF-04-XX-LT-W-1032 ---- CONC298 Design Design Management Plan 11-Oct-22 26-Oct-22 15 2 CLOSED RHDHV 2

ENVIRONMEN
29 JB1071-HAI-TR-00067 JB1071-HAI-04-ZZ-HS-W-00067 CONC308
TAL ENVIRONMENTAL ASPECT & IMPACT REGISTER 15-Oct-22 25-Oct-22 15 1 CLOSED RHDHV 1

30 JB1071-HAI-TR-00082 JB1071-HAI-04-ZZ-RP-W-00082 CONC389 Report Coarse Aggregates and Fine Aggregates Samples Test Reports 1-Nov-22 5-Nov-22 4 R&R 3
CONC437
31 JB1071-HAI-TR-00091 JB1071-HAI-04-ZZ-HS-W-00091
CONC533
HSE Storage Management Plan 12-Nov-22 21-Nov-22 9 4-Dec-22 7-Dec-22 3 1 CLOSED RHDHV 1

32 JB1071-HAI-TR-00104 JB1071-HAI-04-ZZ-MS-W-00104 CONC488 MS Method Statement List 24-Nov-22 OPEN

33 JB1071-HAI-TR-00105 JB1071-HAI-04-ZZ-HS-W-00105 CONC496 HSE Security Management Plan 26-Nov-22 27-Dec-22 31 CLOSED RHDHV 1

34 JB1071-HAI-TR-00106 JB1071-HAI-04-ZZ-HS-W-00106 CONC497 QC List of Materials With Frequency of tests 27-Nov-22 CLOSED FOR INFORMATION AND RECORD

35 JB1071-HAIF-04-XX-LT-W-1068 JB1071-HAI-04-ZZ-HS-W-00109 CONC525 HSE NIGHT WORK ACTIVITY PLAN 1-Dec-22 OPEN

36 JB1071-HAI-TR-00110 JB1071-HAI-04-ZZ-RP-W-00110 CONC534 RP Preliminary Pile Load Test Report (Silos Area) 4-Dec-22 3-Jan-23 CLOSED

JB1071-HAIF-04-XX-LT-W-1075 CONC611
37
JB-1071-HAI-TR-00132
JB1071-HAI-04-ZZ-SH-W-01075
'CONC646
SH Revised Engineering & Design Schedule 22-Dec-22 27-Dec-22 5 29-Dec-22 19-Jan-23 CLOSED RHDHV 1

38 JB1071-HAIF-04-XX-LT-W-1076 JB1071-HAI-04-ZZ-SH-W-01076 CONC620 SH Recovery Schedule 26-Dec-22 OPEN

39 JB1071-HAI-04-ZZ-TR-W-00123 JB1071-HAI-04-ZZ-RP-W-00123 CONC627 RP Concrete Durability Tests Reports (GAC and Saudi Read Mix) 26-Dec-22 CLOSED FOR INFORMATION AND RECORD

27-Dec-22

JB1071-HAIF-04-XX-LT-W-1023 CONC258 12--JAN-23


40
JB-1071-HAI-TR-00128
JB1071-HAI-04-ZZ-RP-W-00128
'CONC635
RP Scope Delivery Responsibility Matrix 2-Oct-22 13-Oct-22 11 19-Jan-23 CLOSED RHDHV 1

18--JAN-23

41 JB-1071-HAI-TR-00137 JB1071-HAI-04-ZZ-RP-W-00137 CONC658 RP Concrete Durability Tests Reports (Saudi Read Mix Concrete) 2-Jan-23 CLOSED FOR INFORMATION AND RECORD

REPLY TO WIR-
42 attached with WIR JB1071-HAI-04-ZZ-WIR-W-00077 JB1071-HAI-04-ZZ-RP-W-00077
W-00077
RP Soil Samples Tests Reports (Admin Building and Silos Area) 5-Jan-23 CLOSED FOR INFORMATION AND RECORD

43 JB-1071-HAI-TR-00142 JB1071-HAI-04-ZZ-RP-W-00142 CONC679 RP Concrete Durability Tests Report (GAC Read Mix Concrete) 7-Jan-23 CLOSED FOR INFORMATION AND RECORD

44 JB-1071-HAI-TR-00143 JB1071-HAI-04-ZZ-RP-W-00143 CONC682 RP Soil Samples Tests Reports (Silos Area) 7-Jan-23 CLOSED FOR INFORMATION AND RECORD

45 JB-1071-HAI-TR-00144 JB1071-HAI-04-ZZ-RP-W-00144 CONC685 RP Soil Samples Tests Reports (Admin Building) 7-Jan-23 CLOSED FOR INFORMATION AND RECORD

46 JB-1071-HAI-TR-00153 JB1071-HAI-04-ZZ-RP-W-00153 REPLY TO WIR- RP


Sub Base and Base Course Samples Tests Reports 11-Jan-23 CLOSED FOR INFORMATION AND RECORD
W-00101 (Muhammed Tahir Al Oqbi Crusher)

47 JB1071-HAI-TR-00170 JB1071-HAI-04-ZZ-HS-W-00170 CONC764 HSE LOCK OUT TAG OUT PROCEDURE 28-Jan-23 CLOSED FOR INFORMATION AND RECORD

48 JB1071-HAI-TR-00183 JB1071-HAI-04-ZZ-MA-W-00183 CONC771 RP PILE INTEGRITY TEST REPORT SILO # 6 & SILO # 12 29-Jan-23 CLOSED FOR INFORMATION AND RECORD

49 JB1071-HAI-TR-00184 JB1071-HAI-04-ZZ-MA-W-00184 CONC772 RP Loading Test Report for Non-Working pile (Test Pile # 2) 30-Jan-23 CLOSED FOR INFORMATION AND RECORD

50 JB1071-HAI-TR-00229 JB1071-HAI-04-ZZ-MA-W-00229 CONC908 RP Symaga's Descriptive memory of the silo calculation for Flat bottom silos 27-Feb-23 CLOSED FOR INFORMATION AND RECORD

51 JB1071-HAI-TR-00230 JB1071-HAI-04-ZZ-MA-W-00230 CONC909 RP


Symaga's Descriptive memory of the silo calculation for hopper 27-Feb-23 CLOSED FOR INFORMATION AND RECORD
silos T45

52 JB1071-HAI-TR-00231 JB1071-HAI-04-ZZ-MA-W-00231 CONC910 RP


Symaga's Descriptive memory of the silo calculation for hopper 27-Feb-23 CLOSED FOR INFORMATION AND RECORD
silos T60

M/s NEUERO
53 JB1071-HAIF-04-XX-LT-W-1108 JB1071-HAIF-04-XX-LT-W-1108 CONC966
Profile Ship Unloader Approval 9-Mar-23 13-Mar-23 CLOSED RHDHV 1

54 JB-1071-HAI-TR-00252 JB1071-HAI-04-ZZ-RP-W-00252 CONC979 RP Loading Test Report for working pile (Pile # SP12-1) 12-Mar-23 CLOSED FOR INFORMATION AND RECORD

55 JB-1071-HAI-TR-00254 JB1071-HAI-04-ZZ-SH-W-00254 CONC989 SH ENGINEERING DESIGN SCHEDULE (RECOVERY) 15-Mar-23 OPEN

20-MAR-23 14-JUN-23
11-June-23
CONC991 aMessage aMessage
56 JB-1071-HAI-TR-00255 JB1071-HAI-04-ZZ-RP-W-01077
CONC1385
RP Stability check report- Berth no 11 15-Mar-23 3-APR-23
24-June-23
03-JUL-23 CLOSED RHDHV 1
aMessage
CODE-3 CODE-1

57 JB1071-HAI-TR-00258 JB1071-HAI-04-ZZ-RP-W-00258 CONC996 RP PILE INTEGRITY TEST REPORT SILO # 3, 4 & SILO # 10 15-Mar-23 CLOSED FOR INFORMATION AND RECORD

GEOTECHNICAL SITE INVESTIGATION REPORT FOR REMAINING 3NOS.


58 JB1071-HAI-TR-00263 JB1071-HAI-04-ZZ-RP-W-00263 CONC1006 RP BOREHOLE, TRANSFER CONVEYOR & LANDSIDE SHIP UNLOADER RAIL 16-Mar-23 CLOSED FOR INFORMATION AND RECORD
AREA

59 JB1071-HAI-TR-00274 JB1071-HAI-04-ZZ-RP-W-00274 CONC1073 RP PILE INTEGRITY TEST REPORT SILO # 5 AND # 11 4-Apr-23 CLOSED FOR INFORMATION AND RECORD

60 JB1071-HAI-TR-00280 JB1071-HAI-04-ZZ-RP-W-00280 CONC1103 RP STATIC PILE LOAD TEST REPORT FOR WORKING PILE (SP3- 1) 9-Apr-23 CLOSED FOR INFORMATION AND RECORD

61 JB1071-HAI-TR-00281 JB1071-HAI-04-ZZ-RP-W-00281
CONC1118
RP
Estimation for Portable water storage capacity & Septic tank storage capacity 12-Apr-23 19-Apr-23 27-Apr-23 16-May-23 R&R
CONC1149 calculations

62 JB1071-HAI-TR-00288 JB1071-HAI-04-ZZ-RP-W-00288 CONC1160 RP PILE INTEGRITY TEST REPORT SILOS 1, 2 & 9 30-Apr-23 CLOSED FOR INFORMATION AND RECORD

63 JB1071-HAI-TR-00315 JB1071-HAI-04-ZZ-RP-W-01120 CONC1252 RP


Zamil Steel Factory Quality 18-May-23 25-May-23 CLOSED 2
Plan

64 JB1071-HAI-TR-00319 JB1071-HAI-04-ZZ-RP-W-00319 CONC1269 RP Haif Batching Plant Calibration Report 22-May-23 CLOSED FOR INFORMATION AND RECORD

CONC1306
65 JB1071-HAI-TR-00334 JB1071-HAI-04-ZZ-RP-W-00334
CONC1443
RP Portable Water Pump Calculation 30-May-23 12-Jun-23 13 22-Jun-23 17-Jul-23 CLOSED 2
66 JB1071-HAI-TR-00348 JB1071-HAI-04-ZZ-RP-W-00348 CONC1360 RP
BUHLER DELIVERY NOTE PACKING LIST NO 2016010526 6-Jun-23 18-Jul-23 CLOSED FOR INFORMATION AND RECORD
(Shipment N0. 1)

67 JB1071-HAI-TR-00350 JB1071-HAI-04-ZZ- IE -W-00350 CONC1362 IE Process Equipment InstallationCompany Detail (REMORA) 6-Jun-23 20-Jun-23 CLOSED FOR INFORMATION AND RECORD

68 JB1071-HAI-TR-00351 JB1071-HAI-04-ZZ-RP-W-00351 CONC1363 RP


Design Calculation for Silo Slab Support Scaffolding 6-Jun-23 CLOSED FOR INFORMATION AND RECORD
(Manar Aleskan)

69 JB-1071-HAI-TR-00368 JB1071-HAI-04-ZZ-RP-W-00368 CONC1408 RP BUHLER DELIVERY NOTE PACKING LIST NO 2016010757 14-Jun-23 18-Jul-23 CLOSED FOR INFORMATION AND RECORD

70 JB1071-HAI-TR-00374 JB1071-HAI-04-ZZ-RP-W-00374 CONC1428 RP


BUHLER DELIVERY NOTE PACKING 18-Jun-23 CLOSED FOR INFORMATION AND RECORD
LIST NO 2016010615

71 JB1071-HAI-TR-00395 JB1071-HAI-04-ZZ-RP-W-00395 CONC1513 RP


BUHLER DELIVERY NOTE PACKING 11-Jul-23 12-Jul-23 CLOSED FOR INFORMATION AND RECORD
LIST NO 2016011158# 5

72 JB1071-HAI-TR-00399 JB1071-HAI-04-ZZ-RP-W-00399 CONC1527 RP


SUMMER NIGHT WORK ACTIVITY 13-Jul-23 CLOSED FOR INFORMATION AND RECORD
PLAN

73 JB1071-HAI-TR-00445 JB1071-HAI-04-ZZ-RP-W-00445 CONC1594 RP BUHLER DELIVERY NOTE PACKING LIST NO 2016010919. (Shipment # 4) 23-Jul-23 CLOSED FOR INFORMATION AND RECORD

74 JB1071-HAIF-04-ZZ-LT-W-1192 JB1071-HAIF-04-ZZ-LT-W-1192 CONC1637 RP Project Mitigation Plan & Recovery Schedule 1-Aug-23 15-Aug-23 CLOSED RHDHV 2

75 JB1071-HAI-TR-00469 JB1071-HAI-04-ZZ-RP-W-00469 CONC1672 RP Initial Check List for Silos Erection 8-Aug-23 CLOSED FOR INFORMATION AND RECORD

76 JB1071-HAI-TR-00489 JB1071-HAI-04-ZZ-RP-W-00489 CONC1719 RP


BUHLER DELIVERY NOTE PACKING 17-Aug-23 CLOSED FOR INFORMATION AND RECORD
LIST NO 2016011295 (Shipment # 6)

77 JB1071-HAI-TR-00496 JB1071-HAIF-01-ZZ-HS-W-00496 CONC1739 HSE


Emergency Medical CPR (Cardio Pulmonary 21-Aug-23 CLOSED FOR INFORMATION AND RECORD
Resuscitation) Drill
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Sub Contractor-(Prequalification) - PQA-Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04

Days Response Days Final


SN Submittal Ref. Number Documents Number Discipline SUB/SUP ID CODE Title SUPPLY MATERIALS Trading Contact no. Issued Date Response Date Issued Date Response Date Days Open Issued Date Days Open Issued Date Response Date Status Doc. Status Eng. Rev
Open Date Open status/Comments

JB1071-HAIF-02-XX-RS-S- Investigation
1
0002 ------ CIVIL Service
----- Aces PQ Documents Soil Investigation Services (+966) 12 6641 422 6-Apr-22 12-Apr-22 6 1 CLOSED RHDHV 1

2 Email Dated -8 May 22 ------ General Design ----- Designer M/s Cosmos ------ 8-May-22 4-Jul-22 57 2 CLOSED RHDHV 2

JB1071-HAIF-03-ZZ-QC-C-
3
0001 ------ CIVIL Supplier CONC002 Prequalification of Ready mix Concrete Suppliers. CONCRETE SUPPLIER (SAUDI Readymix) 31-May-22 11-Jun-22 11 1 CLOSED RHDHV 1

4
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC015
Prequalification of Steel Rebar Company (Al Rajhi STEEL INDUSTRIES 5-Jun-22 7-Jun-22 2 20-Jun-22 23-Jun-22 3 2 CLOSED RHDHV 2
0001 Industries)

5
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC016
Prequalification of Steel Rebar Company (Saudi STEEL INDUSTRIES 5-Jun-22 7-Jun-22 2 20-Jun-22 23-Jun-22 3 2 CLOSED RHDHV 2
0002 Iron & Steel Company HADEED)

6
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC017
Prequalification of Steel Rebar Company (Ittefaq & STEEL INDUSTRIES 5-Jun-22 7-Jun-22 2 2 CLOSED
Apprived with BRC 2
0003 Steel) Transmittal # 0063

7
JB1071-HAIF-ZZ-XX-PQ-T-
------ CIVIL Supplier CONC018
Prequalification of Construction Chemicals FOSAM CONSTRUCTION CHEMICALS 25-Jun-22 27-Jun-22 2 2 CLOSED RHDHV 2
0004 COMPANY

8 JB-1071-HAI-TR-011 ------ CIVIL Supplier CONC023


Prequalification of Construction Termite Construction Termite Treatment 13-Jul-22 20-Jul-22 7 2 CLOSED RHDHV 2
Treatment Application. HIT Company

9 JB1071-HAI-TR-014 ------ ELE Supplier ECOM021


Prequalification of BAHRA ADVANCED CABLE ELECTRIC INDUSTRIES (966) 12 591 1115 17-Jul-22 25-Jul-22 8 R&R
MANUFACTURE Co. LTD

10 JB1071-HAI-TR-015 ------ ELE Supplier ECOM020


Prequalification of SADAF ELECTRIC INDUSTRIES ELECTRIC INDUSTRIES (966) 12 608 0006 17-Jul-22 25-Jul-22 8 R&R
Co. (SEICO)

11 JB1071-HAI-TR-016 ------ CIVIL Supplier ------


Prequalification of Don Construction Produts CONSTRUCTION CHEMICALS 011 211 2350 18-Jul-22 26-Jul-22 8 2 CLOSED RHDHV 2
(DCP) Saudi Company.

12 JB1071-HAI-TR-017 ------ CIVIL Third Party CONCO21


Prequalification of Riyadh Giotechnique & Third Party Lab Test. +966-11-465-6465 18-Jul-22 26-Jul-22 8 2 CLOSED RHDHV 2
Foundations (RGF)

13 JB1071-HAI-TR-0021 JB1071-HAI-04-ZZ-PQ-W-0021 ELE Supplier CONC033 Prequalification


Co. (SESCO)
of SESCO ELECTRIC INDUSTRIES ELECTRIC INDUSTRIES (966) 13 882 9546 25-Jul-22 28-Jul-22 3 1 CLOSED RHDHV 1

14 JB1071-HAI-TR-0028 JB1071-HAI-04-ZZ-PQ-W-0028 CIVIL Supplier CONC043


Prequalification of Unitech Building & Construction Materials +966 11 415 4722 26-Jul-22 28-Jul-22 2 1 CLOSED RHDHV 1
construction materials Supplier

Prequalification of Durar Masagh Trading


15 JB1071-HAI-TR-0029 JB1071-HAI-04-ZZ-PQ-W-0029 CIVIL
Workshop & Spare Parts (Plan, Elevation
CONC045 Company Building & construction materials
& Section) Construction Materials 966 11 241 4445 26-Jul-22 8-Aug-22 13 2 CLOSED RHDHV 2
Supplier

Prequalification of SAUDI ELECTRIC SUPPLY


16 JB1071-HAI-TR-0032 JB1071-HAI-04-ZZ-PQ-W-0032 ELE Supplier CONC053 COMPANY (SESCO) FOR ERICO EARTHING & ELECTRIC INDUSTRIES +966138829546 30-Jul-22 8-Aug-22 9 1 CLOSED RHDHV 1
LIGHTNING SYSTEMS.

17 JB1071-HAI-TR-0033 JB1071-HAI-04-ZZ-PQ-W-0033 CIVIL Supplier CONC056


Prequalification for Piling Work (Stromek Saudi Civil & Foundation Work. 011 450 4066 31-Jul-22 4-Aug-22 4 1 CLOSED RHDHV 1
Foundation Co.)

18 JB1071-HAI-TR-0034 JB1071-HAI-04-ZZ-PQ-W-0034 CIVIL Supplier CONC058 Prequalification for Piling Work (Delta Co.) Civil & Foundation Work. +966 13 849 1613 31-Jul-22 2-Aug-22 2 2 CLOSED RHDHV 2

19 JB1071-HAI-TR-0037 JB1071-HAI-04-ZZ-PQ-W-0037 CIVIL Supplier CONC074


Prequalification for Piling Work (GROUND Civil & Foundation Work. 013 887 3677 6-Aug-22 9-Aug-22 3 R&R
ENGINEERING CONTRACTOR)

20 JB1071-HAI-TR-00038 JB1071-HAI-04-ZZ-PQ-W-00038 CIVIL Supplier CONC079


Prequalification for Piling Work (JEDDAH Civil & Foundation Work. +966 12 6521 066 7-Aug-22 5-Sep-22 29 1 CLOSED RHDHV 1
FOUNDATION CO.)

21 JB1071-HAI-TR-00044 JB1071-HAI-04-ZZ-PQ-W-00044 CIVIL Supplier CONC108 Prequalification of Gulf Engineering House (GEH) Third Party Lab Test. 011 453 7171 17-Aug-22 31-Aug-22 14 R&R

22 JB1071-HAI-TR-00048 JB1071-HAI-04-ZZ-PQ-W-00048 MECH Supplier CONC132 Prequalification of Zamil Air-Conditioner Mechanial 011 472 5555 25-Aug-22 8-Sep-22 14 1 CLOSED RHDHV 1

23 JB1071-HAI-TR-00053 JB1071-HAI-04-ZZ-PQ-W-00053 MECH Supplier CONC165


Prequalification of Neproplast (National Mechanial 012 647 5010 5-Sep-22 13-Oct-22 38 1 CLOSED RHDHV 1
Marketing Est. Co. Ltd.)

24 JB1071-HAI-TR-00063 JB1071-HAI-04-ZZ-PQ-W-00063 CIVIL Supplier CONC266


BRC INDUSTRIAL SAUDIA Company(Ittefaq Steel CIVIL +966 11 4602692 4-Oct-22 8-Oct-22 4 2 CLOSED RHDHV 2
Rebar Authorized Distributor/Dealer)

CONC267 1
25 JB1071-HAI-TR-00064 JB1071-HAI-04-ZZ-PQ-W-00064 CIVIL Supplier Saudi Anfal Co. for project Ltd. Automatic Doors and System 96612447788 4-Oct-22 17-Oct-22 13 7-Feb-23 9-Feb-23 2 1 CLOSED RHDHV
CONC817

26 JB1071-HAI-TR-00066 JB1071-HAI-04-ZZ-PQ-W-00066 ELE Supplier CONC305


Bahra Advanced Cable Manufacture Co. LTD ELECTRIC INDUSTRIES 012 591 1115 13-Oct-22 26-Oct-22 13 1 CLOSED RHDHV 1
Supply of PVC, UPVC conduits and Accessories

27 JB1071-HAI-TR-00068 JB1071-HAI-04-ZZ-PQ-W-00068 ELE Supplier CONC320


KHEREIJI SHOWROOMS COMPANY (KSC) PVC Electrical Material Manufacturers & Supplier 011 4783088 18-Oct-22 26-Oct-22 8 1 CLOSED RHDHV 1
Conduits and Accessories from EGA

28 JB1071-HAI-TR-00069 JB1071-HAI-04-ZZ-PQ-W-00069 ELE Supplier CONC321


MK Switches, Sockets, Single Phase Disconnect Electrical Material Manufacturers & Supplier 011 4783088 19-Oct-22 23-Oct-22 4 2 CLOSED RHDHV 2
Switches-Supplier(Khereiji Showrooms Company)

29 JB1071-HAI-TR-00070 JB1071-HAI-04-ZZ-PQ-W-00070 ELE Supplier CONC322


DECODUCT Indoor and Outdoor PVC Conduits and Electrical Material Manufacturers & Supplier +966 2654377 19-Oct-22 24-Oct-22 5 1 CLOSED RHDHV 1
Accessories - Supplier Interplast Co. Ltd.

30 JB1071-HAI-TR-00071 JB1071-HAI-04-ZZ-PQ-W-00071 MECH Supplier CONC327 Elevator System Contracting Company (ESCCO) Elevator Supplier +966 12 2631907 20-Oct-22 27-Oct-22 7 R&R

31 JB1071-HAI-TR-00072 JB1071-HAI-04-ZZ-PQ-W-00072 MECH Supplier CONC328 Fire Fighting Equipments (SAFECO) Fire Fighting Equipments 011 2650070 20-Oct-22 25-Oct-22 5 1 CLOSED RHDHV 1
Sub Contractor-(Prequalification) - PQA-Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04

Days Response Days Final


SN Submittal Ref. Number Documents Number Discipline SUB/SUP ID CODE Title SUPPLY MATERIALS Trading Contact no. Issued Date Response Date Issued Date Response Date Days Open Issued Date Days Open Issued Date Response Date Status Doc. Status Eng. Rev
Open Date Open status/Comments

32 JB1071-HAI-TR-00073 JB1071-HAI-04-ZZ-PQ-W-00073 CIVIL Supplier CONC332 Saudi Paint Company Ltd. (Paintco) Paint Industries 114465555 20-Oct-22 25-Oct-22 5 R&R

33 JB1071-HAI-TR-00074 JB1071-HAI-04-ZZ-PQ-W-00074 CIVIL Supplier CONC334 General Agencies and Contracting (GAC) Supply of Ready Mix Concrete 014 3962810 22-Oct-22 23-Oct-22 1 2 CLOSED RHDHV 2

34 JB1071-HAI-TR-00076 JB1071-HAI-04-ZZ-PQ-W-00076 CIVIL Supplier CONC346 Al Rashed Cement Company Cement Trading and Distribution +13 887 9405 24-Oct-22 30-Oct-22 6 2 CLOSED RHDHV 2

35 JB1071-HAI-TR-00077 JB1071-HAI-04-ZZ-PQ-W-00077 ELE Supplier CONC349 Pre-Qualification for Al Ashoury Industries Cable Management System +112650630 24-Oct-22 27-Oct-22 3 1 CLOSED RHDHV 1

36 JB1071-HAI-TR-00078 JB1071-HAI-04-ZZ-PQ-W-00078 ELE Supplier CONC350 Pre-Qualification for Power Solution industries Cable Management System +966 11 2422511 24-Oct-22 1-Nov-22 8 R&R

37 JB1071-HAI-TR-00079 JB1071-HAI-04-ZZ-PQ-W-00079 CIVIL Supplier CONC353 Pre-Qualification for Hamdan alshobhi Cement Trading and Distribution +143324444 25-Oct-22 30-Oct-22 5 2 CLOSED RHDHV 2

38 JB1071-HAI-TR-00081 JB1071-HAI-04-ZZ-PQ-W-00081 ELE Supplier CONC363 Radya International from EATON Electrical MaterialsTrading 011 4966667 27-Oct-22 1-Nov-22 5 1 CLOSED RHDHV 1

CONC400 International Building System Factory Co. Ltd.


39 JB1071-HAI-TR-00083 JB1071-HAI-04-ZZ-PQ-W-00083 CIVIL Supplier CONC514 Steel Structure 011 265 0004 5-Nov-22 7-Nov-22 2 30-Nov-22 8-Dec-22 8 13-Dec-22 14-Dec-22 1 1 CLOSED RHDHV 1
CONC567 (IBSF)

40 JB1071-HAI-TR-00084 JB1071-HAI-04-ZZ-PQ-W-00084 CIVIL Supplier CONC401 Mahmood Saeed Steel Industries Co. Ltd. (MSSI) Steel Structure 12 288 0717 5-Nov-22 7-Nov-22 2 2 CLOSED RHDHV 2

41 JB1071-HAI-TR-00085 JB1071-HAI-04-ZZ-PQ-W-00085 CIVIL Supplier CONC404


Insulation and Wrapping Products Co. Ltd. Waterproofing 0114980332 5-Nov-22 9-Nov-22 4 1 CLOSED RHDHV 1
(INSUWRAP)

42 JB1071-HAI-TR-00086 JB1071-HAI-04-ZZ-PQ-W-00086 CIVIL Supplier CONC408


Arabian Building Support and Waterproofing 0114609090 6-Nov-22 9-Nov-22 3 1 CLOSED RHDHV 1
Rehabilitation Co. Ltd. (ABSAR)

43 JB1071-HAI-TR-00089 JB1071-HAI-04-ZZ-PQ-W-00089 CIVIL Supplier CONC414


Al Zamil Steel Pre-Engineered Buildings Steel Structure 13 847 1840 7-Nov-22 8-Nov-22 1 2 CLOSED RHDHV 2
Co. Ltd

44 JB1071-HAI-TR-00093 JB1071-HAI-04-ZZ-PQ-W-00093 ELE Revised


Supplier Mohammed
Engineering & Design Schedule A. Alfaddaghi & partner Co. Supply & Installation of Power Generators +966 90008182 14-Nov-22 20-Nov-22 6 R&R

CONC447
45 JB1071-HAI-TR-00094 JB1071-HAI-04-ZZ-PQ-W-00094 ELE Supplier CONC515 Alkhorayef Commercial Company. Supply & Installation of Power Generators 11 265 1124 14-Nov-22 26-Nov-22 12 30-Nov-22 7-Dec-22 7 16-Jan-23 2-Feb-23 R&R
CONC721

46 JB1071-HAI-TR-00095 JB1071-HAI-04-ZZ-PQ-W-00095 ELE Supplier CONC448 Saudi Arabian Services Company (SASCOM) Supply & Installation of Power Generators 13 857 6550 14-Nov-22 21-Nov-22 7 R&R

47 JB1071-HAI-TR-00102 JB1071-HAI-04-ZZ-PQ-W-00102 ELE Supplier CONC475 Alfanar Company Supply & Installation of Transformer 800-124-1333 21-Nov-22 3-Dec-22 12 2 CLOSED RHDHV 2

48 JB1071-HAI-TR-00103 JB1071-HAI-04-ZZ-PQ-W-00103 ELE Supplier CONC476 The Saudi Transformers Company LTD. (STC) Supply & Installation of Transformer 011 460 0525 21-Nov-22 3-Dec-22 12 2 CLOSED RHDHV 2

49 JB1071-HAI-TR-00138 JB1071-HAI-04-ZZ-PQ-W-00138 CIVIL Supplier CONC660 GANTREX Supply and Installation of Rail track 050 4336398 2-Jan-23 3-Jan-23 1 1 CLOSED RHDHV 1

50 JB1071-HAI-TR-00152 JB1071-HAI-04-ZZ-PQ-W-00152 ELE Supplier CONC703 Alfanar Company MV and LV cables, wires, and control cables 800-124-1333 11-Jan-23 11-Jan-23 0 2 CLOSED RHDHV 2

51 JB1071-HAI-TR-00154 JB1071-HAI-04-ZZ-PQ-W-00154 ELE Supplier CONC706 Riyadh Cable MV and LV cables, wires, and control cables +966 11 265 0850 12-Jan-23 22-Jan-23 CLOSED RHDHV 1

52 JB1071-HAI-TR-00156 JB1071-HAI-04-ZZ-PQ-W-00156 CIVIL Supplier CONC714 Saudi Anfal Co. for project Ltd. Supply of Sliding , Swing Gate and Arm Barrier System 96612447788 15-Jan-23 23-Jan-23 1 CLOSED RHDHV 1

53 JB1071-HAI-TR-00157 JB1071-HAI-04-ZZ-PQ-W-00157 ELE Supplier CONC715 Red Sea Cables Company Supply of MV and LV cables, wires, and control cables 966 2886303 Ext 120 15-Jan-23 22-Jan-23 1 CLOSED RHDHV 1

Supply of Concrete
54 JB1071-HAI-TR-00192 JB1071-HAI-04-ZZ-PQ-W-00192 CIVIL Supplier CONC784 Rawafed Trading Company (RTCO) Admixtures for Haif Manufacturing and trading of Building Material +966122367519 2-Feb-23 12-Feb-23 10 R&R RHDHV 3
Batching Plant

Supply of
1. FU- MECH FIRE VALVES supplying fittings and valves and mechanical
2. FU- MECH FIRE materials
55 JB1071-HAI-TR-00199 JB1071-HAI-04-ZZ-PQ-W-00199 MECH Supplier CONC815 Future Mechanics Trading Co. (Fu-Mech) HYDRANTS.
+966 114784242 7-Feb-23 12-Feb-23 5 R&R RHDHV 3
3. FU -MECH GROOVE & and fire protection equipment
THREADED COUPLINGS

Supply of Workshop
56 JB1071-HAI-TR-00200 JB1071-HAI-04-ZZ-PQ-W-00200 MECH Supplier CONC816 Al Bawardi Tools & Hardware Equipment Supplying of Tools & Hardware 13 833 5555 7-Feb-23 12-Feb-23 5 1 CLOSED RHDHV 1

Supply of Ring Main Unit


57 JB1071-HAI-TR-00201 JB1071-HAI-04-ZZ-PQ-W-00201 ELE Supplier CONC818 Alfanar Company (RMU) Manufacture Electrical Construction Products 800-124-1333 7-Feb-23 12-Feb-23 5 1 CLOSED RHDHV 1

Supply of Ring Main Unit


58 JB1071-HAI-TR-00202 JB1071-HAI-04-ZZ-PQ-W-00202 ELE Supplier CONC819 Siemens Ltd (RMU) Manufacture Electrical Products 055941 2773 7-Feb-23 12-Feb-23 5 1 CLOSED RHDHV 1

Supply of Ring Main Unit


59 JB1071-HAI-TR-00203 JB1071-HAI-04-ZZ-PQ-W-00203 ELE Supplier CONC820 Bright Wires Company Ltd. (RMU) Electrical Products 112176265 7-Feb-23 16-Feb-23 R&R

Supply of Ring Main Unit


60 JB1071-HAI-TR-00204 JB1071-HAI-04-ZZ-PQ-W-00204 ELE Supplier CONC824 Schneider Electric (RMU) Electrical Products 920011101 7-Feb-23 12-Feb-23 5 2 CLOSED RHDHV 2

61 JB1071-HAI-TR-00205 JB1071-HAI-04-ZZ-PQ-W-00205 MECH Supplier CONC825 Riyadh Foundry Company MANHOLE COVER Manufacturing Cast and Ductile Iron Products +966 114784242 7-Feb-23 16-Feb-23 R&R
Sub Contractor-(Prequalification) - PQA-Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04

Days Response Days Final


SN Submittal Ref. Number Documents Number Discipline SUB/SUP ID CODE Title SUPPLY MATERIALS Trading Contact no. Issued Date Response Date Issued Date Response Date Days Open Issued Date Days Open Issued Date Response Date Status Doc. Status Eng. Rev
Open Date Open status/Comments

62 JB1071-HAI-TR-00208 JB1071-HAI-04-ZZ-PQ-W-00208 CIVIL Supplier CONC837


SealTech (Saudi Center for Insulation & Concrete Supply and Apply of Water Waterproofing, Thermal Insulation and Concrete 112544222 8-Feb-23 16-Feb-23 R&R
Repair Co.) proofing Materials Repair

Supply of Earthing and


63 JB1071-HAI-TR-00210 JB1071-HAI-04-ZZ-PQ-W-00210 ELE Supplier CONC840 Al Amana for Electrical Industries Lightning Protection System ELECTRIC INDUSTRIES
011 4222 2078 9-Feb-23 12-Feb-23 R&R RHDHV 3

Supply of Elevator for


64 JB1071-HAI-TR-00215 JB1071-HAI-04-ZZ-PQ-W-00215 MECH Supplier CONC859 OTIS Elevators Company Primary and Secondary Elevator Manufacturer 800 244 0134 14-Feb-23 19-Feb-23 1 CLOSED RHDHV 1
Head House

LEADING AGENT Trading Co. Chamber of Supply of doors hardware


65 JB1071-HAI-TR-00223 JB1071-HAI-04-ZZ-PQ-W-00223 CIVIL Supplier CONC 883
Commerce Materials from BASI GmbH Doors Hardware Materials Supplier 011-2785485 21-Feb-23 1-Mar-23 1 CLOSED RHDHV 1

MV and LV cables, wires, and


66 JB1071-HAI-TR-00227 JB1071-HAI-04-ZZ-PQ-W-00227 ELE Supplier CONC896 Bahra Cables Group Company control cables Manufacture Electrical Cables +966 12 591 1115 25-Feb-23 1-Mar-23 1 CLOSED RHDHV 1

Supply of Indoor and


67 JB1071-HAI-TR-00232 JB1071-HAI-04-ZZ-PQ-W-00232 ELE Supplier CONC914 Al Nasser Pro (Noortek) outdoor Lighting Fixture Lighting and Controls +966 14777700 27-Feb-23 7-Mar-23 1 CLOSED RHDHV 1
(Brand Noortek)

Supply of Aluminum
68 JB1071-HAI-TR-00233 JB1071-HAI-04-ZZ-PQ-W-00233 CIVIL Supplier CONC915 Sanabel Aluminium Company doors ,windows and Manufacture of Aluminium Products +966-11-2651958 27-Feb-23 8-Mar-23 1 CLOSED RHDHV 1
aluminum claddings

Supply of doors hardware


69 JB1071-HAI-TR-00236 JB1071-HAI-04-ZZ-PQ-W-00236 CIVIL Supplier CONC925 Saudi Etqaan Company. Materials (Simplex Doors Hardware Materials Supplier 011-4733043 1-Mar-23 13-Mar-23 1 CLOSED RHDHV 1
Hardware)

Supply of Reinforcement
70 JB1071-HAI-TR-00242 JB1071-HAI-04-ZZ-PQ-W-00242 CIVIL Supplier CONC938 Dextra Group Couplers Manufacture of Reinforcement Couplers +966 56 123 2777 4-Mar-23 5-Mar-23 1 CLOSED RHDHV 1

Design and Review the


drawings required approval
71 JB1071-HAI-TR-00245 JB1071-HAI-04-ZZ-PQ-W-00245 General -- CONC953 Rakaez Al Memar Consulting Company from High Commission of HCIS Approved Consultant 011 229 3191 7-Mar-23 9-Mar-23 1 CLOSED RHDHV 1
industrial security (HCIS)

CONC 1091 Delta Plus Trading Company


Supply and installation of
72 JB1071-HAI-TR-00277 JB1071-HAI-04-ZZ-PQ-W-00277 MECH Supplier
Fuel System Petroleum Services 590323753 6-Apr-23 12-Apr-23 2 CLOSED RHDHV 2

CONC 1190 Arabian Waterproofing industries Co. (Awazel)


Supply of Waterproofing 0114788276
73 JB1071-HAI-TR-00297 JB1071-HAI-04-ZZ-PQ-W-00297 CIVIL Supplier
Materials Manufacturer of waterproofing materials 6-May-23 7-May-23 CLOSED 1

Supply of Floor drains, Roof


CONC 1192 Saudi Cast
drains, Cleanout, Manhole
74 JB1071-HAI-TR-00298 JB1071-HAI-04-ZZ-PQ-W-00298 MECH Supplier
cover Drainage Products 590323753 6-May-23 14-May-23 CLOSED 1
/ frame.

Supply of valves - water


75 JB1071-HAI-TR-00299 JB1071-HAI-04-ZZ-PQ-W-00299 MECH Supplier CONC 1195 SHAMS Eastern Province Trading Est hammer arrestor, backflow Suppliers of Drainage, Plumbing
and Mechanical materials
013 8143982 6-May-23 9-May-23 CLOSED 1
preventer from WATTS

Supply of Sanitary Fixture


76 JB1071-HAI-TR-00303 JB1071-HAI-04-ZZ-PQ-W-00303 MECH Supplier CONC 1202 Al hayat building materials Co./ Isam k. kabbani from Saudi Ceramics, Mixers Distributors for sanitary products 533238544 7-May-23 14-May-23 CLOSED 1
& Fittings from Grohe.

77 JB1071-HAI-TR-00305 JB1071-HAI-04-ZZ-PQ-W-00305 MECH Supplier CONC1208


Etihad Cranes and Lifting Solution (GH Cranes and Supply of Mono Rail Electric
Hoist from GH Cranes and Cranes and Lifting 013 833 2480 8-May-23 14-May-23 CLOSED 1
Components) Components

78 JB1071-HAI-TR-00307 JB1071-HAI-04-ZZ-PQ-W-00307 MECH Supplier CON1216 INFINAIR ARABIA CO. Supply of Exhaust fans Manufacturer of ventilation fans 569752674 10-May-23 14-May-23 R&R 3

Supply of Ring Main Unit


79 JB1071-HAI-TR-00308 JB1071-HAI-04-ZZ-PQ-W-00308 ELE Supplier COC1223 Lucy Switchgear Arabia (LSA) (RMU) Manufacturers & Supplier of Ring Main Unit (RMU) 138147910 13-May-23 14-May-23 R&R 3

Supply of HVAC accessories


80 JB1071-HAI-TR-00309 JB1071-HAI-04-ZZ-PQ-W-00309 MECH Supplier CONC1224 Mariam Trading Company and Partner
and Plumbing / Fire Distributors for HVAC accessories and Plumbing / 0112913611 13-May-23 17-May-23 CLOSED 1
Fighting supports Fire Fighting supports
accessories.

Supply of Concrete Manufacture of Concrete


81 JB1071-HAI-TR-00318 JB1071-HAI-04-ZZ-PQ-W-00318 CIVIL Supplier COC1258 Suliman Abdul Rehman Namlah Factory (SANCO) Block,Interlock,Kerbstone Block,Interlock,Kerbstone, Tiles
143213755 20-May-23 21-May-23 CLOSED RHDHV 1
and Tiles

82 JB1071-HAI-TR-00320 JB1071-HAI-04-ZZ-PQ-W-00320 CIVIL Supplier CONC1268 Jotun Saudia Co. Ltd.


Supply of the internal and Manufacture and Distribution of Decorative paints, 126362483 22-May-23 28-May-23 CLOSED RHDHV 1
external Paint Protective and marine coatings

83 JB1071-HAI-TR-00327 JB1071-HAI-04-ZZ-PQ-W-00327 ELE Supplier CONC1284 Ultimate Solution Trading Company


Supply of EMT Conduits & Distributor for International Tube and Conduit 011 4762611 24-May-23 28-May-23 CLOSED RHDHV 1
Fittings Produced by ITCC Company Ltd. (ITCC) Conduits & Fittings Product
Sub Contractor-(Prequalification) - PQA-Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03 Rev.P04

Days Response Days Final


SN Submittal Ref. Number Documents Number Discipline SUB/SUP ID CODE Title SUPPLY MATERIALS Trading Contact no. Issued Date Response Date Issued Date Response Date Days Open Issued Date Days Open Issued Date Response Date Status Doc. Status Eng. Rev
Open Date Open status/Comments

CONC1296 Al hayat building materials Co./ Isam k. kabbani


Supply of Sanitary Fixture
84 JB1071-HAI-TR-00330 JB1071-HAI-04-ZZ-PQ-W-00330 MECH Supplier
from Saudi Ceramics Distributors for sanitary products 533238544 28-May-23 29-May-23 CLOSED RHDHV 1

Supplier, Installer and


85 JB1071-HAI-TR-00335 JB1071-HAI-04-ZZ-PQ-W-00335 ELE Supplier CONC1309 Al Matbouli Sound and Communications integrator of low current Supply of Public Address System produced by TOA 112920643 31-May-23 4-Jun-23 CLOSED RHDHV 1
System

86 JB1071-HAI-TR-00344 JB1071-HAI-04-ZZ-PQ-W-00344 MECH Supplier CONC1343 Rabie Al- Takyeef Factory (RTF)
Supply of AIR OUTLETS & Manufacturer of Air Conditioning outlets and duct 114982414 3-Jun-23 15-Jun-23 CLOSED RHDHV 1
DUCT ACCESSORIES accessories

Supply of Aluminum
87 JB1071-HAI-TR-00352 JB1071-HAI-04-ZZ-PQ-W-00352 CIVIL Supplier CONC1364 Continual Facades Aluminum Factory (CFF) doors ,windows and Manufacture of Aluminum and Glass Products 534190847 6-Jun-23 14-Jun-23 CLOSED RHDHV 1
aluminum claddings

88 JB1071-HAI-TR-00354 JB1071-HAI-04-ZZ-PQ-W-00354 CIVIL Supplier CONC1378 Al Rasheed Marble & Granite Factory (RMG) Supply of Marble & Granite Manufacture and Supply of Marble & Granite +966 50 00 73502 8-Jun-23 13-Jun-23 CLOSED RHDHV 2

Supply and Application of


CONC1437 BMC Kabbani Construction Group
waterproofing Materials
89 JB1071-HAI-TR-00376 JB1071-HAI-04-ZZ-PQ-W-00376 CIVIL Supplier
(Primer, Membrane, Waterproofing Material Supply and Applicators 012 627 8000 21-Jun-23 25-Jun-23 CLOSED 1
Protection Board etc)

Supply of CCTV System DISTRIBUTOR FOR HANWHA TECHWIN CCTV AND


90 JB1071-HAI-TR-00377 JB1071-HAI-04-ZZ-PQ-W-00377 ELE Supplier CONC1440 SECURITY HOUSE TRADING ESTABLISHMENT from HANWA GROUP and ACS
+966 532 109 295 21-Jun-23 18-Jul-23 R&R 3
WISENET

CONC1470 Aldrees Industrial & Trading Co. (ALITCO) Supply and installation of Fuel
91 JB1071-HAI-TR-00389 JB1071-HAI-04-ZZ-PQ-W-00389 MECH Supplier
System
Supply of Oil and Gas Equipment (Fuel System) 011 4489646 2-Jul-23 13-Jul-23 CLOSED RHDHV 2

Supply of Joint and Termination


Bright Wires Company Ltd. for Contracting and for
92 JB1071-HAI-TR-00392 JB1071-HAI-04-ZZ-PQ-W-00392 ELE Supplier CONC1477
Trading 3x500mm² AL/XLPE/LLDPE -
Electrical Products from NKT 112176265 3-Jul-23 17-Jul-23 CLOSED RHDHV 2
MV CABLE 13.8KV from NKT

CONC1520 Fazah Industrial Group Supply of Aluminum Composite


93 JB1071-HAI-TR-00397 JB1071-HAI-04-ZZ-PQ-W-00397 CIVIL Supplier
Cladding Panels
Manufacturer of Aluminum Product 920023472 13-Jul-23 18-Jul-23 CLOSED RHDHV 2

94 JB1071-HAI-TR-00398 JB1071-HAI-04-ZZ-PQ-W-00398 MECH Supplier CONC1521 Sharqawi Air Distribution System Co. Factory Supply of Duct, Fittings, Manufacturer and Fabrication of Duct and its 0126380683 13-Jul-23 19-Jul-23 R&R RHDHV 3
dampers & louvers Accessories

Supply of Fire Fighting Pumps,


Water Supply Pumps,
95 JB1071-HAI-TR-00401 JB1071-HAI-04-ZZ-PQ-W-00401 MECH Supplier CONC1531 Tawreed Company LLC. Submersible and Pressurization Mechanical and Electrical equipment Supplier 144633338 16-Jul-23 18-Jul-23 CLOSED RHDHV 1
Unit from Xylem (Previously
Known as ITT Corporation)

CONC1533 RAK Ceramics LLC Supply of Porcelain Tile and


96 JB1071-HAI-TR-00403 JB1071-HAI-04-ZZ-PQ-W-00403 CIVIL Supplier
Ceramic Tile
Manufacturer ceramic ,porcelain wall and floor tiles +966 11 488 9977 16-Jul-23 17-Jul-23 CLOSED RHDHV 1

CONC1585 Saudi Ceramic Company Supply of Porcelain Tile and


97 JB1071-HAI-TR-00443 JB1071-HAI-04-ZZ-PQ-W-00443 CIVIL Supplier
Ceramic Tile
Manufacturer ceramic, porcelain wall and floor tiles 011 8298888 19-Jul-23 23-Jul-23 CLOSED RHDHV 2

CONC1663 Modern Tools Establishment Supply of Rebar Coupler


98 JB1071-HAI-TR-00464 JB1071-HAI-04-ZZ-PQ-W-00464 CIVIL Supplier
(Modern Rebar Coupler)
Manufacturing of Rebar Couplers 112811518 6-Aug-23 7-Aug-23 CLOSED RHDHV 1

CONC1671 Aldrees Industrial & Trading Co (ALITCO) Supply of Wooden and Metal
99 JB1071-HAI-TR-00468 JB1071-HAI-04-ZZ-PQ-W-00468 CIVIL Supplier
Doors
Manufacturing of Wooden and Metal Doors +966 11 295 0025 7-Aug-23 30-Aug-23 CLOSED RHDHV 1

Supply of Fire alarm System


100 JB1071-HAI-TR-00480 JB1071-HAI-04-ZZ-PQ-W-00480 ELE Supplier CONC1693 Rawabi & Gulf Marvel Co. Ltd (RGM) from Simplex (USA)
Distributer of Fire alarm System 12160987 12-Aug-23 OPEN

Supply of Shutter door ,Gat


101 JB1071-HAI-TR-00481 JB1071-HAI-04-ZZ-PQ-W-00481 CIVIL Supplier CONC1695 Rollc Metal Industries Factory barrier, Sliding gate and Swing Design and Manufacturing of Automatic Doors 011 4164688 12-Aug-23 30-Aug-23 CLOSED RHDHV 1
gate

Supply of Aluminum
CONC1717 Advanced International Trading Co. doors ,windows , claddings,
102 JB1071-HAI-TR-00487 JB1071-HAI-04-ZZ-PQ-W-00487 CIVIL Supplier
curtain wall and
Manufacture of Aluminium Products ,+966-11-2651958 16-Aug-23 30-Aug-23 R&R 3
accessories (ALUPCO System)

QMI Building Metal Products Manufacturing LLC


103 JB1071-HAI-TR-00490 JB1071-HAI-04-ZZ-PQ-W-00490 CIVIL Supplier CONC1725
(Masdar Building Materials) Supply of Metal Doors Manufacturing Metal Doors 118293333 17-Aug-23 30-Aug-23 CLOSED RHDHV 1

CONC1752 BRM Machinery and Equipment Rental L.L.C Supply of Slip Form Machinery
104 JB1071-HAI-TR-00499 JB1071-HAI-04-ZZ-PQ-W-00499 CIVIL Supplier
and Equipment
Slip Form Equipment 97143366112 23-Aug-23 24-Aug-23 CLOSED RHDHV 1

105 JB1071-HAI-TR-00536 JB1071-HAI-04-ZZ-PQ-W-00536 ELE Supplier CONC1854 Al Aamedah Modern Poles Co Supply of External Lighting Manufacturing of lighting poles, lights and 114480501 13-Sep-23 OPEN
Poles, lights with accessories accessories

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Material Submittal - MTS - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION


T T
Project JB1071 Rev.P01 Rev.P02 O Rev.P03 O Rev.P04 Rev.P05
D D
A ADay
Contact Days YDays Ys Doc. Final
SN Submittal Ref. Number Documents Number ID CODE Item Discipline Title Supplier Issued Date Response Date Issued Date Response Date Issued Date Response Date Issued Date Response Date Days Open Issued Date Response Date Days Open Status Eng.Rev
no. Open Open Ope Status status/Comments
D Dn
A A
1 JB1071-HAI-TR-0018 ----- ECOM022 MTS CIVIL Formwork release agent material Fosam --- 21-Jul-22 25-Jul-22 4 T T
### 1 CLOSED RHDHV 1
E E

2 JB1071-HAI-TR-0019 ----- CONC030 MTS CIVIL Concure WB309-Clear Curing Compound Fosam --- 24-Jul-22 25-Jul-22 1 1 CLOSED RHDHV 1

3 JB1071-HAI-TR-0035 JB1071-HAI-04-ZZ-MA-W-0035 CONC059 MTS CIVIL POLYETHYLENE SHEET UNITECH --- 1-Aug-22 4-Aug-22 3 2 CLOSED RHDHV 2

4 JB1071-HAI-TR-0036 JB1071-HAI-04-ZZ-MA-W-0036 CONC061 MTS CIVIL Concrete Mix Design Saudi Redimex --- 1-Aug-22 2-Aug-22 1 2 CLOSED RHDHV 2

5 JB1071-HAI-TR-00039 JB1071-HAI-04-ZZ-MA-W-00039 CONC080 MTS CIVIL Nitoproof 10, Bitumen Emulsion Protective Coating (DampProofing)Fosam Company Fosam --- 7-Aug-22 22-Aug-22 15 27-Sep-22 3-Oct-22 6 1 CLOSED RHDHV 1
CONC242 Limited.

6 JB1071-HAI-TR-00040 JB1071-HAI-04-ZZ-MA-W-00040 CONC084 MTS CIVIL Concrete Curing Compound DON Construction Products (DCP). DCP --- 8-Aug-22 30-Aug-22 22 R&R
DURAR Masagh Trading
7 JB1071-HAI-TR-00041 JB1071-HAI-04-ZZ-MA-W-00041 CONC088 MTS CIVIL POLYETHYLENE SHEET
Company
--- 9-Aug-22 27-Aug-22 18 R&R

8 JB1071-HAI-TR-00043 JB1071-HAI-04-ZZ-MA-W-00043 CONC097 MTS CIVIL Bitucell (Bitumen impregnated Fibre Board) Fosam Company Limited --- 11-Aug-22 23-Aug-22 12 2 CLOSED RHDHV 2

9 JB1071-HAI-TR-00045 JB1071-HAI-04-ZZ-MA-W-00045 CONC112 MTS CIVIL RENDEROC TG XTRA, Concrete Repair Mortar Fosam Company Limited --- 17-Aug-22 23-Aug-22 6 2 CLOSED RHDHV 2

CONC175
10 JB1071-HAI-TR-00055 JB1071-HAI-04-ZZ-MA-W-00055 CONC370 MTS CIVIL Fiprocide, Termite Control Spray,HIT Pest Control HIT Pest Control --- 7-Sep-22 13-Oct-22 36 29-Oct-22 11-Nov-22 13 26-Nov-22 8-Dec-22 12 1 CLOSED 1
CONC494

11 JB1071-HAI-TR-00056 JB1071-HAI-04-ZZ-MA-W-00056 CONC179 MTS CIVIL Material Submittal,Concrete Design Mix 40MPa with Silica Fume. Saudi Ready Mix Concrete --- 8-Sep-22 22-Sep-22 14 2 CLOSED RHDHV 2

12 JB1071-HAI-TR-00058 JB1071-HAI-04-ZZ-MA-W-00058 CONC227 MTS CIVIL Nitomortar TC2000, Epoxy based Concrete Repair Mortar Fossam --- 22-Sep-22 15-Oct-22 23 R&R

13 JB1071-HAI-TR-00059 JB1071-HAI-04-ZZ-MA-W-00059 CONC230 MTS CIVIL Nitoflor Hardtop (Monolithic surface hardening compound for fresh concrete floors) Fossam --- 24-Sep-22 16-Oct-22 R&R

14 JB1071-HAI-TR-00060 JB1071-HAI-04-ZZ-MA-W-00060 CONC245 MTS CIVIL SUPERCAST PVC (Centrally and externally placed PVC waterstops) Fossam --- 28-Sep-22 27-Oct-22 29 1 CLOSED 1

15 JB1071-HAI-TR-00062 JB1071-HAI-04-ZZ-MA-W-00062 Workshop


CONC263
& Spare Parts (Plan, Elevation
CIVIL
& Section)Concrete Design Mix 40MPa with Silica Fume for Piling Saudi Ready Mix Concrete --- 3-Oct-22 31-Oct-22 28 2 CLOSED RHDHV 2

16 JB1071-HAI-TR-00065 JB1071-HAI-04-ZZ-MA-W-00065 CONC286 MTS CIVIL Setseal A, Concrete Curing Compound DCP --- 9-Oct-22 18-Oct-22 9 2 CLOSED RHDHV 2

Flocrete SP129, Hyperplast PC261, Flocrete RPC9. Concrete Admixtures for Haif
17 JB1071-HAI-TR-00087 JB1071-HAI-04-ZZ-MA-W-00087 CONC410 MTS CIVIL
Batching Plant
DCP --- 6-Nov-22 8-Nov-22 2 R&R

18 JB1071-HAI-TR-00090 JB1071-HAI-04-ZZ-MA-W-00090 CONC432 MTS CIVIL Concrete Design Mix 40MPa with Silica Fume, from GAC Batching Plant GAC --- 12-Nov-22 21-Nov-22 9 2 CLOSED RHDHV 2

CONC538
14-Dec-22 21-DEC-22
19 JB1071-HAI-TR-00111 JB1071-HAI-04-ZZ-MA-W-00111 CONC545 MTS CIVIL Concrete Design Mixes 40MPa with Silica Fume from HAIF Batching Plant HAIF Batching Plant --- 5-Dec-22 6-Dec-22 22-Aug-23 CLOSED
25-JUL-23
aMessage
CONC575

20 JB1071-HAI-TR-00118 JB1071-HAI-04-ZZ-MA-W-00118 CONC576 MTS CIVIL MasterRheobuild 945, MasterPozzolith 327 - Concrete Admixtures Master Builders Soolutions --- 14-Dec-22 15-Dec-22 1 1 CLOSED RHDHV 1

21 JB1071-HAI-TR-00131 JB1071-HAI-04-ZZ-MA-W-00131 CONC640 MTS CIVIL Fosroc Brushbond Protective Coating for Blinding of Process Building Fosam Saudi Arabia --- 29-Dec-22 1-Jan-23 3 5-Jan-23 1 CLOSED RHDHV 1

22 JB1071-HAI-TR-00139 JB1071-HAI-04-ZZ-MA-W-00139 CONC667 MTS CIVIL Concrete Design Mix 40MPa Mix with GGBS Saudi Ready Mix Concrete --- 3-Jan-23 24-Aug-23 CLOSED 1

23 JB1071-HAI-TR-00140 JB1071-HAI-04-ZZ-MA-W-00140 CONC668 MTS CIVIL Concrete Design Mix 15 Mpa for Blinding from HAIF Batching Plant HAIF Batching Plant --- 3-Jan-23 7-Jan-23 OPEN
CONC684

8-JAN-23
3-01-23 Amessage
24 JB1071-HAI-TR-00141 JB1071-HAI-04-ZZ-MA-W-00141 CONC669 MTS MECH. Pit less Weigh Bridge from Mettler Toledo Mettler Toledo --- 29-01-23 15-02-23 2 CLOSED RHDHV 2
aMessage ECOM267
19-02-23

25 JB1071-HAI-TR-00146 JB1071-HAI-04-ZZ-MA-W-00146 CONC689 MTS ELE PVC, \UPVC Conduits and Fittings DECODUCT --- 8-Jan-23 13-Feb-23 36 2 CLOSED RHDHV 2

26 JB1071-HAI-TR-00149 JB1071-HAI-04-ZZ-MA-W-00149 CONC696 MTS CIVIL SikaSwell A Volclay Waterstop for Pile Cap Sika Saudi Arabia Co. Ltd --- 9-Jan-23 11-Jan-23 2 CLOSED RHDHV 1
Sika Saudi Arabia Co. Ltd

27 JB1071-HAI-TR-00150 JB1071-HAI-04-ZZ-MA-W-00150 CONC700 MTS CIVIL Supercast SW30, Volclay Waterstop for Pile Cap FOSAM Saudi Co. Ltd. --- 10-Jan-23 27-Feb-23 48 1 CLOSED RHDHV 1

28 JB1071-HAI-TR-00151 JB1071-HAI-04-ZZ-MA-W-00151 CONC701 MTS CIVIL MasterSeal 910, Volclay Waterstop for Pile Cap BASF (Master Builders --- 10-Jan-23 12-Jan-23 2 1 CLOSED RHDHV 1
Solutions)

29 JB1071-HAI-TR-00163 JB1071-HAI-04-ZZ-MA-W-00163 CONC740 MTS CIVIL Setseal AW309, Concrete Curing Compound DON Construction Products --- 22-Jan-23 23-Jan-23 1 1 CLOSED RHDHV 1
(DCP).

30 JB1071-HAI-TR-00164 JB1071-HAI-04-ZZ-MA-W-00164 CONC741 MTS CIVIL Setseal B, Water proofing Cementitious Coating for Blinding of Silos Foundations Don Construction Products --- 22-Jan-23 23-Jan-23 1 1 CLOSED RHDHV 1
(DCP).

Hypersel DP-2010H, Volclay Waterstop for Pile Cap Alternate of Sikaswell & Don Construction Products
31 JB1071-HAI-TR-00165 JB1071-HAI-04-ZZ-MA-W-00165 CONC745 MTS CIVIL
Masterseal 910 (DCP)
--- 23-Jan-23 14-Feb-23 22 1 R&R RHDHV 3

32 JB1071-HAI-TR-00166 JB1071-HAI-04-ZZ-MA-W-00166 CONC748 MTS CIVIL SikaTop Seal 107, Water proofing Cementitious Coating for Blinding of Silos Sika Saudi Arabia Co. Ltd --- 23-Jan-23 14-Feb-23 22 2 CLOSED RHDHV 2
Foundations (Alternator of Brushbond Fosroc)

33 JB1071-HAI-TR-00181 JB1071-HAI-04-ZZ-MA-W-00181 CONC769 MTS CIVIL NITOBOND AR Concrete Bonding Agent for fresh concrete with old Concrete Fosam Company Limited --- 29-Jan-23 16-Feb-23 18 1 CLOSED RHDHV 1

34 JB1071-HAI-TR-00182 JB1071-HAI-04-ZZ-MA-W-00182 CONC770 MTS CIVIL Screed Concrete Design Mix 15 MPA for Protection of Cementitious Water proofing Saudi Ready Mix Concrete --- 29-Jan-23 CLOSED

35 JB1071-HAI-TR-00186 JB1071-HAI-04-ZZ-MA-W-00186 CONC779 MTS CIVIL Concrete Design Mix 15 Mpa Screed (for cementitious waterproofing Protection) from --- 31-Jan-23 OPEN
HAIF Batching Plant HAIF Batching Plant

36 JB1071-HAI-TR-00187 JB1071-HAI-04-ZZ-MA-W-00187 CONC780 MTS CIVIL Fiberboard / Fillerboard (Bitumen impregnated Fibre Board) for Expansion and --- 31-Jan-23 14-Feb-23 14 1 CLOSED RHDHV 1
Isolation Joints DCP
37 JB1071-HAI-TR-00198 JB1071-HAI-04-ZZ-MA-W-00198 CONC813 MTS ELE Earthing and Lightning Protection System Supplier SESCO, Brand ABB --- 6-Feb-23 14-Feb-23 1 CLOSED RHDHV 1
Furse

38 JB1071-HAI-TR-00207 JB1071-HAI-04-ZZ-MA-W-00207 CONC831 MTS MECH. Workshop Equipments Al Bawardi Tools and Hardware --- 8-Feb-23 19-Feb-23 1 CLOSED RHDHV 1

39 JB1071-HAI-TR-00211 JB1071-HAI-04-ZZ-MA-W-00211 CONC841 MTS MECH. BOBCAT/SKID LOADER (2 Nos.) Abdullah Abunayyan Trading --- 9-Feb-23 aMessage Amessage 19-Feb-23 1 CLOSED RHDHV 1
Corp. (JCB) 16-2-23 18-02-23

40 JB1071-HAI-TR-00214 JB1071-HAI-04-ZZ-MA-W-00214 CONC858 MTS MECH. Black Seamless Steel Pipe for Above Ground (Inside Building) Fire Water Pipe Interpipe / Al Othman Industrial --- 13-Feb-23 27-Feb-23 14 1 CLOSED RHDHV 1
Marketing Co.

41 JB1071-HAI-TR-00216 JB1071-HAI-04-ZZ-MA-W-00216 CONC862 MTS MECH. HDPE Pipes and Fittings for External Underground Water Supply Network Neproplast (National Marketing --- 14-Feb-23 28-Feb-23 14 1 CLOSED RHDHV 1
Est. Co. Ltd)

42 JB1071-HAI-TR-00217 JB1071-HAI-04-ZZ-MA-W-00217 CONC863 MTS MECH. One Wheel Loader from JCB Abdullah Abunayyan Trading --- 15-Feb-23 20-Feb-23 26-Jul-23 OPEN
CONC1617 Corp. (JCB)

43 JB1071-HAI-TR-00218 JB1071-HAI-04-ZZ-MA-W-00218 CONC869 MTS MECH. HDPE Pipes and Fittings for External Underground Fire Fighting Network Neproplast (National Marketing --- 16-Feb-23 28-Feb-23 12 1 CLOSED RHDHV 2
Est. Co. Ltd)

CONC874 UPVC Pipes and Fittings for above and underground (Internal and external) Sewer 19-Feb-23 8-Mar-23
44 JB1071-HAI-TR-00219 JB1071-HAI-04-ZZ-MA-W-00219 MTS MECH. Neproplast (National Marketing --- 05-Apr-23 9-Apr-23 9-Apr-23 2 CLOSED 2
CONC1098 drainage, Waste and Vents Network Est. Co. Ltd) aMessage
aMessage

45 JB1071-HAI-TR-00221 JB1071-HAI-04-ZZ-MA-W-00221 CONC878 MTS MECH. UPVC Pipes and Fittings for above and underground (Internal and external) Storm Neproplast (National Marketing --- 19-Feb-23 1-Mar-23 14-Aug-23 OPEN
CONC1702 Network Est. Co. Ltd)

46 JB1071-HAI-TR-00222 JB1071-HAI-04-ZZ-MA-W-00222 CONC879 MTS CIVIL Concrete Mix Designs 40 MPa (OPC+GGBS) and 25 MPa (OPC+SF) --- 20-Feb-23 31-Aug-23 CLOSED RHDHV 1
from HAIF Batching Plant HAIF Batching Plant

47 JB1071-HAI-TR-00225 JB1071-HAI-04-ZZ-MA-W-00225 CONC888 MTS CIVIL GGBS for HAIF Batching Plant Super Cement Manufacturing --- 21-Feb-23 27-Feb-23 1 CLOSED RHDHV 1
Company L.L.C.

48 JB1071-HAI-TR-00228 JB1071-HAI-04-ZZ-MA-W-00228 CONC898 MTS CIVIL Plasti Board (Protection Board for Waterproofing Coating Paint) DCP --- 25-Feb-23 27-Feb-23 2 1 CLOSED RHDHV 1

49 JB1071-HAI-TR-00234 JB1071-HAI-04-ZZ-MA-W-00234 CONC922 MTS MECH. One Dockage Carter and Complete set of Sieves Suitable for Grain and Maize Carter Day International, Inc. --- 1-Mar-23 14-Mar-23 1 CLOSED RHDHV 1

CONC923
CONC995 4-MAR-23 4-Apr-23 27-Apr-23
50 JB1071-HAI-TR-00235 JB1071-HAI-04-ZZ-MA-W-00235
CONC1135
MTS ELE Steel Back Boxes Steel City / Supplier SESCO --- 1-Mar-23
aMessage
12-Mar-23
aMessage 08-May-23 14-May-23 2 CLOSED RHDHV 2
CONC1154 supersede

51 JB1071-HAI-TR-00244 JB1071-HAI-04-ZZ-MA-W-00244 CONC948 MTS CIVIL Rebar Coupler (Repair Grip) for 25mm Rebar from Dextra Group Dextra Group --- 6-Mar-23 7-Mar-23 1 1 CLOSED RHDHV 1

CONC950 12-MAR-23 9-Apr-23


CONC1104 aMessage 19-Apr-23 16-Apr-23
52 JB1071-HAI-TR-00245 JB1071-HAI-04-ZZ-MA-W-00245
CONC1206
MTS MECH. Passenger Lifts (2 Nos.) for Primary Head House and Secondary Head House OTIS --- 6-Mar-23
26-MAR-23 and aMessage 8-May-23 10-May-23 16-May-23 21-May-23 CLOSED RHDHV 2
CONC1240 R&R 25-Apr-23
aMessage

16-MAR-23
Prime Diesel Generators for Substation #3, #4 and #5. 19-Mar-23
53 JB1071-HAI-TR-00251 JB1071-HAI-04-ZZ-MA-W-00251 CONC971 MTS ELE (16-Mar-23) Attacged Track Record --- 12-Mar-23 aMessage 2 CLOSED 2
(19-Mar-23) Attched Reference List for CUMMINS DG Set Model C1250D6 & CUMMINS-UK
22-Mar-23
C1000D6B aMessage

54 JB1071-HAI-TR-00253 JB1071-HAI-04-ZZ-MA-W-00253 CONC985 MTS MECH. PPR Pipes and Fittings for Hot & Cold Water supply --- 14-Mar-23 9-Apr-23 10-Apr-23 1 CLOSED RHDHV 1
CONC1099 Tahweel Pipes

JB1071-HAI-04-ZZ-RP-W-00265 Anchor Bolts (ZAMIL) (P03_CONC1233) 15-May-23 16-May-23 CLOSED

JB1071-HAI-04-ZZ-RP-W-00266
Steel Plates for Primary Members Paint (ZAMIL) 17-May-23 29-May-23 CLOSED
(P03_CONC1247)

JB1071-HAIF-04-XX-LT-W- GI Coils for Secondary Members (ZAMIL) _P01 & _P02


1120
JB1071-HAIF-04-XX-LT-W-
1139 JB1071-HAI-04-ZZ-RP-W-00267
1 - Steel Plates for Primary Members._P03 4-Jun-23 11-Jun-23 OPEN
JB1071-HAIF-04-XX-LT-W- 2 - GI Coil for Pre-Galvanized Secondary Members._P03 19-Apr-23
1148 CONC1025 MTS 3- Connection Bolt (For Primary Members) & Machine Bolts (For ZAMIL -- 22-Mar-23 3-Apr-23 04-May-23 8-MAY-23 RHDHV 2
JB1071-HAIF-04-XX-LT-W- CONC1139 LTR#4296
1150 STEEL
Secondary Members)_P03 (LTR#1160) CONC1347 Additional Data
55 JB1071-HAIF-04-XX-LT-W- STRUCTURE
1160
JB1071-HAIF-04-XX-LT-W-
1162

Single skin Panels for Sheeting & Color (ZAMIL)_P01 & P02
JB1071-HAI-04-ZZ-RP-W-00268 1-External Single Skin Panels (Type ‘‘S‘‘/ Color: Frost White)_P03 6-Jun-23 15-Jun-23 CLOSED
2-Carbon Steel & Stainless-Steel Fasteners_P03 (LTR#1162)
CONC1357

JB1071-HAI-TR-00325 JB1071-HAI-04-ZZ-MA-W-00325 CONC1277 MTS Steel Flooring Systems (ZAMIL) ZAMIL -- 23-May-23 7-Jun-23 CLOSED 2

56 JB1071-HAI-TR-00279 JB1071-HAI-04-ZZ-RP-W-00279 CONC 1095 MTS ELE PVC, UPVC conduits & accessories Bahra Cables Company --- 8-Apr-23 16-Apr-23 CLOSED 1

CONC1152 aMessage
57 JB1071-HAI-TR-00285 JB1071-HAI-04-ZZ-MA-W-00285 CONC1217 MTS ELE Prime Diesel Generators for Substation #3, #4 and #5. CUMMINS-UK --- 27-Apr-23
30-April-23
11-May-23 14-May-23 18-May-23 CLOSED 2
CONC1230

58 JB1071-HAI-TR-00286 JB1071-HAI-04-ZZ-MA-W-00286 CONC1153 MTS MECH. Laboratory Equipment Sieves ISO 5223 (20 to 29) Carter Day International, Inc. --- 27-Apr-23 7-May-23 CLOSED 1
Laboratory Equipment
3- Two Sensitive Weighers 3- Ohaus™
6- Two Sample Dividers 8-MAY-23
59 JB1071-HAI-TR-00306 JB1071-HAI-04-ZZ-MA-W-00306 CONC1209 MTS MECH. 6- Perten Instruments --- 20-MAY-23 21-May-23 CLOSED 1
12- RIFFLE DIVIDER (divided in 2 parts the meets the 12- Seedburo USA Sepersede
international association for seed tests) 16- Memmert
16- ATMOSPHERIC OVEN)

60 JB1071-HAI-TR-00328 JB1071-HAI-04-ZZ-MA-W-00328 CONC1290 MTS CIVIL Bituminous Waterproofing Membrane (PY 40200 E, 4mm thick) Arabian Waterproofing --- 27-May-23 29-May-23 CLOSED 1
industries Co. (Awazel)

CONC1342 03-JUL-23
61 JB1071-HAI-TR-00343 JB1071-HAI-04-ZZ-MA-W-00343 CONC1469 MTS MECH. Electric Monorail Hoist for HH1 and TT2 GH Crane Components/Etihad --- 3-Jun-23 6-Jun-23 2-Jul-23 eMessage 3-Aug-23 10-Aug-23 CLOSED 1
CONC1650 Cranes Company 10-AUG-23

62 JB1071-HAI-TR-00355 JB1071-HAI-04-ZZ-MA-W-00355 COC1382 MTS ELE 13.8KV Ring Main Unit (RMU) Schneider / Rawabi Electric --- 10-Jun-23 14-Jun-23 CLOSED 2

Floor Drain
Clean-out 1
Clean-out 2
Vent Cap
63 JB1071-HAI-TR-00356 JB1071-HAI-04-ZZ-MA-W-00356 CONC1386 MTS MECH. Roof drain --- 11-Jun-23 14-Jun-23 CLOSED RHDHV 2
Roof drain - Scupper Saudi Cast
Downspout Nozzle
Manhole cover - Heavy duty
Manhole cover - Heavy duty
Catch basin Cover

64 JB1071-HAI-TR-00357 JB1071-HAI-04-ZZ-MA-W-00357 CONC1387 MTS CIVIL Gate Barrier System (CAME – G6000) Saudi Anfal --- 11-Jun-23 14-Jun-23 CLOSED RHDHV 1

65 JB1071-HAI-TR-00358 JB1071-HAI-04-ZZ-MA-W-00358 CONC1388 MTS CIVIL Steel Rolling Shutters Doors JX (J&G) Motor Saudi Anfal --- 11-Jun-23 14-Jun-23 CLOSED RHDHV 1

66 JB1071-HAI-TR-00359 JB1071-HAI-04-ZZ-MA-W-00359 CONC1390 MTS CIVIL Swing Gate System (CAME – ATI 3000 - 5024) Saudi Anfal --- 11-Jun-23 17-Jun-23 R&R 3

JB1071-HAIF-04-XX-LT-W- JB1071-HAI-04-ZZ-MA-W-00360 STEEL 12-June-23


67 CONC1389 MTS Steel Plates for Primary Members ZAMIL --- 11-Jun-23 19-June-23 CLOSED RHDHV 2
1169 STRUCTURE
aMessage

Laboratory Equipment
68 JB1071-HAI-TR-00361 JB1071-HAI-04-ZZ-MA-W-00361 CONC1393 MTS MECH. 1- Five sample picking pens Seedburo USA --- 12-Jun-23 14-Jun-23 CLOSED RHDHV 1
14- Two - RKS Aluminum Probe (length 2,00 m x Ø 30 mm - Aluminum)

69 JB1071-HAI-TR-00362 JB1071-HAI-04-ZZ-MA-W-00362 CONC1396 MTS MECH. Fuel Tank , Fuel Pumps and Accessories list attached. Delta Plus --- 12-Jun-23 18-Jun-23 R&R RHDHV 3

70 JB1071-HAI-TR-00363 JB1071-HAI-04-ZZ-MA-W-00363 CONC1398 MTS ELE Oil type MV (13.8 - 0.4KV) Transformers (Aluminium winding) The Saudi Transformers Co. --- 13-Jun-23 20-Jun-23 CLOSED 1
LTD (STC)

Grohe , Saudi Saudi Ceramics,


71 JB1071-HAI-TR-00365 JB1071-HAI-04-ZZ-MA-W-00365 CONC1403 MTS MECH. Sanitary Fixtures as per attached Material Schedule List Apell /Al hayat building --- 13-Jun-23 3-Jul-23 CLOSED 1
materials Co./ Isam k. kabbani

18-June-23
aMessage
72 JB1071-HAI-TR-00369 JB1071-HAI-04-ZZ-MA-W-00369 CONC1411 MTS ELE Material Submittal for EMT Conduits & Fittings ITCC / Ultimate Solution --- 15-Jun-23 03-Jul-23 CLOSED 2
Trading Co. aMessage
6-Jul-23
CONC1411

73 JB1071-HAI-TR-00370 JB1071-HAI-04-ZZ-MA-W-00370 CONC1412 MTS MECH. Material Submittal for Plumbing, Ducting Supports and Ducting Accessories (List Mariam Trading Co. & Partners --- 15-Jun-23 3-Jul-23 CLOSED 1
Attached) (MTC)

74 JB1071-HAI-TR-00371 JB1071-HAI-04-ZZ-MA-W-00371 CONC1414 MTS MECH. GENERAL DUTY VALVES & SPECIALTIES WATER METER FOR PLUMBING PIPING WATTS / SHAMS Eastern --- 15-Jun-23 6-Jul-23 CLOSED 1
Province Trading Est

Material Submittal for Laboratory Equipment


75 JB1071-HAI-TR-00378 JB1071-HAI-04-ZZ-MA-W-00378 CONC1441 MTS MECH. 9- Gas hazard kit for Measuring CO2 complete with accessories --- 21-Jun-23 5-Jul-23 CLOSED 2
18- Set of 2 Sieves + Support Testo, Seedburo USA
31- One Truck Sampler

76 JB1071-HAI-TR-00388 JB1071-HAI-04-ZZ-MA-W-00388 CONC1463 MTS CIVIL Material Submittal for underground using double layers of SBS Bituminous --- 26-Jun-23 REF TO TR#00391 CLOSED REF TO TR#00391
Waterproofing Membrane and Accoesiros. Awazel / BMC

2-JULY-23
77 JB1071-HAIF-04-XX-LT-W- JB1071-HAI-04-ZZ-MA-W-00390 CONC1474 MTS STEEL Material Submittal for Micro Rib Rockwool Sandwich Panels (Zamil) --- Amessage 10-JUL-23 CLOSED RHDHV 1
1179 CONC1593 STRUCTURE ZAMIL 17-july-23 23-JUL-23
23-JUL-23

CONC1475 Material Submittal for underground using double layers of SBS Bituminous 2-JUL-23 3-JUL-23
78 JB1071-HAI-TR-00391 JB1071-HAI-04-ZZ-MA-W-00391 MTS CIVIL Awazel / BMC --- 4-JUL-23 4-Jul-23 4-Jul-23 CLOSED RHDHV 1
CONC1481 Waterproofing Membrane and Accessories aMessage
aMessage

79 JB1071-HAI-TR-00400 JB1071-HAI-04-ZZ-MA-W-00400 CONC1528 MTS ELE Material Submittal for 13.8KV Ring Main Unit (RMU) --- 15-Jul-23 23-Jul-23 26-Aug-23 OPEN
CONC1759 Alfanar Company

80 JB1071-HAI-TR-00446 JB1071-HAI-04-ZZ-MA-W-00446 CONC1615 MTS CIVIL Conbextra TS Grout for Steel Silos Anchors Bolts Fosam Company Limited --- 26-Jul-23 1-Aug-23 CLOSED RHDHV 1

Material Submittal Laboratory Equipment


2- Two hectoliter test weight machines complete with accessories
81 JB1071-HAI-04-ZZ-MA-W- JB1071-HAI-04-ZZ-MA-W-00447 CONC1623 MTS MECH. 4 -Two moisture measuring ovens --- 30-Jul-23 1-Aug-23 CLOSED RHDHV 1
00447 Seedburo, Memmret , Potclays
13 - NILEMA - LITRE (to determine the specific weight)
19 - WOODEN SIEVE FOR MAIZE
82 JB1071-HAI-TR-00448 JB1071-HAI-04-ZZ-MA-W-00448 CONC1624 MTS MECH. Material Submittal for One Truck Sampler Seedburo --- 30-Jul-23 31-Aug-23 CLOSED 2

83 JB1071-HAI-TR-00449 JB1071-HAI-04-ZZ-MA-W-00449 CONC1625 MTS MECH. Material Submittal for Workshop Equipments Daesan Korea, GoldArc,Fini --- 30-Jul-23 7-Aug-23 R&R 3
Compressor

84 JB1071-HAI-TR-00459 JB1071-HAI-04-ZZ-MA-W-00459 CONC1645 MTS MECH. Material Submittal for One Passenger Lift / Elevator for Admin Building OTIS --- 1-Aug-23 20-Aug-23 CLOSED RHDHV 1

Laboratory Equipment
85 JB1071-HAI-TR-00462 JB1071-HAI-04-ZZ-MA-W-00462 CONC1658 MTS MECH. 5 - Two fast moisture measuring equipment (digital with computer and printer) Perten Instruments --- 5-Aug-23 10-Aug-23 CLOSED 1
10 - One cereals Infraneo

86 JB1071-HAI-TR-00466 JB1071-HAI-04-ZZ-MA-W-00466 CONC1670 MTS ELE Material Submittal for MV(13.8KV) 3Cx500mm² AL/XLPE/LLDPE Cable Riyadh Cables --- 7-Aug-23 17-Aug-23 CLOSED 1

87 JB1071-HAI-TR-00467 JB1071-HAI-04-ZZ-MA-W-00467 CONC1669 MTS CIVIL Material Submital for Rebar Coupler (O-Type) for 25mm Rebar from MRC Modern Tools Establishment --- 7-Aug-23 10-Aug-23 CLOSED 1

88 JB1071-HAI-TR-00478 JB1071-HAI-04-ZZ-MA-W-00478 CONC1692 MTS CIVIL Material Submittal for Door Hardware, Material List Attached Saudi Etqaan Co. / Simplex --- 12-Aug-23 31-Aug-23 CLOSED RHDHV 2

89 JB1071-HAI-TR-00479 JB1071-HAI-04-ZZ-MA-W-00479 CONC1694 MTS CIVIL Material Submital for Steel Rebar Anchoring (Sika AnchorFix®-2+ Tropical) Sika --- 12-Aug-23 OPEN

90 JB1071-HAI-TR-00488 JB1071-HAI-04-ZZ-MA-W-00488 CONC1718 MTS CIVIL Material Submittal for Door Hardware, Material List Attached Leading Agent Trading Co. / --- 16-Aug-23 31-Aug-23 CLOSED RHDHV 1
BASI

91 JB1071-HAI-TR-00497 JB1071-HAI-04-ZZ-MA-W-00497 CON1746 MTS CIVIL Material Submital Conplast SP415 and Conplast RP265. Concrete Admixtures for Haif --- 22-Aug-23 23-Aug-23 CLOSED RHDHV 1
Batching Plant Fosam

Material Submittal of 40 Mpa Concrete Mix Design with Silica Fume for Slip Form work
92 JB1071-HAI-TR-00498 JB1071-HAI-04-ZZ-MA-W-00498 CONC1747 MTS CIVIL at Flat HAIF Batching Plant --- 22-Aug-23 24-Aug-23 R&R 3
Storage from HAIF Batching Plant

93 JB1071-HAI-TR-00500 JB1071-HAI-04-ZZ-MA-W-00500 CONC1756 MTS CIVIL Material Submittal for Plaster and Block Work Accoesiros. Unitech Building & construction --- 26-Aug-23 30-Aug-23 CLOSED RHDHV 1
materials Supplier

94 JB1071-HAI-TR-00501 JB1071-HAI-04-ZZ-MA-W-00501 CONC1757 MTS ELE Material Submittal for Oil type MV (13.8 - 0.4KV) Transformers (Aluminium winding) Alfanar --- 26-Aug-23 OPEN

95 JB1071-HAI-TR-00511 JB1071-HAI-04-ZZ-MA-W-00511 CONC1781 MTS ELE Material Submittal for LV Cables Red Sea Cables Company --- 30-Aug-23 OPEN

96 JB1071-HAI-TR-00515 JB1071-HAI-04-ZZ-MA-W-00515 CONC1791 MTS CIVIL Material Submittal for Concrete Masonry Unit (CMU) for all buildings as per attached Suliman Abdul Rehman --- 3-Sep-23 7-Sep-23 CLOSED RHDHV 2
Data Sheets Namlah Factory (SANCO)

Material Submittal for Laboratory Equipment


97 JB1071-HAI-TR-00517 JB1071-HAI-04-ZZ-MA-W-00517 CONC1801 MTS MECH. 15- Multi-Compartments Oven (with 20 dishes) Chopin Technologies --- 4-Sep-23 13-Sep-23 CLOSED RHDHV 1
30- Stainless Steel Box

5-Sep-23
98 JB1071-HAI-TR-00518 JB1071-HAI-04-ZZ-MA-W-00518 CONC1802 MTS MECH. Material Submittal for Fire Pumps (Electrical, Diesel and Jockey Pumps) XYLEM (ITT)/ Tawreed --- 10-Sep-23 OPEN
Company LLC (aMessage)

NKT / BRIGHT WIRES


99 JB1071-HAI-TR-00523 JB1071-HAI-04-ZZ-MA-W-00523 CONC11813 MTS ELE Material submittal for MV(13.8KV) 3Cx500mm² AL/XLPE/LLDPE Cable Joints and --- 6-Sep-23 OPEN
Terminations (Pre-molded) COMPANY FOR
CONTRACTING & TRADING

100 JB1071-HAI-TR-00525 JB1071-HAI-04-ZZ-MA-W-00525 CONC1833 MTS MECH. Material Submittal for Potable (Booster) Pumps (2duty + 1Standby) XYLEM (ITT)/ Tawreed --- 11-Sep-23 OPEN
Company LLC

101 JB1071-HAI-TR-00527 JB1071-HAI-04-ZZ-MA-W-00527 CONC1839 MTS MECH. Material Submittal for Air Outlets and Duct Accessories Rabie Al- Takyeef Factory --- 12-Sep-23 OPEN
(RTF)

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proce
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Invoice Submittal - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION T


O
Project JB1071 Rev.00 Rev.01 D
A
Response Y
SN Submittal Ref. Number ID CODE Item Title Issued Date Response Date Days Open Issued Date Date Days Open Status Doc. Status Eng.Review Final Statuse/Remarks
D
A
Unofficial T
E
1 JB1071-HAIF-ZZ-XX-IN-LT-Q-0001 letter Release of 10% Advance Payment against Bank Guarantee. 13-Jun-22 15-Jun-22 receaved CLOSED
fromat from
client

2 JB1071-HAIF-ZZ-XX-IN-LT-Q-0002 INVOICE Advance Payment Invoice AP01 16-Jun-22 18-Jun-22 2 19-Jun-22 CLOSED

3 JB1071-HAIF-ZZ-XX-IN-LT-Q-0003 INVOICE CLOSED

4 JB1071-HAIF-ZZ-XX-IN-LT-Q-0004 INVOICE Advance Payment Invoice AP01 26-Jun-22 CLOSED

5 JB1071-HAIF-ZZ-XX-IN-LT-Q-0005 INVOICE 4-Jul-22 28-Jul-22 CLOSED

6 JB1071-HAIF-04-ZZ-IV-W-1039 AFP002 APPLICATION Application for Intrim Payment Certificate No 1 20-Oct-22 21-Nov-22 32 CLOSED 1

7 JB1071-HAIF-04-ZZ-IV-W-1063 AFP003 INVOICE Interim Payment Certificate No-01 22-Nov-22 CLOSED

8 JB1071-HAIF-04-ZZ-IV-W-1084 AFP005 APPLICATION Application for Intrim Payment Certificate No 2 21-Jan-23 22-Jan-23 CLOSED 1

9 JB1071-HAIF-04-ZZ-IV-W-1086 AFP006 INVOICE-03 Interim Payment Certificate No-02 23-Jan-23 CLOSED

10 JB1071-HAIF-04-ZZ-IV-W-1097 AFP003 APPLICATION Application for Intrim Payment Certificate No 3 13-Feb-23 6-Mar-23 CLOSED

11 JB1071-HAIF-04-ZZ-IV-W-1106 Email & INVOICE-04 Interim Payment Certificate No-03 7-Mar-23 CLOSED
CONC965

12 JB1071-HAIF-04-ZZ-IV-W-1122 CONC1029 APPLICATION-4 Application for Intrim Payment Certificate No 4 22-Mar-23 CLOSED

13 JB1071-HAIF-04-ZZ-IV-W-1125 Email & INVOICE-04 Interim Payment Certificate No-04 28-Mar-23 CLOSED
CONC965

14 JB1071-HAIF-04-ZZ-IV-W-1141 CONC1144 APPLICATION-5 Application for Intrim Payment Certificate No 5 26-Apr-23 30-Apr-23 CLOSED

15 JB1071-HAIF-04-ZZ-IV-W-1143 CONC 1162 INVOICE-05 Invoice for Interm Payment Certificate No-5 1-May-23

16 JB1071-HAIF-04-ZZ-IV-W-1156 CONC1311 APPLICATION-6 Application for Intrim Payment Certificate No 6 30-May-23 5-Jun-23 CLOSED

17 JB1071-HAIF-04-ZZ-IV-W-1161 CONC1356 INVOICE-06 Invoice for Interm Payment Certificate No-6 6-Jun-23
18 JB1071-HAIF-04-ZZ-IV-W-1175 CONC1447 APPLICATION-7 Application for Intrim Payment Certificate No 7 22-Jun-23 10-Jul-23

19 JB1071-HAIF-04-ZZ-IV-W-1183 CONC1503 INVOICE-07 Invoice for Interm Payment Certificate No-7 10-Jul-23

20 JB1071-HAIF-04-ZZ-IV-W-1191 CONC1633 APPLICATION-8 Application for Intrim Payment Certificate No 8 31-Jul-23

21 JB1071-HAIF-04-ZZ-IV-W-1193 CONC1646 INVOICE-08 Invoice for Interm Payment Certificate No-8 2-Aug-23

22 JB1071-HAIF-04-ZZ-IV-W-1199 CONC1768 APPLICATION-9 Application for Intrim Payment Certificate No 9 28-Aug-23

23 JB1071-HAIF-04-ZZ-IV-W-1200 CONC1808 INVOICE-09 Invoice for Interm Payment Certificate No-9 6-Sep-23

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

1 JB1071-HAI-04-ZZ-WIR-W-00001 CONC081 CVL


Inspection request for ConcreteTrial Mixes of 35MPA and 40 MPA design Saudi Ready Mix 7-Aug-22 13-Aug-22 6 2 CLOSED RHDHV 2
mixes

2 JB1071-HAI-04-ZZ-WIR-W-00002 CONC110 CVL


Concrete CompressiveStrength Test at 7 days for Trial Mixes samples of RGF 17-Aug-22 23-Aug-22 6 2 CLOSED RHDHV 2
35MPA and 40MPA.

3 JB1071-HAI-04-ZZ-WIR-W-00003 CVL
Concrete Compressive Strength Test at 14 days for Trial Mixes samples of RGF 24-Aug-22 OPEN
35MPA and 40MPA.

4 JB1071-HAI-04-ZZ-WIR-W-00004 CONC137 CVL


Collecting Sample of Coarse Aggregates 20mm, 10mm and Fine Aggregate Al Ourvi Crushers, Yanbu 28-Aug-22 28-Aug-22 0 28-Aug-22 30-Aug-22 2 2 CLOSED RHDHV 2
CONC140 (sand) for Haif Ready Mix Concrete Batch Plant

5 JB1071-HAI-04-ZZ-WIR-W-00005 CONC146 CVL Concrete Trial Mixes of 15MPA and 30MPA design mixes. Saudi Ready Mix 30-Aug-22 4-Sep-22 5 2 CLOSED RHDHV 2

6 JB1071-HAI-04-ZZ-WIR-W-00006 CONC152 CVL Concrete Trial Mixes of 40MPA design mixes. Saudi Ready Mix 31-Aug-22 4-Sep-22 4 2 CLOSED RHDHV 2

7 JB1071-HAI-04-ZZ-WIR-W-00007 CONC173 CVL


Compressive Strength Test at 07days forTrial Mixessamplesof 15Mpa, RGF 7-Sep-22 12-Sep-22 5 2 CLOSED RHDHV 2
30Mpaand 40Mpa.

8 JB1071-HAI-04-ZZ-WIR-W-00008 CONC178 CVL


ConcreteCompressive Strength Test at 28days forTrial Mixessamplesof RGF 8-Sep-22 12-Sep-22 4 2 CLOSED RHDHV 2
35MPA and 40MPA.

9 JB1071-HAI-04-ZZ-WIR-W-00009 CONC195 CVL


Concrete Compressive Strength Test at 14 days for Trial Mixes samples of RGF 14-Sep-22 OPEN
15Mpa, 30Mpa and 40Mpa.

10 JB1071-HAI-04-ZZ-WIR-W-00010 CONC225 CVL Inspection request for Setting out of preliminary Piles At Site 22-Sep-22 OPEN

11 JB1071-HAI-04-ZZ-WIR-W-00011 CONC244 CVL


Compressive Strength Test at 28days forTrial Mixessamples of 15Mpa, RGF 28-Sep-22 5-Oct-22 7 2 CLOSED RHDHV 2
30Mpaand 40Mpa.

12 JB1071-HAI-04-ZZ-WIR-W-00012 CONC279 CVL Steel reinforcement Cage for Preliminary Pile Near to Silos Area 6-Oct-22 10-Oct-22 4 2 CLOSED RHDHV 2

13 JB1071-HAI-04-ZZ-WIR-W-00013 CONC310 CVL Concrete Pouring for Pile#1 Near to Silos Area 15-Oct-22 OPEN

Concrete Compressive Strength Test at 07 days for Reaction Pile # 4, Design Riyadh Geotechnique &
14 JB1071-HAI-04-ZZ-WIR-W-00014 CONC333 CVL Foundation 20-Oct-22 OPEN
Mix sample 40Mpa. Company Laboratory (RGF).

Concrete Compressive Strength Test at 07 days for Test Pile # 1, Design Mix ARAB COMPANY FOR
15 JB1071-HAI-04-ZZ-WIR-W-00015 CONC344 CVL LABORATORIES AND SOIL 22-Oct-22 OPEN
sample 40Mpa. (ACES)

16 JB1071-HAI-04-ZZ-WIR-W-00016 CONC342 CVL Concrete Pouring for Preliminary test Pile -2 Near to Silos Area 23-Oct-22 OPEN

Concrete Compressive Strength Test at 07 days for Riyadh Geotechnique &


17 JB1071-HAI-04-ZZ-WIR-W-00017 CONC348 CVL Foundations 24-Oct-22 OPEN
Reaction Pile # 3 (RGF)

18 JB1071-HAI-04-ZZ-WIR-W-00018 CONC355 CVL


Concrete Compressive Strength Test at 07 days for Reaction Pile # 2, (Silos Riyadh Geo-Technique & 25-Oct-22 OPEN
Area) Design Mix sample 40Mpa. Foundations (RGF)

Concrete Compressive Strength Test at 14 days for Reaction Pile # 4, Design Riyadh Geotechnique &
CONC367
19 JB1071-HAI-04-ZZ-WIR-W-00019 CVL Foundation 27-Oct-22 30-Oct-22 OPEN
CONC378 Mix sample 40Mpa. Company Laboratory (RGF)

Concrete Compressive Strength Test at 14 days for Reaction Pile # 3 and at 7 Riyadh Geotechnique &
20 JB1071-HAI-04-ZZ-WIR-W-00020 CONC382 CVL Foundations 31-Oct-22 OPEN
days for Test Pile # 2. Design Mix sample 40Mpa. (RGF)

Concrete Compressive Strength Test at 14 days for Reaction Pile # 2 and at 7 Riyadh Geotechnique &
21 JB1071-HAI-04-ZZ-WIR-W-00021 CONC385 CVL Foundations 1-Nov-22 OPEN
days for Reaction Pile # 6 (RGF)

Concrete Compressive Strength Test at 7 days for Reaction Pile # 8 (Silos Riyadh Geotechnique &
22 JB1071-HAI-04-ZZ-WIR-W-00022 INS005 CVL Foundations 2-Nov-22 OPEN
Area).Design Mix sample 40Mpa. (RGF)

Concrete Compressive Strength Test at 14 days for Reaction Pile # 1 and at 7 Riyadh Geotechnique &
23 JB1071-HAI-04-ZZ-WIR-W-00023 INS006 CVL FosrocFoundations
Brushbond Protective Coating for Blinding of Process Building OPEN
days for Reaction Pile # 5, Design Mix sample 40Mpa. (RGF)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

Concrete Compressive Strength Test at 14 days for Test Pile # 2. Design Mix Riyadh Geotechnique &
24 JB1071-HAI-04-ZZ-WIR-W-00024 INS008 CVL Foundations 7-Nov-22 OPEN
sample 40Mpa. (RGF)

25 JB1071-HAI-04-ZZ-WIR-W-00025 INS009 CVL


Inspection request for Concrete Trial Mix of 40MPA mix design with silica Saudi Ready Mix Batch Plant 7-Nov-22 OPEN
fume.

26 JB1071-HAI-04-ZZ-WIR-W-00026 INS010 CVL


Concrete Compressive Strength Test at 14 days for Reaction Pile # 6 (Silos Riyadh Geotechnique & 8-Nov-22 OPEN
Area). Design Mix sample 40Mpa. Foundations (RGF)

Concrete Trial Mix of 40MPA mix design with silica fume at GAC Batching General Agencies & Con.
27 JB1071-HAI-04-ZZ-WIR-W-00027 INS011 CVL (GAC) 8-Nov-22 OPEN
Plant Batchin Plant

Adil Hamdan Al Sobhi Est.


28 JB1071-HAI-04-ZZ-WIR-W-00028 INS012 CVL
Collecting Sample of Coarse Aggregates 20mm, 10mm and Fine Aggregate (Coarse Agg.) 8-Nov-22 OPEN
(sand) for Haif Ready Mix Concrete Batching Plant. Khalid Saeed Hamood Cont.
Est. (Fine Agg.)

29 JB1071-HAI-04-ZZ-WIR-W-00029 INS013 CVL


Concrete Compressive Strength Test at 14 days for Reaction Pile # 8 (Silos Riyadh Geotechnique & 9-Nov-22 OPEN
Area). Design Mix sample 40Mpa. Foundations (RGF)

Concrete Compressive Strength Test at 28 days for Reaction Pile # 4 and at 14 Riyadh Geotechnique &
30 JB1071-HAI-04-ZZ-WIR-W-00030 INS015 CVL Foundation 10-Nov-22 OPEN
days for Reaction Pile # 5- Design Mix sample 40Mpa. Company Laboratory (RGF).

Concrete Compressive Strength Test at 28 days for Test Pile # 1, Design Mix Riyadh Geotechnique &
31 JB1071-HAI-04-ZZ-WIR-W-00031 INS016 CVL Foundation 12-Nov-22 OPEN
sample 40Mpa. Company Laboratory (RGF).

32 JB1071-HAI-04-ZZ-WIR-W-00032 INS017 CVL Inspection request for Pile Load Testing for Test Pile # 1 of silos area Silos Area Test Pile # 1 13-Nov-22 OPEN

Concrete Compressive Strength Test at 07 days for Trial Mix 40 Mpa with Riyadh Geotechnique &
33 JB1071-HAI-04-ZZ-WIR-W-00033 INS019 CVL Foundations 14-Nov-22 OPEN
Silica Fume. (RGF)

Concrete Compressive Strength Test at 28 days for Reaction Pile # 3. Design Riyadh Geotechnique &
34 JB1071-HAI-04-ZZ-WIR-W-00034 INS020 CVL Foundations 14-Nov-22 OPEN
Mix sample 40Mpa. (RGF)

Concrete Compressive Strength Test at 28 days for Reaction Pile # 2 (Silos Riyadh Geotechnique &
35 JB1071-HAI-04-ZZ-WIR-W-00035 INS023 CVL Foundations 15-Nov-22 OPEN
Area). Design Mix sample 40Mpa. (RGF)

Compressive Strength of Concrete at 7 days for Trial Mix of 40MPA mix design Riyadh Geotechnique &
36 JB1071-HAI-04-ZZ-WIR-W-00036 INS024 CVL Foundations 15-Nov-22 OPEN
with silica fume from GAC ready mix concrete (RGF)

37 JB1071-HAI-04-ZZ-WIR-W-00037 INS025 CVL Pile Steel Cage and Pre Pour for Pile # SP6-24 Silos Area 15-Nov-22 OPEN

Concrete Compressive Strength Test at 28 days for Reaction Pile # 1 and at 7 Riyadh Geotechnique &
38 JB1071-HAI-04-ZZ-WIR-W-00038 INS026 CVL Foundations 17-Nov-22 OPEN
days for Reaction Pile # 7, Design Mix sample 40Mpa. (RGF)

Concrete Compressive Strength Test at 28 days for Test Pile # 2. Design Mix Riyadh Geotechnique &
39 JB1071-HAI-04-ZZ-WIR-W-00039 INS027 CVL Foundations 21-Nov-22 OPEN
sample 40Mpa. (RGF)

Concrete Compressive Strength Test at 14 days for Trial Mix 40 Mpa with Riyadh Geotechnique &
40 JB1071-HAI-04-ZZ-WIR-W-00040 INS028 CVL Foundations 21-Nov-22 OPEN
Silica Fume. (Saudi Ready Mix Concrete) (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP6-24 with Silica Riyadh Geotechnique &
41 JB1071-HAI-04-ZZ-WIR-W-00041 INS029 CVL Foundations 22-Nov-22 OPEN
Fume. (Saudi Ready Mix Concrete) (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP6-22 with Silica Riyadh Geotechnique &
42 JB1071-HAI-04-ZZ-WIR-W-00042 INS030 CVL Foundations 23-Nov-22 OPEN
Fume. (Saudi Ready Mix Concrete) (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP6-18, SP6-20 & Riyadh Geotechnique &
43 JB1071-HAI-04-ZZ-WIR-W-00043 INS031 CVL Foundations 24-Nov-22 OPEN
SP6-25 with Silica Fume. (Saudi Ready Mix Concrete) (RGF)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

44 JB1071-HAI-04-ZZ-WIR-W-00044 INS032 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-10, SP6-27 Revised Engineering & 26-Nov-22 OPEN
and SP6-37. (Saudi Ready Mix Concrete) Design Schedule

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-9, SP6-12, Riyadh Geotechnique &
45 JB1071-HAI-04-ZZ-WIR-W-00045 INS033 CVL Foundations 27-Nov-22 OPEN
SP6-19 and SP6-21. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-23, SP6-26 Riyadh Geotechnique &
46 JB1071-HAI-04-ZZ-WIR-W-00046 INS035 CVL Foundations 28-Nov-22 OPEN
and SP6-28. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-8, SP6-11, Riyadh Geotechnique &
47 JB1071-HAI-04-ZZ-WIR-W-00047 INS037 CVL Foundations 30-Nov-22 OPEN
SP6-13 and SP6-36. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-3, SP6-5, Riyadh Geotechnique &
48 JB1071-HAI-04-ZZ-WIR-W-00048 INS038 CVL Foundations 1-Dec-22 OPEN
SP6-29, SP6-35 and SP12-22 (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-2, SP6-4, Riyadh Geotechnique &
49 JB1071-HAI-04-ZZ-WIR-W-00049 INS039 CVL Foundations 3-Dec-22 OPEN
SP6-17, SP6-30 and SP12-20 (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-1, SP6-14, Riyadh Geotechnique &
50 JB1071-HAI-04-ZZ-WIR-W-00050 INS040 CVL Foundations 4-Dec-22 OPEN
SP12-21, SP12-24 and SP5-24. (RGF)

Concrete Compressive Strength Test at 28 days for Trial Mix 40 Mpa with Riyadh Geotechnique &
51 JB1071-HAI-04-ZZ-WIR-W-00051 INS041 CVL Foundations 5-Dec-22 OPEN
Silica Fume. (Saudi Ready Mix Concrete) (RGF)

INS042
52 JB1071-HAI-04-ZZ-WIR-W-00052 INS043
CVL Concrete Trial Mixes of 40MPA mix design with silica fume at Haif Batch Plant. Haif Batch Plant 6-Dec-22 OPEN

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-6, SP6-18 Riyadh Geotechnique &
53 JB1071-HAI-04-ZZ-WIR-W-00053 INS044 CVL Foundations 6-Dec-22 OPEN
and SP6-31. (RGF)

Compressive Strength of Concrete at 28 days for Trial Mix of 40MPA mix Riyadh Geotechnique &
54 JB1071-HAI-04-ZZ-WIR-W-00054 INS045 CVL Foundations 6-Dec-22 OPEN
design with silica fume from GAC ready mix concrete (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-7, SP6-15 Riyadh Geotechnique &
55 JB1071-HAI-04-ZZ-WIR-W-00055 INS046 CVL Foundations 7-Dec-22 OPEN
and SP12-9, SP12-23. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-16, SP6-32 Riyadh Geotechnique &
56 JB1071-HAI-04-ZZ-WIR-W-00056 INS048 CVL Foundations 8-Dec-22 OPEN
and SP12-19, SP12-36. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-33, SP12-11 Riyadh Geotechnique &
57 JB1071-HAI-04-ZZ-WIR-W-00057 INS049 CVL Foundations 10-Dec-22 OPEN
and SP12-17, SP12-34. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP6-34, SP12-10 Riyadh Geotechnique &
58 JB1071-HAI-04-ZZ-WIR-W-00058 INS050 CVL Foundations 11-Dec-22 OPEN
and SP12-26, SP12-35. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP12-4, SP12-8 Riyadh Geotechnique &
59 JB1071-HAI-04-ZZ-WIR-W-00059 INS051 CVL Foundations 12-Dec-22 OPEN
and SP12-16, SP12-37. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP12-3, SP12-7 Riyadh Geotechnique &
60 JB1071-HAI-04-ZZ-WIR-W-00060 INS052 CVL Foundations 13-Dec-22 OPEN
and SP12-25, SP5-20. (RGF)

Riyadh Geotechnique &


61 JB1071-HAI-04-ZZ-WIR-W-00061 INS053 CVL Concrete Compressive Strength Test at 28 days for Silo Pile # SP6-24. Foundations 13-Dec-22 OPEN
(RGF)

Compressive Strength Concrete at 7 days of Trial Mixes of 40MPA mix design Riyadh Geotechnique &
62 JB1071-HAI-04-ZZ-WIR-W-00062 INS054 CVL Foundations 13-Dec-22 OPEN
with silica fume for Haif Batch Plant. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP12-2, SP12-33 Riyadh Geotechnique &
63 JB1071-HAI-04-ZZ-WIR-W-00063 INS055 CVL Foundations 14-Dec-22 OPEN
and SP5-18, SP5-22, SP5-25. (RGF)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

Riyadh Geotechnique &


64 JB1071-HAI-04-ZZ-WIR-W-00064 INS056 CVL Concrete Compressive Strength Test at 28 days for Silo Pile # SP6-22. Foundations 14-Dec-22 OPEN
(RGF)

65 JB1071-HAI-04-ZZ-WIR-W-00065 INS057 CVL Concrete Trial Mixes of 40MPA mix design with silica fume at Haif Batch Plant. Haif Batch Plant 14-Dec-22 OPEN

Compressive Strength Test at 7 days for Silo Pile # SP12-1, SP12-21 and SP12- Riyadh Geotechnique &
66 JB1071-HAI-04-ZZ-WIR-W-00066 INS058 CVL Foundations 15-Dec-22 CLOSED
23. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP12-1, SP5-21 Riyadh Geotechnique &
67 JB1071-HAI-04-ZZ-WIR-W-00067 INS059 CVL Foundations 15-Dec-22 OPEN
and SP5-23. (RGF)

Concrete Compressive Strength Test at 28 days for Silo Pile # SP6 – 18, SP6- Riyadh Geotechnique &
68 JB1071-HAI-04-ZZ-WIR-W-00068 INS060 CVL 20 and SP6-25 Foundations 15-Dec-22 OPEN
(RGF)

69 JB1071-HAI-04-ZZ-WIR-W-00069 INS061 CVL Pile Load Testing for Test Pile # 2 of silos area. Silos Area Test Pile # 2 15-Dec-22 OPEN

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-10, SP6- Riyadh Geotechnique &
70 JB1071-HAI-04-ZZ-WIR-W-00070 INS062 CVL Foundations 17-Dec-22 OPEN
27, SP6-37. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 15, SP12- Riyadh Geotechnique &
71 JB1071-HAI-04-ZZ-WIR-W-00071 INS063 CVL 32 and SP5-19, SP5-26 Foundations 17-Dec-22 OPEN
(RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-9, SP6-12, Riyadh Geotechnique &
72 JB1071-HAI-04-ZZ-WIR-W-00072 INS064 CVL Foundations 18-Dec-22 OPEN
SP6-19 and SP6-21. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 6, SP12- Riyadh Geotechnique &
73 JB1071-HAI-04-ZZ-WIR-W-00073 INS065 CVL 12, SP12-31 and SP5-9, SP5-12, SP5-36 Foundations 18-Dec-22 OPEN
(RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-23, SP6-26 Riyadh Geotechnique &
74 JB1071-HAI-04-ZZ-WIR-W-00074 INS066 CVL Foundations 19-Dec-22 OPEN
and SP6-28. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 5, SP12- Riyadh Geotechnique &
75 JB1071-HAI-04-ZZ-WIR-W-00075 INS067 CVL Foundations 19-Dec-22 OPEN
27, SP12-30 and SP5-8, SP5-10, SP5-27, SP5-35 (RGF)

Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 14, SP12- Riyadh Geotechnique &
76 JB1071-HAI-04-ZZ-WIR-W-00076 INS068 CVL Foundations 20-Dec-22 OPEN
28, and SP5-3, SP5-11, SP5-28, SP5-37 (RGF)

77 JB1071-HAI-04-ZZ-WIR-W-00077 INS069 CVL


Inspection request for collecting Soil Sample from Silo Area and Admin Silos Area and Admin 20-Dec-22 OPEN
Building. Building

Concrete Compressive Strength Test at 7 days for Silo Pile # SP12– 13, and Riyadh Geotechnique &
78 JB1071-HAI-04-ZZ-WIR-W-00078 INS070 CVL Foundations 21-Dec-22 OPEN
SP5-4, SP5-13, SP5-17 and SP11-34, SP11-37 (RGF)

79 JB1071-HAI-04-ZZ-WIR-W-00079 INS071 CVL


Concrete Compressive Strength Test at 7 days for C40 Trial Mix from Haif Haif Batch Plant 21-Dec-22 OPEN
Batching Plant.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-8, SP6-11, Riyadh Geotechnique &
80 JB1071-HAI-04-ZZ-WIR-W-00080 INS072 CVL Foundations 21-Dec-22 OPEN
SP6-13 and SP6-36. (RGF)

81 JB1071-HAI-04-ZZ-WIR-W-00081 INS073 CVL Coordinates for Admin Building. Admin Building 22-Dec-22 OPEN

82 JB1071-HAI-04-ZZ-WIR-W-00082 INS074 CVL Coordinates of Piling for Silo Number 4. Silos Area 22-Dec-22 OPEN

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-3, SP6-5, Riyadh Geotechnique &
83 JB1071-HAI-04-ZZ-WIR-W-00083 INS075 CVL Foundations 22-Dec-22 OPEN
SP6-29, SP6-35 and SP12-22. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-2, SP5-5, Riyadh Geotechnique &
84 JB1071-HAI-04-ZZ-WIR-W-00084 INS076 CVL Foundations 22-Dec-22 OPEN
SP11-36, SP11-21 and SP12-29. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-1, SP5-29, Riyadh Geotechnique &
85 JB1071-HAI-04-ZZ-WIR-W-00085 INS077 CVL Foundations 24-Dec-22 OPEN
SP11-19, SP11-24 and SP11-35. (RGF)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-2, SP6-4, Riyadh Geotechnique &
86 JB1071-HAI-04-ZZ-WIR-W-00086 INS078 CVL Foundations 24-Dec-22 OPEN
SP6-17, SP6-30 and SP12-20. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-6, SP5-16, Riyadh Geotechnique &
87 JB1071-HAI-04-ZZ-WIR-W-00087 INS079 CVL Foundations 25-Dec-22 OPEN
SP5-30, SP11-17, SP11-18, SP11-20, SP11-22, SP11-23 and SP11-33. (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-1, SP6-14, Riyadh Geotechnique &
88 JB1071-HAI-04-ZZ-WIR-W-00088 INS080 CVL Foundations 25-Dec-22 27-Dec-22 2 CLOSED RHDHV
SP12-21, SP12-24 and SP5-24. (RGF)

89 JB1071-HAI-04-ZZ-WIR-W-00089 INS081 CVL Setting Out Coordinates of Piling for Silo Number 10. Silos Area 25-Dec-22 OPEN

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-7, SP5-14, Riyadh Geotechnique &
90 JB1071-HAI-04-ZZ-WIR-W-00090 INS084 CVL Foundations 26-Dec-22 OPEN
SP5-34, SP11-8, SP11-11, SP11-9, SP11-16, SP11-32 and SP4-18. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-15, SP5-33, Riyadh Geotechnique &
91 JB1071-HAI-04-ZZ-WIR-W-00091 INS085 CVL Foundations 27-Dec-22 OPEN
SP4-20, SP11-10, SP11-25, SP11-2, SP11-12, SP11-15. (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-6, SP6-18 Riyadh Geotechnique &
92 JB1071-HAI-04-ZZ-WIR-W-00092 INS086 CVL Foundations 27-Dec-22 OPEN
and SP6-31. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-31, SP11- Riyadh Geotechnique &
93 JB1071-HAI-04-ZZ-WIR-W-00093 INS087 CVL Foundations 28-Dec-22 OPEN
31, SP11-37, SP11-26, SP4-22, SP4-19 and SP4-25 (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-7, SP6-15, Riyadh Geotechnique &
94 JB1071-HAI-04-ZZ-WIR-W-00094 INS088 CVL Foundations 28-Dec-22 OPEN
SP12-9 and SP12-23. (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-16, SP6-32 Riyadh Geotechnique &
95 JB1071-HAI-04-ZZ-WIR-W-00095 INS089 CVL Foundations 29-Dec-22 OPEN
and SP12-19, SP12-36. (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP5-32, SP4-21, Riyadh Geotechnique &
96 JB1071-HAI-04-ZZ-WIR-W-00096 INS090 CVL SP4-24, SP4-8, SP4-23, SP4-27, SP11-4, SP11-30, SP11-1 and SP10-34, SP10- Foundations 29-Dec-22 OPEN
37 (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP4-26, SP4-36, Riyadh Geotechnique &
97 JB1071-HAI-04-ZZ-WIR-W-00097 INS091 CVL SP4-9, SP4-11, SP4-37, SP4-10, SP10-18, SP10-36, SP10-33, SP11-05, SP11-06 Foundations 31-Dec-22 OPEN
& SP11-27 (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-33, SP12- Riyadh Geotechnique &
98 JB1071-HAI-04-ZZ-WIR-W-00098 INS092 CVL Foundations 31-Dec-22 OPEN
11 and SP12-17, SP12-34 (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles # SP4-12, SP4-17, Riyadh Geotechnique &
99 JB1071-HAI-04-ZZ-WIR-W-00099 INS093 CVL SP4-28, SP4-3, SP4-13, SP4-35, SP11-13, SP11-14, SP10-32, SP10-35, SP10-8, Foundations 1-Jan-23 OPEN
SP10-16 (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-34, SP12- Riyadh Geotechnique &
100 JB1071-HAI-04-ZZ-WIR-W-00100 INS094 CVL Foundations 1-Jan-23 OPEN
10 and SP12-26, SP12-3 (RGF)

101 JB1071-HAI-04-ZZ-WIR-W-00101 INS095 CVL witness of Collecting Sub-Base sample from Abdullah Oqbi Crusher. Abdullah Oqbi Crusher. 2-Jan-23 OPEN

Concrete Compressive Strength Test at 7 days for Silo Piles # SP4-4, SP4-2,
Riyadh Geotechnique &
102 JB1071-HAI-04-ZZ-WIR-W-00102 INS096 CVL SP4-34, SP4-1, SP11-28, SP10-31, SP10-17, SP10-15, SP10-2, SP10-21, SP10- Foundations (RGF)
2-Jan-23 OPEN
30.

103 JB1071-HAI-04-ZZ-WIR-W-00103 INS097 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP12-4, SP12-8 Riyadh Geotechnique & 2-Jan-23 OPEN
and SP12-16, SP12-37. Foundations (RGF)

104 JB1071-HAI-04-ZZ-WIR-W-00104 INS098 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP11-29, SP4- Riyadh Geotechnique & 3-Jan-23 OPEN
29, SP4-5, SP4-7, SP4-14, SP4-6 SP10-7, SP10-20, SP10-23 & SP10-19 Foundations (RGF)

105 JB1071-HAI-04-ZZ-WIR-W-00105 INS099 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-3, SP12-7, Riyadh Geotechnique & 3-Jan-23 OPEN
SP12-25 & SP5-20 Foundations (RGF)

106 JB1071-HAI-04-ZZ-WIR-W-00106 INS100 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles SP4-16, SP4-15, Riyadh Geotechnique & 4-Jan-23 OPEN
SP4-30, SP10-22, SP10-6, SP10-14, SP10-25, SP10-1, SP10-9, SP3-20 & SP3-23 Foundations (RGF)

107 JB1071-HAI-04-ZZ-WIR-W-00107 INS101 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-2, SP12-33, Riyadh Geotechnique & 4-Jan-23 OPEN
SP5-18, SP5-22 & SP5-25 Foundations (RGF)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

Concrete Compressive Strength Test at 7 days for Silo Piles SP4-31, SP4-32,
Riyadh Geotechnique &
108 JB1071-HAI-04-ZZ-WIR-W-00108 INS102 CVL SP4-33, SP10-29, SP10-10, SP10-24, SP10-3, SP10-11, SP3-21, SP3-25, SP3-18 Foundations (RGF)
5-Jan-23 OPEN
& SP3-22

109 JB1071-HAI-04-ZZ-WIR-W-00109 INS103 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-1, SP5-21 & Riyadh Geotechnique & 5-Jan-23 OPEN
SP5-23 Foundations (RGF)

Riyadh Geotechnique &


110 JB1071-HAI-04-ZZ-WIR-W-00110 INS104 CVL Compaction Test (FDT) for Admin Building under the blinding. Foundations (RGF)
5-Jan-23 OPEN

111 JB1071-HAI-04-ZZ-WIR-W-00111 INS105 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-15, SP12- Riyadh Geotechnique & 7-Jan-23 OPEN
32, SP5-19 & SP5-26 Foundations (RGF)

112 JB1071-HAI-04-ZZ-WIR-W-00112 INS106 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles SP10-26, SP10-4, Riyadh Geotechnique & 7-Jan-23 OPEN
SP3-19, SP3-24, SP3-10, SP3-37 & SP9-18 Foundations (RGF)

113 JB1071-HAI-04-ZZ-WIR-W-00113 INS107 CVL Inspection request for Trial Mix 15 Mpa Mix Design at Haif Batch Plant. Haif Batching Plant 7-Jan-23 OPEN

Concrete Compressive Strength Test at 7 days for Silo Piles SP10-5, SP10-27,
Riyadh Geotechnique &
114 JB1071-HAI-04-ZZ-WIR-W-00114 INS108 CVL SP10-12, SP3-3, SP3-4, SP3-8, SP3-9, SP3-11, SP3-26, SP3-36, SP9-21 & SP9- Foundations (RGF)
8-Jan-23 OPEN
37

115 JB1071-HAI-04-ZZ-WIR-W-00115 INS109 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-6, SP12-12, Riyadh Geotechnique & 8-Jan-23 OPEN
SP12-31, SP5-9, SP5-12 & SP5-36 Foundations (RGF)

Saudi Reay Mix Batching


116 JB1071-HAI-04-ZZ-WIR-W-00116 INS110 CVL Trial Mix 40 Mpa (OPC + GGBS) Mix Design at Saudi Ready Mix Batching Plant. Plant
8-Jan-23 OPEN

Concrete Compressive Strength Test at 7 days for Silo Piles SP10-13, SP10-28,
Riyadh Geotechnique &
117 JB1071-HAI-04-ZZ-WIR-W-00117 INS111 CVL SP3-12, SP3-5, SP3-17, SP3-27, SP3-34, SP9-34, SP9-36, SP9-8, SP9-35 & SP9- Foundations (RGF)
9-Jan-23 OPEN
19

118 JB1071-HAI-04-ZZ-WIR-W-00118 INS112 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-5, SP12-27, Riyadh Geotechnique & 9-Jan-23 OPEN
SP12-30, SP5-8, SP5-10, SP5-27 & SP5-35 Foundations (RGF)

119 JB1071-HAI-04-ZZ-WIR-W-00119 INS115 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-14, SP12- Riyadh Geotechnique & 10-Jan-23 OPEN
28, SP5-3, SP5-11, SP5-28 & SP5-37 Foundations (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles SP3-1, SP3-2, SP3-
Riyadh Geotechnique &
120 JB1071-HAI-04-ZZ-WIR-W-00120 INS116 CVL 7, SP3-13, SP3-28, SP3-35, SP9-2, SP9-3, SP9-9, SP9-17, SP9-20, SP9-22 & SP9- Foundations (RGF)
10-Jan-23 OPEN
33

121 JB1071-HAI-04-ZZ-WIR-W-00121 INS117 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-13, SP5-4, Riyadh Geotechnique & 11-Jan-23 OPEN
SP5-13, SP5-17, SP11-34 & SP11-37 Foundations (RGF)

122 JB1071-HAI-04-ZZ-WIR-W-00122 INS118 CVL


Concrete Compressive Strength Test at 28 days for C40 (OPC + MS) Trial Mix Haif Batching Plant 11-Jan-23 OPEN
from Haif Batching Plant.

Inspection request for Elevation and Compaction Test (FDT) under the
123 JB1071-HAI-04-ZZ-WIR-W-00123 INS119 CVL blinding for Silo # 6 and Haif Batching Plant 11-Jan-23 OPEN
Silo # 12 at Silos Area.

124 JB1071-HAI-04-ZZ-WIR-W-00124 INS120 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles SP3-6, SP3-33, Riyadh Geotechnique & 11-Jan-23 OPEN
SP3-14, SP3-16, SP9-23, SP9-10, SP9-7, SP9-16, SP9-1, SP9-11 & SP9-24 Foundations (RGF)

125 JB1071-HAI-04-ZZ-WIR-W-00125 INS121 CVL


Inspection request for Excavation, Backfilling and Compaction test (FDT) Admin Building 11-Jan-23 OPEN
under the blinding at Admin Building

126 JB1071-HAI-04-ZZ-WIR-W-00126 INS122 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles SP9-30, SP9-15, Haif Batching Plant 12-Jan-23 OPEN
SP9-4, SP9-25, SP9-32, SP9-12, SP9-6, SP9-27, SP3-29, SP3-15 & SP3-30

127 JB1071-HAI-04-ZZ-WIR-W-00127 INS123 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP12-29, SP11- Riyadh Geotechnique & 12-Jan-23 OPEN
21, SP11-36, SP5-2 & SP5-5 Foundations (RGF)

128 JB1071-HAI-04-ZZ-WIR-W-00128 INS124 CVL


Inspection request for Integrity test of Piles for Silo # 6, Silo # 12 at Silos area. Silos Area 12-Jan-23 OPEN
(Attached Certificates)

129 JB1071-HAI-04-ZZ-WIR-W-00129 INS125 CVL


Inspection request for Termites Control Spray at Silo # 6 and Silo # 12 under Silos Area 14-Jan-23 OPEN
the blinding of pile cap.

130 JB1071-HAI-04-ZZ-WIR-W-00130 INS126 CVL


Inspection request for Concrete Compressive Strength Test at 7 days for Haif Batching Plant 14-Jan-23 OPEN
15Mpa Trial Mix from Haif Batching Plant
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

131 JB1071-HAI-04-ZZ-WIR-W-00131 INS127 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 6. Silo # 6, Silos Area 14-Jan-23 OPEN

132 JB1071-HAI-04-ZZ-WIR-W-00132 INS130 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles SP5-1, SP5-29, Riyadh Geotechnique & 14-Jan-23 OPEN
SP11-19, SP11-24 & SP11-35 Foundations (RGF)

Concrete Compressive Strength Test at 7 days for Silo Piles SP3-32, SP3-31,
133 JB1071-HAI-04-ZZ-WIR-W-00133 INS131 CVL SP9-31, SP9-5, SP9-26, SP9-14, SP2-20, SP2-18, SP2-22, SP2-19, SP2-37, SP8- Haif Batching Plant 14-Jan-23 OPEN
37 & SP8-35

134 JB1071-HAI-04-ZZ-WIR-W-00134 INS132 CVL


Concrete Compressive Strength Test at 7 days for C40 (OPC + GGBS) Trial Mix Riyadh Geotechnique & 15-Jan-23 OPEN
from Saudi Ready Mix Concrete Foundations (RGF)

Concrete Compressive Strength Test at 7 days for Silo


135 JB1071-HAI-04-ZZ-WIR-W-00135 INS133 CVL Piles # SP9-13, SP9-29, SP2-24, SP2-8, SP2-36, SP2-23, SP8-33, SP8-36, SP8- Haif Batching Plant 15-Jan-23 OPEN
34, SP8-21.

Concrete Compressive Strength Test at 28 days for Silo


Riyadh Geotechnique &
136 JB1071-HAI-04-ZZ-WIR-W-00136 INS134 CVL Piles # SP11-17, SP11-18, SP11-20, SP11-33, SP11-22, SP11-23, SP5-6, SP5- Foundations (RGF)
15-Jan-23 OPEN
16, SP5-30.

137 JB1071-HAI-04-ZZ-WIR-W-00137 INS135 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 12. Silo # 12, Silos Area 15-Jan-23 OPEN

138 JB1071-HAI-04-ZZ-WIR-W-00138 INS136 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP9-28, SP2-17, Haif Batching Plant 16-Jan-23 OPEN
SP2-9, SP2-25, SP2-35, SP8-8, SP8-17, SP8-23, SP8-16, SP8-18, SP8-20, SP8-32

Concrete Compressive Strength Test at 28 days for Silo


Riyadh Geotechnique &
139 JB1071-HAI-04-ZZ-WIR-W-00139 INS137 CVL Piles # SP11-8, SP11-11, SP11-32, SP11-9, SP11-16, SP5-7, SP5-14, SP5-34, Foundations (RGF)
16-Jan-23 OPEN
SP4-18

140 JB1071-HAI-04-ZZ-WIR-W-00140 INS138 CVL Inspection request for Termites Control Spray at Admin Building Foundation. Admin Building 17-Jan-23 OPEN

141 JB1071-HAI-04-ZZ-WIR-W-00141 INS139 CVL


Inspection request for Pouring Blinding Concrete for Admin Building Admin Building 17-Jan-23 OPEN
Foundation.

142 JB1071-HAI-04-ZZ-WIR-W-00142 INS140 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-20, SP11- Riyadh Geotechnique & 17-Jan-23 OPEN
10, SP11-25, SP11-2, SP11-12, SP11-15, SP5-15 & SP5-33 Foundations (RGF)

143 JB1071-HAI-04-ZZ-WIR-W-00143 INS141 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP2-2, SP2-3, Haif Batching Plant 17-Jan-23 OPEN
SP2-10, SP2-11, SP8-19 & SP8-22

144 JB1071-HAI-04-ZZ-WIR-W-00144 INS142 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP2-34, SP2-4, Haif Batching Plant 18-Jan-23 OPEN
SP2-7, SP2-26, SP2-16, SP8-7, SP8-9 & SP8-15

145 JB1071-HAI-04-ZZ-WIR-W-00145 INS143 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP5-31, SP11- Riyadh Geotechnique & 18-Jan-23 OPEN
31, SP11-3, SP11-7, SP11-26, SP4-22, SP4-19 & SP4-25 Foundations (RGF)

146 JB1071-HAI-04-ZZ-WIR-W-00146 INS144 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP2-12, SP2-6, Haif Batching Plant 19-Jan-23 OPEN
SP2-32, SP2-15, S2-5, SP8-2, SP8-10, SP8-24 & SP8-3

147 JB1071-HAI-04-ZZ-WIR-W-00147 INS145 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP10-37, SP10- Riyadh Geotechnique & 19-Jan-23 OPEN
34, SP4-21, SP4-24, SP4-8, SP4-23, SP4-27, SP11-4, SP11-30, SP11-1 & SP5-32 Foundations (RGF)

148 JB1071-HAI-04-ZZ-WIR-W-00148 INS147 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP2-27, SP2-14, Haif Batching Plant 21-Jan-23 OPEN
SP2-33, SP2-13, SP2-31, SP8-1, SP8-11, SP8-4, SP8-31.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-26, SP4-
Riyadh Geotechnique &
149 JB1071-HAI-04-ZZ-WIR-W-00149 INS148 CVL 36, SP4-9, SP4-11, SP4-37, SP4-10, SP10-18, SP10-36, SP10-33, SP11-5, SP11- Foundations (RGF)
21-Jan-23 OPEN
6, SP11-27

Concrete Compressive Strength Test at 28 days for Silo Piles # SP11-13, SP11-
Riyadh Geotechnique &
150 JB1071-HAI-04-ZZ-WIR-W-00150 INS149 CVL 14, SP4-12, SP4-17, SP4-28, SP4-3, SP4-13, SP4-35, SP10-32, SP10-35, SP10-8 Foundations (RGF)
22-Jan-23 OPEN
& SP10-16

151 JB1071-HAI-04-ZZ-WIR-W-00151 INS150 CVL


Compressive Strength Test at 7 days for Silo Piles # SP2-30, SP2-28, SP2-29, Haif Batching Plant 22-Jan-23 OPEN
SP8-6, SP8-25, SP8-30, SP1-22 & SP1-20

152 JB1071-HAI-04-ZZ-WIR-W-00152 INS151 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP8-26, SP8-5, Haif Batching Plant 23-Jan-23 OPEN
SP8-14, SP1-24, SP1-19, SP1-23, SP1-37 & SP1-21
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

Concrete Compressive Strength Test at 28 days for Silo Piles # SP11-28, SP10-
Riyadh Geotechnique &
153 JB1071-HAI-04-ZZ-WIR-W-00153 INS152 CVL 31, SP10-17, SP10-15, SP10-2, SP10-21, SP10-30, SP4-4, SP4-2, SP4-34 & SP4- Foundations (RGF)
23-Jan-23 OPEN
1

154 JB1071-HAI-04-ZZ-WIR-W-00154 INS154 CVL


Inspection request for Elevation and Compaction Test (FDT) under the Silos Area (Silo 5 24-Jan-23 OPEN
blinding for Silo # 5 and Silo # 11 foundations at Silos Area. and Silo 11)

155 JB1071-HAI-04-ZZ-WIR-W-00155 INS155 CVL


Inspection request for Termites Control Spray at Silo 5 and Silos 11 under the Silos Area (Silo 5 24-Jan-23 OPEN
blinding of Foundation. and Silo 11)

156 JB1071-HAI-04-ZZ-WIR-W-00156 INS156 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 11. Silo # 5, Silos Area 24-Jan-23 OPEN

157 JB1071-HAI-04-ZZ-WIR-W-00157 INS157 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP8-12, SP8-29, Haif Batching Plant 24-Jan-23 OPEN
SP1-18, SP1-10, SP1-8, SP1-25, SP1-35 & SP7-37

158 JB1071-HAI-04-ZZ-WIR-W-00158 INS158 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP11-29, SP4- Riyadh Geotechnique & 24-Jan-23 OPEN
29, SP4-5, SP4-7, SP4-14, SP4-6, SP10-7, SP10-20, SP10-23 & SP 10-19 Foundations (RGF)

159 JB1071-HAI-04-ZZ-WIR-W-00159 INS159 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP8-13, SP8-28, Haif Batching Plant 25-Jan-23 OPEN
SP1-36, SP1-9, SP1-11, SP1-17, SP1-3, SP7-18, SP7-36.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-16, SP4-
Riyadh Geotechnique &
160 JB1071-HAI-04-ZZ-WIR-W-00160 INS160 CVL 15, SP4-30, SP10-22, SP10-6, SP10-14, SP10-25, SP10-1 SP10-9, SP3-20, SP3- Foundations (RGF)
25-Jan-23 OPEN
23.

161 JB1071-HAI-04-ZZ-WIR-W-00161 INS161 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 5. Silo # 5, Silos Area 25-Jan-23 OPEN

162 JB1071-HAI-04-ZZ-WIR-W-00162 INS162 CVL


Inspection request for Concrete Compressive Strength Test at 7 days for Flat Haif Batching Plant 25-Jan-23 OPEN
Storage Piles # FP1-313, FP1-409.

163 JB1071-HAI-04-ZZ-WIR-W-00163 INS163 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP8-27, SP1-34, Haif Batching Plant 26-Jan-23 OPEN
SP1-2, SP1-4, SP7-35, SP7-22 & SP7-19

Concrete Compressive Strength Test at 28 days for Silo Piles # SP4-31, SP4-
Riyadh Geotechnique &
164 JB1071-HAI-04-ZZ-WIR-W-00164 INS164 CVL 32, SP4-33, SP10-29, SP10-10, SP10-24, SP10-3, SP10-11, SP3-21, SP3-25, Foundations (RGF)
26-Jan-23 OPEN
SP3-18 & SP3-22

165 JB1071-HAI-04-ZZ-WIR-W-00165 INS166 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP1-7, SP1-12, Haif Batching Plant 28-Jan-23 OPEN
SP7-23, SP7-20, SP7-17, SP7-24, SP7-2, SP7-34 & SP7-10

166 JB1071-HAI-04-ZZ-WIR-W-00166 INS167 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP10-26, SP10- Riyadh Geotechnique & 28-Jan-23 OPEN
4, SP3-19, SP3-24, SP3-10, SP3-37 & SP9-18 Foundations (RGF)

167 JB1071-HAI-04-ZZ-WIR-W-00167 INS168 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP7-21, SP7-28, Haif Batching Plant 29-Jan-23 OPEN
SP1-16 & SP1-1

168 JB1071-HAI-04-ZZ-WIR-W-00168 INS169 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP10-5, SP10- Riyadh Geotechnique & 29-Jan-23 OPEN
12, SP3-3, SP3-4, SP3-8, SP3-9, SP3-11, SP3-26, SP3-36, SP9-21 & SP9-37 Foundations (RGF)

169 JB1071-HAI-04-ZZ-WIR-W-00169 INS172 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP1-33, SP1-6, Haif Batching Plant 30-Jan-23 OPEN
SP1-26, SP1-15, SP1-27, SP1-3, SP1-32, SP7-11, SP7-9, SP7-16, SP7-3.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP10-13,


Riyadh Geotechnique &
170 JB1071-HAI-04-ZZ-WIR-W-00170 INS173 CVL SP10-28, SP3-12, SP3-5, SP3-17, SP3-27, SP3-34, SP9-34, SP9-36, SP9-8, SP9- Foundations (RGF)
30-Jan-23 OPEN
35, SP9-19.

171 JB1071-HAI-04-ZZ-WIR-W-00171 INS176 CVL


Compressive Strength Test at 7 days for Silo Piles # SP1-13, Haif Batching Plant 31-Jan-23 OPEN
SP1-31, SP7-33, SP7-7, SP7-4, SP7-32, SP7-25.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP3-1, SP3-2,
Riyadh Geotechnique &
172 JB1071-HAI-04-ZZ-WIR-W-00172 INS177 CVL SP3-7, SP3-13, SP3-28, SP3-35, SP9-2, SP9-3, SP9-9, SP9-17, SP9-20, SP9-22, Foundations (RGF)
31-Jan-23 OPEN
SP9-33
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

173 JB1071-HAI-04-ZZ-WIR-W-00173 INS179 CVL


Cementitious Waterproofing (Setseal B) sample at Silos Area, Silos #6 1-Feb-23 OPEN
Silos # 6.

174 JB1071-HAI-04-ZZ-WIR-W-00174 INS180 CVL


Inspection request for Design Mix C15 Screed Trial Mix from Haif Batching Haif Batching Plant 1-Feb-23 OPEN
Plant.

175 JB1071-HAI-04-ZZ-WIR-W-00175 INS181 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP3-6, SP3-33, Riyadh Geotechnique & 1-Feb-23 OPEN
SP3-14, SP3-16, SP9-23, SP9-10, SP9-7, SP9-16, SP9-1, SP9-11 & SP9-24 Foundations (RGF)

176 JB1071-HAI-04-ZZ-WIR-W-00176 INS182 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP1-28, SP1-14, Haif Batching Plant 1-Feb-23 OPEN
SP1-30, SP1-29, SP7-1, SP7-6, SP7-31, SP7-12, SP7-26, SP7-15 & SP7-5

177 JB1071-HAI-04-ZZ-WIR-W-00177 INS184 CVL


Inspection request for application of Cementitious Waterproofing for Pile Cap Silo # 6, Silos Area 2-Feb-23 OPEN
of Silo # 6

178 JB1071-HAI-04-ZZ-WIR-W-00178 INS185 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 6. Silo # 6, Silos Area 2-Feb-23 OPEN

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-
179 JB1071-HAI-04-ZZ-WIR-W-00179 INS187 CVL 289, FP1-193,FP1-337,FP1-145. Haif Batching Plant 2-Feb-23 OPEN

180 JB1071-HAI-04-ZZ-WIR-W-00180 INS188 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP3-29, SP3- Haif Batching Plant 2-Feb-23 OPEN
15, SP3-30, SP9-30, SP9-15, SP9-4, SP9-25, SP9-32, SP9-12, SP9-6, SP9-27.

181 JB1071-HAI-04-ZZ-WIR-W-00181 INS189 CVL


Concrete Compressive Strength Test at 7 days for Silo Piles # SP7-27, SP7-14, Haif Batching Plant 2-Feb-23 OPEN
SP7-30, SP7-13, SP7-28

182 JB1071-HAI-04-ZZ-WIR-W-00182 INS190 CVL Inspection request for Steel Reinforcement of Admin Building Foundation Admin Building 4-Feb-23 OPEN

183 JB1071-HAI-04-ZZ-WIR-W-00183 INS191 CVL


Inspection request for Concrete Compressive Strength Test at 7 days for Silo Haif Batching Plant 4-Feb-23 OPEN
Piles # SP7-29.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP3-31,SP9-


184 JB1071-HAI-04-ZZ-WIR-W-00184 INS192 CVL 31, SP9-5, SP9-26, SP9-14, SP2-20, SP2-18, SP2-22, SP2-19, SP2-37, SP8-37, Haif Batching Plant 4-Feb-23 OPEN
SP8-35,SP3-32.

185 JB1071-HAI-04-ZZ-WIR-W-00185 INS193 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-97, Haif Batching Plant 4-Feb-23 OPEN
FP1-385,FP1-433,FP1-241,FP1-1,FP1-242,FP1-146,FP1-194,FP1-290,FP1-98.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-49,
186 JB1071-HAI-04-ZZ-WIR-W-00186 INS194 CVL FP1-338, FP1-386, FP1-147, FP1-4, FP1-2, FP1-5, FP1-99, FP1-195, FP1-243, Haif Batching Plant 5-Feb-23 OPEN
FP1-339 & FP1-50

187 JB1071-HAI-04-ZZ-WIR-W-00187 INS195 CVL


Concrete Compressive Strength Test at 28 days for Silos Storage Piles # S9-13, Haif Batching Plant 5-Feb-23 OPEN
S9-29, S2-21, S2-24, S2-8, S2-36, S2-23, S8-33, S8-36, S8-34 & S8-21

188 JB1071-HAI-04-ZZ-WIR-W-00188 INS196 CVL Inspection request for Concrete Pouring of Admin Building Raft Foundation Admin Building 5-Feb-23 OPEN

189 JB1071-HAI-04-ZZ-WIR-W-00189 INS198 CVL


Concrete Compressive Strength Test at 28 days of Trial Mix 40 Mpa (OPC + Riyadh Geotechnique & 6-Feb-23 OPEN
GGBS) Mix Design from Saudi Ready Mix Batching Plant. Foundations (RGF)

Concrete Compressive Strength Test at 28 days for Silo Piles # SP9-28,SP2-


190 JB1071-HAI-04-ZZ-WIR-W-00190 INS199 CVL 17, SP2-9, SP2-25, SP2-35, SP8-17, SP8-23, SP8-16, SP8-18, SP8-20, SP8-32, Haif Batching Plant 6-Feb-23 OPEN
SP8-8.

191 JB1071-HAI-04-ZZ-WIR-W-00191 INS200 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 6-Feb-23 OPEN
387, FP1-291,FP1-51,FP1-53,FP1-148,FP1-3,FP1-100,FP1-6.

192 JB1071-HAI-04-ZZ-WIR-W-00192 INS201 CVL


Inspection request for Elevation and Compaction Test (FDT) under the SILOS AREA 7-Feb-23 OPEN
blinding for Silo # 4 at Silo area
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

193 JB1071-HAI-04-ZZ-WIR-W-00193 INS202 CVL


Inspection request for Termites Control Spray at Silo # 4 under the blinding of SILOS AREA 7-Feb-23 OPEN
pile cap

194 JB1071-HAI-04-ZZ-WIR-W-00194 INS203 CVL Inspection request for Pouring Blinding Concrete for Pile Cap of Silo # 4. SILOS AREA 7-Feb-23 OPEN

195 JB1071-HAI-04-ZZ-WIR-W-00195 INS204 CVL Integrity test of Piles for Silo # 5, Silo # 11 at Silos area. SILOS AREA 7-Feb-23 OPEN

196 JB1071-HAI-04-ZZ-WIR-W-00196 INS205 CVL Concrete Pouring of Admin Building Raft Foundation Remaining Part Admin Building 7-Feb-23 OPEN

197 JB1071-HAI-04-ZZ-WIR-W-00197 INS206 CVL


Inspection request for laying of polythene sheet prior to casting of lean SILOS AREA 7-Feb-23 OPEN
concrete at Silos #4

198 JB1071-HAI-04-ZZ-WIR-W-00198 INS207 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP2-10,SP2- Haif Batching Plant 7-Feb-23 OPEN
11, SP8-19, SP8-22,SP2-3,SP2-2.

199 JB1071-HAI-04-ZZ-WIR-W-00199 INS210 CVL


Inspection request for Working Pile Load Testing for Pile # SP12 -1, Silos # 12 Silo # 12, Silos Area. 8-Feb-23 OPEN
at Silos Area.

200 JB1071-HAI-04-ZZ-WIR-W-00200 INS211 CVL


Inspection request for Steel Reinforcement of Columns Neck at Admin Admin Building 8-Feb-23 OPEN
Building.

201 JB1071-HAI-04-ZZ-WIR-W-00201 INS212 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 8-Feb-23 OPEN
196,FP1-244,FP1-52,FP1-292,FP1-340,FP1-101.

202 JB1071-HAI-04-ZZ-WIR-W-00202 INS213 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP2-34,SP2-4, Haif Batching Plant 8-Feb-23 OPEN
SP2-7, SP2-26,SP2-1,SP8-7,SP8-9,SP8-15.

203 JB1071-HAI-04-ZZ-WIR-W-00203 INS214 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP2-12,SP2-6, Haif Batching Plant 9-Feb-23 OPEN
SP2-32, SP2-15,SP2-5,SP8-2,SP8-10,SP8-24,SP8-3.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-388
204 JB1071-HAI-04-ZZ-WIR-W-00204 INS215 CVL FP1-149,FP1-197,FP1-245,FP1-54,FP1-7,FP1-293,FP1-150,FP1-102,FP1- Haif Batching Plant 9-Feb-23 OPEN
341,FP1-198,FP1-55.

205 JB1071-HAI-04-ZZ-WIR-W-00205 INS218 CVL


Inspection request for application of Cementitious Waterproofing for Pile Cap Silo # 5, Silos Area 11-Feb-23 OPEN
of Silo # 5.

206 JB1071-HAI-04-ZZ-WIR-W-00206 INS219 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 5. Silo # 5, Silos Area 11-Feb-23 OPEN

207 JB1071-HAI-04-ZZ-WIR-W-00207 INS220 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-103 Haif Batching Plant 11-Feb-23 OPEN
FP1-389,FP1-246,FP1-481,FP1-434,FP1-151,FP1-342,FP1-199,FP2-1.

208 JB1071-HAI-04-ZZ-WIR-W-00208 INS221 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP2-27,SP2- Haif Batching Plant 11-Feb-23 OPEN
14, SP2-33, SP2-13,SP8-1,SP8-11,SP8-4,SP8-31.

209 JB1071-HAI-04-ZZ-WIR-W-00209 INS223 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP2-30,SP2- Haif Batching Plant 12-Feb-23 OPEN
28, SP2-29, SP8-6,SP8-25,SP8-30,SP1-22,SP1-20

210 JB1071-HAI-04-ZZ-WIR-W-00210 INS224 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-390 Haif Batching Plant 12-Feb-23 OPEN
FP1-436,FP1-247,FP1-295,FP1-435,FP1-437,FP1-343,FP2-2

211 JB1071-HAI-04-ZZ-WIR-W-00211 INS225 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP8-26,SP8-5, Haif Batching Plant 13-Feb-23 OPEN
SP8-14, SP1-24,SP1-19,SP1-23,SP1-37,SP1-21.

212 JB1071-HAI-04-ZZ-WIR-W-00212 INS226 CVL


Inspection request for Concrete Compressive Strength Test at 28 days for Flat Haif Batching Plant 13-Feb-23 OPEN
Storage Piles # FP1-298.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

213 JB1071-HAI-04-ZZ-WIR-W-00213 INS227 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 13-Feb-23 OPEN
438, FP1-391,FP1-482,FP1-439,FP1-483,FP2-3,FP2-4,FP2-5,FP2-6,FP2-7.

214 JB1071-HAI-04-ZZ-WIR-W-00214 INS229 CVL


Inspection request for Form Work of Columns Neck (17 No.) at Admin Admin Building 14-Feb-23 OPEN
Building.

215 JB1071-HAI-04-ZZ-WIR-W-00215 INS230 CVL


Inspection request for Pouring Concrete of Columns Neck (17 No.) at Admin Admin Building 14-Feb-23 OPEN
Building.

216 JB1071-HAI-04-ZZ-WIR-W-00216 INS231 CVL


Inspection request for Compaction Test (FDT) under the blinding for Silo # 3 Silo # 3, Silos Area 14-Feb-23 OPEN
foundations at Silos Area

217 JB1071-HAI-04-ZZ-WIR-W-00217 INS232 CVL


Inspection request for Termites Control Spray at Silo # 3 under the blinding of Silo # 3, Silos Area 14-Feb-23 OPEN
Foundation at silos area.

218 JB1071-HAI-04-ZZ-WIR-W-00218 INS233 CVL


Inspection request for Installation of Polythene Sheet at Silo # 3 under the Silo # 3, Silos Area 14-Feb-23 OPEN
blinding of Foundation at silos area

Inspection request for Concrete Compressive Strength Test at 7 days for Flat
219 JB1071-HAI-04-ZZ-WIR-W-00219 INS234 CVL Storage Piles # FP1 - 484, 485, 486, 487, 440, 488, 392, 441, 344, 200, 248, Haif Batching Plant 14-Feb-23 OPEN
296, 8.

220 JB1071-HAI-04-ZZ-WIR-W-00220 INS235 CVL


Inspection request for Concrete Compressive Strength Test at 28 days for Silo Haif Batching Plant 14-Feb-23 OPEN
Piles # SP8-12, SP8-24, SP1-18, SP1-10, SP1-8, SP1-25, SP1-35, SP7-37.

221 JB1071-HAI-04-ZZ-WIR-W-00221 INS237 CVL Inspection request for Pouring Blinding at Silo # 3 Foundation at silos area. Haif Batching Plant 14-Feb-23 OPEN

222 JB1071-HAI-04-ZZ-WIR-W-00222 INS238 CVL


Inspection request for application of Cementitious Waterproofing (Brush Haif Batching Plant 15-Feb-23 OPEN
Bond) for Pile Cap of Silo # 11.

223 JB1071-HAI-04-ZZ-WIR-W-00223 INS239 CVL


Inspection request for Concrete Compressive Strength Test at 28 days for Flat Haif Batching Plant 15-Feb-23 OPEN
Storage Piles # FP1-313,FP1-409

224 JB1071-HAI-04-ZZ-WIR-W-00224 INS240 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP8-13,SP8- Haif Batching Plant 15-Feb-23 OPEN
28, SP1-36, SP1-9,SP1-11,SP1-17,SP1-3,SP7-18,SP7-36.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-104
225 JB1071-HAI-04-ZZ-WIR-W-00225 INS241 CVL FP1-152,FP1-393,FP1-345,FP1-297,FP1-489,FP1-9,FP1-8,FP1-249,FP1- Haif Batching Plant 15-Feb-23 OPEN
153,FP1-56,FP1-265,FP2-9.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-
226 JB1071-HAI-04-ZZ-WIR-W-00226 INS242 CVL 250FP1-201,FP1-57,FP1-10,FP1-154,FP1-105,FP1-11,FP1-106,FP1-202,FP1- Haif Batching Plant 16-Feb-23 OPEN
155,FP1-59,FP1-217,FP1-457.

227 JB1071-HAI-04-ZZ-WIR-W-00227 INS243 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP8-27,SP1- Haif Batching Plant 16-Feb-23 OPEN
34, SP1-2, SP1-4,SP7-35,SP7-22,SP7-19.

228 JB1071-HAI-04-ZZ-WIR-W-00228 INS244 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP7-21,SP7-8, Haif Batching Plant 18-Feb-23 OPEN
SP1-16, SP1-1.

229 JB1071-HAI-04-ZZ-WIR-W-00229 INS245 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-203 Haif Batching Plant 18-Feb-23 OPEN
FP1-58,FP1-12,FP1-251,FP1-107,FP1-252,FP1-13,FP1-60,FP1-204,FP1-108.

230 JB1071-HAI-04-ZZ-WIR-W-00230 INS246 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP7-23,SP7- Haif Batching Plant 19-Feb-23 OPEN
20, SP7-17,SP7-24,SP7-2,SP7-34,SP7-10,SP1-7, SP1-12.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-156
231 JB1071-HAI-04-ZZ-WIR-W-00231 INS247 CVL FP1-346,FP1-394,FP1-61,FP1-14,FP1-347,FP1-361,FP1-299,FP1-109,FP1- Haif Batching Plant 19-Feb-23 OPEN
395,FP1-157,FP1-62,FP1-205,FP1-253,FP1-314.

232 JB1071-HAI-04-ZZ-WIR-W-00232 INS248 CVL


Inspection request for application of Cementitious Waterproofing (Brush SILOS AREA # 12 19-Feb-23 OPEN
Bond) for Pile Cap of Silo # 12
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

233 JB1071-HAI-04-ZZ-WIR-W-00233 INS249 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 12. SILOS AREA # 12 19-Feb-23 OPEN

234 JB1071-HAI-04-ZZ-WIR-W-00234 INS250 CVL


Inspection request for Compaction Test (FDT) under the blinding for Silo # 10 Silo # 10, Silos Area 20-Feb-23 OPEN
foundations at Silos Area.

235 JB1071-HAI-04-ZZ-WIR-W-00235 INS251 CVL


Inspection request for Termites Control Spray at Silo # 10 under the blinding Silo # 10, Silos Area 20-Feb-23 OPEN
of Foundation at silos area.

236 JB1071-HAI-04-ZZ-WIR-W-00236 INS252 CVL


Inspection request for Installation of Polythene Sheet at Silo # 10 under the Silo # 10, Silos Area 20-Feb-23 OPEN
blinding of Foundation at silos area.

237 JB1071-HAI-04-ZZ-WIR-W-00237 INS253 CVL


Inspection request for Form Work of Columns Neck (15 No.) at Admin Admin Building 20-Feb-23 OPEN
Building.

238 JB1071-HAI-04-ZZ-WIR-W-00238 INS254 CVL


Inspection request for Pouring Concrete of Columns Neck (15 Nos.) at Admin Admin Building 20-Feb-23 OPEN
Building.

239 JB1071-HAI-04-ZZ-WIR-W-00239 INS255 CVL


Inspection request for Steel Reinforcement of Silo # 6 Foundations at Silos Silo # 6, Silos Area 20-Feb-23 OPEN
Area.

Inspection request for Concrete Compressive Strength Test at 28 days for Silo
240 JB1071-HAI-04-ZZ-WIR-W-00240 INS256 CVL Piles # SP1-33,SP1-6, Haif Batching Plant 20-Feb-23 OPEN
SP1-26,SP1-15,SP1-5,SP1-27,SP1-32,SP7-11, SP7-9,SP7-16,SP7-3.

Inspection request for Concrete Compressive Strength Test at 7 days for Flat
241 JB1071-HAI-04-ZZ-WIR-W-00241 INS257 CVL
Storage Piles # FP1-300 Haif Batching Plant 20-Feb-23 OPEN
FP1-301,FP1-348,FP1-158,FP1-110,FP1-206,FP1-254,FP1-111,FP1-15,FP1-
349,FP1-159,FP1-207,FP1-410,FP1-218,FP1-458.

242 JB1071-HAI-04-ZZ-WIR-W-00242 INS258 CVL


Inspection request for Integrity test of Piles for Silo # 3, Silo # 4 and Silo # 10 Silo # 3 , 4 and 10 - Silos 20-Feb-23 OPEN
at Silos area Area

243 JB1071-HAI-04-ZZ-WIR-W-00243 INS259 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP1-13,SP1- Haif Batching Plant 21-Feb-23 OPEN
31, SP7-33,SP7-7,SP7-32,SP7-25,SP7-4.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-256
244 JB1071-HAI-04-ZZ-WIR-W-00244 INS260 CVL FP1-303,FP1-16,FP1-302,FP1-63,FP1-255,FP1-160,FP1-266,FP1-73,FP1- Haif Batching Plant 21-Feb-23 OPEN
112,FP1-208,FP1-304,FP1-350,FP1-351,FP1-352,FP1-396,FP1-362,FP1-169.

245 JB1071-HAI-04-ZZ-WIR-W-00245 INS261 CVL Inspection request for Pouring Blinding at Silo # 10 Foundation at silos area. Silo # 10, Silos Area 21-Feb-23 OPEN

246 JB1071-HAI-04-ZZ-WIR-W-00246 INS263 CVL


Concrete Compressive Strength Test at 28 days for Silo Piles # SP1-28,SP1- Haif Batching Plant 22-Feb-23 OPEN
14, SP1-30,SP1-29,SP7-1,SP7-6,SP7-31,SP7-12,SP7-26,SP7-15,SP7-5.

Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-399
247 JB1071-HAI-04-ZZ-WIR-W-00247 INS264 CVL FP1-400,FP1-397,FP1-209,FP1-305,FP1-257,FP1-161,FP1-219,FP1-267,FP1- Haif Batching Plant 22-Feb-23 OPEN
401,FP1-353,FP1-113,FP1-17,FP1-258,FP1-210,FP1-162,FP1-114,FP1-170.

248 JB1071-HAI-04-ZZ-WIR-W-00248 INS265 CVL


Inspection request for Form Work of Columns Neck (12 No.) at Admin Admin Building 22-Feb-23 OPEN
Building.

249 JB1071-HAI-04-ZZ-WIR-W-00249 INS266 CVL


Inspection request for Pouring Concrete of Columns Neck (12 Nos.) at Admin Admin Building 22-Feb-23 OPEN
Building

250 JB1071-HAI-04-ZZ-WIR-W-00250 INS267 CVL


Inspection request for application of Cementitious Waterproofing (Brush Silo # 4, Silos Area 23-Feb-23 OPEN
Bond) for Pile Cap of Silo # 4.

251 JB1071-HAI-04-ZZ-WIR-W-00251 INS268 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 4. Silo # 4, Silos Area 23-Feb-23 OPEN

252 JB1071-HAI-04-ZZ-WIR-W-00252 INS269 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- 64, Haif Batching Plant 23-Feb-23 OPEN
65, 66, 115, 67, 18, 19, 116, 163, 121, 315
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

253 JB1071-HAI-04-ZZ-WIR-W-00253 INS270 CVL


Concrete Compressive Strength Test at 28 days for Silos Piles SP7- 27, SP7- Haif Batching Plant 23-Feb-23 OPEN
14, SP7- 30, SP7- 13 SP7- 28 and Flat Storage Piles # FP1- 289, 193, 337, 145.

254 JB1071-HAI-04-ZZ-WIR-W-00254 INS273 CVL


Concrete Compressive Strength Test at 28 days for Flat Storage Piles # FP1- Haif Batching Plant 25-Feb-23 OPEN
289,193,337,145.

255 JB1071-HAI-04-ZZ-WIR-W-00255 INS274 CVL


Inspection request for Concrete Compressive Strength Test at 28 days for Silo Haif Batching Plant 25-Feb-23 OPEN
Piles # SP7-29.

256 JB1071-HAI-04-ZZ-WIR-W-00256 INS275 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 25-Feb-23 OPEN
211,259,20,21,212,164,22,25,411,74,363.

257 JB1071-HAI-04-ZZ-WIR-W-00257 INS276 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 6, Silo Area 25-Feb-23 OPEN
system for Silo # 6.

258 JB1071-HAI-04-ZZ-WIR-W-00258 INS277 CVL


Inspection request for Termites Control Spray at Silo # 2 under the blinding of Silo # 2, Silos Area 26-Feb-23 OPEN
Foundation at silos area.

259 JB1071-HAI-04-ZZ-WIR-W-00259 INS278 CVL


Inspection request for Installation of Polythene Sheet at Silo # 2 under the Silo # 2, Silos Area 26-Feb-23 OPEN
blinding of Foundation at silos area.

260 JB1071-HAI-04-ZZ-WIR-W-00260 INS279 CVL


Inspection request for Trial Mix C40 Mpa (OPC + GGBS) Mix Design at Haif Silo # 2, Silos Area 26-Feb-23 OPEN
Batching

261 JB1071-HAI-04-ZZ-WIR-W-00261 INS280 CVL


Concrete Compressive Strength Test at 28 days for Flat Storage Piles # FP1- Haif Batching Plant 26-Feb-23 OPEN
49, 338, 386, 147, 4, 2, 5, 99, 195, 243, 339, 50.

262 JB1071-HAI-04-ZZ-WIR-W-00262 INS281 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1-68, Haif Batching Plant 26-Feb-23 OPEN
24, 120, 69, 23, 168, 70, 72, 171, 26, 122, 316.

263 JB1071-HAI-04-ZZ-WIR-W-00263 INS282 CVL


Inspection request for Compaction Test (FDT) under the blinding for Silo # 2 Silo # 2, Silos Area 26-Feb-23 OPEN
foundations at Silos Area

264 JB1071-HAI-04-ZZ-WIR-W-00264 INS284 CVL


Inspection request for pouring blinding concrete for Silo # 2 foundations at Silo # 2, Silos Area 27-Feb-23 OPEN
Silos Area.

265 JB1071-HAI-04-ZZ-WIR-W-00265 INS285 CVL


Concrete Compressive Strength Test at 28 days for Flat Storage Piles # FP1- Haif Batching Plant 27-Feb-23 OPEN
387,291,51,53,148,3,100,6.

266 JB1071-HAI-04-ZZ-WIR-W-00266 INS286 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 27-Feb-23 OPEN
118,117,11,119,216,165,264,167,166,213,214,260,172,412,220,505,364.

267 JB1071-HAI-04-ZZ-WIR-W-00267 INS287 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 28-Feb-23 OPEN
215,261,263,308,311,262,306,307,312,310,268,413,27,123,221.

268 JB1071-HAI-04-ZZ-WIR-W-00268 INS288 CVL


Concrete Compressive Strength Test at 7 days for Flat Storage Piles # FP1- Haif Batching Plant 1-Mar-23 OPEN
309,354,355,356,357,359,402,360,358,407,124,356,75.

269 JB1071-HAI-04-ZZ-WIR-W-00269 INS289 CVL


Concrete Compressive Strength Test at 28 days for Flat Storage Piles # FP1- Haif Batching Plant 1-Mar-23 OPEN
196,244,52,292,340,101.

270 JB1071-HAI-04-ZZ-WIR-W-00270 INS290 CVL Inspection request for Formwork of Silo # 6 Foundations at Silos Area. Silo # 6, Silos Area 1-Mar-23 OPEN

271 JB1071-HAI-04-ZZ-WIR-W-00271 INS291 CVL


Inspection request for Working Pile Load Testing for Pile # FP1 – 298 at Flat Flat Storage Area 2-Mar-23 OPEN
Storage Area.

272 JB1071-HAI-04-ZZ-WIR-W-00272 INS292 ELE


Inspection request for Installation of Earthing and Lightning protection Admin Building 4-Mar-23 5-Mar-23 OPEN
system at Admin building.

273 JB1071-HAI-04-ZZ-WIR-W-00273 INS293 CVL


Inspection request for Form Work of Columns Neck (11 No.) at Admin Admin Building 4-Mar-23 OPEN
Building.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

274 JB1071-HAI-04-ZZ-WIR-W-00274 INS294 CVL


Inspection request for Surface Preparation prior to Waterproofing Coating Admin Building 4-Mar-23 OPEN
Paint for Foundations and Columns Neck at Admin Building

275 JB1071-HAI-04-ZZ-WIR-W-00275 INS295 CVL Inspection request for Pouring Concrete of Silo # 6 Foundations at Silos Area. Silo # 6, Silos Area 4-Mar-23 OPEN

276 JB1071-HAI-04-ZZ-WIR-W-00276 INS297 CVL Pouring Concrete of Columns Neck (11 No.) at Admin Building. Admin Building 5-Mar-23 OPEN

277 JB1071-HAI-04-ZZ-WIR-W-00277 INS298 CVL Inspection request for collecting Soil Sample from Silo Area. Silos Area 6-Mar-23 OPEN

278 JB1071-HAI-04-ZZ-WIR-W-00278 INS299 CVL


Inspection request for Steel Reinforcement of Silo # 5 Foundations (Pile Cap) Silos Area 7-Mar-23 OPEN
at Silos Area.

279 JB1071-HAI-04-ZZ-WIR-W-00279 INS300 CVL


Inspection request for application of Cementitious Waterproofing (Brush Silo # 2, Silos Area 8-Mar-23 OPEN
Bond) for Pile Cap of Silo # 2

280 JB1071-HAI-04-ZZ-WIR-W-00280 INS301 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 2. Silo # 2, Silos Area 8-Mar-23 OPEN

281 JB1071-HAI-04-ZZ-WIR-W-00281 INS303 CVL Inspection request for Formwork of Silo # 5 Foundations at Silos Area. Silo # 5, Silos Area 9-Mar-23 OPEN

282 JB1071-HAI-04-ZZ-WIR-W-00282 INS304 CVL


Inspection request for first Surface Waterproofing Coating Paint for RAFT Silo # 6, Silos Area 11-Mar-23 OPEN
FOUNDATION of Silo # 6

283 JB1071-HAI-04-ZZ-WIR-W-00283 INS305 CVL


Inspection request for first Surface Waterproofing Coating Paint for Admin Building 11-Mar-23 OPEN
Foundations and Columns Neck at Admin Building

284 JB1071-HAI-04-ZZ-WIR-W-00284 INS306 CVL Inspection request for Working Pile Load test of Silo# 3 Silos Area # 3 11-Mar-23 OPEN

285 JB1071-HAI-04-ZZ-WIR-W-00285 INS308 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 5, Silo Area 12-Mar-23 17-Mar-23 OPEN
system for Silo # 5.

286 JB1071-HAI-04-ZZ-WIR-W-00286 INS309 CVL Inspection request for Pouring Concrete of Silo # 5 Foundations at Silos Area. Silo # 5, Silo Area 12-Mar-23 OPEN

287 JB1071-HAI-04-ZZ-WIR-W-00287 INS310 CVL


Inspection request for Steel Reinforcement of Silo # 11 Foundations (Pile Cap) Silo # 11, Silos Area 13-Mar-23 OPEN
at Silos Area.

288 JB1071-HAI-04-ZZ-WIR-W-00288 INS311 CVL


Inspection request for Integrity test of Piles for Silo # 1, Silo # 2 and Silo # 9 at Silo # 1 , 2 and 9 - Silos Area 14-Mar-23 OPEN
Silos area

289 JB1071-HAI-04-ZZ-WIR-W-00289 INS313 CVL


Inspection request for Steel Reinforcement of Silo # 4 Foundations (Pile Cap) Silo # 4, Silos Area 14-Mar-23 OPEN
at Silos Area.

290 JB1071-HAI-04-ZZ-WIR-W-00290 INS314 CVL


Screed Concrete for Protection of Damp Proofing (3rd Coats) above Raft Admin Building 14-Mar-23 OPEN
(Horizontal Surface) at Admin Building

291 JB1071-HAI-04-ZZ-WIR-W-00291 INS315 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 11, Silo Area 15-Mar-23 16-Mar-23 17-Mar-23 OPEN
INS318 system for Silo # 11.

292 JB1071-HAI-04-ZZ-WIR-W-00292 INS316 CVL Inspection request for Formwork of Silo # 11 Foundations at Silos Area. Silo # 11, Silo Area 15-Mar-23 OPEN

293 JB1071-HAI-04-ZZ-WIR-W-00293 INS317 CVL


Inspection request for Pouring Concrete of Silo # 11 Foundations at Silos Silo # 11, Silo Area 15-Mar-23 OPEN
Area.

294 JB1071-HAI-04-ZZ-WIR-W-00294 INS319 CVL


Inspection request for application of Cementitious Waterproofing (Brush Silo # 3, Silos Area 16-Mar-23 OPEN
Bond) for Pile Cap of Silo # 3.

295 JB1071-HAI-04-ZZ-WIR-W-00295 INS320 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 3. Silo # 3, Silos Area 16-Mar-23 OPEN

296 JB1071-HAI-04-ZZ-WIR-W-00296 INS321 CVL


Inspection request for Compaction Test (FDT) under the blinding for Silo # 09 Silo # 09, Silos Area 16-Mar-23 OPEN
foundations at Silos Area.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

297 JB1071-HAI-04-ZZ-WIR-W-00297 INS322 CVL


Inspection request for Termites Control Spray at Silo # 09 under the blinding Silo # 09, Silos Area 16-Mar-23 OPEN
of Foundation at silos area.

298 JB1071-HAI-04-ZZ-WIR-W-00298 INS323 CVL


Inspection request for Installation of Polythene Sheet at Silo # 09 under the Silo # 09, Silos Area 16-Mar-23 OPEN
blinding of Foundation at silos area.

299 JB1071-HAI-04-ZZ-WIR-W-00299 INS324 CVL Inspection request for Pouring Blinding at Silo # 09 Foundation at silos area. Silo # 09, Silos Area 16-Mar-23 OPEN

300 JB1071-HAI-04-ZZ-WIR-W-00300 INS325 CVL


Inspection request for first Surface Waterproofing Coating Paint for RAFT Silo # 05, Silos Area 16-Mar-23 18-3-23 OPEN
FOUNDATION of Silo # 5 aMessage

301 JB1071-HAI-04-ZZ-WIR-W-00301 INS326 CVL


Inspection request for Working Pile Load Testing for Pile # SP10 -1, Silos # 10 Silo # 10, Silos Area. 16-Mar-23 OPEN
at Silos Area.

302 JB1071-HAI-04-ZZ-WIR-W-00302 INS329 CVL


Inspection request for Steel Reinforcement of Silo # 6 two Columns at Silos Silo # 6, Silos Area 18-Mar-23 OPEN
Area. COLUMNS

Silo # 6, Silos Area


303 JB1071-HAI-04-ZZ-WIR-W-00303 INS330 CVL Inspection request for Formwork of two Columns of Silo # 6 at Silos Area. COLUMNS
18-Mar-23 OPEN

304 JB1071-HAI-04-ZZ-WIR-W-00304 INS331 CVL


Inspection request for Pouring concrete of two Columns of Silo # 6 at Silos Silo # 6, Silos Area 18-Mar-23 OPEN
Area. COLUMNS

305 JB1071-HAI-04-ZZ-WIR-W-00305 INS332 CVL Inspection request for Formwork of Silo # 4 Foundations at Silos Area. Silo # 4, Silos Area 18-Mar-23 OPEN

306 JB1071-HAI-04-ZZ-WIR-W-00306 INS333 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 4, Silos Area 18-Mar-23 OPEN
system for Raft Silo # 4.

307 JB1071-HAI-04-ZZ-WIR-W-00307 INS338 CVL


Inspection request for application of Cementitious Waterproofing (Brush Silo # 9, Silos Area 20-Mar-23 OPEN
Bond) for Pile Cap of Silo # 09

308 JB1071-HAI-04-ZZ-WIR-W-00308 INS339 CVL Inspection request for Pouring Screed concrete for Pile Cap of Silo # 09. Silo # 9, Silos Area 20-Mar-23 OPEN

309 JB1071-HAI-04-ZZ-WIR-W-00309 INS340 CVL Inspection request for Pouring Concrete of Silo # 4 Foundations at Silos Area. Silo # 4, Silos Area 20-Mar-23 OPEN

310 JB1071-HAI-04-ZZ-WIR-W-00310 INS341 CVL


Inspection request for Steel Reinforcement of Silo # 6 two Columns (5 & 7) at Silo # 6, Silos Area 20-Mar-23 OPEN
Silos Area. COLUMNS

311 JB1071-HAI-04-ZZ-WIR-W-00311 INS342 CVL


Inspection request for Formwork of two Columns of Silo # 6 (5 & 7) at Silos Silo # 6, Silos Area 20-Mar-23 OPEN
Area. COLUMNS

312 JB1071-HAI-04-ZZ-WIR-W-00312 INS343 CVL


Inspection request for Pouring concrete of two Columns of Silo # 6 (5 & 7) at Silo # 6, Silos Area 20-Mar-23 OPEN
Silos Area. COLUMNS

313 JB1071-HAI-04-ZZ-WIR-W-00313 INS345 CVL


Inspection request for Steel Reinforcement of Silo # 6 Columns (16 Silo # 6, Silos Area 21-Mar-23 OPEN
COLUMNS) at Silos Area. COLUMNS

314 JB1071-HAI-04-ZZ-WIR-W-00314 INS347 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 12, RAFT Silo Area 21-Mar-23 22-Mar-23 CLOSED 2
system for Raft Silo # 12.

315 JB1071-HAI-04-ZZ-WIR-W-00315 INS350 CVL


Inspection request for Steel Reinforcement of Silo # 12 Foundations (Pile Cap) Silo # 12, RAFT Silo Area 22-Mar-23 OPEN
at Silos Area.

316 JB1071-HAI-04-ZZ-WIR-W-00316 INS351 CVL Inspection request for Formwork of Silo # 12 Foundations at Silos Area. Silo # 12, RAFT Silo Area 22-Mar-23 OPEN

317 JB1071-HAI-04-ZZ-WIR-W-00317 INS352 CVL


Inspection request for Pouring Concrete of Silo # 12 Foundations at Silos Silo # 12, RAFT Silo Area 22-Mar-23 OPEN
Area.

318 JB1071-HAI-04-ZZ-WIR-W-00318 INS353 CVL


Inspection request for protection board water proofing for Foundations and Admin Bldg 22-Mar-23 OPEN
Columns Neck at Admin Building

319 JB1071-HAI-04-ZZ-WIR-W-00319 INS357 CVL Inspection request for 1st. layer backfilling . Admin Building 23-Mar-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

320 JB1071-HAI-04-ZZ-WIR-W-00320 INS358 CVL


Inspection request for Formwork of two Columns of Silo # 6 (SC1,SC3 ) at Silo # 6, Silos Area 23-Mar-23 OPEN
Silos Area. COLUMNS

321 JB1071-HAI-04-ZZ-WIR-W-00321 INS359 CVL


Inspection request for Pouring concrete of two Columns of Silo # 6 (SC1 & Silo # 6, Silos Area 23-Mar-23 OPEN
SC3) at Silos Area. COLUMNS

322 JB1071-HAI-04-ZZ-WIR-W-00322 INS360 CVL


Inspection request for Formwork of three Columns of Silo # 6 (5, 15 & 17) at Silo # 6, Silos Area 25-Mar-23 OPEN
Silos Area. COLUMNS

323 JB1071-HAI-04-ZZ-WIR-W-00323 INS361 CVL


Inspection request for Pouring concrete of three Columns of Silo # 6 (5, 15 & Silo # 6, Silos Area 25-Mar-23 OPEN
17) at Silos Area. COLUMNS

324 JB1071-HAI-04-ZZ-WIR-W-00324 INS362 CVL


Inspection request for Compaction Test (FDT) under the blinding for Silo # 08 Silo # 08, Silos Area 26-Mar-23 OPEN
foundations at Silos Area.

325 JB1071-HAI-04-ZZ-WIR-W-00325 INS363 CVL


Inspection request for Termites Control Spray at Silo # 8 under the blinding of Silo # 8, Silos Area 26-Mar-23 OPEN
Foundation at silos area.

Inspection request for Installation of Polythene Sheet at Silo # 8 under the 26-Mar-23
326 JB1071-HAI-04-ZZ-WIR-W-00326 INS364 CVL Silo # 8, Silos Area 4-May-23 OPEN
blinding of Foundation at silos area Secondary file

327 JB1071-HAI-04-ZZ-WIR-W-00327 INS365 CVL nspection request for Pouring Blinding at Silo # 8 Foundation at silos area Silo # 8, Silos Area 26-Mar-23 OPEN

328 JB1071-HAI-04-ZZ-WIR-W-00328 INS366 CVL


Inspection request for application of Cementitious Waterproofing Silo # 10, Silos Area 27-Mar-23 OPEN
(brushbond) for Pile Cap of Silo # 10.

329 JB1071-HAI-04-ZZ-WIR-W-00329 INS367 CVL Inspection request for pouring screed for Pile Cap of Silo # 10. Silo # 10, Silos Area 27-Mar-23 OPEN

330 JB1071-HAI-04-ZZ-WIR-W-00330 INS369 CVL Inspection request for 2nd. Layer of backfilling. Admin Building 28-Mar-23 OPEN

331 JB1071-HAI-04-ZZ-WIR-W-00331 INS370 CVL


Inspection request for Formwork of four Columns of Silo # 6 (2, 9, 13 & 19) at Silo # 6, Silos Area 28-Mar-23 OPEN
Silos Area. COLUMNS

332 JB1071-HAI-04-ZZ-WIR-W-00332 INS371 CVL


Inspection request for Pouring concrete of four Columns of Silo # 6 (2, 9, 13 & Silo # 6, Silos Area 28-Mar-23 OPEN
19) at Silos Area COLUMNS

333 JB1071-HAI-04-ZZ-WIR-W-00333 INS372 CVL


Inspection request for Steel Reinforcement of Silo # 2 Foundations (Pile Cap) Silo # 2, Silos Area 29-Mar-23 OPEN
at Silos Area.

334 JB1071-HAI-04-ZZ-WIR-W-00334 INS373 CVL


Inspection request for first Surface Waterproofing Coating Paint for RAFT Silo # 11 and 12, Silos Area 29-Mar-23 OPEN
FOUNDATION of Silo # 11 and Silo # 12

335 JB1071-HAI-04-ZZ-WIR-W-00335 INS375 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 2, RAFT Silo Area 30-Mar-23 OPEN
INS381 system for Raft Silo # 2

336 JB1071-HAI-04-ZZ-WIR-W-00336 INS376 CVL


Inspection request for Formwork of Silo # 2 Foundations (Pile Cap) at Silos Silo # 2, Silos Area 30-Mar-23 OPEN
INS382 Area

337 JB1071-HAI-04-ZZ-WIR-W-00337 INS377 CVL


Inspection request for pouring concrete of Silo # 2 Foundations (Pile Cap) at Silo # 2, Silos Area 30-Mar-23 OPEN
INS383 Silos Area.

338 JB1071-HAI-04-ZZ-WIR-W-00338 INS378 CVL


Inspection request for protection board water proofing for Foundations at Silo Silo # 6, Silos Area 30-Mar-23 OPEN
INS384 #6

Inspection request for Columns Reinforcement of Six Columns of Silo # 5


INS379 Silo # 5, Silos Area
339 JB1071-HAI-04-ZZ-WIR-W-00339 INS385
CVL (1,3,4,6,8,10 ) at Silos Area. COLUMNS
30-Mar-23 OPEN

340 JB1071-HAI-04-ZZ-WIR-W-00340 INS387 CVL Inspection request for 3rd. Layer of backfilling. Admin Building 1-Apr-23 OPEN

341 JB1071-HAI-04-ZZ-WIR-W-00341 INS388 CVL


Inspection request for Formwork of three Columns of Silo # 6 (12, 16 & 20) at Silo # 6, Silos Area 1-Apr-23 OPEN
Silos Area. COLUMNS

342 JB1071-HAI-04-ZZ-WIR-W-00342 INS389 CVL


Inspection request for Pouring concrete of three Columns of Silo # 6 (12, 16 & Silo # 6, Silos Area 1-Apr-23 OPEN
20) at Silos Area. COLUMNS
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

343 JB1071-HAI-04-ZZ-WIR-W-00343 INS390 CVL


Inspection request for Formwork of four Columns of Silo # 5 (1, 4, 6 &10) at Silo # 5, Silos Area 1-Apr-23 OPEN
Silos Area. COLUMNS

344 JB1071-HAI-04-ZZ-WIR-W-00344 INS391 CVL


Inspection request for pouring concrete of four Columns of Silo # 5 (1, 4, 6 Silo # 5, Silos Area 1-Apr-23 OPEN
&10) at Silos Area. COLUMNS

345 JB1071-HAI-04-ZZ-WIR-W-00345 INS392 CVL


Inspection request for Columns Reinforcement of Six Columns of Silo # 5 (2, Silo # 5, Silos Area 3-Apr-23 OPEN
5,7,9,11,12) at Silos Area. COLUMNS

346 JB1071-HAI-04-ZZ-WIR-W-00346 INS393 CVL


Inspection request for Columns Reinforcement of Fifteen Columns of Silo # 4 Silo # 4, Silos Area 3-Apr-23 OPEN
(1,2,3,4,5,6,7,8,9,10.11,12,15,16,17) at Silos Area. COLUMNS

347 JB1071-HAI-04-ZZ-WIR-W-00347 INS394 CVL


Inspection request for protection board on water proofing for Foundations at Silo # 5, Silos Area 4-Apr-23 OPEN
Silo # 5.

348 JB1071-HAI-04-ZZ-WIR-W-00348 INS395 CVL


Inspection request for Steel Reinforcement of Silo # 3 Foundations (Pile Cap) Silo # 3, Silos Area 4-Apr-23 OPEN
at Silos Area.

349 JB1071-HAI-04-ZZ-WIR-W-00349 INS396 CVL


Inspection request for Formwork of four Columns of Silo # 5 (3, 5, 7 & 9) at Silo # 5 4-Apr-23 OPEN
Silos Area.

350 JB1071-HAI-04-ZZ-WIR-W-00350 INS397 CVL


Inspection request for pouring concrete of four Columns of Silo # 5 (3, 5, 7 & Silo # 5 4-Apr-23 OPEN
9) at Silos Area.

351 JB1071-HAI-04-ZZ-WIR-W-00351 INS398 CVL Inspection request for Formwork of one Column of Silo # 6 (18) at Silos Area. Silo # 6 4-Apr-23 OPEN

352 JB1071-HAI-04-ZZ-WIR-W-00352 INS399 CVL


Inspection request for Pouring concrete of one Column of Silo # 6 (18) at Silos Silo # 6 4-Apr-23 OPEN
Area.

353 JB1071-HAI-04-ZZ-WIR-W-00353 INS400 CVL


Inspection request for protection board on water proofing coating for Silo # 11 and 12, Silos Area 5-Apr-23 OPEN
Foundations at Silo # 11 and 12

354 JB1071-HAI-04-ZZ-WIR-W-00354 INS401 CVL


Inspection request for Columns Reinforcement of Ten Columns of Silo # 12 Silo # 12, Silos Area 6-Apr-23 OPEN
(1,2,3,4,5,6,7,8,9,10) at Silos Area COLUMNS

355 JB1071-HAI-04-ZZ-WIR-W-00355 INS402 CVL


Inspection request for Columns Formwork four Columns of Silo # 12 (2, 3, 4, Silo # 12, Silos Area 6-Apr-23 OPEN
6) at Silos Area COLUMNS

356 JB1071-HAI-04-ZZ-WIR-W-00356 INS403 CVL


Inspection request for Concrete Pouring four Columns of Silo # 12 (2, 3, 4, 6) Silo # 12, Silos Area 6-Apr-23 OPEN
at Silos Area COLUMNS

357 JB1071-HAI-04-ZZ-WIR-W-00357 INS404 CVL


Inspection request for Installation of Earthing and Lightning protection Silo # 3, RAFT Silos Area 6-Apr-23 8-Apr-23 CLOSED
system for Raft Silo # 3

358 JB1071-HAI-04-ZZ-WIR-W-00358 INS405 CVL Inspection request for Formwork of Silo # 3 Foundations (Raft) at Silos Area Silo # 3, Silos Area 6-Apr-23 OPEN

359 JB1071-HAI-04-ZZ-WIR-W-00359 INS406 CVL


Inspection request for Concrete Pouring of Silo # 3 Foundations (Raft) at Silos Silo # 3, Silos Area 6-Apr-23 OPEN
Area

360 JB1071-HAI-04-ZZ-WIR-W-00360 INS407 CVL


Inspection request for Surface Preparation of Silo # 4 Foundations prior to Silo # 4 6-Apr-23 OPEN
waterproofing (Bituminous) coating at Silos Area

361 JB1071-HAI-04-ZZ-WIR-W-00361 INS408 CVL Inspection request for 4th. Layer of infill at admin building Admin Building 6-Apr-23 OPEN

362 JB1071-HAI-04-ZZ-WIR-W-00362 INS409 CVL


Inspection request for 1st Layer of backfilling of Silo # 5, 6, 11 and 12 at Silos Sio Area 6-Apr-23 OPEN
Area

363 JB1071-HAI-04-ZZ-WIR-W-00363 INS410 CVL


Inspection request for Columns Reinforcement of Ten Columns of Silo # 12 Silo # 12, Silos Area 8-Apr-23 OPEN
(11,12,13,14,15,16,17,18,19,20) at Silos Area. COLUMNS

8-Apr-23
Inspection request for Sample of Aeration Pipe for Silos slab. 500mm 4-May-23
364 JB1071-HAI-04-ZZ-WIR-W-00364 INS411 MECH Silso Area Secondry File 9-Apr-23 CLOSED
diameter and 3mm thick. 9-May-23
aMessage

365 JB1071-HAI-04-ZZ-WIR-W-00365 INS412 CVL


Inspection request for Columns Formwork four Columns of Silo # 12 (1, 5, 7, Silo # 12, Silos Area 8-Apr-23 OPEN
9) at Silos Area. COLUMNS
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

366 JB1071-HAI-04-ZZ-WIR-W-00366 INS413 CVL


Inspection request for Concrete Pouring four Columns of Silo # 12 (1, 5, 7, 9) Silo # 12, Silos Area 8-Apr-23 OPEN
at Silos Area. COLUMNS

367 JB1071-HAI-04-ZZ-WIR-W-00367 INS414 CVL


Inspection request for Formwork of four Columns of Silo # 5 (2, 8, 11 &12) at Silo # 5, Silos Area 8-Apr-23 OPEN
Silos Area. COLUMNS

368 JB1071-HAI-04-ZZ-WIR-W-00368 INS415 CVL


Inspection request for pouring concrete of four Columns of Silo # 5 (2, 8, Silo # 5, Silos Area 8-Apr-23 OPEN
11&12) at Silos Area. COLUMNS

369 JB1071-HAI-04-ZZ-WIR-W-00369 INS416 CVL


Inspection request for Columns Formwork of four Columns at Silo # 4 (1, 2, 3, Silo # 4, Silos Area 8-Apr-23 OPEN
4) at Silos Area. COLUMNS

370 JB1071-HAI-04-ZZ-WIR-W-00370 INS417 CVL


Inspection request for Concrete Pouring of four Columns at Silo # 4 (1, 2, 3, 4) Silo # 4, Silos Area 8-Apr-23 OPEN
at Silos Area. COLUMNS

371 JB1071-HAI-04-ZZ-WIR-W-00371 INS418 CVL


Inspection request for Steel Reinforcement of Silo # 9 Foundations (Pile Cap) Silo # 9 9-Apr-23 OPEN
at Silos Area

372 JB1071-HAI-04-ZZ-WIR-W-00372 INS419 CVL Inspection request for Formwork of Silo # 9 Foundations (Raft) at Silos Area Silo # 9 9-Apr-23 OPEN

373 JB1071-HAI-04-ZZ-WIR-W-00373 INS420 CVL


Inspection request for Installation of Earthing and Lightning protection Silo # 9 9-Apr-23 10-Apr-23 CLOSED RHDHV 2
system for Raft Silo # 9.

374 JB1071-HAI-04-ZZ-WIR-W-00374 INS421 CVL


Inspection request for Concrete Pouring of Silo # 9 Foundations (Raft) at Silos Silo # 9 9-Apr-23 OPEN
Area.

375 JB1071-HAI-04-ZZ-WIR-W-00375 INS422 CVL Inspection request for 5th. Layer of infill at admin building. Admin Building 10-Apr-23 OPEN

376 JB1071-HAI-04-ZZ-WIR-W-00376 INS423 CVL


Inspection request for 2nd Layer of backfilling of Silo # 5, 6, 11 and 12 at Silos Silo # 5,6,11 & 12. Silos Area 10-Apr-23 OPEN
Area.

377 JB1071-HAI-04-ZZ-WIR-W-00377 INS424 CVL


Inspection request for Columns Reinforcement of eight Columns of Silo # 5 Silo # 5, Silos Area 10-Apr-23 OPEN
(13,14,15,16,17,18,19,20) at Silos Area. COLUMNS

378 JB1071-HAI-04-ZZ-WIR-W-00378 INS425 CVL


Inspection request for Columns Formwork five Columns of Silo # 12 Silo # 12, Silos Area 10-Apr-23 OPEN
(8,10,11,13,20) at Silos Area. COLUMNS

379 JB1071-HAI-04-ZZ-WIR-W-00379 INS426 CVL


Inspection request for Concrete Pouring five Columns of Silo # 12 Silo # 12, Silos Area 10-Apr-23 OPEN
(8,10,11,13,20) at Silos Area. COLUMNS

380 JB1071-HAI-04-ZZ-WIR-W-00380 INS427 CVL


Inspection request for Working Pile Load Testing for Pile # SP8 -1, Silos # 08 Silo # 08, Silos Area. 11-Apr-23 OPEN
at Silos Area.

381 JB1071-HAI-04-ZZ-WIR-W-00381 INS428 CVL


Inspection request for Formwork of four Columns of Silo # 5 (13, 15, 17 & 20) Silo # 5, Silos Area 11-Apr-23 OPEN
at Silos Area. COLUMNS

382 JB1071-HAI-04-ZZ-WIR-W-00382 INS429 CVL


Inspection request for pouring concrete of four Columns of Silo # 5 (13, 15, Silo # 5, Silos Area 11-Apr-23 OPEN
17& 20) at Silos Area. COLUMNS

383 JB1071-HAI-04-ZZ-WIR-W-00383 INS430 CVL


Inspection request for first Surface Waterproofing Coating Paint for RAFT SILOS AREA 11-Apr-23 OPEN
INS431 FOUNDATION of Silo # 6

384 JB1071-HAI-04-ZZ-WIR-W-00384 INS432 CVL Inspection request for 6th. Layer of infill at admin building. Admin Building 12-Apr-23 OPEN

385 JB1071-HAI-04-ZZ-WIR-W-00385 INS433 CVL


Inspection request for Columns Reinforcement of ten Columns of Silo # 3 Silo # 3, Silos Area 12-Apr-23 OPEN
(1,2,3,4,5,6,7,8,9,10) at Silos COLUMNS

386 JB1071-HAI-04-ZZ-WIR-W-00386 INS434 CVL Inspection request for 7th. Layer of infill at admin building Admin Building 13-Apr-23 OPEN

387 JB1071-HAI-04-ZZ-WIR-W-00387 INS435 CVL


Inspection request for 3rd Layer of backfilling of Silo # 5, 6, 11 and 12 at Silos Silo # 5, 6, 11 and 12 13-Apr-23 OPEN
Area

388 JB1071-HAI-04-ZZ-WIR-W-00388 INS436 CVL


Inspection request for Columns Formwork four Columns of Silo # 12 Silo # 12 (12,15,17,19 13-Apr-23 OPEN
(12,15,17,19) at Silos Area
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

389 JB1071-HAI-04-ZZ-WIR-W-00389 INS437 CVL


Inspection request for Concrete Pouring four Columns of Silo # 12 Silo # 12 (12,15,17,19 13-Apr-23 OPEN
(12,15,17,19,) at Silos Area

390 JB1071-HAI-04-ZZ-WIR-W-00390 INS438 CVL


Inspection request for Columns Formwork of four Columns at Silo # 4 Silo # 4 (5,6,7,8) 13-Apr-23 OPEN
(5,6,7,8) at Silos Area

391 JB1071-HAI-04-ZZ-WIR-W-00391 INS439 CVL


Inspection request for Concrete Pouring of four Columns at Silo # 4 (5,6,7,8) Silo # 4 (5,6,7,8) 13-Apr-23 OPEN
at Silos Area.

392 JB1071-HAI-04-ZZ-WIR-W-00392 INS440 CVL Inspection request for Steel Reinforcement of Silo # 6 Wall (W1) at Silos Area. Silo # 6, Silos Area 15-Apr-23 OPEN

393 JB1071-HAI-04-ZZ-WIR-W-00393 INS441 CVL


Inspection request for Columns Reinforcement of fifteen Columns of Silo # 2 Silo # 2, Silos Area 15-Apr-23 OPEN
(1,2,3,4,5,6,7,8,9,10,11,12,13,14,15) at Silos Area. COLUMNS

394 JB1071-HAI-04-ZZ-WIR-W-00394 INS442 CVL


Inspection request for Surface Preparation of Silo # 2 Foundations prior to Silo # 2, Silos Area 15-Apr-23 OPEN
waterproofing (Bituminous) coating at Silos Area.

395 JB1071-HAI-04-ZZ-WIR-W-00395 INS443 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Silos # 2, Silos Area 16-Apr-23 OPEN
for Raft foundation

396 JB1071-HAI-04-ZZ-WIR-W-00396 INS444 CVL


Inspection request for installation of protection board on Foundations at Silo Silo # 4, Silos Area 16-Apr-23 OPEN
# 4.

397 JB1071-HAI-04-ZZ-WIR-W-00397 INS445 CVL


Inspection request for Columns Formwork three Columns of Silo # 12 Silo # 12, Silos Area 17-Apr-23 OPEN
(14,16,18) at Silos Area. COLUMNS

398 JB1071-HAI-04-ZZ-WIR-W-00398 INS446 CVL


Inspection request for Concrete Pouring three Columns of Silo # 12 (14,16,18) Silo # 12 17-Apr-23 OPEN
at Silos Area.

399 JB1071-HAI-04-ZZ-WIR-W-00399 INS447 CVL Inspection request for collecting Soil Sample from Silo Area. (Silo # 1 and 7) Silo # 1 & 7 .Silos Area 17-Apr-23 OPEN

400 JB1071-HAI-04-ZZ-WIR-W-00400 INS448 CVL


Inspection request for application of Cementitious Waterproofing (Brush Silo # 8, Silos Area 17-Apr-23 OPEN
Bond) for Pile Cap of Silo # 8

401 JB1071-HAI-04-ZZ-WIR-W-00401 INS449 CVL


Inspection request for Compaction Test (FDT) under the blinding for Silo # 07 Silo # 07, Silos Area 17-Apr-23 OPEN
foundations at Silos Area.

402 JB1071-HAI-04-ZZ-WIR-W-00402 INS450 CVL


Inspection request for Formwork of four Columns of Silo # 5 (14,16,18,19) at Silo # 5, Silos Area 17-Apr-23 OPEN
Silos Area. COLUMNS

403 JB1071-HAI-04-ZZ-WIR-W-00403 INS451 CVL


Inspection request for pouring concrete of four Columns of Silo # 5 Silo # 5 17-Apr-23 OPEN
(14,16,18,19) at Silos Area.

404 JB1071-HAI-04-ZZ-WIR-W-00404 INS452 CVL


Inspection request for Termites Control Spray at Silo # 7 under the blinding of Silo # 7 17-Apr-23 OPEN
Foundation at silos area.

405 JB1071-HAI-04-ZZ-WIR-W-00405 INS454 CVL


Inspection request for Installation of Polythene Sheet at Silo # 7 under the Silo # 7 17-Apr-23 OPEN
blinding of Foundation at silos area.

406 JB1071-HAI-04-ZZ-WIR-W-00406 INS455 CVL Inspection request for Pouring Blinding at Silo # 7 Foundation at silos area. Silo # 7 Area 17-Apr-23 OPEN

407 JB1071-HAI-04-ZZ-WIR-W-00407 INS456 CVL


Inspection request for Columns Formwork of Two Columns at Silo # 4 (9,10) Silo # 4, Silos Area 18-Apr-23 OPEN
at Silos Area. COLUMNS

408 JB1071-HAI-04-ZZ-WIR-W-00408 INS457 CVL


Inspection request for Concrete Pouring of Two Columns at Silo # 4 (9,10) at Silo # 4, Silos Area 18-Apr-23 OPEN
Silos Area. COLUMNS

409 JB1071-HAI-04-ZZ-WIR-W-00409 INS458 CVL


Inspection request for Columns Formwork of four Columns at Silo # 2 Silo # 2, Silos Area 18-Apr-23 OPEN
(1,3,4,7) at Silos Area COLUMNS

410 JB1071-HAI-04-ZZ-WIR-W-00410 INS459 CVL


Inspection request for Concrete Pouring of four Columns at Silo # 2 (1,3,4,7) Silo # 2, Silos Area 18-Apr-23 OPEN
at Silos Area. COLUMNS

411 JB1071-HAI-04-ZZ-WIR-W-00411 INS460 CVL Inspection request for pouring screed for Pile Cap of Silo # 8. Silo # 8, Silos Area 18-Apr-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

412 JB1071-HAI-04-ZZ-WIR-W-00412 INS461 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 6, Silos Area 18-Apr-23 19-Apr-23 CLOSED RHDHV 2
system for Wall of Silo # 6.

413 JB1071-HAI-04-ZZ-WIR-W-00413 INS462 CVL


Inspection request for installation of protection board on Foundations at Silo Silo # 2, Silos Area 25-Apr-23 OPEN
# 2.

414 JB1071-HAI-04-ZZ-WIR-W-00414 INS463 CVL


Inspection request for Surface Preparation of Silo # 3 Foundations prior to Silo # 3, Silos Area 25-Apr-23 OPEN
waterproofing (Bituminous) coating at Silos Area.

415 JB1071-HAI-04-ZZ-WIR-W-00415 INS464 CVL


Inspection request for Formwork of wall (Highlighted part on drawing) of silo Silo # 6, Silos Area 25-Apr-23 OPEN
# 6 at Silos Area.

416 JB1071-HAI-04-ZZ-WIR-W-00416 INS465 CVL


Inspection request for Concrete Pouring of wall (Highlighted part on drawing) Silo # 6, Silos Area 25-Apr-23 OPEN
of silo # 6 at Silos Area.

417 JB1071-HAI-04-ZZ-WIR-W-00417 INS466 CVL


Inspection request for Columns Formwork of three Columns at Silo # 2 Silo # 2, Silos Area 25-Apr-23 OPEN
(2,9,15) at Silos Area. COLUMNS

418 JB1071-HAI-04-ZZ-WIR-W-00418 INS467 CVL


Inspection request for Concrete Pouring of three Columns at Silo # 2 (2,9,15) Silo # 2, Silos Area 25-Apr-23 OPEN
at Silos Area. COLUMNS

419 JB1071-HAI-04-ZZ-WIR-W-00419 INS468 CVL Inspection request for Last Layer of infill at admin building. Admin Building 25-Apr-23 OPEN

420 JB1071-HAI-04-ZZ-WIR-W-00420 INS469 CVL Inspection request for 1st Layer of backfilling of Silo # 2 at Silos Area. Silo # 2. Silos Area 25-Apr-23 OPEN

421 JB1071-HAI-04-ZZ-WIR-W-00421 INS470 CVL


Inspection request for Columns Formwork of five Columns at Silo # 4 Silo # 4, Silos Area 25-Apr-23 OPEN
(13,14,15,16,17) at Silos Area. COLUMNS

422 JB1071-HAI-04-ZZ-WIR-W-00422 INS471 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 4 Silo # 4, Silos Area 25-Apr-23 OPEN
(13,14,15,16,17) at Silos Area. COLUMNS

423 JB1071-HAI-04-ZZ-WIR-W-00423 INS472 CVL


Inspection request for Compaction Test (FDT) under the blinding for Bagging Station 26-Apr-23 OPEN
foundations at Bagging Station.

424 JB1071-HAI-04-ZZ-WIR-W-00424 INS473 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Silos # 3, Silos Area 26-Apr-23 OPEN
for Raft foundation of Silo # 3.

425 JB1071-HAI-04-ZZ-WIR-W-00425 INS474 CVL Inspection request for Collecting soil sample from Bagging Station. Bagging Station 26-Apr-23 OPEN

426 JB1071-HAI-04-ZZ-WIR-W-00426 INS475 CVL


Inspection request for Steel Reinforcement of Silo # 10 Foundations (Raft) at Silo # 10, Silos Area 27-Apr-23 OPEN
Silos Area.

427 JB1071-HAI-04-ZZ-WIR-W-00427 INS476 CVL Inspection request for formwork of Silo # 10 Foundations (Raft) at Silos Area. Silo # 10, Silos Area 27-Apr-23 OPEN

428 JB1071-HAI-04-ZZ-WIR-W-00428 INS477 CVL


Inspection request for Columns Reinforcement of 20 Columns of Silo # 11 at Silo # 11, Silos Area 27-Apr-23 OPEN
Silos Area.

429 JB1071-HAI-04-ZZ-WIR-W-00429 INS478 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 10, RAFT Silos Area 27-Apr-23 2-May-23 CLOSED RHDHV 2
system for Raft Silo # 10.

430 JB1071-HAI-04-ZZ-WIR-W-00430 INS479 CVL


Inspection request for Working Pile Load Testing for Pile # BP2-28 at bagging Bagging Station, Pile # BP2- 27-Apr-23 OPEN
station. 28

Piling Silo # 7 & 8 - Silos


431 JB1071-HAI-04-ZZ-WIR-W-00431 INS480 CVL Inspection request for Pile Integrity test of Silo # 7 and 8 at Silos area. Area
27-Apr-23 OPEN

432 JB1071-HAI-04-ZZ-WIR-W-00432 INS481 CVL


Inspection request for Columns Formwork of five Columns at Silo # 2 Silo # 2, Silos Area 27-Apr-23 OPEN
(6,8,10,11,13) at Silos Area. COLUMNS

433 JB1071-HAI-04-ZZ-WIR-W-00433 INS482 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 2 Silo # 2, Silos Area 27-Apr-23 OPEN
(6,8,10,11,13) at Silos Area COLUMNS

434 JB1071-HAI-04-ZZ-WIR-W-00434 INS483 CVL


Inspection request for Columns Formwork of five Columns at Silo # 4 Silo # 4, Silos Area 27-Apr-23 OPEN
(11,12,18,19,20) at Silos Area. COLUMNS
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

435 JB1071-HAI-04-ZZ-WIR-W-00435 INS484 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 4 Silo # 4, Silos Area 27-Apr-23 OPEN
(11,12,18,19,20) at Silos Area. COLUMNS

436 JB1071-HAI-04-ZZ-WIR-W-00436 INS485 CVL


Inspection request for pouring concrete of Silo # 10 Foundations (Raft) at Silo # 10, Silos Area 27-Apr-23 OPEN
Silos Area.

437 JB1071-HAI-04-ZZ-WIR-W-00437 INS486 CVL


Inspection request for Columns Formwork of five Columns at Silo # 11 Silo # 11, Silos Area 29-Apr-23 OPEN
(1,3,6,8,10) at Silos Area

438 JB1071-HAI-04-ZZ-WIR-W-00438 INS487 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 11 Silo # 11, Silos Area 29-Apr-23 OPEN
(1,3,6,8,10) at Silos Area

439 JB1071-HAI-04-ZZ-WIR-W-00439 INS488 CVL Inspection request for Steel Reinforcement of Silo # 5 Wall (W1) at Silos Area. Silo # 5, Silos Area 29-Apr-23 OPEN

440 JB1071-HAI-04-ZZ-WIR-W-00440 INS489 CVL


Inspection request for installation of protection board on Foundations at Silo Silo # 3, Silos Area 29-Apr-23 OPEN
# 3.

441 JB1071-HAI-04-ZZ-WIR-W-00441 INS490 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 5, Silos Area 30-Apr-23 2-May-23 CLOSED RHDHV 2
system for Wall of Silo # 5.

442 JB1071-HAI-04-ZZ-WIR-W-00442 INS491 CVL Inspection request for Steel Reinforcement of Silo # 3 Wall (W1) at Silos Area. Silo # 3, Silos Area 30-Apr-23 OPEN

443 JB1071-HAI-04-ZZ-WIR-W-00443 INS492 CVL


Inspection request for Columns Reinforcement of ten Columns of Silo # 3 Silo # 3, Silos Area 30-Apr-23 OPEN
(11,12,13,14,15,16,17,18,19,20) at Silos Area. COLUMNS

444 JB1071-HAI-04-ZZ-WIR-W-00444 INS493 CVL


Inspection request for Columns Formwork of five Columns at Silo # 3 Silo # 3, Silos Area 1-May-23 OPEN
(1,2,3,9,10) at Silos Area. COLUMNS

445 JB1071-HAI-04-ZZ-WIR-W-00445 INS494 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 3 Silo # 3, Silos Area 1-May-23 OPEN
(1,2,3,9,10) at Silos Area. COLUMNS

446 JB1071-HAI-04-ZZ-WIR-W-00446 INS495 CVL Inspection request for Steel Reinforcement of Silo # 4 Wall (W1) at Silos Area. Silo # 4, Silos Area 1-May-23 OPEN

447 JB1071-HAI-04-ZZ-WIR-W-00447 INS496 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 4, Silos Area 1-May-23 2-May-23 CLOSED RHDHV 2
system for Wall of Silo # 4.

448 JB1071-HAI-04-ZZ-WIR-W-00448 INS497 CVL


Inspection request for Columns Formwork of five Columns at Silo # 2 Silo # 2, Silos Area 1-May-23 OPEN
(5,12,14,17,18) at Silos Area. COLUMNS

449 JB1071-HAI-04-ZZ-WIR-W-00449 INS498 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 2 Silo # 2, Silos Area 1-May-23 OPEN
(5,12,14,17,18) at Silos Area. COLUMNS

450 JB1071-HAI-04-ZZ-WIR-W-00450 INS499 CVL


Inspection request for 1st Layer of backfilling (FDT) of Silo # 3 and 4 at Silos Silo # 3 and 4. Silos Area 1-May-23 OPEN
Area.

451 JB1071-HAI-04-ZZ-WIR-W-00451 INS500 CVL


Inspection request for application of Cementitious Waterproofing (Brush Silo # 7, Silos Area 2-May-23 OPEN
Bond) for Pile Cap of Silo # 7

452 JB1071-HAI-04-ZZ-WIR-W-00452 INS501 CVL Inspection request for pouring screed for Pile Cap of Silo # 7 Silo # 7, Silos Area 2-May-23 OPEN

453 JB1071-HAI-04-ZZ-WIR-W-00453 INS502 CVL


Inspection request for 2nd Layer of backfilling (FDT) of Silo # 2,3 and 4 at Silo # 2,3 and 4. Silos Area 2-May-23 OPEN
Silos Area.

454 JB1071-HAI-04-ZZ-WIR-W-00454 INS503 CVL


Inspection request for Compaction Test (FDT) under the blinding for Bagging Station 2-May-23 OPEN
foundations at Bagging Station. (Highlighted area in Drawing)

455 JB1071-HAI-04-ZZ-WIR-W-00455 INS504 CVL


Inspection request for Surface Preparation of Silo # 9 Foundations prior to Silo # 9, Silos Area 2-May-23 OPEN
waterproofing (Bituminous) coating at Silos Area.

456 JB1071-HAI-04-ZZ-WIR-W-00456 INS505 CVL


Inspection request for Columns Formwork of five Columns at Silo # 3 Silo # 3, Silos Area 2-May-23 OPEN
(4,5,6,7,8) at Silos Area.

457 JB1071-HAI-04-ZZ-WIR-W-00457 INS506 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 3 (4,5,6,7,8) Silo # 3, Silos Area 2-May-23 OPEN
at Silos Area.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

458 JB1071-HAI-04-ZZ-WIR-W-00458 INS507 CVL


Inspection request for Columns Formwork of five Columns at Silo # 11 Silo # 11, Silos Area 2-May-23 OPEN
(2,4,5,7,9) at Silos Area

459 JB1071-HAI-04-ZZ-WIR-W-00459 INS508 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 11 Silo # 11, Silos Area 2-May-23 OPEN
(2,4,5,7,9) at Silos Area

460 JB1071-HAI-04-ZZ-WIR-W-00460 INS510 CVL


Inspection request for Termites Control Spray under the blinding of Bagging Station. 3-May-23 OPEN
foundations at Bagging Station. (Highlighted area in Drawing)

461 JB1071-HAI-04-ZZ-WIR-W-00461 INS511 CVL


Inspection request for Installation of Polythene Sheet under the blinding of Bagging Station. 3-May-23 OPEN
foundations at Bagging Station. (Highlighted area in Drawing)

462 JB1071-HAI-04-ZZ-WIR-W-00462 INS512 CVL


Inspection request for Pouring Blinding of foundations at Bagging Station. Bagging Station. 3-May-23 OPEN
(Highlighted area in Drawing)

463 JB1071-HAI-04-ZZ-WIR-W-00463 INS513 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Silos # 9, SILOS AREA 3-May-23 OPEN
for RAFT FOUNDATION of Silo # 9

464 JB1071-HAI-04-ZZ-WIR-W-00464 INS514 CVL


Inspection request for Columns Formwork of three Columns at Silo # 2 Silo # 2, Silos Area 3-May-23 OPEN
(16,19,20) at Silos Area. COLUMNS

465 JB1071-HAI-04-ZZ-WIR-W-00465 INS515 CVL


Inspection request for Concrete Pouring of three Columns at Silo # 2 Silo # 2, Silos Area 3-May-23 OPEN
(16,19,20) at Silos Area. COLUMNS

INS516 Inspection request for Formwork of wall (Highlighted part on drawing) of silo
466 JB1071-HAI-04-ZZ-WIR-W-00466 INS520 CVL Silo # 5, Silos Area 3-May-23 4-May-23 6-May-23 OPEN
INS535 # 4 at Silos Area.

INS517 Inspection request for Concrete Pouring of wall (Highlighted part on drawing)
467 JB1071-HAI-04-ZZ-WIR-W-00467 INS521 CVL Silo # 5, Silos Area 3-May-23 4-May-23 6-May-23 OPEN
INS534 of silo # 4 at Silos Area.

468 JB1071-HAI-04-ZZ-WIR-W-00468 INS518 CVL


Inspection request for Formwork of wall (Highlighted part on drawing) of silo Silo # 6, Silos Area 3-May-23 OPEN
# 6 at Silos Area.

469 JB1071-HAI-04-ZZ-WIR-W-00469 INS519 CVL


Inspection request for Concrete Pouring of wall (Highlighted part on drawing) Silo # 6, Silos Area 3-May-23 OPEN
of silo # 6 at Silos Area

470 JB1071-HAI-04-ZZ-WIR-W-00470 INS522 CVL


Inspection request for Columns Formwork of five Columns at Silo # 11 Silo # 11, Silos Area 4-May-23 OPEN
(11,13,15,17,18) at Silos Area

471 JB1071-HAI-04-ZZ-WIR-W-00471 INS523 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 11 Silo # 11, Silos Area 4-May-23 OPEN
(11,13,15,17,18) at Silos Area

472 JB1071-HAI-04-ZZ-WIR-W-00472 INS524 CVL


Inspection request for Surface Preparation of Silo # 10 Foundations prior to Silo # 10, Silos Area 4-May-23 OPEN
waterproofing (Bituminous) coating at Silos Area.

473 JB1071-HAI-04-ZZ-WIR-W-00473 INS525 CVL


Inspection request for 3rd Layer of backfilling (FDT) of Silo # 2,3 and 4 at Silo # 2,3 and 4. Silos Area 4-May-23 OPEN
Silos Area.

474 JB1071-HAI-04-ZZ-WIR-W-00474 INS526 CVL


Inspection request for Columns Formwork of five Columns at Silo # 3 Silo # 3, Silos Area 4-May-23 OPEN
(13,14,15,16,17) at Silos Area. COLUMNS

475 JB1071-HAI-04-ZZ-WIR-W-00475 INS527 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 3 Silo # 3, Silos Area 4-May-23 OPEN
(13,14,15,16,17) at Silos Area. COLUMNS

476 JB1071-HAI-04-ZZ-WIR-W-00476 INS528 CVL


Inspection request for Termites Control Spray under the blinding of Slab on Admin Building 4-May-23 OPEN
Grade at Admin Building. (Highlighted Area in Drawing)

477 JB1071-HAI-04-ZZ-WIR-W-00477 INS529 CVL


Inspection request for Installation of Polythene Sheet under the blinding of Admin Building 4-May-23 OPEN
Slab on Grade at Admin Building. (Highlighted Area in Drawing)

478 JB1071-HAI-04-ZZ-WIR-W-00478 INS530 CVL


Inspection request for Pouring Blinding under Slab on Grade at Admin Admin Building 4-May-23 OPEN
Building. (Highlighted Area in Drawing)

479 JB1071-HAI-04-ZZ-WIR-W-00479 INS531 CVL


Inspection request for Pouring Blinding under Slab on Grade at Admin Admin Building 6-May-23 OPEN
Building.

Inspection request for first coat of Waterproofing Coating (Bituminous) Paint


480 JB1071-HAI-04-ZZ-WIR-W-00480 INS532 CVL for RAFT FOUNDATION of Silo # 10 Silo # 10, Silos Area 6-May-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

481 JB1071-HAI-04-ZZ-WIR-W-00481 INS536 CVL


Inspection request for Columns Reinforcement of 20 Columns of Silo # 9 (1 to Silo # 09 7-May-23 OPEN
20) at Silos Area.

482 JB1071-HAI-04-ZZ-WIR-W-00482 INS537 CVL


Inspection request for Columns Formwork of five Columns at Silo # 11 Silo # 11 7-May-23 OPEN
(12,14,16,19,20) at Silos Area.

483 JB1071-HAI-04-ZZ-WIR-W-00483 INS538 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 11 Silo # 11 7-May-23 OPEN
(12,14,16,19,20) at Silos Area

484 JB1071-HAI-04-ZZ-WIR-W-00484 INS539 CVL Inspection request for Steel Reinforcement of Silo # 2 Wall (W1) at Silos Area. Silo # 02 7-May-23 OPEN

485 JB1071-HAI-04-ZZ-WIR-W-00485 INS540 CVL


Inspection request for Formwork of wall W1 (Highlighted part on drawing) of Silo # 05, Silos Area 7-May-23 OPEN
silo # 5 at Silos Area.

486 JB1071-HAI-04-ZZ-WIR-W-00486 INS541 CVL


Inspection request for Concrete Pouring of wall W1 (Highlighted part on Silo # 05, Silos Area 7-May-23 OPEN
drawing) of silo # 5 at Silos Area.

487 JB1071-HAI-04-ZZ-WIR-W-00487 INS542 CVL


Inspection request for Compaction Test (FDT) under the blinding for TRANSFER TOWER-1 7-May-23 OPEN
foundations at Transfer Tower 1.

488 JB1071-HAI-04-ZZ-WIR-W-00488 INS543 CVL


Inspection request for Columns Formwork of five Columns at Silo # 3 Silo # 03 7-May-23 OPEN
(11,12,18,19,20) at Silos Area.

489 JB1071-HAI-04-ZZ-WIR-W-00489 INS544 CVL


Inspection request for Concrete Pouring of five Columns at Silo # 3 Silo # 03 7-May-23 OPEN
(11,12,18,19,20) at Silos Area.

490 JB1071-HAI-04-ZZ-WIR-W-00490 INS545 CVL Inspection request for Pile Integrity Test at bagging station. BAGGING STATION 8-May-23 OPEN

491 JB1071-HAI-04-ZZ-WIR-W-00491 INS546 CVL


Inspection request for installation of protection board on Foundations at Silo Silo # 10 8-May-23 OPEN
# 10.

492 JB1071-HAI-04-ZZ-WIR-W-00492 INS547 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 08 8-May-23 OPEN
system for Raft (Foundation) Silo # 8.

493 JB1071-HAI-04-ZZ-WIR-W-00493 INS548 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 03 8-May-23 OPEN
system for Wall of Silo # 3.

494 JB1071-HAI-04-ZZ-WIR-W-00494 INS550 CVL


Inspection request for Steel Reinforcement of Silo # 8 Foundations (Pile Cap) Silo # 08 9-May-23 OPEN
at Silos Area.

495 JB1071-HAI-04-ZZ-WIR-W-00495 INS551 CVL Inspection request for Formwork of Silo # 8 Foundations (Raft) at Silos Area. Silo # 08 9-May-23 OPEN

496 JB1071-HAI-04-ZZ-WIR-W-00496 INS552 CVL


Inspection request for Concrete Pouring of Silo # 8 Foundations (Raft) at Silos Silo # 08 9-May-23 OPEN
Area.

497 JB1071-HAI-04-ZZ-WIR-W-00497 INS553 CVL


Inspection request for Termites Control Spray under the blinding for TRANSFER TOWER-1 9-May-23 OPEN
foundations at Transfer Tower 1.

498 JB1071-HAI-04-ZZ-WIR-W-00498 INS554 CVL


Inspection request for Installation of Polythene Sheet under the blinding for TRANSFER TOWER-1 9-May-23 OPEN
foundations at Transfer Tower 1.

499 JB1071-HAI-04-ZZ-WIR-W-00499 INS555 CVL Inspection request for Pouring Blinding for foundations at Transfer Tower 1. TRANSFER TOWER-1 9-May-23 OPEN

500 JB1071-HAI-04-ZZ-WIR-W-00500 INS556 CVL


Inspection request for for application of Cementitious Waterproofing (Brush Bagging Station 10-May-23 OPEN
Bond) at Bagging Station. (Highlighted area in Drawing)

501 JB1071-HAI-04-ZZ-WIR-W-00501 INS557 CVL


Inspection request for Pouring Screed concrete at Bagging Station foundation. Bagging Station 10-May-23 OPEN
(Highlighted area in Drawing)

502 JB1071-HAI-04-ZZ-WIR-W-00502 INS558 CVL


Inspection request for Steel Reinforcement of Silo # 12 Wall (W1) at Silos Silo # 12, Silos Area 10-May-23 OPEN
Area.

503 JB1071-HAI-04-ZZ-WIR-W-00503 INS559 CVL


Inspection request for Columns Formwork of five Columns (12,16,18,19,20) of Silo # 09, Silos Area 10-May-23 OPEN
Silo # 9 at Silos Area.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

504 JB1071-HAI-04-ZZ-WIR-W-00504 INS560 CVL


Inspection request for Columns Concrete Pouring of five Columns Silo # 09, Silos Area 10-May-23 OPEN
(12,16,18,19,20) of Silo # 9 at Silos Area.

505 JB1071-HAI-04-ZZ-WIR-W-00505 INS561 CVL


Inspection request for Formwork of wall W1 (Highlighted part on drawing) of Silo # 05, Silos Area 10-May-23 OPEN
silo # 5 at Silos Area.

506 JB1071-HAI-04-ZZ-WIR-W-00506 INS562 CVL


Inspection request for Concrete Pouring of wall W1 (Highlighted part on Silo # 05, Silos Area 10-May-23 OPEN
drawing) of silo # 5 at Silos Area.

507 JB1071-HAI-04-ZZ-WIR-W-00507 INS563 CVL


Inspection request for Formwork of wall (Highlighted part on drawing) of silo Silo # 03, Silos Area 10-May-23 OPEN
# 3 at Silos Area.

508 JB1071-HAI-04-ZZ-WIR-W-00508 INS564 CVL


Inspection request for Concrete Pouring of wall (Highlighted part on drawing) Silo # 03, Silos Area 10-May-23 OPEN
of silo # 3 at Silos Area.

509 JB1071-HAI-04-ZZ-WIR-W-00509 INS566 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 02, Silos Area 11-May-23 OPEN
system for Wall of Silo # 2.

510 JB1071-HAI-04-ZZ-WIR-W-00510 INS567 CVL


Inspection request for Columns Formwork of five Columns (4,5,6,8,10) of Silo Silo # 09, Silos Area 11-May-23 OPEN
# 9 at Silos Area

Inspection request for Columns Concrete Pouring of five Columns (4,5,6,8,10)


511 JB1071-HAI-04-ZZ-WIR-W-00511 INS568 CVL of Silo # 9 at Silos Area. Silo # 09, Silos Area 11-May-23 OPEN

512 JB1071-HAI-04-ZZ-WIR-W-00512 INS569 CVL


Inspection request for Columns Formwork of five Columns (11, 13, 14, 15, 16) Silo # 09, Silos Area 13-May-23 OPEN
of Silo # 9 at Silos Area.

Inspection request for Columns Concrete Pouring of five Columns


513 JB1071-HAI-04-ZZ-WIR-W-00513 INS570 CVL (11,13,14,15,16) of Silo # 9 at Silos Area. Silo # 09, Silos Area 13-May-23 OPEN

514 JB1071-HAI-04-ZZ-WIR-W-00514 INS571 CVL


Inspection request for 1st Layer of backfilling (FDT) of Silo # 9 and 10 at Silos Silo # 09,10 Silos Area 13-May-23 OPEN
Area.

515 JB1071-HAI-04-ZZ-WIR-W-00515 INS572 CVL Inspection request for Formwork of Silo # 2 Wall (W1) at Silos Area Silo # 02, Silos Area 13-May-23 OPEN

516 JB1071-HAI-04-ZZ-WIR-W-00516 INS573 CVL Inspection request for Concrete Pouring of Silo # 2 Wall (W1) at Silos Area. Silo # 02, Silos Area 13-May-23 OPEN

517 JB1071-HAI-04-ZZ-WIR-W-00517 INS574 CVL


Inspection request for Columns Reinforcement of 20 Columns of Silo # 10 at Silo # 10, Silos Area 14-May-23 OPEN
Silos Area.

518 JB1071-HAI-04-ZZ-WIR-W-00518 INS575 CVL


Inspection request for Compaction Test (FDT) under the blinding for Bagging Station 14-May-23 OPEN
foundations at Bagging Station. (Highlighted area in Drawing)

519 JB1071-HAI-04-ZZ-WIR-W-00519 INS576 CVL


Inspection request for application of Cementitious Waterproofing (Brush Bagging Station 14-May-23 OPEN
Bond) at Bagging Station. (Highlighted area in Drawing)

520 JB1071-HAI-04-ZZ-WIR-W-00520 INS577 CVL


Inspection request for Pouring Screed concrete at Bagging Station foundation. Bagging Station 14-May-23 OPEN
(Highlighted area in Drawing)

521 JB1071-HAI-04-ZZ-WIR-W-00521 INS578 CVL


Inspection request for application of Cementitious Waterproofing (Brush Transfer Tower 1 14-May-23 OPEN
Bond) at Transfer Tower 1.

522 JB1071-HAI-04-ZZ-WIR-W-00522 INS579 CVL


Inspection request for Pouring Screed concrete at Transfer Tower 1 Transfer Tower 1 14-May-23 OPEN
foundation.

523 JB1071-HAI-04-ZZ-WIR-W-00523 INS580 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 12. 15-May-23 OPEN
system for Wall of Silo # 12.

524 JB1071-HAI-04-ZZ-WIR-W-00524 INS581 CVL


Inspection request for Columns Formwork of five Columns (1,2,3,7,9) of Silo # Silo # 09. 15-May-23 OPEN
9 at Silos Area.

525 JB1071-HAI-04-ZZ-WIR-W-00525 INS582 CVL


Inspection request for Columns Concrete Pouring of five Columns (1,2,3,7,9) Silo # 09. 15-May-23 OPEN
of Silo # 9 at Silos Area.

526 JB1071-HAI-04-ZZ-WIR-W-00526 INS583 CVL


Inspection request for Termites Control Spray under the blinding of Bagging Station 15-May-23 OPEN
foundations at Bagging Station. (Highlighted area in Drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

527 JB1071-HAI-04-ZZ-WIR-W-00527 INS584 CVL


Inspection request for Installation of Polythene Sheet under the blinding of Bagging Station 15-May-23 OPEN
foundations at Bagging Station. (Highlighted area in Drawing)

528 JB1071-HAI-04-ZZ-WIR-W-00528 INS585 CVL


Inspection request for Pouring Blinding of foundations at Bagging Station. Bagging Station 15-May-23 OPEN
(Highlighted area in Drawing)

529 JB1071-HAI-04-ZZ-WIR-W-00529 INS586 CVL


Inspection request for Formwork of wall (Highlighted part on drawing) of silo Silo # 03. 15-May-23 OPEN
# 3 at Silos Area

530 JB1071-HAI-04-ZZ-WIR-W-00530 INS587 CVL


Inspection request for Concrete Pouring of wall (Highlighted part on drawing) Silo # 03. 15-May-23 OPEN
of silo # 3 at Silos Area.

531 JB1071-HAI-04-ZZ-WIR-W-00531 INS588 ELE


Inspection request for Installation of PVC Conduit for small power, telephone Admin Building 15-May-23 OPEN
and data at Admin Building.

532 JB1071-HAI-04-ZZ-WIR-W-00532 INS589 CVL


Inspection request for Close out of NCR # JB1071-RHD-04-XX-NC-Z-0014 Silos Raft Foundation 16-May-23 OPEN
Damaged Plasti-board at Silos Raft Foundations.

533 JB1071-HAI-04-ZZ-WIR-W-00533 INS590 CVL


Inspection request for Columns Formwork of ten Columns (11, 13, 15, 17, 19, Silos # 10 17-May-23 OPEN
02, 04, 06, 08 & 10) of Silo # 10 at Silos Area.

534 JB1071-HAI-04-ZZ-WIR-W-00534 INS591 CVL


Inspection request for Columns Concrete Pouring of ten Columns (11, 13, 15, Silos # 10 17-May-23 OPEN
17, 19, 02, 04, 06, 08 & 10) of Silo # 10 at Silos Area.

535 JB1071-HAI-04-ZZ-WIR-W-00535 INS592 CVL


Inspection request for Formwork of wall (W1) at Silo # 12. ((Highlighted part Silos # 12 18-May-23 OPEN
on drawing)

536 JB1071-HAI-04-ZZ-WIR-W-00536 INS593 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 12. Silos # 12 18-May-23 OPEN
((Highlighted part on drawing)

537 JB1071-HAI-04-ZZ-WIR-W-00537 INS594 CVL


Inspection request for Steel Reinforcement of Silo # 11 Wall (W1) at Silos Silos # 11 18-May-23 OPEN
Area.

Inspection request for Installation of Sleeves 3(160MM DIA UPVC) for


incoming Power Cable,3(63MM DIA UPVC)from SMDB TO LP,PP,AC Panel &
Admin Building (Under Slab
538 JB1071-HAI-04-ZZ-WIR-W-00538 INS595 ELE 6NO (1(50MM DIA UPVC),4(63MM DIA UPVC)) for Data, TP, CCTV, 2(50MM on Grade)
20-May-23 OPEN
DIA UPVC) For Fire Alarm, 2(50MM DIA UPVC) for LC Earthing and Panel
Board Earthing 2(50MM DIA UPVC) for Outdoor Light.

539 JB1071-HAI-04-ZZ-WIR-W-00539 INS596 CVL


Inspection request for Surface Preparation of Silo # 8 Foundations prior to Silos # 08 20-May-23 OPEN
waterproofing (Bituminous) coating at Silos Area.

540 JB1071-HAI-04-ZZ-WIR-W-00540 INS597 CVL


Inspection request for 2nd Layer of backfilling (FDT) of Silo # 9 and 10 at Silos Silo # 9 and 10 20-May-23 OPEN
Area.

541 JB1071-HAI-04-ZZ-WIR-W-00541 INS598 CVL


Inspection request for Columns Formwork of 10 Columns Silo # 10 20-May-23 OPEN
(1,3,5,7,9,12,14,16,18,20) of Silo # 10 at Silos Area.

542 JB1071-HAI-04-ZZ-WIR-W-00542 INS599 CVL


Inspection request for Concrete Pouring of 10 Columns Silo # 10 20-May-23 14-Jun-23 OPEN
(1,3,5,7,9,12,14,16,18,20) of Silo # 10 at Silos Area.

543 JB1071-HAI-04-ZZ-WIR-W-00543 INS600 CVL


Inspection request for Formwork of wall (Highlighted part on drawing) of silo Silo # 04 20-May-23 OPEN
# 4 at Silos Area.

544 JB1071-HAI-04-ZZ-WIR-W-00544 INS601 CVL


Inspection request for Concrete Pouring of wall (Highlighted part on drawing) Silo # 04 20-May-23 OPEN
of silo # 4 at Silos Area.

545 JB1071-HAI-04-ZZ-WIR-W-00545 INS602 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Silo # 08 21-May-23 OPEN
for Raft foundation of Silo # 8.

546 JB1071-HAI-04-ZZ-WIR-W-00546 INS603 CVL Inspection request for Pile Integrity test for Transfer Tower 1 Piling. Transfer Tower 1 21-May-23 OPEN

547 JB1071-HAI-04-ZZ-WIR-W-00547 INS604 CVL Inspection request for Pile Integrity Test at bagging station. Bagging Station 21-May-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

548 JB1071-HAI-04-ZZ-WIR-W-00548 INS605 CVL


Inspection request for Installation of Earthing and Lightning protection Silo # 11 22-May-23 OPEN
system for Wall of Silo # 11

549 JB1071-HAI-04-ZZ-WIR-W-00549 INS606 CVL


Inspection request for Formwork of Silo # 2 Wall (W1) at Silos Area. Silo # 02 22-May-23 OPEN
(Highlighted Area in Drawing)

550 JB1071-HAI-04-ZZ-WIR-W-00550 INS607 CVL


Inspection request for Concrete Pouring of Silo # 2 Wall (W1) at Silos Area. Silo # 02 22-May-23 OPEN
(Highlighted Area in Drawing)

551 JB1071-HAI-04-ZZ-WIR-W-00551 INS608 CVL


Inspection request for application of Cementitious Waterproofing (Brush Bagging Station 22-May-23 OPEN
Bond) at Bagging Station. (Highlighted area in Drawing)

552 JB1071-HAI-04-ZZ-WIR-W-00552 INS609 CVL


Inspection request for Pouring Screed concrete at Bagging Station foundation. Bagging Station 22-May-23 OPEN
(Highlighted area in Drawing)

553 JB1071-HAI-04-ZZ-WIR-W-00553 INS611 CVL


Inspection request for Columns Reinforcement of twenty Columns of Silo # 8 Silo # 8 23-May-23 OPEN
(1 to 20) at Silos Area.

554 JB1071-HAI-04-ZZ-WIR-W-00554 INS612 CVL


Inspection request for 3rd Layer of backfilling (FDT) of Silo # 9 and 10 at Silos Silo # 9 24-May-23 OPEN
Area.

555 JB1071-HAI-04-ZZ-WIR-W-00555 INS613 CVL


Inspection request for installation of protection board on Foundations at Silo Silo # 8 24-May-23 OPEN
# 8.

556 JB1071-HAI-04-ZZ-WIR-W-00556 INS614 CVL


Inspection request for Formwork of wall (W1) at Silo # 11. (Highlighted part Silo # 11 24-May-23 OPEN
on drawing)

557 JB1071-HAI-04-ZZ-WIR-W-00557 INS615 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 11. Silo # 11 24-May-23 OPEN
(Highlighted part on drawing)

558 JB1071-HAI-04-ZZ-WIR-W-00558 INS616 CVL Inspection request for Steel Reinforcement of Silo # 9 Wall (W1) at Silos Area. Silo # 9 25-May-23 OPEN

559 JB1071-HAI-04-ZZ-WIR-W-00559 INS617 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 7 25-May-23 OPEN
system for Raft Silo # 7

560 JB1071-HAI-04-ZZ-WIR-W-00560 INS618 CVL


Inspection request for Steel Reinforcement of foundations (Part 1) at Bagging Bagging Station 25-May-23 5-Jun-23 OPEN
Station. (Highlighted area in Drawing)

561 JB1071-HAI-04-ZZ-WIR-W-00561 INS619 CVL


Inspection request for Formwork of foundations (Part 1) at Bagging Station. Bagging Station 25-May-23 5-Jun-23 OPEN
(Highlighted area in Drawing)

562 JB1071-HAI-04-ZZ-WIR-W-00562 INS620 CVL


Inspection request for Concrete pouring of foundations (Part 1) at Bagging Bagging Station 25-May-23 5-Jun-23 OPEN
Station. (Highlighted area in Drawing)

563 JB1071-HAI-04-ZZ-WIR-W-00563 INS623 ELE


Inspection request for Installation of Earthing and Lightning protection Bagging Station 27-May-23 OPEN
system at Bagging Station. (Part1 as Highlighted area in drawing)

564 JB1071-HAI-04-ZZ-WIR-W-00564 INS624 CVL


Inspection request for Steel Reinforcement of Silo # 7 Foundations (Pile Cap) Silo # 7 28-May-23 OPEN
at Silos Area.

565 JB1071-HAI-04-ZZ-WIR-W-00565 INS625 CVL Inspection request for Formwork of Silo # 7 Foundations (Raft) at Silos Area. Silo # 7 28-May-23 OPEN

566 JB1071-HAI-04-ZZ-WIR-W-00566 INS626 CVL


Inspection request for Concrete Pouring of Silo # 7 Foundations (Raft) at Silos Silo # 7 28-May-23 OPEN
Area.

567 JB1071-HAI-04-ZZ-WIR-W-00567 INS627 CVL


Inspection request for Formwork of wall (W1) at Silo # 12. (Highlighted part Silo # 12 28-May-23 OPEN
on drawing)

568 JB1071-HAI-04-ZZ-WIR-W-00568 INS628 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 12. Silo # 12 28-May-23 OPEN
(Highlighted part on drawing)

569 JB1071-HAI-04-ZZ-WIR-W-00569 INS631 CVL Inspection request for 1st Layer of backfilling around of Silo # 8 at Silos Area. Silo # 08 30-May-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

570 JB1071-HAI-04-ZZ-WIR-W-00570 INS632 CVL


Inspection request for Columns Formwork of six Columns at Silo # 8 Silo # 08 30-May-23 OPEN
(4,5,6,8,10,11) at Silos Area

571 JB1071-HAI-04-ZZ-WIR-W-00571 INS633 CVL


Inspection request for Concrete Pouring of six Columns at Silo # 8 Silo # 08 30-May-23 OPEN
(4,5,6,8,10,11) at Silos Area

572 JB1071-HAI-04-ZZ-WIR-W-00572 INS634 CVL


Inspection request for Formwork of wall (W1) at Silo # 11. (Highlighted part Silo # 11 30-May-23 OPEN
on drawing)

573 JB1071-HAI-04-ZZ-WIR-W-00573 INS635 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 11. Silo # 11 30-May-23 OPEN
(Highlighted part on drawing)

574 JB1071-HAI-04-ZZ-WIR-W-00574 INS636 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 09 31-May-23 OPEN
system for Wall of Silo # 9.

575 JB1071-HAI-04-ZZ-WIR-W-00575 INS637 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 10 31-May-23 OPEN
system for Wall of Silo # 10.

576 JB1071-HAI-04-ZZ-WIR-W-00576 INS638 CVL


Inspection request for Steel Reinforcement of Silo # 10 Wall (W1) at Silos Silo # 10 31-May-23 OPEN
Area

577 JB1071-HAI-04-ZZ-WIR-W-00577 INS639 CVL


Inspection request for Columns Formwork of four Columns at Silo # 8 Silo # 08 31-May-23 OPEN
(13,15,17,18) at Silos Area

578 JB1071-HAI-04-ZZ-WIR-W-00578 INS640 CVL


Inspection request for Concrete Pouring of four Columns at Silo # 8 Silo # 08 31-May-23 OPEN
(13,15,17,18) at Silos Area

Inspection request for embedded item tests dry penetration, sand blasting
579 JB1071-HAI-04-ZZ-WIR-W-00579 INS642 MECH and dry film thickness test for Aeration Pipes and Angles Frames for Silos slab. (Silo # 5, 6 , 11 and 12) 3-Jun-23 OPEN
(Silo # 5, 6 , 11 and 12)

580 JB1071-HAI-04-ZZ-WIR-W-00580 INS643 CVL Inspection request for 2nd Layer of backfilling around of Silo # 8 at Silos Area. Silo # 08 3-Jun-23 OPEN

581 JB1071-HAI-04-ZZ-WIR-W-00581 INS644 CVL


Inspection request for collecting soil sample and concrete raw materials HAIF BATCHING PLANT 3-Jun-23 OPEN
sample from batching plant.

582 JB1071-HAI-04-ZZ-WIR-W-00582 INS648 CVL


Inspection request for Formwork of wall (W1) at Silo # 10. (Highlighted part Silo # 10. 4-Jun-23 OPEN
on drawing)

583 JB1071-HAI-04-ZZ-WIR-W-00583 INS649 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 10. Silo # 10. 4-Jun-23 OPEN
(Highlighted part on drawing)

584 JB1071-HAI-04-ZZ-WIR-W-00584 INS650 CVL


Inspection request for Columns Formwork of ten Columns at Silo # 8 Silo # 08 5-Jun-23 OPEN
(1,2,3,7,9,12,14,16,19,20) at Silos Area

585 JB1071-HAI-04-ZZ-WIR-W-00585 INS651 CVL


Inspection request for Concrete Pouring of ten Columns at Silo # 8 Silo # 08 5-Jun-23 OPEN
(1,2,3,7,9,12,14,16,19,20) at Silos Area.

586 JB1071-HAI-04-ZZ-WIR-W-00586 INS657 CVL


Inspection request for Formwork of wall (W1) at Silo # 10. (Highlighted part Silo # 10. 7-Jun-23 OPEN
on drawing)

587 JB1071-HAI-04-ZZ-WIR-W-00587 INS658 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 10. Silo # 10. 7-Jun-23 OPEN
(Highlighted part on drawing)

588 JB1071-HAI-04-ZZ-WIR-W-00588 INS659 CVL Inspection request for Slab Reinforcement of Silo # 6. Silo # 06 7-Jun-23 OPEN

589 JB1071-HAI-04-ZZ-WIR-W-00589 INS660 CVL Inspection request for Slab Formwork of Silo # 6. Silo # 06 8-Jun-23 OPEN

590 JB1071-HAI-04-ZZ-WIR-W-00590 INS661 CVL Inspection request for Pouring Concrete of the Slab of Silo # 6. Silo # 06 8-Jun-23 OPEN

591 JB1071-HAI-04-ZZ-WIR-W-00591 INS662 CVL


Inspection request for Columns Reinforcement of twenty Columns of Silo # 7 Silo # 07 10-Jun-23 OPEN
(1 to 20) at Silos Area.

592 JB1071-HAI-04-ZZ-WIR-W-00592 INS663 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 08 11-Jun-23 OPEN
system for Wall of Silo # 8.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

593 JB1071-HAI-04-ZZ-WIR-W-00593 INS664 CVL


Inspection request for Formwork of wall (W1) at Silo # 9. (Highlighted part on Silo # 09 11-Jun-23 OPEN
drawing)

594 JB1071-HAI-04-ZZ-WIR-W-00594 INS665 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 9. (Highlighted Silo # 09 11-Jun-23 OPEN
part on drawing)

595 JB1071-HAI-04-ZZ-WIR-W-00595 INS666 CVL


Inspection request for Installation of Drainage pipe for Lab Room in Admin Admin Building 11-Jun-23 OPEN
Building.

596 JB1071-HAI-04-ZZ-WIR-W-00596 INS667 CVL


Inspection request for Steel Reinforcement of Slab on Grade at Admin Admin Building 11-Jun-23 OPEN
Building. (Highlighted Area in Drawing)

597 JB1071-HAI-04-ZZ-WIR-W-00597 INS668 CVL


Inspection request for Formwork of Slab on Grade at Admin Building. Admin Building 11-Jun-23 OPEN
(Highlighted Area in Drawing)

598 JB1071-HAI-04-ZZ-WIR-W-00598 INS669 CVL


Inspection request for Installation of PVC Pipes for small Power, Data and TP Admin Building 11-Jun-23 OPEN
at Ground Floor. (Under Slab on Grade)

599 JB1071-HAI-04-ZZ-WIR-W-00599 INS670 CVL


Inspection request for pouring concrete of Slab on Grade at Admin Building. Admin Building 11-Jun-23 OPEN
(Highlighted Area in Drawing)

600 JB1071-HAI-04-ZZ-WIR-W-00600 INS671 CVL


Inspection request for Steel Reinforcement of foundations (Part 2) at Bagging Bagging Station 12-Jun-23 OPEN
Station. (Highlighted area in Drawing)

601 JB1071-HAI-04-ZZ-WIR-W-00601 INS672 CVL


Inspection request for Formwork of foundations (Part 2) at Bagging Station. Bagging Station 12-Jun-23 OPEN
(Highlighted area in Drawing)

602 JB1071-HAI-04-ZZ-WIR-W-00602 INS673 ELE


Inspection request for Installation of Earthing and Lightning protection Bagging Station 12-Jun-23 OPEN
system at Bagging Station. (Part2 as Highlighted area in drawing)

603 JB1071-HAI-04-ZZ-WIR-W-00603 INS674 CVL


Inspection request for Concrete pouring of foundations (Part 2) at Bagging Bagging Station 12-Jun-23 OPEN
Station.(Highlighted area in Drawing)

604 JB1071-HAI-04-ZZ-WIR-W-00604 INS675 CVL


Inspection request for Surface Preparation of Silo # 7 foundation prior to Silo # 07 13-Jun-23 OPEN
waterproofing (Bituminous) coating at silos area

605 JB1071-HAI-04-ZZ-WIR-W-00605 INS676 CVL


Inspection request for Columns Formwork of 10 Nos. at Silo # 7 Silo # 07 13-Jun-23 OPEN
(2,4,6,8,10,11,13,15,17,18) at Silos Area

606 JB1071-HAI-04-ZZ-WIR-W-00606 INS678 CVL


Inspection request for Concrete Pouring of ten Columns at Silo # 7 Silo # 07 13-Jun-23 OPEN
(2,4,6,8,10,11,13,15,17,18) at Silos Area.

607 JB1071-HAI-04-ZZ-WIR-W-00607 INS679 CVL


Inspection request for Formwork of wall (W1) at Silo # 9. (Highlighted part on Silo # 09 13-Jun-23 OPEN
drawing)

608 JB1071-HAI-04-ZZ-WIR-W-00608 INS680 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 9. (Highlighted Silo # 09 13-Jun-23 OPEN
part on drawing)

609 JB1071-HAI-04-ZZ-WIR-W-00609 INS686 CVL Inspection request for Steel Reinforcement of Silo # 8 Wall (W1) at Silos Area. Silo # 08 14-Jun-23 OPEN

610 JB1071-HAI-04-ZZ-WIR-W-00610 INS687 CVL Inspection request for Slab Reinforcement of Silo # 12. Silo # 12 15-Jun-23 OPEN

611 JB1071-HAI-04-ZZ-WIR-W-00611 INS688 CVL


Inspection request for Columns Formwork of 10 Columns at Silo # 7 Silo # 07 15-Jun-23 OPEN
(1,3,5,7,9,12,14,16,19,20) at Silos Area

612 JB1071-HAI-04-ZZ-WIR-W-00612 INS689 CVL


Inspection request for Concrete Pouring of ten Columns at Silo # 7 Silo # 07 15-Jun-23 OPEN
(1,3,5,7,9,12,14,16,19,20) at Silos Area.

613 JB1071-HAI-04-ZZ-WIR-W-00613 INS690 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Silo # 07 17-Jun-23 OPEN
for Raft foundation of Silo # 7.

614 JB1071-HAI-04-ZZ-WIR-W-00614 INS691 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 12 17-Jun-23 OPEN
(Embedded Items) at Slab of Silo # 12.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

615 JB1071-HAI-04-ZZ-WIR-W-00615 INS692 CVL Inspection request for Slab Formwork of Silo # 12. Silo # 12 17-Jun-23 OPEN

616 JB1071-HAI-04-ZZ-WIR-W-00616 INS693 CVL Inspection request for Pouring Concrete of the Slab of Silo # 12 Silo # 12 17-Jun-23 OPEN

617 JB1071-HAI-04-ZZ-WIR-W-00617 INS694 CVL


Inspection request for Formwork of wall (W1) at Silo # 8. (Highlighted part on Silo # 08 18-Jun-23 OPEN
drawing).

618 JB1071-HAI-04-ZZ-WIR-W-00618 INS695 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 8. (Highlighted Silo # 08 18-Jun-23 OPEN
part on drawing).

619 JB1071-HAI-04-ZZ-WIR-W-00619 INS696 CVL


Inspection request for Surface Preparation of bagging station Foundations Bagging Station 18-Jun-23 OPEN
(Part 1) prior to waterproofing (Bituminous) coating.

620 JB1071-HAI-04-ZZ-WIR-W-00620 INS697 CVL Inspection request for Slab Reinforcement of Silo # 5. Silo # 05 18-Jun-23 OPEN

621 JB1071-HAI-04-ZZ-WIR-W-00621 INS698 CVL


Inspection request for Steel Reinforcement of Slab on Grade at Admin Admin Building 19-Jun-23 OPEN
Building. (Highlighted Area in Drawing)

622 JB1071-HAI-04-ZZ-WIR-W-00622 INS699 CVL


Inspection request for Formwork of Slab on Grade at Admin Building. Admin Building 19-Jun-23 OPEN
(Highlighted Area in Drawing)

623 JB1071-HAI-04-ZZ-WIR-W-00623 INS700 ELE


Inspection request for Installation of PVC Pipes for small Power, Data and TP Admin Building 19-Jun-23 OPEN
at Ground Floor. (Under Slab on Grade) (Part 2)

624 JB1071-HAI-04-ZZ-WIR-W-00624 INS701 MECH


Inspection request for Installation of Drainage pipe for canteen and cafeteria Admin Building 19-Jun-23 OPEN
in Admin Building

625 JB1071-HAI-04-ZZ-WIR-W-00625 INS702 CVL Inspection request for Slab Formwork of Silo # 5. Silo # 05 19-Jun-23 OPEN

626 JB1071-HAI-04-ZZ-WIR-W-00626 INS703 CVL Inspection request for Pouring Concrete of the Slab of Silo # 5. Silo # 05 19-Jun-23 OPEN

627 JB1071-HAI-04-ZZ-WIR-W-00627 INS704 CVL


Inspection request for pouring concrete of Slab on Grade at Admin Building. Admin Building 19-Jun-23 OPEN
(Highlighted Area in Drawing)

628 JB1071-HAI-04-ZZ-WIR-W-00628 INS705 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 05 20-Jun-23 OPEN
(Embedded Items) at Slab of Silo # 5.

629 JB1071-HAI-04-ZZ-WIR-W-00629 INS708 CVL


Inspection request for Formwork of wall (W1) at Silo # 8. (Highlighted part on Silo # 08 20-Jun-23 OPEN
drawing).

630 JB1071-HAI-04-ZZ-WIR-W-00630 INS709 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 8. (Highlighted Silo # 08 20-Jun-23 OPEN
part on drawing).

Inspection request for Compaction Test (FDT) under the blinding for
631 JB1071-HAI-04-ZZ-WIR-W-00631 INS710 CVL foundations at Flat Storage. Silo # 08 21-Jun-23 OPEN
(Axis 1 to 5, Highlighted area in Drawing)

632 JB1071-HAI-04-ZZ-WIR-W-00632 INS711 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Flat Storage Area 21-Jun-23 OPEN
at bagging station Foundations. (Part 1)

INS712
633 JB1071-HAI-04-ZZ-WIR-W-00633 INS720
CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 21-Jun-23 22-Jun-23 OPEN

634 JB1071-HAI-04-ZZ-WIR-W-00634 INS713 CVL


Inspection request for Working Pile Load Testing for Pile # FP1 – 72 at Flat Flat Storage Area 21-Jun-23 22-Jun-23 OPEN
INS721 Storage Area.

635 JB1071-HAI-04-ZZ-WIR-W-00635 INS714 CVL


Inspection request for collecting rock backfill material under the blinding of Flat Storage Area 21-Jun-23 OPEN
Head House, Transfer Tower and Flat Storage

636 JB1071-HAI-04-ZZ-WIR-W-00636 INS715 CVL


Inspection request for installation of protection board on Foundations at Silo Silo # 7. 22-Jun-23 OPEN
# 7.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

637 JB1071-HAI-04-ZZ-WIR-W-00637 INS716 CVL Inspection request for Steel Reinforcement of Silo # 7 Wall (W1) at Silos Area. Silo # 7. 22-Jun-23 OPEN

638 JB1071-HAI-04-ZZ-WIR-W-00638 INS717 ELE


Inspection request for Installation of Earthing and Lightning protection Silo # 7. 22-Jun-23 25-Jun-23 OPEN
INS723 system for Wall of Silo # 7.

639 JB1071-HAI-04-ZZ-WIR-W-00639 INS718 CVL


Inspection request for Termites Control Spray at Flat Storage (Axis 1 to 7) Flat Storage Area 22-Jun-23 OPEN
under the blinding of Foundation.(Highlighted Area on Drawing)

640 JB1071-HAI-04-ZZ-WIR-W-00640 INS719 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage (Axis 1 to Flat Storage Area 22-Jun-23 OPEN
5) under the blinding of Foundation.

641 JB1071-HAI-04-ZZ-WIR-W-00641 INS722 CVL


Inspection request for pouring the blinding for foundations at Flat Storage. Flat Storage Area 24-Jun-23 OPEN
(Axis 1 to 7 and B to I1, Highlighted area in Drawing)

642 JB1071-HAI-04-ZZ-WIR-W-00642 INS724 CVL Inspection request for Slab Reinforcement of Silo # 11. Silo # 11. 24-Jun-23 OPEN

643 JB1071-HAI-04-ZZ-WIR-W-00643 INS725 CVL Inspection request for Slab Formwork of Silo # 11. Silo # 11. 24-Jun-23 OPEN

644 JB1071-HAI-04-ZZ-WIR-W-00644 INS726 MECH


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 11. 24-Jun-23 OPEN
(Embedded Items) at Slab of Silo # 11.

645 JB1071-HAI-04-ZZ-WIR-W-00645 INS727 CVL Inspection request for Pouring Concrete of the Slab of Silo # 11. Silo # 11. 24-Jun-23 OPEN

646 JB1071-HAI-04-ZZ-WIR-W-00646 INS728 CVL


Inspection request for Concrete Compressive Strength Test at 7 days for Slab Silo # 12 24-Jun-23 OPEN
of Silo # 12.

647 JB1071-HAI-04-ZZ-WIR-W-00647 INS729 CVL


Inspection request for Formwork of wall (W1) at Silo # 7. (Highlighted part on Silo # 7 25-Jun-23 OPEN
drawing).

648 JB1071-HAI-04-ZZ-WIR-W-00648 INS730 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 7. (Highlighted Silo # 7 25-Jun-23 OPEN
part on drawing).

INS732
649 JB1071-HAI-04-ZZ-WIR-W-00649 INS750
CVL Inspection request for Pile Integrity Test at Head House 1. Head House-1 25-Jun-23 6-Jul-23 OPEN

650 JB1071-HAI-04-ZZ-WIR-W-00650 INS733 CVL


Inspection request for embedded item tests dry penetration for Aeration Silos 25-Jun-23 OPEN
Tubes for Silos slab. (Silo # 1,2,3,4,7,8,9,10)

Inspection request for application of Cementitious Waterproofing (Brush


651 JB1071-HAI-04-ZZ-WIR-W-00651 INS734 CVL Bond) for foundations at Flat Storage.(Axis 1 to 7 and B to I1, Highlighted area Flat Storage Area 2-Jul-23 OPEN
in Drawing)

652 JB1071-HAI-04-ZZ-WIR-W-00652 INS735 CVL


Inspection request for Pouring Screed concrete for foundations at Flat Flat Storage Area 2-Jul-23 OPEN
Storage. (Axis 1 to 7 and B to I1, Highlighted area in Drawing)

653 JB1071-HAI-04-ZZ-WIR-W-00653 INS736 CVL


Inspection request for Formwork of wall (W1) at Silo # 7. (Highlighted part on Silo # 7. 2-Jul-23 OPEN
drawing).

654 JB1071-HAI-04-ZZ-WIR-W-00654 INS737 CVL


Inspection request for Pouring Concrete of wall (W1) at Silo # 7. (Highlighted Silo # 7. 2-Jul-23 OPEN
part on drawing).

655 JB1071-HAI-04-ZZ-WIR-W-00655 INS738 CVL Inspection request for Slab Reinforcement of Silo # 4. Silo # 4 3-Jul-23 OPEN

656 JB1071-HAI-04-ZZ-WIR-W-00656 INS739 CVL


Inspection request for embedded item tests dry film thickness test for Silo # 4,10 3-Jul-23 OPEN
Aeration Tubes and Angles Frames for Silos slab. (Silo # 4,10)

657 JB1071-HAI-04-ZZ-WIR-W-00657 INS740 CVL Inspection request for 3rd Layer of backfilling around of Silo # 8 at Silos Area. Silo # 8 3-Jul-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

Inspection request for application of Cementitious Waterproofing (Brush


658 JB1071-HAI-04-ZZ-WIR-W-00658 INS741 CVL Bond) for foundations at Flat Storage.(Axis 2 to 7 and B to H, Highlighted area Flat Storage Area 4-Jul-23 OPEN
in Drawing)

659 JB1071-HAI-04-ZZ-WIR-W-00659 INS742 CVL


Inspection request for Pouring Screed concrete for foundations at Flat Flat Storage Area 4-Jul-23 OPEN
Storage. (Axis 2 to 7 and B to H, Highlighted area in Drawing)

660 JB1071-HAI-04-ZZ-WIR-W-00660 INS743 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 4. 4-Jul-23 OPEN
(Embedded Items) at Slab of Silo # 4.

661 JB1071-HAI-04-ZZ-WIR-W-00661 INS744 CVL Inspection request for Slab Formwork of Silo # 4. Silo # 4. 4-Jul-23 OPEN

662 JB1071-HAI-04-ZZ-WIR-W-00662 INS745 CVL Inspection request for Pouring Concrete of the Slab of Silo # 4. Silo # 4. 4-Jul-23 OPEN

663 JB1071-HAI-04-ZZ-WIR-W-00663 INS746 CVL


Inspection request for Surface Preparation of bagging station Foundations Bagging Station 5-Jul-23 OPEN
(Part 2) prior to waterproofing (Bituminous) coating.

664 JB1071-HAI-04-ZZ-WIR-W-00664 INS747 CVL


Inspection request for installation of protection board of bagging station Bagging Station 5-Jul-23 OPEN
Foundations (Part 1).

665 JB1071-HAI-04-ZZ-WIR-W-00665 INS748 CVL


Inspection request for Steel Reinforcement of Columns (15 Nos) at Ground admin Building 5-Jul-23 OPEN
Level of Admin Building.

666 JB1071-HAI-04-ZZ-WIR-W-00666 INS749 CVL


Inspection request for Installation of Drainage pipe for Toilets and Cafeteria in admin Building 5-Jul-23 OPEN
Admin Building.

Inspection request for Compaction Test (FDT) under the blinding for
667 JB1071-HAI-04-ZZ-WIR-W-00667 INS751 CVL foundations at Flat Storage. Flat Storage Area 6-Jul-23 OPEN
(Axis 7 to 13 & B to I1, Highlighted area in Drawing)

668 JB1071-HAI-04-ZZ-WIR-W-00668 INS752 CVL Inspection request for collecting soil sample from Flat Storage. Flat Storage Area 6-Jul-23 OPEN

669 JB1071-HAI-04-ZZ-WIR-W-00669 INS753 CVL


Inspection request for Working Pile Load Testing for Pile # FP1 – 85 at Flat Flat Storage Area 8-Jul-23 OPEN
Storage Area.

670 JB1071-HAI-04-ZZ-WIR-W-00670 INS754 CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 8-Jul-23 OPEN

671 JB1071-HAI-04-ZZ-WIR-W-00671 INS755 CVL


Inspection request for Formwork of Columns (12 Nos) at Ground Level of admin Building 8-Jul-23 9-Jul-23 OPEN
INS763 Admin Building.

672 JB1071-HAI-04-ZZ-WIR-W-00672 INS756 CVL


Inspection request for Concrete Pouring of Columns (12 Nos) at Ground Level admin Building 8-Jul-23 9-Jul-23 OPEN
INS764 of Admin Building.

673 JB1071-HAI-04-ZZ-WIR-W-00673 INS757 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Bagging Station 9-Jul-23 OPEN
at bagging station Foundations. (Part 2)

674 JB1071-HAI-04-ZZ-WIR-W-00674 INS759 CVL


Inspection request for Termites Control Spray at Flat Storage (Axis 7 to 13) Flat Storage Area 9-Jul-23 OPEN
under the blinding of Foundation.(Highlighted Area on Drawing)

675 JB1071-HAI-04-ZZ-WIR-W-00675 INS758 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage (Axis 7 to Flat Storage Area 9-Jul-23 OPEN
13) under the blinding of Foundation.

676 JB1071-HAI-04-ZZ-WIR-W-00676 INS760 CVL


Inspection request for pouring the blinding for foundations at Flat Storage. Flat Storage Area 9-Jul-23 OPEN
(Axis 7 to 13 and B to I1, Highlighted area in Drawing)

677 JB1071-HAI-04-ZZ-WIR-W-00677 INS765 CVL


Inspection request for Surface Preparation prior to Waterproofing Coating admin Building 10-Jul-23 OPEN
Paint (Bituminous) for Grade Beam at Admin Building.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

678 JB1071-HAI-04-ZZ-WIR-W-00678 INS766 CVL


Inspection request for backfilling (FDT) 1st Layer around the foundation (Part Bagging Station 10-Jul-23 OPEN
1) at Bagging Station.

679 JB1071-HAI-04-ZZ-WIR-W-00679 INS767 CVL


Inspection request for application of primer prior to installation of Head House-1 10-Jul-23 OPEN
Waterproofing Membrane in Foundation at Head House 1.

680 JB1071-HAI-04-ZZ-WIR-W-00680 INS768 CVL Inspection request for Slab Reinforcement of Silo # 10. Silo # 10. 10-Jul-23 OPEN

681 JB1071-HAI-04-ZZ-WIR-W-00681 INS769 MECH


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 10. 10-Jul-23 OPEN
(Embedded Items) at Slab of Silo # 10.

682 JB1071-HAI-04-ZZ-WIR-W-00682 INS770 CVL Inspection request for Slab Formwork of Silo # 10. Silo # 10. 10-Jul-23 OPEN

683 JB1071-HAI-04-ZZ-WIR-W-00683 INS771 CVL Inspection request for Pouring Concrete of the Slab of Silo # 10. Silo # 10. 10-Jul-23 OPEN

684 JB1071-HAI-04-ZZ-WIR-W-00684 INS773 CVL


Inspection request for Steel Reinforcement of Columns (11 Nos) at Ground Admin Building 11-Jul-23 OPEN
Floor of Admin Building.

685 JB1071-HAI-04-ZZ-WIR-W-00685 INS774 CVL


Inspection request for 1st coat Waterproofing Coating Paint (Bituminous) for Admin Building 11-Jul-23 OPEN
Grade Beam at Admin Building

686 JB1071-HAI-04-ZZ-WIR-W-00686 INS775 CVL Inspection request for steel reinforcement of foundations at Transfer Tower 1. Transfer Tower 1. 11-Jul-23 OPEN

687 JB1071-HAI-04-ZZ-WIR-W-00687 INS776 CVL Inspection request for installation of Anchor Boult at Transfer Tower 1. Transfer Tower 1. 11-Jul-23 OPEN

688 JB1071-HAI-04-ZZ-WIR-W-00688 INS777 CVL Inspection request for formwork of foundations at Transfer Tower 1. Transfer Tower 1. 11-Jul-23 OPEN

689 JB1071-HAI-04-ZZ-WIR-W-00689 INS778 CVL


Inspection request for Working Pile Load Testing for Pile # FP1 – 421 at Flat Flat Storage Area 12-Jul-23 OPEN
Storage Area.

690 JB1071-HAI-04-ZZ-WIR-W-00690 INS779 CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 12-Jul-23 OPEN

Inspection request for Compaction Test (FDT) under the blinding for
691 JB1071-HAI-04-ZZ-WIR-W-00691 INS780 CVL foundations at Flat Storage. Flat Storage Area 12-Jul-23 OPEN
(Axis 13 to 21 & B to I1, Highlighted area in Drawing)

692 JB1071-HAI-04-ZZ-WIR-W-00692 INS781 CVL


Inspection request for installation of Waterproofing Membrane in Foundation Head House-1 12-Jul-23 OPEN
at Head House 1.

Inspection request for installation of geotextile on waterproofing membrane


693 JB1071-HAI-04-ZZ-WIR-W-00693 INS782 CVL in Foundation at Head Head House-1 12-Jul-23 OPEN
House 1

694 JB1071-HAI-04-ZZ-WIR-W-00694 INS783 CVL


Inspection request for casting protection screed for waterproofing membrane Head House-1 12-Jul-23 OPEN
in Foundation at Head House 1

695 JB1071-HAI-04-ZZ-WIR-W-00695 INS784 CVL


Inspection request for Installation of Sleeves 7((5/50MM DIA UPVC) for Transfer Tower 1. 12-Jul-23 OPEN
incoming LC able, (2/50MM DIA UPVC) For Earthing at TT1

696 JB1071-HAI-04-ZZ-WIR-W-00696 INS785 CVL Inspection request for pouring Concrete on foundation at Transfer Tower 1 Transfer Tower 1. 12-Jul-23 OPEN

697 JB1071-HAI-04-ZZ-WIR-W-00697 INS787 CVL


Inspection request for backfilling (FDT) 2nd Layer around the foundation Bagging Station 13-Jul-23 OPEN
(Part 1) at Bagging Station.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

698 JB1071-HAI-04-ZZ-WIR-W-00698 INS788 CVL


Inspection request for installation of protection board of bagging station Bagging Station 13-Jul-23 OPEN
Foundations (Part 2).

Inspection request for Steel Reinforcement of foundations at Bagging Station


699 JB1071-HAI-04-ZZ-WIR-W-00699 INS789 CVL Part 3. Bagging Station 13-Jul-23 OPEN
(Highlighted area in Drawing)

700 JB1071-HAI-04-ZZ-WIR-W-00700 INS790 CVL


Inspection request for Steel Reinforcement of Columns Pedestal at Bagging Bagging Station 13-Jul-23 OPEN
Station.(Part 1and 2)(Highlighted area in Drawing)

701 JB1071-HAI-04-ZZ-WIR-W-00701 INS791 CVL


Inspection request for Termites Control Spray at Flat Storage (Axis 13 to 21) Flat Storage Area 13-Jul-23 OPEN
under the blinding of Foundation.(Highlighted Area on Drawing)

702 JB1071-HAI-04-ZZ-WIR-W-00702 INS792 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage (Axis 13 Flat Storage Area 13-Jul-23 OPEN
to 21) under the blinding of Foundation.

703 JB1071-HAI-04-ZZ-WIR-W-00703 INS793 CVL


Inspection request for pouring the blinding for foundations at Flat Storage. Flat Storage Area 13-Jul-23 OPEN
(Axis 13 to 21 and B to I1, Highlighted area in Drawing)

704 JB1071-HAI-04-ZZ-WIR-W-00704 INS794 CVL


Inspection request for Formwork of Columns (10 Nos) at Ground Floor of Admin Building 15-Jul-23 OPEN
Admin Building.

705 JB1071-HAI-04-ZZ-WIR-W-00705 INS795 CVL


Inspection request for Concrete Pouring of Columns (10 Nos) at Ground Floor Admin Building 15-Jul-23 OPEN
of Admin Building.

706 JB1071-HAI-04-ZZ-WIR-W-00706 INS796 CVL


Inspection request for embedded item tests dry film thickness test for Silo # 3,9 15-Jul-23 OPEN
Aeration Tubes and Angles Frames for Silos slab. (Silo # 3,9)

707 JB1071-HAI-04-ZZ-WIR-W-00707 INS797 CVL


Inspection request for Termites Control Spray at Flat Storage Tunnel (Axis 34 Flat Storage Area 15-Jul-23 OPEN
to 9A) under the blinding of Foundation.(Highlighted Area on Drawing)

708 JB1071-HAI-04-ZZ-WIR-W-00708 INS798 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage Tunnel Flat Storage Area 15-Jul-23 OPEN
(Axis 34 to 9A) under the blinding of Foundation.

709 JB1071-HAI-04-ZZ-WIR-W-00709 INS799 CVL


Inspection request for pouring the blinding for foundations at Flat Storage Flat Storage Area 15-Jul-23 OPEN
Tunnel (Axis 34 to 9A Highlighted area in Drawing)

Inspection request for application of Cementitious Waterproofing (Brush


710 JB1071-HAI-04-ZZ-WIR-W-00710 INS800 CVL Bond) for foundations at Flat Storage.(Axis 7 to 13 and B to I1, Highlighted Flat Storage Area 15-Jul-23 OPEN
area in Drawing)

711 JB1071-HAI-04-ZZ-WIR-W-00711 INS801 CVL


Inspection request for Pouring Screed concrete for foundations at Flat Flat Storage Area 15-Jul-23 OPEN
Storage. (Axis 7 to 13 and B to I1, Highlighted area in Drawing)

712 JB1071-HAI-04-ZZ-WIR-W-00712 INS802 CVL


Inspection request for Steel Reinforcement of Columns (28 Nos) at Ground admin Building 16-Jul-23 OPEN
Floor of Admin Building.

713 JB1071-HAI-04-ZZ-WIR-W-00713 INS803 CVL


Inspection request for Formwork of foundations (Part 3) at Bagging Station. Bagging Station 16-Jul-23 OPEN
(Highlighted area in Drawing)

Inspection request for Installation of Earthing and Lightning protection


714 JB1071-HAI-04-ZZ-WIR-W-00714 INS804 ELE system at Bagging Station. Bagging Station 16-Jul-23 OPEN
(Part 3 as Highlighted area in drawing)

Inspection request for Concrete pouring of foundations (Part 3) at Bagging


715 JB1071-HAI-04-ZZ-WIR-W-00715 INS805 CVL Station. Bagging Station 16-Jul-23 OPEN
(Highlighted area in Drawing)

716 JB1071-HAI-04-ZZ-WIR-W-00716 INS806 CVL Inspection request for Slab Reinforcement of Silo # 3. Silo # 3. 16-Jul-23 OPEN

717 JB1071-HAI-04-ZZ-WIR-W-00717 INS808 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 3. 17-Jul-23 OPEN
(Embedded Items) at Slab of Silo # 3.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

718 JB1071-HAI-04-ZZ-WIR-W-00718 INS809 CVL Inspection request for Slab Formwork of Silo # 3. Silo # 3. 17-Jul-23 OPEN

719 JB1071-HAI-04-ZZ-WIR-W-00719 INS810 CVL Inspection request for Pouring Concrete of the Slab of Silo # 3. Silo # 3. 17-Jul-23 OPEN

720 JB1071-HAI-04-ZZ-WIR-W-00720 INS811 CVL


Inspection request for Formwork of Columns (12 Nos) at Ground Floor of Admin Building 17-Jul-23 OPEN
Admin Building.

721 JB1071-HAI-04-ZZ-WIR-W-00721 INS812 CVL


Inspection request for Concrete Pouring of Columns (12 Nos) at Ground Floor Admin Building 17-Jul-23 OPEN
of Admin Building.

722 JB1071-HAI-04-ZZ-WIR-W-00722 INS813 CVL Inspection request for formwork of columns Pedestals at Transfer Tower 1. Transfer Tower 1. 18-Jul-23 OPEN

723 JB1071-HAI-04-ZZ-WIR-W-00723 INS814 CVL


Inspection request for concrete pouring of columns Pedestals at Transfer Transfer Tower 1. 18-Jul-23 OPEN
Tower 1.

724 JB1071-HAI-04-ZZ-WIR-W-00724 INS815 CVL


Inspection request for steel reinforcement for Elevator Foundation at Head Head House-1 18-Jul-23 OPEN
House 1.

725 JB1071-HAI-04-ZZ-WIR-W-00725 INS816 CVL


Inspection request for pouring concrete for Elevator Foundation at Head Head House-1 18-Jul-23 OPEN
House 1.

726 JB1071-HAI-04-ZZ-WIR-W-00726 INS817 CVL


Inspection request for backfilling (FDT) 1st Layer around the foundation (Part Bagging Station 18-Jul-23 OPEN
2) at Bagging Station.

727 JB1071-HAI-04-ZZ-WIR-W-00727 INS818 CVL


Inspection request for installation of water stopper for Elevator Foundation at Head House-1 18-Jul-23 OPEN
Head House 1.

728 JB1071-HAI-04-ZZ-WIR-W-00728 INS820 CVL


Inspection request for Termites Control Spray at Flat Storage Tunnel (Axis 22 Flat Storage Area 19-Jul-23 OPEN
to 34) under the blinding of Foundation.(Highlighted Area on Drawing)

729 JB1071-HAI-04-ZZ-WIR-W-00729 INS821 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage Tunnel Flat Storage Area 19-Jul-23 OPEN
(Axis 22 to 34) under the blinding of Foundation.

730 JB1071-HAI-04-ZZ-WIR-W-00730 INS822 CVL


Inspection request for pouring the blinding for foundations at Flat Storage Flat Storage Area 19-Jul-23 OPEN
Tunnel (Axis 22 to 34 Highlighted area in Drawing)

731 JB1071-HAI-04-ZZ-WIR-W-00731 INS823 CVL


Inspection request for Termites Control Spray at Transfer Tower 2 under the Transfer Tower 2 19-Jul-23 OPEN
blinding of Foundation.

732 JB1071-HAI-04-ZZ-WIR-W-00732 INS824 CVL


Inspection request for Installation of Polythene Sheet at Transfer Tower 2 Transfer Tower 2 19-Jul-23 OPEN
under the blinding of Foundation.

733 JB1071-HAI-04-ZZ-WIR-W-00733 INS825 CVL


Inspection request for pouring the blinding for foundations at Transfer Tower Transfer Tower 2 19-Jul-23 OPEN
2.

734 JB1071-HAI-04-ZZ-WIR-W-00734 INS826 CVL


Inspection request for Working Pile Load Testing for Pile # FP1 – 360 at Flat Flat Storage Area 20-Jul-23 OPEN
Storage Area.

Inspection request for Compaction Test (FDT) under the blinding for
735 JB1071-HAI-04-ZZ-WIR-W-00735 INS827 CVL foundations at Flat Storage. Flat Storage Area 20-Jul-23 OPEN
(Axis 36 to 9A & B to I1, Highlighted area in Drawing)

736 JB1071-HAI-04-ZZ-WIR-W-00736 INS828 CVL


Inspection request for Termites Control Spray at Flat Storage (Axis 36 to 9A) Flat Storage Area 20-Jul-23 OPEN
under the blinding of Foundation.(Highlighted Area on Drawing)

737 JB1071-HAI-04-ZZ-WIR-W-00737 INS829 CVL


Inspection request for backfilling (FDT) 2nd Layer around the foundation Bagging Station 20-Jul-23 OPEN
(Part 2) at Bagging Station.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

738 JB1071-HAI-04-ZZ-WIR-W-00738 INS830 CVL


Inspection request for Formwork of Columns (12 Nos) at Ground Floor of Admin Building 20-Jul-23 OPEN
Admin Building.

739 JB1071-HAI-04-ZZ-WIR-W-00739 INS831 CVL


Inspection request for Concrete Pouring of Columns (12 Nos) at Ground Floor admin Building 20-Jul-23 OPEN
of Admin Building.

740 JB1071-HAI-04-ZZ-WIR-W-00740 INS832 CVL Inspection request for steel reinforcement for Foundation at Head House 1. Head House-1 20-Jul-23 OPEN

741 JB1071-HAI-04-ZZ-WIR-W-00741 INS833 CVL Inspection request for Formwork of Foundation at Head House 1. Head House-1 20-Jul-23 OPEN

742 JB1071-HAI-04-ZZ-WIR-W-00742 INS834 ELE


Inspection request for Installation of Earthing and Lightning protection Head House-1 22-Jul-23 OPEN
system for Head House 1 foundation.

743 JB1071-HAI-04-ZZ-WIR-W-00743 INS835 CVL Inspection request for pouring concrete for Foundation at Head House 1. Head House-1 22-Jul-23 OPEN

744 JB1071-HAI-04-ZZ-WIR-W-00744 INS836 CVL


Inspection request for Steel Reinforcement of Columns (3 Nos) at Ground admin Building 22-Jul-23 OPEN
Floor of Admin Building.

745 JB1071-HAI-04-ZZ-WIR-W-00745 INS837 CVL


Inspection request for installation of protection board for Grade Beam at admin Building 22-Jul-23 OPEN
Admin Building.

746 JB1071-HAI-04-ZZ-WIR-W-00746 INS838 CVL Inspection request for Slab Reinforcement of Silo # 9. Silo # 9. 23-Jul-23 OPEN

747 JB1071-HAI-04-ZZ-WIR-W-00747 INS839 ELE


Inspection request for Installation of PVC Pipes for small Power, Data and TP admin Building 23-Jul-23 OPEN
at Ground Floor. (Under Slab on Grade) Highlighted Area.

748 JB1071-HAI-04-ZZ-WIR-W-00748 INS840 CVL


Inspection request for Steel Reinforcement of Slab on Grade at Admin admin Building 23-Jul-23 OPEN
Building. (Highlighted Area in Drawing)

749 JB1071-HAI-04-ZZ-WIR-W-00749 INS841 CVL


Inspection request for Formwork of Slab on Grade at Admin Building. admin Building 23-Jul-23 OPEN
(Highlighted Area in Drawing)

750 JB1071-HAI-04-ZZ-WIR-W-00750 INS842 CVL


Inspection request for pouring concrete of Slab on Grade at Admin Building. admin Building 23-Jul-23 OPEN
(Highlighted Area in Drawing)

751 JB1071-HAI-04-ZZ-WIR-W-00751 INS843 MECH


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 9. 24-Jul-23 OPEN
(Embedded Items) at Slab of Silo # 9.

752 JB1071-HAI-04-ZZ-WIR-W-00752 INS844 CVL Inspection request for Slab Formwork of Silo # 9. Silo # 9. 24-Jul-23 OPEN

753 JB1071-HAI-04-ZZ-WIR-W-00753 INS845 CVL


Inspection request for installation of Anchors Bolts (9 Pedestals) at Bagging Bagging Station 24-Jul-23 30-Jul-23 OPEN
INS866 Station Part 1.

754 JB1071-HAI-04-ZZ-WIR-W-00754 INS846 CVL


Inspection request for formwork of Columns Pedestal (9 Nos) at Bagging Bagging Station 24-Jul-23 30-Jul-23 OPEN
INS867 Station Part 1.

755 JB1071-HAI-04-ZZ-WIR-W-00755 INS847 CVL Inspection request for Pouring Concrete of the Slab of Silo # 9. Silo # 9. 24-Jul-23 OPEN

756 JB1071-HAI-04-ZZ-WIR-W-00756 INS848 CVL


Inspection request for concrete pouring of Columns Pedestal (9 Nos) at Bagging Station 24-Jul-23 30-Jul-23 OPEN
INS868 Bagging Station Part 1.

Inspection request for application of Cementitious Waterproofing (Brush


757 JB1071-HAI-04-ZZ-WIR-W-00757 INS849 CVL Bond) for foundations at Flat Storage.(Axis 13 to 21 and B to I1, Highlighted Flat Storage Area 25-Jul-23 OPEN
area in Drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

758 JB1071-HAI-04-ZZ-WIR-W-00758 INS850 CVL


Inspection request for Pouring Screed concrete for foundations at Flat Flat Storage Area 25-Jul-23 OPEN
Storage. (Axis 13 to 21 and B to I1, Highlighted area in Drawing)

Inspection request for Compaction Test (FDT) under the blinding for
759 JB1071-HAI-04-ZZ-WIR-W-00759 INS851 CVL foundations at Flat Storage. Flat Storage Area 26-Jul-23 OPEN
(Axis 28 to 36 & B to I1, Highlighted area in Drawing)

760 JB1071-HAI-04-ZZ-WIR-W-00760 INS852 CVL


Inspection request for 1st. layer backfilling (FDT) around the Grade Beam at admin Building 26-Jul-23 OPEN
Admin Building.

761 JB1071-HAI-04-ZZ-WIR-W-00761 INS853 CVL


Inspection request for backfilling (FDT) 3rd Layer around the foundation Bagging Station 29-Jul-23 OPEN
(Part 1 & 2) at Bagging Station

762 JB1071-HAI-04-ZZ-WIR-W-00762 INS854 CVL


Inspection request for application of primer prior to installation of Head House-1 29-Jul-23 OPEN
Waterproofing Membrane around the foundation at Head House 1.

763 JB1071-HAI-04-ZZ-WIR-W-00763 INS856 CVL Inspection request for Slab Reinforcement of Silo # 8. Silo # 8. 30-Jul-23 OPEN

764 JB1071-HAI-04-ZZ-WIR-W-00764 INS857 CVL Inspection request for Pile Integrity Test at Flat Storage. (Highlight Area) Flat Storage Area 30-Jul-23 OPEN

765 JB1071-HAI-04-ZZ-WIR-W-00765 INS858 CVL


Inspection request for embedded item tests dry film thickness test for (Silo # 2,8) 30-Jul-23 OPEN
Aeration Tubes and Angles Frames for Silos slab. (Silo # 2,8)

766 JB1071-HAI-04-ZZ-WIR-W-00766 INS859 CVL Inspection request for Slab Formwork of Silo # 8. Silo # 8. 30-Jul-23 OPEN

767 JB1071-HAI-04-ZZ-WIR-W-00767 INS860 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 8. 30-Jul-23 OPEN
(Embedded Items) at Slab of Silo # 8.

768 JB1071-HAI-04-ZZ-WIR-W-00768 INS861 CVL


Inspection request for Formwork of Columns (11 Nos) at Ground Floor of Admin Building 30-Jul-23 OPEN
Admin Building.

769 JB1071-HAI-04-ZZ-WIR-W-00769 INS862 CVL


Inspection request for Concrete Pouring of Columns (11 Nos) at Ground Floor admin Building 30-Jul-23 OPEN
of Admin Building.

770 JB1071-HAI-04-ZZ-WIR-W-00770 INS863 CVL


Inspection request for steel reinforcement and formwork for beam Head House-1 30-Jul-23 5-Aug-23 OPEN
INS882 Foundation at Head House 1.

771 JB1071-HAI-04-ZZ-WIR-W-00771 INS864 CVL


Inspection request for pouring concrete for beam Foundation at Head House Head House-1 30-Jul-23 5-Aug-23 OPEN
INS883 1.

772 JB1071-HAI-04-ZZ-WIR-W-00772 INS865 CVL Inspection request for Pouring Concrete of the Slab of Silo # 8. Silo # 8. 30-Jul-23 OPEN

773 JB1071-HAI-04-ZZ-WIR-W-00773 INS873 CVL Inspection request for collecting Sub Base sample from Site Stock Pile. Sub Base sample f 31-Jul-23 OPEN

774 JB1071-HAI-04-ZZ-WIR-W-00774 INS874 CVL


Inspection request for installation of Waterproofing Membrane around the Head House-1 1-Aug-23 OPEN
Foundation at Head House 1.

775 JB1071-HAI-04-ZZ-WIR-W-00775 INS875 CVL


Inspection request for Surface Preparation of bagging station Foundations Bagging Station 1-Aug-23 OPEN
(Part 3) prior to waterproofing (Bituminous) coating.

776 JB1071-HAI-04-ZZ-WIR-W-00776 INS876 CVL


Inspection request for Surface preparation prior to grouting (for Flat Storage Area 1-Aug-23 OPEN
waterproofing) of Piling (20 Nos.) at Flat Storage Tunnel.

777 JB1071-HAI-04-ZZ-WIR-W-00777 INS877 CVL


Inspection request for installation of Protection board for Waterproofing Head House-1 2-Aug-23 OPEN
Membrane around the Foundation at Head House 1.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

778 JB1071-HAI-04-ZZ-WIR-W-00778 INS878 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Bagging Station 2-Aug-23 OPEN
at bagging station Foundations. (Part 3)

779 JB1071-HAI-04-ZZ-WIR-W-00779 INS884 CVL


Inspection request for backfilling (FDT) 4th Layer around the foundation Bagging Station 5-Aug-23 OPEN
(Part 1 & 2) at Bagging Station

780 JB1071-HAI-04-ZZ-WIR-W-00780 INS885 CVL Inspection request for setting out (Survey) of foundation at driver facilities. Driver Facilities 5-Aug-23 OPEN

781 JB1071-HAI-04-ZZ-WIR-W-00781 INS886 CVL


Inspection request for installation of Anchors Bolts (6 Pedestals) at Bagging Bagging Station 5-Aug-23 OPEN
Station Part 1.

782 JB1071-HAI-04-ZZ-WIR-W-00782 INS887 CVL


Inspection request for formwork of Columns Pedestal (6 Nos) at Bagging Bagging Station 5-Aug-23 OPEN
Station Part 1.

783 JB1071-HAI-04-ZZ-WIR-W-00783 INS888 CVL


Inspection request for steel reinforcement and formwork for 2 Columns at Head House-1 5-Aug-23 OPEN
Head House 1.

784 JB1071-HAI-04-ZZ-WIR-W-00784 INS889 CVL Inspection request for concrete pouring of 2 Columns at Head House 1. Head House-1 5-Aug-23 OPEN

785 JB1071-HAI-04-ZZ-WIR-W-00785 INS890 CVL


Inspection request for concrete pouring of Columns Pedestal (6 Nos) at Bagging Station 5-Aug-23 OPEN
Bagging Station Part 1.

786 JB1071-HAI-04-ZZ-WIR-W-00786 INS891 CVL


Inspection request for Surface preparation prior to application of primer Flat Storage Area 6-Aug-23 OPEN
(Bituminous) at Flat Storage Tunnel.

787 JB1071-HAI-04-ZZ-WIR-W-00787 INS892 CVL


Inspection request for Steel Reinforcement of Columns Pedestal at Bagging Bagging Station 6-Aug-23 OPEN
Station.(Part 3, Highlighted area in Drawing)

788 JB1071-HAI-04-ZZ-WIR-W-00788 INS893 CVL Inspection request for Slab Reinforcement of Silo # 2. Silo # 2. 6-Aug-23 OPEN

789 JB1071-HAI-04-ZZ-WIR-W-00789 INS894 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 2. 7-Aug-23 OPEN
(Embedded Items) at Slab of Silo # 2.

790 JB1071-HAI-04-ZZ-WIR-W-00790 INS895 CVL


Inspection request for Surface Preparation of Transfer Tower 1 Foundations Transfer Tower 1 7-Aug-23 OPEN
prior to waterproofing (Bituminous) coating.

790 JB1071-HAI-04-ZZ-WIR-W-00791 INS896 CVL Inspection request for Slab Formwork of Silo # 2. Silo # 2. 7-Aug-23 OPEN

792 JB1071-HAI-04-ZZ-WIR-W-00792 INS897 CVL Inspection request for Pouring Concrete of the Slab of Silo # 2. Silo # 2. 7-Aug-23 OPEN

Inspection request for Compaction Test (FDT) under the blinding for
793 JB1071-HAI-04-ZZ-WIR-W-00793 INS898 CVL foundations at Flat Storage. Flat Storage Area 8-Aug-23 OPEN
(Axis 21 to 28 & B to I1, Highlighted area in Drawing)

794 JB1071-HAI-04-ZZ-WIR-W-00794 INS899 CVL


Inspection request for Compaction Test (FDT) under the blinding for Driver Facilities 8-Aug-23 OPEN
foundations at Driver Facilities.

795 JB1071-HAI-04-ZZ-WIR-W-00795 INS900 CVL


Inspection request for installation of protection board of bagging station Bagging Station 8-Aug-23 OPEN
Foundations (Part 3).

Inspection request for application of Cementitious Waterproofing (Brush


796 JB1071-HAI-04-ZZ-WIR-W-00796 INS901 CVL Bond) for foundations at Flat Storage.(Axis 9A to 36 and B to I1, Highlighted Flat Storage Area 8-Aug-23 OPEN
area in Drawing)

797 JB1071-HAI-04-ZZ-WIR-W-00797 INS902 CVL


Inspection request for Pouring Screed concrete for foundations at Flat Flat Storage Area 8-Aug-23 OPEN
Storage. (Axis 9A to 36 and B to I1, Highlighted area in Drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

798 JB1071-HAI-04-ZZ-WIR-W-00798 INS903 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Transfer Tower 1. 8-Aug-23 OPEN
Transfer Tower 1.

799 JB1071-HAI-04-ZZ-WIR-W-00799 INS904 CVL


Inspection request for Steel Reinforcement of Elevator core at Ground Floor of Admin Building 8-Aug-23 OPEN
Admin Building.

800 JB1071-HAI-04-ZZ-WIR-W-00800 INS905 CVL Inspection request for Erection (Steel Structure) of Silo # 6 prior to lifting. Silo # 6 8-Aug-23 OPEN

801 JB1071-HAI-04-ZZ-WIR-W-00801 INS906 CVL Inspection request for Water test of Silo # 6 prior to lifting. Silo # 6 8-Aug-23 OPEN

802 JB1071-HAI-04-ZZ-WIR-W-00802 INS907 CVL


Inspection request for application of primer prior to installation of water Flat Storage Area 9-Aug-23 OPEN
proofing membrane at Flat Storage Tunnel. (High Light Area In Drawing)

803 JB1071-HAI-04-ZZ-WIR-W-00803 INS908 MECH Inspection request for Erection (Steel Structure) of Silo # 12 prior to lifting. Silo # 12 10-Aug-23 OPEN

804 JB1071-HAI-04-ZZ-WIR-W-00804 INS909 MECH Inspection request for Water test of Silo # 12 prior to lifting. Silo # 12 10-Aug-23 OPEN

805 JB1071-HAI-04-ZZ-WIR-W-00805 INS910 CVL


Inspection request for Termites Control Spray under the blinding of Driver Facilities. 10-Aug-23 OPEN
foundation at Driver Facilities.

806 JB1071-HAI-04-ZZ-WIR-W-00806 INS911 CVL


Inspection request for installation of polythene sheet under the blinding of Driver Facilities. 10-Aug-23 OPEN
foundation at Driver Facilities

807 JB1071-HAI-04-ZZ-WIR-W-00807 INS912 CVL


Inspection request for Termites Control Spray at Flat Storage (Axis 21 to 36) Flat Storage Area 10-Aug-23 OPEN
under the blinding of Foundation.(Highlighted Area on Drawing)

808 JB1071-HAI-04-ZZ-WIR-W-00808 INS913 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage (Axis 21 Flat Storage Area 10-Aug-23 OPEN
to 36) under the blinding of Foundation.

809 JB1071-HAI-04-ZZ-WIR-W-00809 INS914 CVL


Inspection request for Termites Control Spray at Flat Storage Tunnel (Axis 1 Flat Storage Area 10-Aug-23 15-Aug-23 OPEN
INS950 to 22) under the blinding of Foundation.(Highlighted Area on Drawing)

810 JB1071-HAI-04-ZZ-WIR-W-00810 INS915 CVL


Inspection request for Installation of Polythene Sheet at Flat Storage Tunnel Flat Storage Area 10-Aug-23 15-Aug-23 OPEN
INS951 (Axis 1 to 22) under the blinding of Foundation.

811 JB1071-HAI-04-ZZ-WIR-W-00811 INS916 CVL


Inspection request for application of installation of water proofing membrane Flat Storage Area 10-Aug-23 OPEN
at Flat Storage Tunnel. (High Light Area In Drawing)

812 JB1071-HAI-04-ZZ-WIR-W-00812 INS917 CVL Inspection request for pouring blinding of foundation at Driver Facilities. Driver Facilities. 10-Aug-23 OPEN

813 JB1071-HAI-04-ZZ-WIR-W-00813 INS918 CVL


Inspection request for Pouring blinding of Foundation at Flat Storage (Axis 21 Flat Storage Area 10-Aug-23 OPEN
to 36) (Highlighted Area on Drawing)

814 JB1071-HAI-04-ZZ-WIR-W-00814 INS919 CVL


Inspection request for pouring the blinding for foundations at Flat Storage Flat Storage Area 10-Aug-23 15-Aug-23 OPEN
INS952 Tunnel (Axis 1 to 22) (Highlighted area in Drawing)

815 JB1071-HAI-04-ZZ-WIR-W-00815 INS920 MECH


Inspection request for Erection of Body sheets (4 Nos) of Silo # 6 prior to Silo # 6 10-Aug-23 12-Aug-23 OPEN
INS922 lifting.

INS921
816 JB1071-HAI-04-ZZ-WIR-W-00816 INS923
MECH Inspection request for Water test of body sheet of Silo # 6 prior to lifting. Silo # 6 10-Aug-23 12-Aug-23 OPEN

817 JB1071-HAI-04-ZZ-WIR-W-00817 INS924 CVL


Inspection request for installation of geotextile on waterproofing membrane Flat Storage Area 12-Aug-23 OPEN
in Flat Storage Tunnel. (High Light Area In Drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

818 JB1071-HAI-04-ZZ-WIR-W-00818 INS925 CVL


Inspection request for pouring protection screed at Flat Storage Tunnel. (High Flat Storage Area 12-Aug-23 OPEN
Light Area In Drawing)

819 JB1071-HAI-04-ZZ-WIR-W-00819 INS926 CVL


Inspection request for Steel Reinforcement of Elevator core at Ground Floor of Admin Building 13-Aug-23 OPEN
Admin Building.

820 JB1071-HAI-04-ZZ-WIR-W-00820 INS927 CVL


Inspection request for pouring concrete of Elevator walls at Ground Floor of Admin Building 13-Aug-23 OPEN
Admin Building.

821 JB1071-HAI-04-ZZ-WIR-W-00821 INS928 CVL


Inspection request for backfilling (FDT) 1st Layer around the foundation (Part Bagging Station 13-Aug-23 OPEN
3) at Bagging Station.

Inspection request for installation of protection board on waterproofing


822 JB1071-HAI-04-ZZ-WIR-W-00822 INS929 CVL membrane (Vertical Area) in Flat Storage Tunnel. (High Light Area In Flat Storage Area 13-Aug-23 OPEN
Drawing)

823 JB1071-HAI-04-ZZ-WIR-W-00823 INS930 MECH Inspection request for Erection (Steel Structure) of Silo # 5 prior to lifting. Silo # 5 13-Aug-23 OPEN

824 JB1071-HAI-04-ZZ-WIR-W-00824 INS931 MECH Inspection request for Water test (Roof) of Silo # 5 prior to lifting. Silo # 5 13-Aug-23 OPEN

825 JB1071-HAI-04-ZZ-WIR-W-00825 INS932 MECH Inspection request for Erection (Steel Structure) of Silo # 11 prior to lifting. Silo # 11 13-Aug-23 OPEN

826 JB1071-HAI-04-ZZ-WIR-W-00826 INS933 MECH Inspection request for Water test (Roof) of Silo # 11 prior to lifting. Silo # 11 13-Aug-23 OPEN

827 JB1071-HAI-04-ZZ-WIR-W-00827 INS935 CVL


Inspection request for Surface preparation prior to application of primer Flat Storage Area 14-Aug-23 OPEN
(Bituminous) at Flat Storage Tunnel. (Highlighted Area in Drawing)

828 JB1071-HAI-04-ZZ-WIR-W-00828 INS936 CVL


Inspection request for application of primer prior to installation of water Flat Storage Area 14-Aug-23 OPEN
proofing membrane at Flat Storage Tunnel. (High Light Area In Drawing)

829 JB1071-HAI-04-ZZ-WIR-W-00829 INS937 CVL


Inspection request for application of installation of water proofing membrane Flat Storage Area 14-Aug-23 OPEN
at Flat Storage Tunnel. (High Light Area In Drawing)

830 JB1071-HAI-04-ZZ-WIR-W-00830 INS938 MECH


Inspection request for Erection of Body sheets (4 Nos) of Silo # 12 prior to Silo # 12 14-Aug-23 OPEN
lifting.

831 JB1071-HAI-04-ZZ-WIR-W-00831 INS939 MECH


Inspection request for Water test of body sheet (4 Nos) of Silo # 12 prior to Silo # 12 14-Aug-23 OPEN
lifting.

Inspection request for installation of protection board on waterproofing


832 JB1071-HAI-04-ZZ-WIR-W-00832 INS940 CVL membrane (Vertical Area) in Flat Storage Tunnel. (High Light Area In Flat Storage Area 15-Aug-23 OPEN
Drawing)

833 JB1071-HAI-04-ZZ-WIR-W-00833 INS941 CVL


Inspection request for installation of geotextile on waterproofing membrane Flat Storage Area 15-Aug-23 OPEN
in Flat Storage Tunnel. (High Light Area In Drawing)

834 JB1071-HAI-04-ZZ-WIR-W-00834 INS942 CVL


Inspection request for pouring protection screed at Flat Storage Tunnel. (High Flat Storage Area 15-Aug-23 OPEN
Light Area In Drawing)

835 JB1071-HAI-04-ZZ-WIR-W-00835 INS943 CVL Inspection request for steel reinforcement of wall (W 1) at Head House 1. Head House-1 15-Aug-23 OPEN

836 JB1071-HAI-04-ZZ-WIR-W-00836 INS944 CVL


Inspection request for application of brush bond on blinding of foundation at Driver Facilities. 15-Aug-23 OPEN
Driver Facilities.

837 JB1071-HAI-04-ZZ-WIR-W-00837 INS945 CVL


Inspection request for pouring protection screed for brush bond at foundation Driver Facilities. 15-Aug-23 OPEN
of Driver Facilities.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

838 JB1071-HAI-04-ZZ-WIR-W-00838 INS946 MECH


Inspection request for Erection of Body sheets (2 Nos. 5 and 6) of Silo # 6 Silo # 6 15-Aug-23 16-Aug-23 OPEN
INS955 prior to lifting.

839 JB1071-HAI-04-ZZ-WIR-W-00839 INS947 MECH


Inspection request for Water test of body sheet (2 Nos, 5 and 6) of Silo # 6 Silo # 6 15-Aug-23 16-Aug-23 OPEN
INS956 prior to lifting.

840 JB1071-HAI-04-ZZ-WIR-W-00840 INS948 MECH


Inspection request for Erection of Body sheets (2 Nos. 5 and 6) of Silo # 12 Silo # 12 15-Aug-23 16-Aug-23 OPEN
INS957 prior to lifting.

841 JB1071-HAI-04-ZZ-WIR-W-00841 INS949 MECH


Inspection request for Water test of body sheet (2 Nos, 5 and 6) of Silo # 12 Silo # 12 15-Aug-23 16-Aug-23 OPEN
INS958 prior to lifting.

842 JB1071-HAI-04-ZZ-WIR-W-00842 INS953 CVL


Inspection request for formwork of wall (W 1) at Head House 1. (Highlighted Head House-1 16-Aug-23 OPEN
Part)

843 JB1071-HAI-04-ZZ-WIR-W-00843 INS954 CVL


Inspection request for concrete pouring of wall (W 1) at Head House 1. Head House-1 16-Aug-23 OPEN
(Highlighted Part)

844 JB1071-HAI-04-ZZ-WIR-W-00844 INS955 CVL


Inspection request for surface preparation prior to application of primer in Head House 1, Intake 17-Aug-23 OPEN
Foundation at Head House 1 intake.

845 JB1071-HAI-04-ZZ-WIR-W-00845 INS956 CVL


Inspection request for backfilling (FDT) 2nd Layer around the foundation Bagging Station 17-Aug-23 OPEN
(Part 3) at Bagging Station.

846 JB1071-HAI-04-ZZ-WIR-W-00846 INS957 CVL


Inspection request for steel reinforcement of wall (W 1and PW1) at Head Head House-1 17-Aug-23 OPEN
House 1. (Highlighted Area)

847 JB1071-HAI-04-ZZ-WIR-W-00847 INS958 MECH


Inspection request for Erection of Body sheets (2 Nos, 1 to 2) of Silo # 11 Silo # 11 17-Aug-23 OPEN
prior to lifting.

848 JB1071-HAI-04-ZZ-WIR-W-00848 INS959 MECH


Inspection request for Water test of body sheet (1 and 2) of Silo # 11 prior to Silo # 11 17-Aug-23 OPEN
lifting.

849 JB1071-HAI-04-ZZ-WIR-W-00849 INS966 CVL


Inspection request for application of primer prior to installation of Head House 1intake. 19-Aug-23 OPEN
Waterproofing Membrane in Foundation at Head House 1intake.

850 JB1071-HAI-04-ZZ-WIR-W-00850 INS967 CVL


Inspection request for installation of Waterproofing Membrane in Foundation Head House 1intake. 19-Aug-23 OPEN
at Head House 1 intake.

851 JB1071-HAI-04-ZZ-WIR-W-00851 INS968 CVL


Inspection request for installation of geotextile on Waterproofing Membrane Head House 1intake. 19-Aug-23 OPEN
in Foundation at Head House 1 intake.

852 JB1071-HAI-04-ZZ-WIR-W-00852 INS969 CVL


Inspection request for casting protection screed for Waterproofing Membrane Head House 1intake. 19-Aug-23 OPEN
in Foundation at Head House 1 intake.

853 JB1071-HAI-04-ZZ-WIR-W-00853 INS970 CVL


Inspection request for Pile Integrity Test at Flat Storage (Highlight Area) and Flat Storage (Highlight Area) 20-Aug-23 OPEN
Truck Intake. and Truck Intake.

854 JB1071-HAI-04-ZZ-WIR-W-00854 INS971 CVL


Inspection request for Formwork of wall (W 1and PW1) at Head House 1. Head House 1. 20-Aug-23 OPEN
(Highlighted Area)

855 JB1071-HAI-04-ZZ-WIR-W-00855 INS972 CVL


Inspection request for Concrete pouring of wall (W 1and PW1) at Head House Head House 1. 20-Aug-23 OPEN
1. (Highlighted Area)

Inspection request for application of Cementitious Waterproofing (Brush


856 JB1071-HAI-04-ZZ-WIR-W-00856 INS973 CVL Bond) for foundations at Flat Storage.(Axis 30 to 37 Along H1 to I1, FLAT STORAGE 20-Aug-23 OPEN
Highlighted area in Drawing)

857 JB1071-HAI-04-ZZ-WIR-W-00857 INS974 CVL


Inspection request for Pouring Screed concrete for foundations at Flat FLAT STORAGE 20-Aug-23 OPEN
Storage. (30 to 37 Along H1 to I1, Highlighted area in Drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

858 JB1071-HAI-04-ZZ-WIR-W-00858 INS977 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 22-Aug-23 OPEN
Nos) at Flat Storage.

859 JB1071-HAI-04-ZZ-WIR-W-00859 INS978 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 22-Aug-23 OPEN
Storage.

860 JB1071-HAI-04-ZZ-WIR-W-00860 INS979 CVL


Inspection request for Installation of Earthing and Lightning protection FLAT STORAGE 22-Aug-23 OPEN
system for Foundation at flat storage. (Highlighted Area on Drawing)

861 JB1071-HAI-04-ZZ-WIR-W-00861 INS980 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation FLAT STORAGE 22-Aug-23 OPEN
along from axis FSB3 to FSA1* and FS1 to 8 at Flat Storage.

862 JB1071-HAI-04-ZZ-WIR-W-00862 INS981 CVL


Inspection request for pouring concrete of Foundation along from axis FSB3 FLAT STORAGE 22-Aug-23 28-Aug-23 OPEN
INS1012 to FSA1* and FS1 to 8 at Flat Storage.

863 JB1071-HAI-04-ZZ-WIR-W-00863 INS982 CVL


Inspection request for protection board on water proofing for Foundations at Transfer Tower 1. 22-Aug-23 OPEN
Transfer Tower 1.

864 JB1071-HAI-04-ZZ-WIR-W-00864 INS983 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (10 FLAT STORAGE 23-Aug-23 OPEN
Nos.) at Flat Storage.

865 JB1071-HAI-04-ZZ-WIR-W-00865 INS984 CVL


Inspection request for Concrete Pouring of Foundation (10 Nos) at Flat FLAT STORAGE 23-Aug-23 OPEN
Storage.

866 JB1071-HAI-04-ZZ-WIR-W-00866 INS985 CVL


Inspection request for backfilling (FDT) 3rd Layer around the foundation Bagging Station 23-Aug-23 OPEN
(Part 3) at Bagging Station.

867 JB1071-HAI-04-ZZ-WIR-W-00867 INS987 CVL


Inspection request for Surface Preparation of bagging station Foundation Top Bagging Station 23-Aug-23 OPEN
(Part 1) prior to waterproofing (Bituminous) coating.

INS988 Inspection request for Steel Reinforcement and Formwork of Foundation from
868 JB1071-HAI-04-ZZ-WIR-W-00868 INS1041 CVL FLAT STORAGE 23-Aug-23 31-Aug-23 OPEN
CONC1073 Axis 23 to 45 at Flat Storage Tunnel.

INS989 Inspection request for pouring concrete of Foundation from Axis 23 to 45 at


869 JB1071-HAI-04-ZZ-WIR-W-00869 INS1042 CVL FLAT STORAGE 23-Aug-23 31-Aug-23 OPEN
CONC1077 Flat Storage Tunnel.

870 JB1071-HAI-04-ZZ-WIR-W-00870 INS990 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 23-Aug-23 OPEN
Nos) at Flat Storage.

871 JB1071-HAI-04-ZZ-WIR-W-00871 INS991 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 23-Aug-23 OPEN
Storage.

872 JB1071-HAI-04-ZZ-WIR-W-00872 INS992 CVL


Inspection request for Formwork of wall (W 1and PW1) at Head House 1. Head House 1. 24-Aug-23 OPEN
(Highlighted Area)

873 JB1071-HAI-04-ZZ-WIR-W-00873 INS993 CVL


Inspection request for Concrete pouring of wall (W 1and PW1) at Head House Head House 1. 24-Aug-23 OPEN
1. (Highlighted Area)

874 JB1071-HAI-04-ZZ-WIR-W-00874 INS994 CVL


Inspection request for surface preparation prior to application of primer on Head House 1. 24-Aug-23 OPEN
wall at Head House.

875 JB1071-HAI-04-ZZ-WIR-W-00875 INS995 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 24-Aug-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

876 JB1071-HAI-04-ZZ-WIR-W-00876 INS996 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 24-Aug-23 OPEN
Storage. (Highlighted on drawing)

877 JB1071-HAI-04-ZZ-WIR-W-00877 INS997 CVL


Inspection request for backfilling (FDT) 1st Layer around the foundation at Transfer Tower 1. 26-Aug-23 OPEN
Transfer Tower 1.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

878 JB1071-HAI-04-ZZ-WIR-W-00878 INS998 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Bagging Station 26-Aug-23 OPEN
on top of foundation at bagging station. (Part 1)

879 JB1071-HAI-04-ZZ-WIR-W-00879 INS999 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 26-Aug-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

880 JB1071-HAI-04-ZZ-WIR-W-00880 INS1000 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 26-Aug-23 OPEN
Storage.(Highlighted on drawing)

881 JB1071-HAI-04-ZZ-WIR-W-00881 INS1001 CVL


Inspection request for application of primer prior to installation of Head House 1 26-Aug-23 OPEN
Waterproofing Membrane on wall at Head House 1. (Highlighted on Drawing)

882 JB1071-HAI-04-ZZ-WIR-W-00882 INS1002 CVL


Inspection request for Installation of Earthing for Foundation at flat storage FLAT STORAGE 26-Aug-23 OPEN
Tunnel. (Highlighted Area on Drawing)

883 JB1071-HAI-04-ZZ-WIR-W-00883 INS1004 CVL


Inspection request for steel reinforcement for intake Foundation at Head Head House 1 27-Aug-23 OPEN
House 1.

884 JB1071-HAI-04-ZZ-WIR-W-00884 INS1005 CVL


Inspection request for backfilling (FDT) 4th Layer around the foundation Bagging Station 27-Aug-23 OPEN
(Part 3) at Bagging Station.

885 JB1071-HAI-04-ZZ-WIR-W-00885 INS1006 CVL


Inspection request for surface preparation prior to application of primer of Head House 1 27-Aug-23 OPEN
wall at Head House.(Highlighted in Drawing)

886 JB1071-HAI-04-ZZ-WIR-W-00886 INS1007 CVL


Inspection request for installation of Waterproofing Membrane on Wall at Head House 1 27-Aug-23 OPEN
Head House 1. (Highlighted in Drawing)

887 JB1071-HAI-04-ZZ-WIR-W-00887 INS1008 CVL


Inspection request for installation of protection boar on Wall at Head House 1. Head House 1 27-Aug-23 OPEN
(Highlighted in Drawing)

888 JB1071-HAI-04-ZZ-WIR-W-00888 INS1009 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 27-Aug-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

889 JB1071-HAI-04-ZZ-WIR-W-00889 INS1010 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 27-Aug-23 OPEN
Storage.(Highlighted on drawing)

890 JB1071-HAI-04-ZZ-WIR-W-00890 INS1011 ELE


Inspection request for Installation of Earthing system for Raft Drivers Driver Facilities. 27-Aug-23 OPEN
Facilities.

891 JB1071-HAI-04-ZZ-WIR-W-00891 INS1013 CVL


Inspection request for steel reinforcement and formwork of foundation at Driver Facilities. 28-Aug-23 OPEN
driver facilities.

892 JB1071-HAI-04-ZZ-WIR-W-00892 INS1014 CVL Inspection request for concrete pouring of foundation at driver facilities. Driver Facilities. 28-Aug-23 OPEN

893 JB1071-HAI-04-ZZ-WIR-W-00893 INS1015 CVL Inspection request for formwork of intake Foundation at Head House 1. Head House 1 28-Aug-23 OPEN

894 JB1071-HAI-04-ZZ-WIR-W-00894 INS1016 ELE


Inspection request for Installation of Earthing system for intake Head House 1 Head House 1 28-Aug-23 OPEN
foundation.

INS1017 Inspection request for concrete pouring of intake Foundation at Head House
895 JB1071-HAI-04-ZZ-WIR-W-00895 INS1027 CVL Head House 1 28-Aug-23 31-Aug-23 OPEN
CONC1038 1.

896 JB1071-HAI-04-ZZ-WIR-W-00896 INS1018 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 28-Aug-23 29-Aug-23 OPEN
INS1020 Nos) at Flat Storage. (Highlighted on Drawing)

897 JB1071-HAI-04-ZZ-WIR-W-00897 INS1019 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 28-Aug-23 29-Aug-23 OPEN
INS1021 Storage. (Highlighted on drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

898 JB1071-HAI-04-ZZ-WIR-W-00898 INS1022 CVL


Inspection request for installation of Waterproofing Membrane on Wall at Head House 1 29-Aug-23 OPEN
Head House 1.(Highlighted in Drawing)

899 JB1071-HAI-04-ZZ-WIR-W-00899 INS1023 CVL


Inspection request for installation of protection board on Wall at Head House Head House 1 29-Aug-23 OPEN
1. (Highlighted in Drawing)

900 JB1071-HAI-04-ZZ-WIR-W-00900 INS1024 CVL


Inspection request for installation of Anchors Bolts (9 Pedestals) at Bagging Bagging Station 29-Aug-23 OPEN
Station Part 2.

901 JB1071-HAI-04-ZZ-WIR-W-00901 INS1025 CVL


Inspection request for formwork of Columns Pedestal (9 Nos) at Bagging Bagging Station 29-Aug-23 OPEN
Station Part 2.

902 JB1071-HAI-04-ZZ-WIR-W-00902 INS1026 CVL


Inspection request for concrete pouring of Columns Pedestal (9 Nos) at Bagging Station 29-Aug-23 OPEN
Bagging Station Part 2.

903 JB1071-HAI-04-ZZ-WIR-W-00903 INS1028 CVL


Inspection request for backfilling (FDT) 2nd Layer around the foundation at Transfer Tower 1. 30-Aug-23 OPEN
Transfer Tower 1.

904 JB1071-HAI-04-ZZ-WIR-W-00904 INS1029 CVL


Inspection request for 1st coat of Waterproofing Coating (Bituminous) Paint FLAT STORAGE 30-Aug-23 OPEN
on isolated foundations at Flat Storage. (Highlighted area drawing)

905 JB1071-HAI-04-ZZ-WIR-W-00905 INS1030 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 30-Aug-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

906 JB1071-HAI-04-ZZ-WIR-W-00906 INS1031 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 30-Aug-23 OPEN
Storage.(Highlighted on drawing)

907 JB1071-HAI-04-ZZ-WIR-W-00907 INS1032 MECH Inspection request for Erection (Steel Structure) of Silo # 04 prior to lifting. Silo # 04 30-Aug-23 OPEN

908 JB1071-HAI-04-ZZ-WIR-W-00908 INS1033 MECH Inspection request for Water test (Roof) of Silo # 4 prior to lifting. Silo # 04 30-Aug-23 OPEN

909 JB1071-HAI-04-ZZ-WIR-W-00909 INS1034 MECH Inspection request for Erection (Steel Structure) of Silo # 10 prior to lifting. Silo # 10 30-Aug-23 OPEN

910 JB1071-HAI-04-ZZ-WIR-W-00910 INS1035 MECH Inspection request for Water test (Roof) of Silo # 10 prior to lifting. Silo # 10 30-Aug-23 OPEN

911 JB1071-HAI-04-ZZ-WIR-W-00911 INS1039 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 31-Aug-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

912 JB1071-HAI-04-ZZ-WIR-W-00912 INS1040 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 31-Aug-23 OPEN
Storage. (Highlighted on drawing)

913 JB1071-HAI-04-ZZ-WIR-W-00913 INS1043 CVL


Inspection request for Steel Reinforcement and Formwork of Strip Foundation FLAT STORAGE 2-Sep-23 OPEN
at Flat Storage. (Highlighted Area)

914 JB1071-HAI-04-ZZ-WIR-W-00914 INS1044 ELE


Inspection request for Installation of Earthing and Lightning protection FLAT STORAGE 2-Sep-23 OPEN
system for Foundation at flat storage. (Highlighted Area on Drawing)

915 JB1071-HAI-04-ZZ-WIR-W-00915 INS1045 CVL


Inspection request for pouring concrete of Strip Foundation at Flat Storage. FLAT STORAGE 2-Sep-23 OPEN
(Highlighted Area)

916 JB1071-HAI-04-ZZ-WIR-W-00916 INS1046 CVL


Inspection request for backfilling (FDT) 3rd Layer around the foundation at Transfer Tower 1. 2-Sep-23 OPEN
Transfer Tower 1.

917 JB1071-HAI-04-ZZ-WIR-W-00917 INS1047 CVL


Inspection request for installation of Anchors Bolts (6 Pedestals) at Bagging Bagging Station 2-Sep-23 OPEN
Station Part 2.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

918 JB1071-HAI-04-ZZ-WIR-W-00918 INS1048 CVL


Inspection request for formwork of Columns Pedestal (6 Nos) at Bagging Bagging Station 2-Sep-23 OPEN
Station Part 2.

919 JB1071-HAI-04-ZZ-WIR-W-00919 INS1049 CVL


Inspection request for concrete pouring of Columns Pedestal (6 Nos) at Bagging Station 2-Sep-23 OPEN
Bagging Station Part 2.

920 JB1071-HAI-04-ZZ-WIR-W-00920 INS1050 CVL Inspection request for formwork of columns neck at driver facilities. Driver Facilities. 3-Sep-23 OPEN

921 JB1071-HAI-04-ZZ-WIR-W-00921 INS1051 CVL Inspection request for concrete pouring of columns neck at driver facilities. Driver Facilities. 3-Sep-23 OPEN

922 JB1071-HAI-04-ZZ-WIR-W-00922 INS1052 CVL


Inspection request for 1st coat of Waterproofing Coating (Bituminous) Paint FLAT STORAGE 3-Sep-23 OPEN
on isolated foundations at Flat Storage. (Highlighted area drawing)

923 JB1071-HAI-04-ZZ-WIR-W-00923 INS1053 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 3-Sep-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

924 JB1071-HAI-04-ZZ-WIR-W-00924 INS1054 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 3-Sep-23 OPEN
Storage. (Highlighted on drawing)

Inspection request of Lighting System (G.F.), Mechanical Power (G.F.), Small


925 JB1071-HAI-04-ZZ-WIR-W-00925 INS1055 ELE Power (G.F.), Access Control (G.F.), Public Address (G.F.), CCTV System (G.F.), FLAT STORAGE 3-Sep-23 OPEN
Fire Alarm System (G.F.) at Admin building

926 JB1071-HAI-04-ZZ-WIR-W-00926 INS1056 CVL


Inspection request for Steel Reinforcement and Formwork of 1st floor Slab at Admin Building. 4-Sep-23 OPEN
Admin Building.

927 JB1071-HAI-04-ZZ-WIR-W-00927 INS1057 CVL


Inspection request for Pile Integrity Test at Flat Storage Tunnel, Truck Intake FLAT STORAGE 4-Sep-23 OPEN
and TT 2.

928 JB1071-HAI-04-ZZ-WIR-W-00928 INS1058 MECH


Inspection request for mechanical works (AC copper pipes selves and Admin Building. 4-Sep-23 OPEN
Installation of Drainage pipe) in Admin Building.

929 JB1071-HAI-04-ZZ-WIR-W-00929 INS1059 CVL Inspection request for pouring concrete of 1st floor Slab at Admin Building. Admin Building. 4-Sep-23 OPEN

930 JB1071-HAI-04-ZZ-WIR-W-00930 INS1060 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 5-Sep-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

931 JB1071-HAI-04-ZZ-WIR-W-00931 INS1061 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 5-Sep-23 OPEN
Storage. (Highlighted on drawing)

932 JB1071-HAI-04-ZZ-WIR-W-00932 INS1062 CVL


Inspection request for installation of Waterproofing Membrane on Foundation Head House 1 5-Sep-23 OPEN
of Intake at Head House 1.

933 JB1071-HAI-04-ZZ-WIR-W-00933 INS1063 CVL


Inspection request for Compaction Test (FDT) under the blinding for SERVICES BUILDING 5-Sep-23 OPEN
foundations at Services Building.

934 JB1071-HAI-04-ZZ-WIR-W-00934 INS1064 CVL Inspection request for anchor bolt (93 Nos) prior to grout at Silo # 6. Silo # 6. 5-Sep-23 OPEN

935 JB1071-HAI-04-ZZ-WIR-W-00935 INS1065 CVL Inspection request for anchor bolt (93 Nos) grouting at Silo # 6. Silo # 6. 5-Sep-23 OPEN

936 JB1071-HAI-04-ZZ-WIR-W-00936 INS1066 CVL


Inspection request for Steel Reinforcement and Formwork of strip Foundation FLAT STORAGE 5-Sep-23 OPEN
along from axis 45 and FSA1* at Flat Storage. (Highlighted Area)

937 JB1071-HAI-04-ZZ-WIR-W-00937 INS1067 ELE


Inspection request for Installation of Earthing and Lightning protection FLAT STORAGE 5-Sep-23 OPEN
system for strip Foundation at flat storage. (Highlighted Area on Drawing)
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

938 JB1071-HAI-04-ZZ-WIR-W-00938 INS1068 CVL


Inspection request for pouring concrete of Strip Foundation along axis 45 and FLAT STORAGE 5-Sep-23 OPEN
FSA1* at Flat Storage.

939 JB1071-HAI-04-ZZ-WIR-W-00939 INS1069 CVL


Inspection request for 1st coat of Waterproofing Coating (Bituminous) Paint FLAT STORAGE 6-Sep-23 OPEN
on strip foundation at Flat Storage. (Highlighted area drawing)

940 JB1071-HAI-04-ZZ-WIR-W-00940 INS1070 CVL Inspection request for anchor bolt (93 Nos) prior to grout at Silo # 11. Silo # 11. 6-Sep-23 OPEN

941 JB1071-HAI-04-ZZ-WIR-W-00941 INS1071 CVL Inspection request for anchor bolt (93 Nos) grouting at Silo # 11. Silo # 11. 6-Sep-23 OPEN

942 JB1071-HAI-04-ZZ-WIR-W-00942 INS1072 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 6-Sep-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

943 JB1071-HAI-04-ZZ-WIR-W-00943 INS1073 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 6-Sep-23 OPEN
Storage. (Highlighted on drawing)

944 JB1071-HAI-04-ZZ-WIR-W-00944 INS1074 CVL


Inspection request for termite control spray under the blinding for Services Building. 7-Sep-23 OPEN
foundations at Services Building.

945 JB1071-HAI-04-ZZ-WIR-W-00945 INS1075 CVL


Inspection request for pouring blinding concrete for foundations at Services Services Building. 7-Sep-23 OPEN
Building.

946 JB1071-HAI-04-ZZ-WIR-W-00946 INS1078 CVL


Inspection request for installation of protection board of Flat Storage FLAT STORAGE 7-Sep-23 OPEN
Foundations (Highlighted Area).

947 JB1071-HAI-04-ZZ-WIR-W-00947 INS1079 CVL


Inspection request for 1st coat of Waterproofing Coating (Bituminous) Paint Driver Facilities. 7-Sep-23 OPEN
on foundations at drivers facilities.

948 JB1071-HAI-04-ZZ-WIR-W-00948 INS1080 CVL


Inspection request for application of primer prior to installation of water FLAT STORAGE 7-Sep-23 OPEN
proofing membrane at Flat Storage Tunnel. (High Light Area In Drawing)

949 JB1071-HAI-04-ZZ-WIR-W-00949 INS1081 CVL


Inspection request for first coat of Waterproofing Coating (Bituminous) Paint Bagging Station 7-Sep-23 OPEN
on top of foundation at bagging station (Part 2)

950 JB1071-HAI-04-ZZ-WIR-W-00950 INS1082 CVL


Inspection request for installation of Anchors Bolts (5 Pedestals) at Bagging Bagging Station 7-Sep-23 OPEN
INS1085 Station Part 3.

951 JB1071-HAI-04-ZZ-WIR-W-00951 INS1083 CVL


Inspection request for formwork of Columns Pedestal (5 Nos) at Bagging Bagging Station 7-Sep-23 OPEN
INS1086 Station Part 3.

952 JB1071-HAI-04-ZZ-WIR-W-00952 INS1084 CVL


Inspection request for concrete pouring of Columns Pedestal (5 Nos) at Bagging Station 7-Sep-23 OPEN
INS1087 Bagging Station Part 3.

953 JB1071-HAI-04-ZZ-WIR-W-00953 INS1088 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 9-Sep-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

954 JB1071-HAI-04-ZZ-WIR-W-00954 INS1089 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 9-Sep-23 OPEN
Storage.(Highlighted on drawing)

955 JB1071-HAI-04-ZZ-WIR-W-00955 INS1090 CVL


Inspection request for Steel Reinforcement of Columns (21 Nos) at 1st Floor ADMIN BUILDING 9-Sep-23 OPEN
of Admin Building.

956 JB1071-HAI-04-ZZ-WIR-W-00956 INS1091 CVL Inspection request for anchor bolt (93 Nos) prior to grout at Silo # 5. Silo # 5. 10-Sep-23 OPEN

957 JB1071-HAI-04-ZZ-WIR-W-00957 INS1092 CVL Inspection request for anchor bolt (93 Nos) grouting at Silo # 5. Silo # 5. 10-Sep-23 OPEN
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

958 JB1071-HAI-04-ZZ-WIR-W-00958 INS1093 MECH Inspection request for Erection (Steel Structure) of Silo # 3 prior to lifting. Silo # 3 10-Sep-23 OPEN

959 JB1071-HAI-04-ZZ-WIR-W-00959 INS1094 MECH Inspection request for Water test (Roof) of Silo # 3 prior to lifting. Silo # 3 10-Sep-23 OPEN

960 JB1071-HAI-04-ZZ-WIR-W-00960 INS1095 CVL


Inspection request for application of brush bond on blinding of foundation at Services Building. 10-Sep-23 OPEN
Service Building.

961 JB1071-HAI-04-ZZ-WIR-W-00961 INS1096 CVL


Inspection request for pouring protection screed for brush bond at foundation Services Building. 10-Sep-23 OPEN
of Service Building.

962 JB1071-HAI-04-ZZ-WIR-W-00962 INS1097 CVL


Inspection request for Installation of Earthing and Lightning protection FLAT STORAGE 11-Sep-23 OPEN
system for strip Foundation at flat storage. (Highlighted Area on Drawing)

963 JB1071-HAI-04-ZZ-WIR-W-00963 INS1098 CVL


Inspection request for 1st layer of backfill (FDT) at Flat Storage. (Highlighted FLAT STORAGE 11-Sep-23 OPEN
Area)

964 JB1071-HAI-04-ZZ-WIR-W-00964 INS1099 CVL


Inspection request for Steel Reinforcement and Formwork of strip Foundation FLAT STORAGE 11-Sep-23 OPEN
along axis 33 and FSA1* at Flat Storage. (Highlighted Area)

965 JB1071-HAI-04-ZZ-WIR-W-00965 INS1100 CVL


Inspection request for pouring concrete of Strip Foundation along axis 33 and FLAT STORAGE 11-Sep-23 OPEN
FSA1* at Flat Storage. (Highlighted Area)

966 JB1071-HAI-04-ZZ-WIR-W-00966 INS1101 CVL


Inspection request for installation of water proofing membrane at Flat Storage FLAT STORAGE 12-Sep-23 OPEN
Tunnel. (High Light Area In Drawing)

Inspection request for installation of protection board on waterproofing


967 JB1071-HAI-04-ZZ-WIR-W-00967 INS1102 CVL membrane (Vertical Area) in Flat Storage Tunnel. (High Light Area In FLAT STORAGE 12-Sep-23 OPEN
Drawing)

968 JB1071-HAI-04-ZZ-WIR-W-00968 INS1103 CVL


Inspection request for pouring protection screed at Flat Storage Tunnel. (High FLAT STORAGE 12-Sep-23 OPEN
Light Area In Drawing)

969 JB1071-HAI-04-ZZ-WIR-W-00969 INS1104 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 12-Sep-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

970 JB1071-HAI-04-ZZ-WIR-W-00970 INS1105 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 12-Sep-23 OPEN
Storage. (Highlighted on drawing)

971 JB1071-HAI-04-ZZ-WIR-W-00971 INS1106 CVL


Inspection request for surface preparation prior to waterproofing in Transfer Tower 2. 12-Sep-23 OPEN
Foundation at Transfer Tower 2.

972 JB1071-HAI-04-ZZ-WIR-W-00972 INS1107 CVL


Inspection request for steel reinforcement and formwork of stair (Level - Head House 1 12-Sep-23 OPEN
3.000 to -0.500) at Head House 1.

973 JB1071-HAI-04-ZZ-WIR-W-00973 INS1108 CVL


Inspection request for pouring concrete of stair (Level -3.000 to -0.500) at Head House 1 12-Sep-23 OPEN
Head House 1.

974 JB1071-HAI-04-ZZ-WIR-W-00974 INS1109 CVL


Inspection request for Formwork of Columns (14 Nos) at 1 floor of Admin ADMIN BUILDING 12-Sep-23 OPEN
Building.

975 JB1071-HAI-04-ZZ-WIR-W-00975 INS1110 CVL


Inspection request for Concrete Pouring of Columns (14 Nos) at 1st floor of ADMIN BUILDING 12-Sep-23 OPEN
Admin Building.

976 JB1071-HAI-04-ZZ-WIR-W-00976 INS1111 CVL


Inspection request for Steel Reinforcement of Columns (24 Nos) and Elevator ADMIN BUILDING 13-Sep-23 OPEN
walls at 1st Floor of Admin Building.

977 JB1071-HAI-04-ZZ-WIR-W-00977 INS1112 CVL


Inspection request for Compaction Test (FDT) under the blinding for SCALE BUILDING 13-Sep-23 OPEN
foundations at Scale Building.
Work Inspection Request - WIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071
REV-P01 REV-P02 REV-P03 REV-P04
Final
S.No. WIR Ref. Number ID CODE DISCIPLINE Title Area Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Issued Date Response Date Time Laps Status Doc. Status Eng.Rev Statuse/Remark
s

978 JB1071-HAI-04-ZZ-WIR-W-00978 INS1113 CVL Inspection request for pouring blinding for foundations at Scale Building. SCALE BUILDING 13-Sep-23 OPEN

979 JB1071-HAI-04-ZZ-WIR-W-00979 INS1114 CVL


Inspection request for Installation of Aeration Tubes and Angle frames Silo # 7. 13-Sep-23 OPEN
(Embedded Items) at Slab of Silo # 7.

980 JB1071-HAI-04-ZZ-WIR-W-00980 INS1115 CVL Inspection request for Slab Reinforcement of Silo # 7. Silo # 7. 13-Sep-23 OPEN

981 JB1071-HAI-04-ZZ-WIR-W-00981 INS1116 CVL Inspection request for Slab Formwork of Silo # 7. Silo # 7. 13-Sep-23 OPEN

982 JB1071-HAI-04-ZZ-WIR-W-00982 INS1117 CVL Inspection request for Pouring Concrete of the Slab of Silo # 7. Silo # 7. 13-Sep-23 OPEN

983 JB1071-HAI-04-ZZ-WIR-W-00983 INS1119 CVL


Inspection request for installation of Waterproofing Membrane on Foundation Head House 1 14-Sep-23 OPEN
of Intake (2nd part) at Head House 1.

984 JB1071-HAI-04-ZZ-WIR-W-00984 INS1120 CVL


Inspection request for Steel Reinforcement of wall at Flat Storage Tunnel. FLAT STORAGE 14-Sep-23 OPEN
(Highlighted Area on Drawing)

985 JB1071-HAI-04-ZZ-WIR-W-00985 INS1121 CVL


Inspection request for installation of Anchors Bolts (6 Pedestals) at Bagging Bagging Station 14-Sep-23 OPEN
Station Part 2.

986 JB1071-HAI-04-ZZ-WIR-W-00986 INS1122 CVL


Inspection request for formwork of Columns Pedestal (6 Nos) at Bagging Bagging Station 14-Sep-23 OPEN
Station Part 3.

987 JB1071-HAI-04-ZZ-WIR-W-00987 INS1123 CVL


Inspection request for concrete pouring of Columns Pedestal (6 Nos) at Bagging Station 14-Sep-23 OPEN
Bagging Station Part 3.

988 JB1071-HAI-04-ZZ-WIR-W-00988 INS1124 CVL


Inspection request for installation of protection board on foundations at Driver Facilities. 14-Sep-23 OPEN
drivers facilities.

989 JB1071-HAI-04-ZZ-WIR-W-00989 INS1125 MECH


Inspection request for Erection (Steel Structure) of Silo # 9 roof prior to Silo # 9 14-Sep-23 OPEN
lifting.

990 JB1071-HAI-04-ZZ-WIR-W-00990 INS1126 MECH Inspection request for Water test (Roof) of Silo # 9 prior to lifting. Silo # 9 14-Sep-23 OPEN

991 JB1071-HAI-04-ZZ-WIR-W-00991 INS1127 CVL


Inspection request for Steel Reinforcement and Formwork of Foundation (12 FLAT STORAGE 14-Sep-23 OPEN
Nos) at Flat Storage. (Highlighted on Drawing)

992 JB1071-HAI-04-ZZ-WIR-W-00992 INS1128 CVL


Inspection request for Concrete Pouring of Foundation (12 Nos) at Flat FLAT STORAGE 14-Sep-23 OPEN
Storage. (Highlighted on drawing)

993 JB1071-HAI-04-ZZ-WIR-W-00993 INS1129 CVL


Inspection request for steel reinforcement of wall (W 1and PW1) at Head Head House 1 16-Sep-23 OPEN
House 1. (Highlighted Area)

994 JB1071-HAI-04-ZZ-WIR-W-00994 INS1130 CVL


Inspection request for 1st coat of Waterproofing Coating (Bituminous) Paint FLAT STORAGE 16-Sep-23 OPEN
on isolated foundations at Flat Storage. (Highlighted area drawing)

995 JB1071-HAI-04-ZZ-WIR-W-00995 INS1131 CVL


Inspection request for Formwork of Columns (14 Nos) at 1st floor of Admin ADMIN BUILDING 16-Sep-23 OPEN
Building.

996 JB1071-HAI-04-ZZ-WIR-W-00996 INS1132 CVL


Inspection request for Concrete Pouring of Columns (14 Nos) at 1st floor of ADMIN BUILDING 16-Sep-23 OPEN
Admin Building.

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with th
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Material Inspection Request - MIR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION


Project JB1071 Rev-P01 Rev-P02 Rev-P03

SN MIR Ref. Number DISCIPLINE ID CODE Title Issued Date Received Date Time Laps Issued Date Received Date Time Issued Date Received Date Time Laps Status Doc. Status Eng.Res Comments
Laps

1 JB1071-HAI-04-ZZ-MA-W-00001 CVL INS001 ReinforcementSteel Bars.Diameter.10mm, 16mm, 20mm,25mm (Al-Rajhi) 7-Sep-22 20-Sep-22 13 29-Oct-22 OPEN
INS004

2 JB1071-HAI-04-ZZ-MA-W-00002 CVL INS002 ReinforcementSteel Bars.Diameter.10mm,20mm, 25mm 18-Oct-22 20-Oct-22 2 2 CLOSED RHDHV 2

3 JB1071-HAI-04-ZZ-MA-W-00003 CVL INS007 Reinforcement Steel Bars. Diameter.10mm, 25mm 3-Nov-22 OPEN

4 JB1071-HAI-04-ZZ-MA-W-00004 CVL INS014 Reinforcement Steel Bars. Diameter.10mm 9-Nov-22 OPEN

5 JB1071-HAI-04-ZZ-MA-W-00005 CVL INS018 Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 13-Nov-22 OPEN

6 JB1071-HAI-04-ZZ-MA-W-00006 CVL INS021 Reinforcement Steel Bars. Diameter.20mm, 25mm 15-Nov-22 OPEN

7 JB1071-HAI-04-ZZ-MA-W-00007 CVL INS022 Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 15-Nov-22 OPEN

8 JB1071-HAI-04-ZZ-MA-W-00008 CVL INS034 Reinforcement Steel Bars. Diameter 25mm 28-Nov-22 OPEN

9 JB1071-HAI-04-ZZ-MA-W-00009 CVL INS036 Coarse Aggregates 10mm, 20mm Fine Aggregates (Sand) 28-Nov-22 28-Nov-22 0 R&R

10 JB1071-HAI-04-ZZ-MA-W-00010 CVL INS047 Reinforcement Steel Bars. Diameter. 10mm, 20mm, 25mm 8-Dec-22 OPEN

11 JB1071-HAI-04-ZZ-MA-W-00011 CVL INS083 Reinforcement Steel Bars 25mm 26-Dec-22 OPEN

12 JB1071-HAI-04-ZZ-MA-W-00012 CVL INS113 Reinforcement Steel Bars. Diameter 10mm, 10mm, 20mm 9-Jan-23 OPEN

13 JB1071-HAI-04-ZZ-MA-W-00013 CVL INS114 POLYETHYLENE SHEET 250 micron 10-Jan-23 12-Jan-23 2 1 CLOSED RHDHV 1

14 JB1071-HAI-04-ZZ-MA-W-00014 CVL INS128 Reinforcement Steel Bars.Diameter 25mm 14-Jan-23 OPEN

15 JB1071-HAI-04-ZZ-MA-W-00015 CVL INS129 POLYETHYLENE SHEET 250 micron (100 ROLLS) 14-Jan-23 OPEN

16 JB1071-HAI-04-ZZ-MA-W-00016 CVL INS146 Reinforcement Steel Bars. Diameter 25mm 22-Jan-23 OPEN

17 JB1071-HAI-04-ZZ-MA-W-00017 CVL INS153 Reinforcement Steel Bars. Diameter 10mm, 20mm 23-Jan-23 OPEN

18 JB1071-HAI-04-ZZ-MA-W-00018 CVL INS165 SikaSwell-A 2010 Red, Sikaflex Constr 28-Jan-23 OPEN

19 JB1071-HAI-04-ZZ-MA-W-00019 CVL INS170 Reinforcement Steel Bars. Diameter 14mm, 20mm, 25mm 30-Jan-23 OPEN

20 JB1071-HAI-04-ZZ-MA-W-00020 CVL INS171 NITOPROOF 10, (10 Drum each 200ML) 30-Jan-23 OPEN

21 JB1071-HAI-04-ZZ-MA-W-00021 CVL INS174 SikaSwell-A 2010 Red, 330 Rolls 31-Jan-23 OPEN

22 JB1071-HAI-04-ZZ-MA-W-00022 CVL INS175 Reinforcement Steel Bars. Diameter 10mm Cut and Bend Steel , 16mm, 20mm, 25mm Rebar 31-Jan-23 OPEN

23 JB1071-HAI-04-ZZ-MA-W-00023 CVL INS178 Setseal B Cementitious Waterproofing (100 bags) 1-Feb-23 18-Mar-23 CLOSED RHDHV 1

24 JB1071-HAI-04-ZZ-MA-W-00024 CVL INS183 Concure WB309 Curing Compound 2-Feb-23 OPEN


(2 Drum), Renderoc TG Xtra.(10 bags)

25 JB1071-HAI-04-ZZ-MA-W-00025 CVL INS186 Brushbond. Cementitious Water Proofing (19 Bags) 2-Feb-23 OPEN

26 JB1071-HAI-04-ZZ-MA-W-00026 CVL INS197 Reinforcement Steel Bars. Diameter 20mm, 25mm, 14mm Rebar 6-Feb-23 OPEN

27 JB1071-HAI-04-ZZ-MA-W-00027 CVL INS208 Brushbond. Cementitious Water Proofing (300 Bags) 8-Feb-23 OPEN

28 JB1071-HAI-04-ZZ-MA-W-00028 CVL INS209 Reinforcement Steel Bars. Diameter 20mm, 25mm Rebar 8-Feb-23 OPEN

29 JB1071-HAI-04-ZZ-MA-W-00029 CVL INS216 Concure WB309 Curing Compound (10 Drum) 9-Feb-23 OPEN

30 JB1071-HAI-04-ZZ-MA-W-00030 CVL INS217 Reinforcement Steel. Cut and Bend Steel 10 mm 11-Feb-23 OPEN

31 JB1071-HAI-04-ZZ-MA-W-00031 CVL INS222 Reinforcement Steel. Cut and Bend Steel 10 mm 12-Feb-23 OPEN

32 JB1071-HAI-04-ZZ-MA-W-00032 CVL INS228 BITUCELL (Fiberboard) (100 Sheets) 14-Feb-23 OPEN

33 JB1071-HAI-04-ZZ-MA-W-00033 CVL INS236 Reinforcement Steel. Cut and Bend Steel 10 mm 14-Feb-23 OPEN

34 JB1071-HAI-04-ZZ-MA-W-00034 CVL INS262 U Bolt Rod Clamp (80 Pieces) 22-Feb-23 4-Mar-23 CLOSED RHDHV 1

26-FEB-23
35 JB1071-HAI-04-ZZ-MA-W-00035 ELE INS271 Bare Copper Conductor 120 mm2 (105 m) 25-Feb-23 Amessage CLOSED RHDHV 1
6-MAR-23

36 JB1071-HAI-04-ZZ-MA-W-00036 CVL INS272 Reinforcement Steel. Rebar Dia 25 mm 25-Feb-23 . OPEN


37 JB1071-HAI-04-ZZ-MA-W-00037 CVL INS283 Reinforcement Steel. Rebar Dia 25 mm 27-Feb-23 OPEN

38 JB1071-HAI-04-ZZ-MA-W-00038 CVL INS296 Reinforcement Steel. Rebar Dia 25 mm 5-Mar-23 OPEN

39 JB1071-HAI-04-ZZ-MA-W-00039 CVL INS302 Reinforcement Steel. Rebar Dia 10 & 20 mm 9-Mar-23 OPEN

40 JB1071-HAI-04-ZZ-MA-W-00040 CVL INS307 Reinforcement Steel. Rebar Dia 10 & 20 mm 12-Mar-23 OPEN

41 JB1071-HAI-04-ZZ-MA-W-00041 CVL INS312 Reinforcement Steel. Rebar Dia 10 mm 12-Mar-23 OPEN

42 JB1071-HAI-04-ZZ-MA-W-00042 ELE INS327 Earthing cable( Bare Copper Conductor 120 mm2 1000m 16-Mar-23 18-Mar-23 CLOSED RHDHV 1

43 JB1071-HAI-04-ZZ-MA-W-00043 CVL INS328 Reinforcement Steel. Rebar Dia 16 &20 mm 16-Mar-23 OPEN

44 JB1071-HAI-04-ZZ-MA-W-00044 CVL INS334 Reinforcement Steel. Rebar Dia 10 CUT & BEND 18-Mar-23 OPEN

45 JB1071-HAI-04-ZZ-MA-W-00045 CVL INS335 U BOLT ROD CLAMP( TYP GLV) – NOMINAL RO 18-Mar-23 19-Mar-23 OPEN
aMessage

46 JB1071-HAI-04-ZZ-MA-W-00046 CVL INS336 CONDUITPVC32MM2.9METER LENGTH HEAVY GAUGE BLACK 2, COUPLINGPVC32mm HEAVY 19-Mar-23 OPEN
GAUGE BLACK

47 JB1071-HAI-04-ZZ-MA-W-00047 CVL INS337 Reinforcement Steel. Rebar Dia 10 & 20mm CUT & BEND 20-Mar-23 OPEN

48 JB1071-HAI-04-ZZ-MA-W-00048 CVL INS344 Reinforcement Steel. Rebar Dia 16 & 20mm 20-Mar-23 OPEN

49 JB1071-HAI-04-ZZ-MA-W-00049 CVL INS346 NITOBOND, RENDEROC TG XTRA 21-Mar-23 OPEN

50 JB1071-HAI-04-ZZ-MA-W-00050 CVL INS348 Rebar Coupler (Repair Grip) for 25mm Rebar from Dextra Group 22-Mar-23 CLOSED RHDHV 1

51 JB1071-HAI-04-ZZ-MA-W-00051 CVL INS349 Plasti Board (Protection Board for Waterproofing Coating Paint)2m*1m*4mm thick. 22-Mar-23 OPEN

52 JB1071-HAI-04-ZZ-MA-W-00052 CVL INS354 Reinforcement Steel. Rebar Dia 10 mmCUTAND BEND &16 mm 22-Mar-23 OPEN

53 JB1071-HAI-04-ZZ-MA-W-00053 CVL INS355 FLEXSEAL GA700,FLEXSEALPU425 gray 22-Mar-23 OPEN

54 JB1071-HAI-04-ZZ-MA-W-00054 CVL INS356 BRUSHBOUND GRAY 23-Mar-23 OPEN

55 JB1071-HAI-04-ZZ-MA-W-00055 CVL INS368 Reinforcement Steel. Rebar Dia 20 mm 28-Mar-23 OPEN

56 JB1071-HAI-04-ZZ-MA-W-00056 CVL INS374 Rebar Coupler (Repair Grip) for 25mm Rebar from Dextra Group 30-Mar-23 OPEN

57 JB1071-HAI-04-ZZ-MA-W-00057 CVL INS386 NITOPROOF 10, (15 Drum each 200ML) 1-Apr-23 OPEN

58 JB1071-HAI-04-ZZ-MA-W-00058 CVL INS509 UPVC/PVC Pipes, Fittings and Pipe Lubricant 3-May-23 OPEN

59 JB1071-HAI-04-ZZ-MA-W-00059 ELE INS549 Reinforcement Steel. Rebar Dia 14 mm 8-May-23 OPEN

60 JB1071-HAI-04-ZZ-MA-W-00060 MECH INS565 Penguard Primer Comp A Penguard Comp B 10-May-23 OPEN
Epoxy primer (Internal and External coat) for Aeration Pipe embedded in Silo Slab.

61 JB1071-HAI-04-ZZ-MA-W-00061 MECH INS610 Steel Plate 3mm and 6mm for Aeration Pipe in Silos 23-May-23 OPEN

62 JB1071-HAI-04-ZZ-MA-W-00062 CVL INS621 Reinforcement Steel. 25-May-23 OPEN


Rebar Dia 10 mm, 25mm

63 JB1071-HAI-04-ZZ-MA-W-00063 MECH INS622 UPVC/PVC Pipes and Fittings 25-May-23 OPEN

64 JB1071-HAI-04-ZZ-MA-W-00064 CVL INS629 Reinforcement Steel. Rebar Dia 10 mm, 25mm 29-May-23 OPEN

65 JB1071-HAI-04-ZZ-MA-W-00065 MECH INS630 PPR Pipes and Test Plugs for hot and cold water supply 29-May-23 OPEN

66 JB1071-HAI-04-ZZ-MA-W-00066 MECH INS641 Penguard Primer Comp A Penguard Comp B 1-Jun-23 OPEN

1/ PVC Heavy Grade Round Conduit 25mm as per D.N


2/ PVC Coupling 25 mm as per D.N
3/ PVC Female Adaptor and pushing 25mm as per D.N
4/ PVC Heavy Grade Round Conduit 20mm as per D.N
67 JB1071-HAI-04-ZZ-MA-W-00067 ELE INS645 5/ PVC Coupling 20 mm as per D.N 4-Jun-23 4-Jun-23 OPEN
INS646 6/ PVC Female Adaptor and pushing 25mm as per D.N
7/ PVC Solvent Cement 250 ml as per D.N
8/ Schedule 40 PVC Conduit 4” as per D.N
9/ Schedule 40 PVC Conduit 4” as per D.N
10/ Bending Springs 20mm , 25mm as per D.N

68 JB1071-HAI-04-ZZ-MA-W-00068 MECH INS647 UPVC/PVC Pipes 25mm 4-Jun-23 OPEN

69 JB1071-HAI-04-ZZ-MA-W-00069 CVL INS656 Jotun Thinner No. 17 for Epoxy Primer 6-Jun-23 OPEN
70 JB1071-HAI-04-ZZ-MA-W-00070 CVL INS677 Reinforcement Steel. Rebar Dia 14 mm, 25mm 13-Jun-23 OPEN

71 JB1071-HAI-04-ZZ-MA-W-00071 CVL INS681 Reinforcement Steel. Rebar Dia 14 mm, 25mm 14-Jun-23 OPEN

72 JB1071-HAI-04-ZZ-MA-W-00072 CVL INS683 SUPERCAST PVC Watafoil 250XHD Water stop 40 Roll 14-Jun-23 OPEN

73 JB1071-HAI-04-ZZ-MA-W-00073 CVL INS684 Curing Compound WB309. (10 Drum) Renderoc TG Xtra.(100 Bags) 14-Jun-23 OPEN

1) U Bolt Rod Clamp as per D.N


2) Connector Clamp as per D.N
74 JB1071-HAI-04-ZZ-MA-W-00074 ELE INS685 3) Inspection Pit as per D.N 14-Jun-23 OPEN
4) Handle Clamp as per D.N
5) Threaded Copperbond Earth Rod as per D.N
6) T- Joint Mould as per D.N

75 JB1071-HAI-04-ZZ-MA-W-00075 MECH INS706 SILOS as per attached Packing Lists, (Included FAT) 20-Jun-23 OPEN

76 JB1071-HAI-04-ZZ-MA-W-00076 ELE INS707 Steel Back Boxes as per DN, FILT GUN RFURSE WELD 20-Jun-23 OPEN

77 JB1071-HAI-04-ZZ-MA-W-00077 MECH INS731 PPR Plumbing Accessories as per attached DN 25-Jun-23 OPEN

78 JB1071-HAI-04-ZZ-MA-W-00078 ELE INS761 Earthing cable (Bare Copper Conductor 120 mm2 2000m) 9-Jul-23 OPEN

79 JB1071-HAI-04-ZZ-MA-W-00079 MECH INS762 Anchor Bolts, Nuts and Washers as per Packing List 9-Jul-23 OPEN

80 JB1071-HAI-04-ZZ-MA-W-00080 MECH INS772 Awazel Primer D41, Waterproofing Membrane PY 40200L. 11-Jul-23 OPEN

81 JB1071-HAI-04-ZZ-MA-W-00081 CVL INS786 Waterproofing Membrane PY 40200L, Mattex Geomat Geotextile. Conbextra HF, Conbextra EP150 12-Jul-23 OPEN

82 JB1071-HAI-04-ZZ-MA-W-00082 CVL INS807 BITUCELL (Fiberboard) (80 Sheets) 17-Jul-23 OPEN

83 JB1071-HAI-04-ZZ-MA-W-00083 CVL INS819 POLYETHYLENE SHEET 250 micron (150 ROLLS) 19-Jul-23 OPEN

84 JB1071-HAI-04-ZZ-MA-W-00084 CVL INS855 Reinforcement Steel. Rebar Dia 32 mm 29-Jul-23 OPEN

85 JB1071-HAI-04-ZZ-MA-W-00085 CVL INS869 Waterproofing Membrane PY 40200L, Awazel MS 40 Protection Board, Awazel Primer D41 30-Jul-23 OPEN

86 JB1071-HAI-04-ZZ-MA-W-00086 CVL INS870 Reinforcement Steel.Rebar Dia 25 mm as per DN 31-Jul-23 OPEN

Penguard Primer Comp A Penguard Comp B


87 JB1071-HAI-04-ZZ-MA-W-00087 CVL INS871 Epoxy primer (Internal and External coat) for Aeration Pipe embedded in Silo Slab and Angles 31-Jul-23 OPEN
Frames.

88 JB1071-HAI-04-ZZ-MA-W-00088 CVL INS872 Curing Compound WB309. (10 Drum) 31-Jul-23 OPEN
Brushbond.(39 Bags)

89 JB1071-HAI-04-ZZ-MA-W-00089 CVL INS879 Plasti Board (Protection Board for Waterproofing Coating Paint)2m*1m*4mm thick. (2000 Nos.) 2-Aug-23 OPEN

90 JB1071-HAI-04-ZZ-MA-W-00090 CVL INS890 Conbextra HF Grout for Piling 2-Aug-23 OPEN

91 JB1071-HAI-04-ZZ-MA-W-00091 CVL INS881 Reinforcement Steel. Rebar Dia 14 mm as per DN 3-Aug-23 OPEN

Awazel MS 40 Protection Board,


92 JB1071-HAI-04-ZZ-MA-W-00092 CVL INS934 Awazel PY40 L200 Membrane, 13-Aug-23 OPEN
Mattex Geomatt NPS 14 Geotextile.

93 JB1071-HAI-04-ZZ-MA-W-00093 CVL INS964 Conbextra TS, Brushbond Grey. 19-Aug-23 OPEN

94 JB1071-HAI-04-ZZ-MA-W-00094 CVL INS965 Reinforcement Steel. Rebar Dia 12 mm, 25mm as per DN 19-Aug-23 OPEN

95 JB1071-HAI-04-ZZ-MA-W-00095 CVL INS975 MRC O –Type Rebar Coupler for 25 mm Rebar as per DN 21-Aug-23 OPEN

96 JB1071-HAI-04-ZZ-MA-W-00096 CVL INS976 Reinforcement Steel. Rebar Dia 12 mm, 20mm and 25mm as per DN 21-Aug-23 OPEN

97 JB1071-HAI-04-ZZ-MA-W-00097 CVL INS1003 Reinforcement Steel. 26-Aug-23 OPEN


Rebar Dia 20 mm as per DN

98 JB1071-HAI-04-ZZ-MA-W-00098 CVL INS1036 Reinforcement Steel. Rebar Dia 12 mm and 14 mm as per DN 30-Aug-23 OPEN
99 JB1071-HAI-04-ZZ-MA-W-00099 CVL INS1037 Grout Conbextra TS.170 bags 30-Aug-23 OPEN

100 JB1071-HAI-04-ZZ-MA-W-00100 MECH INS1118 Anchor Bolts, Nuts and Washers as per Packing List 14-Sep-23 OPEN

Submittals Statuse

Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.


Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
Non-Conformance Report - NCR - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION


Project JB1071

Action & Review of Action


SN Ref. Number ASITE CONC # DISCIPLINE Title Issued Date WIR DATE CLOSED Status Remarks NCR Issued by
Preventative Date Date

1 JB1071-RHD-04-XX-QC-Z-0001 REC002 CVL Lack of Contractor's Direct Supervision / No 28-Nov-22 18-Dec-22


Site Engineers

2 JB1071-RHD-04-XX-QC-Z-0002 CVL Non-approved Batch Plant Materials 29-Nov-22 12-Dec-22

3 JB1071-RHD-04-XX-QC-Z-0003 REC003 CVL Fine Aggregates Arrived on-site Without any 3-Dec-22 18-Dec-22
Delivery Documents

4 JB1071-RHD-04-XX-QC-Z-0004 REC005 CVL Non Provision of Qualified Paramedics/First 4-Dec-22 18-Dec-22


Aid Personnel at Site

5 JB1071-RHD-04-XX-NC-Z-0005 CVL Appointment of Environmental Protection 5-Dec-22


Officer (EPO)

6 JB1071-RHD-04-XX-NC-Z-0006 CVL Out of Position Piles in Silo-06 5-Dec-22 12-Dec-22

7 JB1071-RHD-04-XX-NC-Z-0007 REC006 CVL Failure to Appoint Site-based Design 10-Dec-22 24-Dec-22


Manager (or Design Coordinator)

8 JB1071-RHD-04-XX-NC-Z-0008 Poor Internet Facility in the Engineer's Site 10-Dec-22


Offices
Copies of Standards, Codes of Practice and
9 JB1071-RHD-04-XX-NC-Z-0009 other Publications 12-Dec-22

10 JB1071-RHD-04-XX-NC-Z-0012 ECOM315 CVL Plastic Board Installation of Admin Building 2-Apr-23

11 JB1071-RHD-04-XX-NC-Z-0013 ECOM316 CVL Damage Waterproofing coating at Silos Area 2-Apr-23

Damaged Plasti-board at Silos Raft


12 JB1071-RHD-04-XX-NC-Z-0014 ECOM340 CVL Foundations 10-May-23

Unsafe Conditions During Construction of


13 JB1071-RHD-04-XX-NC-Z-0016 ECOM390 CVL Flat Storage Tunnel 17-Jul-23

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV com
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot
Code 4: For information’.
Site Instruction Request -SI - Log

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071

SN Number DISCIPLINE Title Issued Date Close Date Issued by Eng. Remarks

Workshop & Spare Parts (Plan, Elevation & Section)


Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorpo
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notati
Request for Information - RFI - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION


Project JB1071
Dates
S. No. Originator RFI Ref. Number DISCIPLINE Revision Number Description Status Remarks
Submission Date Resovled Date

1 HAIF EMAIL DATED 30-05-22 GENERAL 00 SITE LAYOUT CORDINATES 30-May-22 1-Jun-22 R&R

2 HAIF JB1071-HAIF-DU-00-RI-K-LT-0001 ELE 00 EXISTING MV CABLE @ PROJECT 23-Jun-22 23-Jun-22 Closed

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
As Built Drawing Submital - AB - Log Sheet

ProgramYANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.00 Rev.01 Rev.02 Rev.03 Rev.04 Rev.05

SN Sub. Ref. Number DISCIPLINE Title DWG Number Ref. Shop DWG Number Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Status Doc. Status Eng. Rev Final status/Comments

Workshop & Spare Parts (Plan, Elevation &


Section)

Fosroc Brushbond Protective Coating for Blinding of Process Building


Revised
Engineering &
Design Schedule
A Approved
Submittals Statuse B Approved as noted
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed. C Re-submit
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER. D Rejected
Method of Statement Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 REV-P01 REV-P02 REV-P03 REV-P04 REV-P05

Days
SN Submittal Ref. Number DISCIPLINE ID CODE DOCUMENTS Number Title Issued Date Response Date
Open
Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Days Open Status Doc. Status Eng.Rev Final Statuse/Remarks

CONC190
REF. THRU EMAIL 6/22/2022
1 CVL CONC398 JB1071-HAI-COS-04-ZZ-MS-W-0030 DESIGN METHOD OF STATEMENT 14-May-22 39 28-Jul-22 8-Aug-22 11 12-Sep-22 27-Sep-22 15 3-Nov-22 12-Nov-22 9 5-Jan-23 20-Jan-23 15 2 CLOSED RHDHV 2
JB1071-HAI-TR-0030 6/28/2022 NEED COMMENTS
CONC674 LETTER
JB-1071-HAIF-02-ZZ-LT-S-0001
2 JB1071-HAIF-02-XX-LT-S-0003 CVL CONC009 ------ METHOD OF STATEMENT FOR BOREHOLE. 28-May-22 20-Jun-22 2 CLOSED RHDHV 2

METHOD OF STATEMENT FOR SITE PREPARATION, EXCAVATION &


3 JB-1071-HAIF-EW-ZZ-LT-C-0001 CVL ------ BACKFILLING.
29-May-22 7-Jun-22 9 2 CLOSED RHDHV 2

4 JB-1071-HAI-TR-0005 CVL CONC192 ------ METHOD OF STATEMENT FOR CONCRETE WORK 3-Jul-22 15-Jul-22 12 13-Sep-22 9-Oct-22 26 2 CLOSED RHDHV 2

CONC151
5 JB1071-HAI-TR-00050 CVL CONC206 JB1071-HAI-04-ZZ-MS-W-00050 METHOD STATEMENT OF BORED CAST IN SITU PILES (STROMEK) 31-Aug-22 8-Sep-22 8 18-Sep-22 27-Sep-22 9 2 CLOSED RHDHV 2

CONC168
6 JB1071-HAI-TR-00054 CVL CONC202 JB1071-HAI-04-ZZ-MS-W-00054 METHOD STATEMENT OF BORED CAST IN SITU PILES (JEDDDAH ) 5-Sep-22 10-Sep-22 5 17-Sep-22 20-Sep-22 3 2 CLOSED RHDHV 2

JB1071-HAIF-04-XX-LT-W-1030 CONC275
7 JB1071-HAIF-04-XX-LT-W-1047 CVL CONC388 JB1071-HAIF-04-XX-MS-W-1030 METHOD STATEMENT FOR PILE LOAD TEST (NON-WORKING PILE) 5-Oct-22 8-Oct-22 3 1-Nov-22 29-Dec-22 58 1 CLOSED RHDHV 1

8 JB-1071-HAI-TR-00112 CVL CONC551 JB1071-HAI-04-XX-MS-W-00112 METHOD STATEMENT FOR PILE INTEGRITY TEST 8-Dec-22 18-Dec-22 10 1 CLOSED RHDHV 1

9 JB-1071-HAI-TR-00120 CVL CONC599 JB1071-HAI-04-XX-MS-W-00120 METHOD STATEMENT FOR PILE LOAD TEST OF WORKING PILE 20-Dec-22 24-Dec-22 4 1 CLOSED RHDHV 1

10 JB-1071-HAI-TR-00121 CVL CONC603 JB1071-HAI-04-XX-MS-W-00121 METHOD STATEMENT FOR PILE HEAD BREAKING 20-Dec-22 27-Dec-22 7 1 CLOSED RHDHV 1

11 JB-1071-HAI-TR-00122 CVL CONC618 JB1071-HAI-04-XX-MS-W-00122 METHOD STATEMENT FOR TERMITE CONTROL 26-Dec-22 4-Jan-23 9 1 CLOSED RHDHV 1

Method Statement for Cementitious Waterproofing for


12 JB-1071-HAI-TR-00168 CVL CONC762 JB1071-HAI-04-XX-MS-W-00168 Piling Cap
28-Jan-23 OPEN

Method Statement for Installation of Earthing, Bonding & Lightning


13 JB-1071-HAI-TR-00185 ELE CONC776 JB1071-HAI-04-XX-MS-W-00185 Protection System
30-Jan-23 OPEN

14 JB1071-HAI-TR-00188 CVL CONC781 JB1071-HAI-04-XX-MS-W-00188 METHOD STATEMENT FOR STATIC LOAD TEST [WORKING PILE]. 31-Jan-23 18-Mar-23 1 CLOSED RHDHV 1

15 JB1071-HAI-TR-00196 CVL CONC810 JB1071-HAI-04-XX-MS-W-00196 Method Statement for Liquid Applied Bituminous Damp Proofing 6-Feb-23 OPEN

CONC958 14-Mar-23
9-Apr-23
15-Apr-23
CONC1105 aMessage aMessage
16 JB1071-HAI-TR-00249 CVL CONC1318 JB1071-HAI-04-XX-MS-W-00249 Method Statement for Dewatering Works 8-Mar-23
27-MAR-23
aMessage
14-May-23
1-Jun-23 21-Jun-23 R&R 3
18-Apr-23
CONC1334 CODE-3 CODE-3

CONC959 13-Mar-23 15-Apr-23


CONC1102
METHOD STATEMENT FOR SHORING SYSTEM CONSISTING OF aMessage aMessage
17 JB1071-HAI-TR-00250 CVL CONC1320 JB1071-HAI-04-XX-MS-W-00250 8-Mar-23 9-Apr-23 1-Jun-23 21-Jun-23 19-Aug-23 22-Aug-23 OPEN
SHEET PILES SYSTEM 27-MAR-23 14-May-23
CONC1335 CODE-3 CODE-3
CONC1727

18 JB1071-HAI-TR-00329 ELE CONC1291 JB1071-HAI-04-XX-MS-W-00329 Method of Statement for Installation of PVC Conduit 28-May-23 4-Jun-23 CLOSED RHDHV 2

Method Statement for


the Installation of
Under/Above Ground
19 JB1071-HAI-TR-00332 MECH CONC1301 JB1071-HAI-04-XX-MS-W-00332 Drainage and Vent
29-May-23 OPEN
Piping System & Water
Supply – PVC Pipes

CONC1321 Method Statement and Risk Assessment for fabrication, Sand


20 JB1071-HAI-TR-00340 MECH JB1071-HAI-04-XX-MS-W-00340 31-May-23 4-Jun-23 24-Jul-23 OPEN
CONC1599 Blasting & Epoxy Coating.

Process Method Statement and Risk Assessment for Assembly & Installation of 21-JUNE-23
21 JB1071-HAI-TR-00349 Building CONC1362 JB1071-HAI-04-XX-MS-W-00349 Storage Silos, Cat Walk and Bagging Bins.
6-Jun-23 20-Jun-23
aMessage
OPEN

Method Statement and Risk Assessment for Static Pile Load Test
22 JB1071-HAI-TR-00364 CVL CONC1401 JB1071-HAI-04-XX-MS-W-00364 at Flat Storage (Working Pile)
13-Jun-23 21-Jun-23 CLOSED 1

Method Statement and Risk Assessment for Concrete works and 25-June-23
02-JULY-23
23 JB1071-HAI-TR-00381 CVL COCN1453 JB1071-HAI-04-XX-MS-W-00381 Application of Bituminous Waterproofing Membrane at below 16-July-23
Amessage
OPEN
ground level of Head House 1, Transfer Tower 2 and Flat Storage aMessage

24 JB1071-HAI-TR-00396 CVL CONC1516 JB1071-HAI-04-XX-MS-W-00396 Method Statement for Steel Erection Works (Zamil) 12-Jul-23 23-Jul-23 CLOSED 2

25 JB1071-HAI-TR-00408 CVL CONC1543 JB1071-HAI-04-XX-MS-W-00408 MS and RA for Flat Storage Dewatering 17-Jul-23 21-Aug-23 CLOSED 1

26 JB1071-HAI-TR-00463 CVL CONC1659 JB1071-HAI-04-XX-MS-W-00463 Method Statement and Risk Assessment for Water Test on Silos 5-Aug-23 OPEN
Method Statement and Risk Assessment for 14-Sep-23
27 JB1071-HAI-TR-00526 CVL CONC1835 JB1071-HAI-04-XX-MS-W-00526 Construction of Flat Storage Tunnel
12-Sep-23
aMessage
OPEN

28 JB1071-HAI-TR-00533 CVL CONC1849 JB1071-HAI-04-XX-MS-W-00533 Method Statement and Risk Assessment for Flat Storage Walls Slipform 13-Sep-23 14-Sep-23 CLOSED 2

Method Statement and Risk Assessment for Removing


29 JB1071-HAI-TR-00537 CVL CONC1855 JB1071-HAI-04-XX-MS-W-00537 Sheet Piles for Head House-1
14-Sep-23 14-Sep-23 CLOSED 2

Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the EMPLOYER.
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.

Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-16, SP6-32 and SP12-19, SP12-36.
INSPECTION AND TEST PLAN ( ITP) LOG SHEET

Program YANBU GRAIN TERMINAL CONSTRUCTION

Project JB1071 Rev.P01 Rev.P02 Rev.P03

Days
SN Submittal Ref. Number Ducoments Ref. Number ID CODE Title Issued Date Response Date Days Open Issued Date Response Date Days Open Issued Date Response Date Status Doc. Status Eng.Rev Final status/Comments
Open

1 JB1071-HAI-TR-0012 JB1071-HAI-04-XX-QC-C-0012 CONC073 Cast In Situ Concrete Works 14-Jul-22 30-Jul-22 16 6-Aug-22 26-Aug-22 20 2 CLOSED RHDHV 2

21-Jul-22 26-Jul-22
2 JB1071-HAI-TR-0013 JB1071-HAI-04-XX-QC-C-0013 ECOM019 Excavation & Backfilling 14-Jul-22 7 26-Aug-22 R&R
25-Jul-22 7-Aug-22

3 JB1071-HAI-TR-00075 JB1071-HAI-04-XX-QC-C-00075 CONC345 BORE PILE CONSTRUCTION 24-Oct-22 30-Oct-22 6 20-Nov-22 3-Dec-22 13 R&R
CONC468
SUPERSEDE

4 JB1071-HAIF-04-XX-LT-W-1051 JB1071-HAIF-04-XX-QC-C-1051 CONC412 List of ITP's Covering whole of the Work's 7-Nov-22 OPEN

5 JB1071-HAI-TR-00366 JB1071-HAIF-04-XX-QC-C-00366 CONC1407 ITP for AREATION TUBE and ANGLE FRAMES 14-Jun-23 OPEN

6 JB1071-HAI-TR-00367 JB1071-HAIF-04-XX-QC-C-00367 CONC1406 ITP for EARTHING and LIGHTNING PROTECTION SYSTEM 14-Jun-23 OPEN

7 JB1071-HAI-TR-00379 JB1071-HAIF-04-XX-QC-C-00379 CONC1449 ITP for CONCEAL PVC CONDUIT & 22-Jun-23 12-Jul-23 OPEN
CONC1508 FITTINGS INSTALLATION
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV comments/notation; work can proceed only with the agreement of the
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot proceed.
Code 4: For information’.
SITE OBSERVATION - Log Sheet

Program YANBU GRAIN TERMINAL CONSTRUCTION


Project JB1071

Action & Review of Action


SN Ref. Number ASITE CONC # DISCIPLINE Title Issued Date WIR DATE CLOSED Status Remarks NCR Issued by
Preventative Date Date

1 JB1071-RHD-04-XX-SO-Z-0001 CVL Trail Mix Design v/s Working Piles - 7 Days 5-Dec-22
Concrete Compression Results

2 JB1071-RHD-04-XX-SO-Z-0002 CVL Concrete Waiting Time on Site 5-Dec-22

3 JB1071-RHD-04-XX-SO-Z-0003 CVL Piling Rigs v/s Production of Piles 6-Dec-22

4 JB1071-RHD-04-XX-SO-Z-0004 CVL Concrete Transit / Waiting Time 6-Dec-22

Concrete Transit / Waiting time;


5 JB1071-RHD-04-XX-SO-Z-0005 CVL Slump test v/s Pouring start time; 13-Dec-22
Max. Aggr size in delivered RMC;
PILE ID #SP12-12

8
Submittals Statuse
Code 1: ‘Consent’ as submitted without comments/notation; work may proceed.
Code 2: ‘Consent’ subject to implementation of RHDHV comments/notation; Re-submission to incorporate RHDHV com
Code 3: ‘No Consent’ and being subject to full re-submission in response to RHDHV's comments/notation; work cannot
Code 4: For information’.
YGT LOG SUMMARY
Submission
Sr.No. Transmittal DISCIPLINE Description Approval Date Status FINAL STATUS Remarks
Date

DESIGN DRAWINGS SUMMARY


CONTRACTOR & CLIENT SITE OFFICES LAYOUT PLAN
1 JB1071-HAIF-CI-XX-DR-T-0001 GENERAL 5-Jun-22 7-Jun-22 CLOSED CODE-2
(MOBILIZATION)

2 JB1071-HAIF-03-ZZ-DR-S-0001 CVL PROPOSED BOREHOLE LAYOUT 20-Jun-22 28-Jun-22 CLOSED CODE-2

JB1071-HAIF-04-XX-LT-W-1038 (P13) GENERAL GENERAL LAYOUT MASTER PLAN P13 19-Oct-22 9-Nov-22 CLOSED CODE-1
3
JB1071-HAI-TR-00092_(P14) GENERAL PROPOSED SCALE BUILDING LOCATION _P14 13-Nov-22 16-Nov-22 R&R CODE-3

Email Dated 27 April 22 Rev.00


4 ARC PROJECT SIGNBOARD 7-May-22 9-May-22 CLOSED CODE-1
Email Dated 07 May 22 Rev.01
Email Dated 08 May 22 Rev.00 SITE ENTRANCE & TEMPORARY SECURITY FENCE PROPOSAL
5 GENERAL 19-May-22 29-Jun-22 CLOSED CODE-2
Email Dated 19 May 22 Rev.01 PLAN

6 Email Dated 21 May 22 Rev.00 GENERAL REVISE SITE LAYOUT (LAND BOUNDARY LINE) 21-May-22 22-May-22 CLOSED CODE-1

7 JB1071-HAI-TR-0007 CVL TOPOGRAPHIC SURVEY DRAWING 6-Jul-22 CLOSED Information

8 JB1071-HAI-TR-0009 ARC GUARD ROOM (PLANS,ELEVATION & SECTION) 2-Nov-22 7-Nov-22 CLOSED CODE-2

9 JB1071-HAI-TR-0010 ARC MAIN TRUCK GATE (PLANS, ELEVATIONS & SECTION) 2-Nov-22 5-Nov-22 CLOSED CODE-2

10 JB1071-HAI-TR-0023 ARC MOSQUE & CANTEEN (PLAN, ELEVATION & SECTION) 25-Jul-22 28-Jul-22 R&R CODE-3

11 JB1071-HAI-TR-0024 ARC DRIVER FACILITIES (PLAN, ELEVATION & SECTION) 26-Dec-22 31-Dec-22 CLOSED CODE-1

12 JB1071-HAI-TR-0025 ARC WORKSHOP & SPARE PARTS (PLAN, ELEVATION & SECTION) 29-Dec-22 1-Jan-23 CLOSED CODE-1

JB1071-HAI-TR-0026
13 ARC SCALE BUILDING (PLANS, ELEVATION & SECTION) 17-Oct-22 11-Nov-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1034

JB1071-HAI-TR-0027
14 ARC PUBLIC TOILETS (PLANS, ELEVATION & SECTION) 17-Oct-22 12-Nov-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1034

TRUCK MAIN GATE BUILDING ISOMETRIC VIEW


15 JB1071-HAIF-04-XX-LT-W-1024 ARC PUBLIC TOILETS ISOMETRIC VIEW 2-Oct-22 17-Oct-22 R&R CODE-3
WORKSHOP & SPARE PARTS ISOMETRIC VIEW

16 -------------- ARC PROPOSAL FOR ADMINSTRATION COMPLEX 3-Oct-22 5-Oct-22 CLOSED CODE-2

17 JB1071-HAI-TR-00051 STR SILOS PILE LAYOUT & DETAILS 9-Nov-22 15-Nov-22 CLOSED CODE-2

18 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 CODE-2

19 JB1071-HAI-TR-00088 ELE MEDIUM VOLTAGE POWER SINGLE LINE DIAGRAM 1-Dec-22 6-Dec-22 R&R CODE-3
JB1071-HAIF-04-XX-LT-W-1062

20 JB1071-HAI-TR-00096 CVL SILOS PILE COORDINATE 15-Dec-22 19-Dec-22 CLOSED Information

Process PLO CONCEPT TRUCK INTAKE / HEAD HOUSE1, TT1 & TT2 _P01
21 JB1071-HAI-TR-00097 Equipment 6-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing 'PLO DESIGN DRAWING TRUCK INTAKE / HEAD HOUSE1, TT1 & TT2 _P02

Process
22 JB1071-HAI-TR-00098 Equipment PLO TRUCK LOADING / BAGGING 6-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing

Process
23 JB-1071-HAI-TR-00099 Equipment STEEL SILOS & DOCUMENTS 19-Nov-22 11-Dec-22 CLOSED CODE-2
Drawing

24 JB1071-HAI-TR-00100 GENERAL PROPOSED SCALE BUILDING LOCATION 29-Dec-22 R&R CODE-3

25 JB1071-HAI-TR-00101 STR ADMIN BUILDING STR 21-Dec-22 1-Jan-23 CLOSED CODE-2

26 JB1071-HAI-TR-00107 STR MAIN TRUCK GATE STR 29-Nov-22 7-Dec-22 CLOSED CODE-2

27 JB1071-HAI-TR-00108 STR GUARD ROOM STR 29-Nov-22 7-Dec-22 CLOSED CODE-2

Process
28 JB1071-HAI-TR-00109 Equipment CIV HEAD HOUSE, TRUCK INTAKE & TRANSFER TOWER 1 & 2 6-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing

Process
29 JB1071-HAI-TR-00113 Equipment CIV Bagging Station 10-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing

Process
30 JB1071-HAI-TR-00114 Equipment CIV Silos Storage 10-Dec-22 13-Dec-22 CLOSED CODE-1
Drawing

Process PLO CONCEPT


31 JB1071-HAI-TR-00115 Equipment DRAWING 13-Dec-22 15-Dec-22 CLOSED CODE-1
Drawing SHIP INTAKE
Process
32 JB1071-HAI-TR-00116 Equipment PLO DESIGN SILOS STORAGE 14-Dec-22 15-Dec-22 CLOSED CODE-1
Drawing

Process
PLO DESIGN
33 JB-1071-HAI-TR-00117 Equipment 14-Dec-22 15-Dec-22 CLOSED CODE-1
BAGGING STATION
Drawing

Process
PLO DESIGN DRAWING
34 JB1071-HAI-TR-00118 Equipment 20-Dec-22 20-Dec-22 CLOSED CODE-1
SHIP INTAKE
Drawing

Process
CIV DESIGN DRAWINGS
35 JB1071-HAI-TR-00119 Equipment 20-Dec-22 20-Dec-22 CLOSED CODE-1
SHIP INTAKE
Drawing

Process
36 JB1071-HAI-TR-00124 Equipment CIV DESIGN DRAWING FLAT STORAGE 26-Dec-22 CLOSED
Drawing

Process
37 JB1071-HAI-TR-00125 Equipment PLO DESIGN DRAWING FLAT STORAGE 26-Dec-22 CLOSED
Drawing

POWER SLD
38 JB1071-HAI-TR-00127 ELE 27-Dec-22 CLOSED
SS2, SS3 & SS4 & SS5

28-Dec-23
39 JB1071-HAI-TR-00129 STR SILOS FOUNDATION & SLAB CLOSED
8-Feb-23 (aMessage)

40 JB1071-HAIF-04-XX-LT-W-1080 ELE MV POWER SINGLE LINE DIAGRAM 31-Dec-22 R&R

1-JAN-23
CONC653
13-FEB-23
41 JB-1071-HAI-TR-00133 MECH. ADMIN BLDG. HVAC drawings CLOSED
aMessage
05-MAR-23
aMessage

42 JB-1071-HAI-TR-00134 ARC ADMIN BLDG. ARCHITECTURAL 1-Jan-23 CLOSED CODE-1

1-JAN-23
JB1071-HAI-TR-00135_P01
43 MECH. SCALE BUILDING MECHANICAL 2-FEB-23 CLOSED
JB1071-HAI-TR-00312_P02
aMessage

44 JB1071-HAI-TR-00136 MECH. MAIN TRUCK GATE MECHANICAL 1-Jan-23 CLOSED

45 JB1071-HAI-TR-00145 STR STEEL STRUCTURE GENERAL NOTES 8-Jan-23 CLOSED

46 JB1071-HAI-TR-00147 CVL GENERAL NOTES & DETAILS FOR CIVIL WORK 9-Jan-23 CLOSED

47 JB1071-HAI-TR-00148 STR FLAT STORAGE PILES COORDINATES 9-Jan-23 CLOSED

Document Submittals - DCS- Log Sheet

1 JB1071-HAIF-COS-00-ZZ-BIM-Z-T-0001 BIM EXECUTION PLAN 22-Nov-22


Revised Engineering & Design Schedule
CLOSED CODE-2

2 Email Dated 21-May-22 CV OF THE HSE MANAGER 21-May-22 30-May-22 CLOSED CODE-2

CONTRACTOR'S KEY PERSONNEL PROJECT CONTROL


3 Email Dated 26-May-22 26-May-22 29-Jun-22 CLOSED CODE-2
MANAGER

4 JB1071-HAIF-01-ZZ-LT-C-0001 QUALITY MANAGEMENT PLAN 24-Nov-22 OPEN


JB-1071-HAI-TR-0006 QUALITY MANAGEMENT PLAN (DRS)

5 JB1071-HAIF-ZZ-XX-LT-G-0001 CALIBRATION CERTIFICATE FOR SURVEY EQUIPMENT. 31-May-22 CLOSED Information

6 JB1071-HAIF-04-XX-LT-W-0002 CONTRACTOR'S CAR POLICY NO. P/300/3601/22/000044 22-Jun-22 30-Jun-22 R&R CODE-3

7 JB1071-HAIF-01-XX-SH-C-0002 SUBMISSION OF MILESTONE SCHEDULE 2-Jun-22 2-Jun-22 CLOSED Information

8 JB1071-HAIF-ZZ-XX-HS-T-0001 HSE MANAGEMENT PLAN 5-Jun-22 22-Jun-22 CLOSED CODE-2

9 JB1071-HAIF-00-XX-ER-Z-T-0001 OFFICE FURNITURE SELECTION 8-Jun-22 9-Jun-22 CLOSED CODE-2

10 JB1071-HAIF-04-ZZ-SH-W-0001 BASE LINE PROJECT SCHEDULE 4-Sep-22 18-Sep-22 R&R CODE-3

11 JB1071-HAIF-04-XX-LT-W-0003 CONTRACTOR'S KEY PERSONNEL (CONSTRUCTION MANAGER) 13-Jun-22 20-Jun-22 CLOSED CODE-2

12 JB1071-HAIF-04-XX-LT-W-0004 CONTRACTOR'S KEY PERSONNEL (QA / QC MANAGER) 20-Jun-22 22-Jun-22 CLOSED CODE-2

JB1071-HAIF-01-ZZ-HS-P-T-0001
13 EMERGENCY RESPOSE PLAN 1-Sep-22 CLOSED
JB1071-HAI-TR-00052
14 JB1071-HAIF-ZZ-XX-ER-LT-W-0002 TRANSPORT FOR ENGINEER/ EMPLOYER. 29-Jun-22 4-Jul-22 CLOSED CODE-2

15 JB1071-HAI-TR-0020 LIFTING PLAN FOR SITE OFFICE PORTA CABIN 24-Jul-22 25-Jul-22 R&R CODE-3

16 JB1071-HAI-TR-0022 FIRST AID PERSONNEL RESUME' 25-Jul-22 8-Sep-22 R&R CODE-3

17 JB1071-HAI-TR-0031 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN 22-Nov-22 CLOSED

18 JB1071-HAI-TR-00042 KEY PERSONNEL ENVIRONMENTAL MANAGER RESUME 10-Aug-22 14-Aug-22 CLOSED CODE-2

19 JB1071-HAIF-ZZ-XX-ER-LT-W-0005 PROPOSAL FOR ADMINISTRATION BUILDING 11-Aug-22 CLOSED Information

20 JB1071-HAI-TR-00046 TRAFFIC MANAGEMENT PLAN 18-Dec-22 CLOSED CODE-2

JB1071-HAIF-01-XX-LT-W-1003
JB1071-HAI-TR-00047
ORGANIZATION CHART 10-Nov-22 21-Nov-22 OPEN CODE-3
JB1071-HAIF-04-XX-LT-W-1033
21 JB1071-HAIF-04-XX-LT-W-1054

JB1071-HAIF-04-XX-LT-W-1053 QA/QC ORGANIZATION CHART 10-Nov-22 27-Nov-22 OPEN CODE-3

GEOTECHNICAL SITE INVESTIGATION REPORT FOR SILOS AREA


22 JB-1071-HAI-TR-00049 30-Aug-22 12-Sep-22 CLOSED CODE-2
BY ACES

23 JB1071-HAI-TR-00057 RISK ASSESSMENT MATRIX 8-Nov-22 CLOSED Information

24 JB1071-HAIF-04-XX-LT-W-1014 CONTRACTOR'S KEY PERSONNEL DESIGN COORDINATOR CV 19-Sep-22 3-Oct-22 CLOSED CODE-2

25 JB1071-HAIF-04-XX-LT-W-1019 PROCESS EQUIPMENT DOCUMENTS FOR APPROVAL (BUHLER) 25-Sep-22 27-Oct-22 CLOSED CODE-2

GEOTECHNICAL SITE INVESTIGATION REPORT FOR ALL AREA


26 JB1071-HAI-TR-00061 29-Sep-22 4-Oct-22 CLOSED CODE-2
BY ACES

JB1071-HAIF-04-XX-LT-W-1029
JB1071-HAIF-04-XX-LT-W-1036
27 CONCRETE DURABILITY REPORT 16-Nov-22 28-Nov-22 CLOSED CODE-2
JB1071-HAIF-04-XX-LT-W-1058
JB-1071-HAI-TR-00130

28 JB1071-HAIF-04-XX-LT-W-1032 DESIGN MANAGEMENT PLAN 11-Oct-22 26-Oct-22 CLOSED CODE-2

29 JB1071-HAI-TR-00067 ENVIRONMENTAL ASPECT & IMPACT REGISTER 15-Oct-22 25-Oct-22 CLOSED CODE-1

COARSE AGGREGATES AND FINE AGGREGATES SAMPLES TEST


30 JB1071-HAI-TR-00082 1-Nov-22 5-Nov-22 R&R CODE-3
REPORTS

31 JB1071-HAI-TR-00091 STORAGE MANAGEMENT PLAN 4-Dec-22 7-Dec-22 CLOSED CODE-1

32 JB1071-HAI-TR-00104 METHOD STATEMENT LIST 24-Nov-22 OPEN

33 JB1071-HAI-TR-00105 SECURITY MANAGEMENT PLAN 26-Nov-22 CLOSED

FOR
34 JB1071-HAI-TR-00106 LIST OF MATERIALS WITH FREQUENCY OF TESTS 27-Nov-22 CLOSED INFORMATION
AND RECORD

35 JB1071-HAIF-04-XX-LT-W-1068 NIGHT WORK ACTIVITY PLAN 1-Dec-22 OPEN

36 JB1071-HAI-TR-00110 PRELIMINARY PILE LOAD TEST REPORT (SILOS AREA) 4-Dec-22 CLOSED

JB1071-HAIF-04-XX-LT-W-1075
37 REVISED ENGINEERING & DESIGN SCHEDULE 22-Dec-22 CLOSED
JB-1071-HAI-TR-00132

38 JB1071-HAIF-04-XX-LT-W-1076 Recovery Schedule 26-Dec-22 OPEN

39 JB1071-HAI-04-ZZ-TR-W-00123 Concrete Durability Tests Reports (GAC and Saudi Read Mix) 26-Dec-22 CLOSED

JB1071-HAIF-04-XX-LT-W-1023
40 Scope Delivery Responsibility Matrix 2-Oct-22 CLOSED
JB-1071-HAI-TR-00128
FOR
41 JB-1071-HAI-TR-00137 Concrete Durability Tests Reports (Saudi Read Mix Concrete) 2-Jan-23 CLOSED INFORMATION
AND RECORD
FOR
attached with WIR JB1071-HAI-04-ZZ-WIR-W-
42 Soil Samples Tests Reports (Admin Building and Silos Area) 5-Jan-23 CLOSED INFORMATION
00077
AND RECORD
FOR
43 JB-1071-HAI-TR-00142 Concrete Durability Tests Report (GAC Read Mix Concrete) 7-Jan-23 CLOSED INFORMATION
AND RECORD
FOR
44 JB-1071-HAI-TR-00143 Soil Samples Tests Reports (Silos Area) 7-Jan-23 CLOSED INFORMATION
AND RECORD
FOR
45 JB-1071-HAI-TR-00144 Soil Samples Tests Reports (Admin Building) 7-Jan-23 CLOSED INFORMATION
AND RECORD
Sub Contractor-(Prequalification) - PQA-Log Sheet
1 JB1071-HAIF-02-XX-RS-S-0002 CIVIL ACES PQ DOCUMENTS 6-Apr-22 12-Apr-22 CLOSED CODE-1

2 Email Dated -8 May 22 General DESIGNER M/S COSMOS 8-May-22 4-Jul-22 CLOSED CODE-2

3 JB1071-HAIF-03-ZZ-QC-C-0001 CIVIL PREQUALIFICATION OF READY MIX CONCRETE SUPPLIERS. 31-May-22 11-Jun-22 CLOSED CODE-1

PREQUALIFICATION OF STEEL REBAR COMPANY (AL RAJHI


4 JB1071-HAIF-ZZ-XX-PQ-T-0001 CIVIL 20-Jun-22 23-Jun-22 CLOSED CODE-2
INDUSTRIES)
PREQUALIFICATION OF STEEL REBAR COMPANY (SAUDI IRON
5 JB1071-HAIF-ZZ-XX-PQ-T-0002 CIVIL 20-Jun-22 23-Jun-22 CLOSED CODE-2
& STEEL COMPANY HADEED)
PREQUALIFICATION OF STEEL REBAR COMPANY (ITTEFAQ &
6 JB1071-HAIF-ZZ-XX-PQ-T-0003 CIVIL 5-Jun-22 7-Jun-22 CLOSED CODE-2
STEEL)
PREQUALIFICATION OF CONSTRUCTION CHEMICALS FOSAM
7 JB1071-HAIF-ZZ-XX-PQ-T-0004 CIVIL 25-Jun-22 27-Jun-22 CLOSED CODE-2
COMPANY
PREQUALIFICATION OF CONSTRUCTION TERMITE TREATMENT
8 JB-1071-HAI-TR-011 CIVIL 13-Jul-22 20-Jul-22 CLOSED CODE-2
APPLICATION. HIT COMPANY
PREQUALIFICATION OF BAHRA ADVANCED CABLE
9 JB1071-HAI-TR-014 ELE 17-Jul-22 25-Jul-22 R&R CODE-3
MANUFACTURE CO. LTD
PREQUALIFICATION OF SADAF ELECTRIC INDUSTRIES CO.
10 JB1071-HAI-TR-015 ELE Concrete Compressive Strength Test at 28 days for Silo Piles # SP6-16,
25-Jul-22
SP6-32 and SP12-19,
R & R SP12-36. CODE-3
(SEICO)
PREQUALIFICATION OF DON CONSTRUCTION PRODUTS (DCP)
11 JB1071-HAI-TR-016 CIVIL 18-Jul-22 26-Jul-22 CLOSED CODE-2
SAUDI COMPANY.
PREQUALIFICATION OF RIYADH GIOTECHNIQUE &
12 JB1071-HAI-TR-017 CIVIL 18-Jul-22 26-Jul-22 CLOSED CODE-2
FOUNDATIONS (RGF)
PREQUALIFICATION OF SESCO ELECTRIC INDUSTRIES CO.
13 JB1071-HAI-TR-0021 ELE 25-Jul-22 28-Jul-22 CLOSED CODE-1
(SESCO)
PREQUALIFICATION OF UNITECH BUILDING & CONSTRUCTION
14 JB1071-HAI-TR-0028 CIVIL 26-Jul-22 28-Jul-22 CLOSED CODE-1
MATERIALS SUPPLIER

PREQUALIFICATION OF DURAR MASAGH TRADING COMPANY


15 JB1071-HAI-TR-0029 CIVIL 26-Jul-22 8-Aug-22 CLOSED CODE-2
BUILDING & CONSTRUCTION MATERIALS SUPPLIER

PREQUALIFICATION OF SAUDI ELECTRIC SUPPLY COMPANY


16 JB1071-HAI-TR-0032 ELE 30-Jul-22 8-Aug-22 CLOSED CODE-1
(SESCO) FOR ERICO EARTHING & LIGHTNING SYSTEMS.

PREQUALIFICATION FOR PILING WORK (STROMEK SAUDI


17 JB1071-HAI-TR-0033 CIVIL 31-Jul-22 4-Aug-22 CLOSED CODE-1
FOUNDATION CO.)

18 JB1071-HAI-TR-0034 CIVIL PREQUALIFICATION FOR PILING WORK (DELTA CO.) 31-Jul-22 2-Aug-22 CLOSED CODE-2

PREQUALIFICATION FOR PILING WORK (GROUND


19 JB1071-HAI-TR-0037 CIVIL 6-Aug-22 9-Aug-22 R&R CODE-3
ENGINEERING CONTRACTOR)
PREQUALIFICATION FOR PILING WORK (JEDDAH FOUNDATION
20 JB1071-HAI-TR-00038 CIVIL 7-Aug-22 5-Sep-22 CLOSED CODE-1
CO.)

21 JB1071-HAI-TR-00044 CIVIL PREQUALIFICATION OF GULF ENGINEERING HOUSE (GEH) 17-Aug-22 31-Aug-22 R&R CODE-3

22 JB1071-HAI-TR-00048 MECH PREQUALIFICATION OF ZAMIL AIR-CONDITIONER 25-Aug-22 8-Sep-22 CLOSED CODE-1

PREQUALIFICATIONOFNEPROPLAST (NATIONAL MARKETING


23 JB1071-HAI-TR-00053 MECH 5-Sep-22 13-Oct-22 CLOSED CODE-1
EST. CO. LTD.)
BRC INDUSTRIAL SAUDIA COMPANY(ITTEFAQ STEEL REBAR
24 JB1071-HAI-TR-00063 CIVIL 4-Oct-22 8-Oct-22 CLOSED CODE-2
AUTHORIZED DISTRIBUTOR/DEALER)

25 JB1071-HAI-TR-00064 CIVIL SAUDI ANFAL CO. FOR PROJECT LTD. 4-Oct-22 17-Oct-22 CLOSED CODE-3

BAHRA ADVANCED CABLE MANUFACTURE CO. LTD SUPPLY OF


26 JB1071-HAI-TR-00066 ELE 13-Oct-22 26-Oct-22 CLOSED CODE-1
PVC, UPVC CONDUITS AND ACCESSORIES

KHEREIJI SHOWROOMS COMPANY (KSC)


27 JB1071-HAI-TR-00068 ELE 18-Oct-22 26-Oct-22 CLOSED CODE-1
PVC CONDUITS AND ACCESSORIES FROM EGA

MK SWITCHES, SOCKETS, SINGLE PHASE DISCONNECT


28 JB1071-HAI-TR-00069 ELE 19-Oct-22 23-Oct-22 CLOSED CODE-2
SWITCHES-SUPPLIER(KHEREIJI SHOWROOMS COMPANY)

DECODUCT INDOOR AND OUTDOOR PVC CONDUITS AND


29 JB1071-HAI-TR-00070 ELE 19-Oct-22 24-Oct-22 CLOSED CODE-1
ACCESSORIES - SUPPLIER INTERPLAST CO. LTD.

30 JB1071-HAI-TR-00071 MECH ELEVATOR SYSTEM CONTRACTING COMPANY (ESCCO) 20-Oct-22 27-Oct-22 R&R CODE-3

31 JB1071-HAI-TR-00072 MECH FIRE FIGHTING EQUIPMENTS (SAFECO) 20-Oct-22 25-Oct-22 CLOSED CODE-1

32 JB1071-HAI-TR-00073 CIVIL SAUDI PAINT COMPANY LTD. (PAINTCO) 20-Oct-22 25-Oct-22 R&R CODE-3

33 JB1071-HAI-TR-00074 CIVIL GENERAL AGENCIES AND CONTRACTING (GAC) 22-Oct-22 23-Oct-22 CLOSED CODE-2

34 JB1071-HAI-TR-00076 CIVIL AL RASHED CEMENT COMPANY 24-Oct-22 30-Oct-22 CLOSED CODE-2

35 JB1071-HAI-TR-00077 ELE PRE-QUALIFICATION FOR AL ASHOURY INDUSTRIES 24-Oct-22 27-Oct-22 CLOSED CODE-1

36 JB1071-HAI-TR-00078 ELE PRE-QUALIFICATION FOR POWER SOLUTION INDUSTRIES 24-Oct-22 1-Nov-22 R&R CODE-3

37 JB1071-HAI-TR-00079 CIVIL PRE-QUALIFICATION FOR HAMDAN ALSHOBHI 25-Oct-22 30-Oct-22 CLOSED CODE-2

38 JB1071-HAI-TR-00081 ELE RADYA INTERNATIONAL FROM EATON 27-Oct-22 1-Nov-22 CLOSED CODE-1

39 JB1071-HAI-TR-00083 CIVIL INTERNATIONAL BUILDING SYSTEM FACTORY CO. LTD. (IBSF) 13-Dec-22 14-Dec-22 CLOSED CODE-1

40 JB1071-HAI-TR-00084 CIVIL MAHMOOD SAEED STEEL INDUSTRIES CO. LTD. (MSSI) 5-Nov-22 7-Nov-22 CLOSED CODE-2

41 JB1071-HAI-TR-00085 CIVIL INSULATION AND WRAPPING PRODUCTS CO. LTD. (INSUWRAP) 5-Nov-22 9-Nov-22 CLOSED CODE-1

ARABIAN BUILDING SUPPORT AND


42 JB1071-HAI-TR-00086 CIVIL 6-Nov-22 9-Nov-22 CLOSED CODE-1
REHABILITATION CO. LTD. (ABSAR)
AL ZAMIL STEEL PRE-ENGINEERED BUILDINGS
43 JB1071-HAI-TR-00089 CIVIL 7-Nov-22 8-Nov-22 CLOSED CODE-2
CO. LTD
44 JB1071-HAI-TR-00093 ELE MOHAMMED A. ALFADDAGHI & PARTNER CO. 14-Nov-22 20-Nov-22 R&R CODE-3

45 JB1071-HAI-TR-00094 ELE ALKHORAYEF COMMERCIAL COMPANY. 30-Nov-22 7-Dec-22 R&R CODE-3

46 JB1071-HAI-TR-00095 ELE SAUDI ARABIAN SERVICES COMPANY (SASCOM) 14-Nov-22 21-Nov-22 R&R CODE-3

47 JB1071-HAI-TR-00102 ELE ALFANAR COMPANY 21-Nov-22 3-Dec-22 CLOSED CODE-2

48 JB1071-HAI-TR-00103 ELE THE SAUDI TRANSFORMERS COMPANY LTD. (STC) 21-Nov-22 3-Dec-22 CLOSED CODE-2

Material Submittal - MTS - Log Sheet


1 JB1071-HAI-TR-0018 CIVIL FORMWORK RELEASE AGENT MATERIAL 21-Jul-22 25-Jul-22 CLOSED

2 JB1071-HAI-TR-0019 CIVIL CONCURE WB309-CLEAR CURING COMPOUND 24-Jul-22 25-Jul-22 CLOSED

3 JB1071-HAI-TR-0035 CIVIL POLYETHYLENE SHEET 1-Aug-22 4-Aug-22 CLOSED

4 JB1071-HAI-TR-0036 CIVIL CONCRETE MIX DESIGN 1-Aug-22 2-Aug-22 CLOSED

NITOPROOF 10, BITUMEN EMULSION PROTECTIVE COATING


5 JB1071-HAI-TR-00039 CIVIL 27-Sep-22 CLOSED
(DAMPPROOFING)FOSAM COMPANY LIMITED.

CONCRETE CURING COMPOUND DON CONSTRUCTION


6 JB1071-HAI-TR-00040 CIVIL 8-Aug-22 30-Aug-22 R&R CODE-3
PRODUCTS (DCP).

7 JB1071-HAI-TR-00041 CIVIL POLYETHYLENE SHEET 9-Aug-22 27-Aug-22 R&R CODE-3

8 JB1071-HAI-TR-00043 CIVIL BITUCELL (BITUMEN IMPREGNATED FIBRE BOARD) 11-Aug-22 23-Aug-22 CLOSED

9 JB1071-HAI-TR-00045 CIVIL RENDEROC TG XTRA, CONCRETE REPAIR MORTAR 17-Aug-22 23-Aug-22 CLOSED

10 JB1071-HAI-TR-00055 CIVIL FIPROCIDE, TERMITE CONTROL SPRAY,HIT PEST CONTROL 26-Nov-22 8-Dec-22 CLOSED

MATERIAL SUBMITTAL,CONCRETE DESIGN MIX 40MPA WITH


11 JB1071-HAI-TR-00056 CIVIL 8-Sep-22 22-Sep-22 CLOSED
SILICA FUME.

NITOMORTAR TC2000, EPOXY BASED CONCRETE REPAIR


12 JB1071-HAI-TR-00058 CIVIL 22-Sep-22 15-Oct-22 R&R CODE-3
MORTAR

NITOFLOR HARDTOP (MONOLITHIC SURFACE HARDENING


13 JB1071-HAI-TR-00059 CIVIL 24-Sep-22 R&R
COMPOUND FOR FRESH CONCRETE FLOORS)

SUPERCAST PVC (CENTRALLY AND EXTERNALLY PLACED PVC


14 JB1071-HAI-TR-00060 CIVIL 28-Sep-22 27-Oct-22 CLOSED
WATERSTOPS)

15 JB1071-HAI-TR-00062 CIVIL CONCRETE DESIGN MIX 40MPA WITH SILICA FUME FOR PILING 3-Oct-22 31-Oct-22 CLOSED

16 JB1071-HAI-TR-00065 CIVIL SETSEAL A, CONCRETE CURING COMPOUND 9-Oct-22 18-Oct-22 CLOSED

FLOCRETE SP129, HYPERPLAST PC261, FLOCRETE RPC9.


17 JB1071-HAI-TR-00087 CIVIL 6-Nov-22 8-Nov-22 R&R CODE-3
CONCRETE ADMIXTURES FOR HAIF BATCHING PLANT

CONCRETE DESIGN MIX 40MPA WITH SILICA FUME, FROM GAC


18 JB1071-HAI-TR-00090 CIVIL 12-Nov-22 21-Nov-22 CLOSED
BATCHING PLANT
14-Dec-22
CONCRETE DESIGN MIXES 40MPA WITH SILICA FUME FROM
19 JB1071-HAI-TR-00111 CIVIL 22-Aug-23 CLOSED
HAIF BATCHING PLANT
aMessage

MasterRheobuild 945, MasterPozzolith 327 - Concrete


20 JB1071-HAI-TR-00118 CIVIL 14-Dec-22 15-Dec-22 CLOSED
Admixtures

Work Inspection Request - WIR - Log Sheet


Inspection request for ConcreteTrial Mixes of 35MPA and 40
1 JB1071-HAI-04-ZZ-WIR-W-00001 CVL 7-Aug-22 13-Aug-22 CLOSED
MPA design mixes

Concrete CompressiveStrength Test at 7 days for Trial Mixes


2 JB1071-HAI-04-ZZ-WIR-W-00002 CVL 17-Aug-22 23-Aug-22 CLOSED
samples of 35MPA and 40MPA.

Concrete Compressive Strength Test at 14 days for Trial Mixes


3 JB1071-HAI-04-ZZ-WIR-W-00003 CVL 24-Aug-22 OPEN
samples of 35MPA and 40MPA.

Collecting Sample of Coarse Aggregates 20mm, 10mm and


4 JB1071-HAI-04-ZZ-WIR-W-00004 CVL 28-Aug-22 30-Aug-22 CLOSED
Fine Aggregate (sand) for Haif Ready Mix Concrete Batch Plant

5 JB1071-HAI-04-ZZ-WIR-W-00005 CVL Concrete Trial Mixes of 15MPA and 30MPA design mixes. 30-Aug-22 4-Sep-22 CLOSED

6 JB1071-HAI-04-ZZ-WIR-W-00006 CVL Concrete Trial Mixes of 40MPA design mixes. 31-Aug-22 4-Sep-22 CLOSED

Compressive Strength Test at 07days forTrial Mixessamplesof


7 JB1071-HAI-04-ZZ-WIR-W-00007 CVL 7-Sep-22 12-Sep-22 CLOSED
15Mpa, 30Mpaand 40Mpa.

ConcreteCompressive Strength Test at 28days forTrial


8 JB1071-HAI-04-ZZ-WIR-W-00008 CVL 8-Sep-22 12-Sep-22 CLOSED
Mixessamplesof 35MPA and 40MPA.

Concrete Compressive Strength Test at 14 days for Trial Mixes


9 JB1071-HAI-04-ZZ-WIR-W-00009 CVL 14-Sep-22 OPEN
samples of 15Mpa, 30Mpa and 40Mpa.

10 JB1071-HAI-04-ZZ-WIR-W-00010 CVL Inspection request for Setting out of preliminary Piles 22-Sep-22 OPEN
Compressive Strength Test at 28days forTrial Mixessamples of
11 JB1071-HAI-04-ZZ-WIR-W-00011 CVL 28-Sep-22 5-Oct-22 CLOSED
15Mpa, 30Mpaand 40Mpa.

12 JB1071-HAI-04-ZZ-WIR-W-00012 CVL Steel reinforcement Cage for Preliminary Pile 6-Oct-22 10-Oct-22 CLOSED

13 JB1071-HAI-04-ZZ-WIR-W-00013 CVL Concrete Pouring for Pile#1 15-Oct-22 OPEN

Concrete Compressive Strength Test at 07 days for Reaction


14 JB1071-HAI-04-ZZ-WIR-W-00014 CVL 20-Oct-22 OPEN
Pile # 4, Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 07 days for Test Pile #


15 JB1071-HAI-04-ZZ-WIR-W-00015 CVL 22-Oct-22 OPEN
1, Design Mix sample 40Mpa.

16 JB1071-HAI-04-ZZ-WIR-W-00016 CVL Concrete Pouring for Preliminary test Pile -2 23-Oct-22 OPEN

Concrete Compressive Strength Test at 07 days for


17 JB1071-HAI-04-ZZ-WIR-W-00017 CVL 24-Oct-22 OPEN
Reaction Pile # 3

Concrete Compressive Strength Test at 07 days for Reaction


18 JB1071-HAI-04-ZZ-WIR-W-00018 CVL 25-Oct-22 OPEN
Pile # 2, (Silos Area) Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 14 days for Reaction


19 JB1071-HAI-04-ZZ-WIR-W-00019 CVL 30-Oct-22 OPEN
Pile # 4, Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 14 days for Reaction


20 JB1071-HAI-04-ZZ-WIR-W-00020 CVL Pile # 3 and at 7 days for Test Pile # 2. Design Mix sample 31-Oct-22 OPEN
40Mpa.

Concrete Compressive Strength Test at 14 days for Reaction


21 JB1071-HAI-04-ZZ-WIR-W-00021 CVL 1-Nov-22 OPEN
Pile # 2 and at 7 days for Reaction Pile # 6

Concrete Compressive Strength Test at 7 days for Reaction Pile


22 JB1071-HAI-04-ZZ-WIR-W-00022 CVL 2-Nov-22 OPEN
# 8 (Silos Area).Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 14 days for Reaction


23 JB1071-HAI-04-ZZ-WIR-W-00023 CVL Pile # 1 and at 7 days for Reaction Pile Fosroc
# 5, Design
Brushbond
Mix sample
Protective Coating for Blinding of Process Building
OPEN
40Mpa.

Concrete Compressive Strength Test at 14 days for Test Pile #


24 JB1071-HAI-04-ZZ-WIR-W-00024 CVL 7-Nov-22 OPEN
2. Design Mix sample 40Mpa.

Inspection request for Concrete Trial Mix of 40MPA mix design


25 JB1071-HAI-04-ZZ-WIR-W-00025 CVL 7-Nov-22 OPEN
with silica fume.

Concrete Compressive Strength Test at 14 days for Reaction


26 JB1071-HAI-04-ZZ-WIR-W-00026 CVL 8-Nov-22 OPEN
Pile # 6 (Silos Area). Design Mix sample 40Mpa.

Concrete Trial Mix of 40MPA mix design with silica fume at


27 JB1071-HAI-04-ZZ-WIR-W-00027 CVL 8-Nov-22 OPEN
GAC Batching Plant

Collecting Sample of Coarse Aggregates 20mm, 10mm and


28 JB1071-HAI-04-ZZ-WIR-W-00028 CVL Fine Aggregate (sand) for Haif Ready Mix Concrete Batching 8-Nov-22 OPEN
Plant.

Concrete Compressive Strength Test at 14 days for Reaction


29 JB1071-HAI-04-ZZ-WIR-W-00029 CVL 9-Nov-22 OPEN
Pile # 8 (Silos Area). Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 28 days for Reaction


30 JB1071-HAI-04-ZZ-WIR-W-00030 CVL Pile # 4 and at 14 days for Reaction Pile # 5- Design Mix sample 10-Nov-22 OPEN
40Mpa.

Concrete Compressive Strength Test at 28 days for Test Pile #


31 JB1071-HAI-04-ZZ-WIR-W-00031 CVL 12-Nov-22 OPEN
1, Design Mix sample 40Mpa.

Inspection request for Pile Load Testing for Test Pile # 1 of silos
32 JB1071-HAI-04-ZZ-WIR-W-00032 CVL 13-Nov-22 OPEN
area

Concrete Compressive Strength Test at 07 days for Trial Mix 40


33 JB1071-HAI-04-ZZ-WIR-W-00033 CVL 14-Nov-22 OPEN
Mpa with Silica Fume.

Concrete Compressive Strength Test at 28 days for Reaction


34 JB1071-HAI-04-ZZ-WIR-W-00034 CVL 14-Nov-22 OPEN
Pile # 3. Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 28 days for Reaction


35 JB1071-HAI-04-ZZ-WIR-W-00035 CVL 15-Nov-22 OPEN
Pile # 2 (Silos Area). Design Mix sample 40Mpa.

Compressive Strength of Concrete at 7 days for Trial Mix of


36 JB1071-HAI-04-ZZ-WIR-W-00036 CVL 40MPA mix design with silica fume from GAC ready mix 15-Nov-22 OPEN
concrete

37 JB1071-HAI-04-ZZ-WIR-W-00037 CVL Pile Steel Cage and Pre Pour for Pile # SP6-24 15-Nov-22 OPEN

Concrete Compressive Strength Test at 28 days for Reaction


38 JB1071-HAI-04-ZZ-WIR-W-00038 CVL Pile # 1 and at 7 days for Reaction Pile # 7, Design Mix sample 17-Nov-22 OPEN
40Mpa.
Concrete Compressive Strength Test at 28 days for Test Pile #
39 JB1071-HAI-04-ZZ-WIR-W-00039 CVL 21-Nov-22 OPEN
2. Design Mix sample 40Mpa.

Concrete Compressive Strength Test at 14 days for Trial Mix 40


40 JB1071-HAI-04-ZZ-WIR-W-00040 CVL 21-Nov-22 OPEN
Mpa with Silica Fume. (Saudi Ready Mix Concrete)

Concrete Compressive Strength Test at 7 days for Silo Pile #


41 JB1071-HAI-04-ZZ-WIR-W-00041 CVL 22-Nov-22 OPEN
SP6-24 with Silica Fume. (Saudi Ready Mix Concrete)

Concrete Compressive Strength Test at 7 days for Silo Pile #


42 JB1071-HAI-04-ZZ-WIR-W-00042 CVL 23-Nov-22 OPEN
SP6-22 with Silica Fume. (Saudi Ready Mix Concrete)

Concrete Compressive Strength Test at 7 days for Silo Pile #


43 JB1071-HAI-04-ZZ-WIR-W-00043 CVL SP6-18, SP6-20 & SP6-25 with Silica Fume. (Saudi Ready Mix 24-Nov-22 OPEN
Concrete)

Concrete Compressive Strength Test at 7 days for Silo Piles #


44 JB1071-HAI-04-ZZ-WIR-W-00044 CVL 26-Nov-22 OPEN
SP6-10, SP6-27 and SP6-37. (Saudi Ready Mix Concrete)

Concrete Compressive Strength Test at 7 days for Silo Piles #


45 JB1071-HAI-04-ZZ-WIR-W-00045 CVL 27-Nov-22 OPEN
SP6-9, SP6-12, SP6-19 and SP6-21.

Concrete Compressive Strength Test at 7 days for Silo Piles #


46 JB1071-HAI-04-ZZ-WIR-W-00046 CVL 28-Nov-22 OPEN
SP6-23, SP6-26 and SP6-28.

Concrete Compressive Strength Test at 7 days for Silo Piles #


47 JB1071-HAI-04-ZZ-WIR-W-00047 CVL 30-Nov-22 OPEN
SP6-8, SP6-11, SP6-13 and SP6-36.

Concrete Compressive Strength Test at 7 days for Silo Piles #


48 JB1071-HAI-04-ZZ-WIR-W-00048 CVL 1-Dec-22 OPEN
SP6-3, SP6-5, SP6-29, SP6-35 and SP12-22

Concrete Compressive Strength Test at 7 days for Silo Piles #


49 JB1071-HAI-04-ZZ-WIR-W-00049 CVL 3-Dec-22 OPEN
SP6-2, SP6-4, SP6-17, SP6-30 and SP12-20

Concrete Compressive Strength Test at 7 days for Silo Piles #


50 JB1071-HAI-04-ZZ-WIR-W-00050 CVL 4-Dec-22 OPEN
SP6-1, SP6-14, SP12-21, SP12-24 and SP5-24.

Concrete Compressive Strength Test at 28 days for Trial Mix 40


51 JB1071-HAI-04-ZZ-WIR-W-00051 CVL 5-Dec-22 OPEN
Mpa with Silica Fume. (Saudi Ready Mix Concrete)

Concrete Trial Mixes of 40MPA mix design with silica fume at


52 JB1071-HAI-04-ZZ-WIR-W-00052 CVL 6-Dec-22 OPEN
Haif Batch Plant.

Concrete Compressive Strength Test at 7 days for Silo Piles #


53 JB1071-HAI-04-ZZ-WIR-W-00053 CVL 6-Dec-22 OPEN
SP6-6, SP6-18 and SP6-31.

Compressive Strength of Concrete at 28 days for Trial Mix of


54 JB1071-HAI-04-ZZ-WIR-W-00054 CVL 40MPA mix design with silica fume from GAC ready mix 6-Dec-22 OPEN
concrete

Concrete Compressive Strength Test at 7 days for Silo Piles #


55 JB1071-HAI-04-ZZ-WIR-W-00055 CVL 7-Dec-22 OPEN
SP6-7, SP6-15 and SP12-9, SP12-23.

Concrete Compressive Strength Test at 7 days for Silo Piles #


56 JB1071-HAI-04-ZZ-WIR-W-00056 CVL 8-Dec-22 OPEN
SP6-16, SP6-32 and SP12-19, SP12-36.

Concrete Compressive Strength Test at 7 days for Silo Piles #


57 JB1071-HAI-04-ZZ-WIR-W-00057 CVL 10-Dec-22 OPEN
SP6-33, SP12-11 and SP12-17, SP12-34.

Concrete Compressive Strength Test at 7 days for Silo Piles #


58 JB1071-HAI-04-ZZ-WIR-W-00058 CVL 11-Dec-22 OPEN
SP6-34, SP12-10 and SP12-26, SP12-35.

Concrete Compressive Strength Test at 7 days for Silo Piles #


59 JB1071-HAI-04-ZZ-WIR-W-00059 CVL 12-Dec-22 OPEN
SP12-4, SP12-8 and SP12-16, SP12-37.

Concrete Compressive Strength Test at 7 days for Silo Piles #


60 JB1071-HAI-04-ZZ-WIR-W-00060 CVL 13-Dec-22 OPEN
SP12-3, SP12-7 and SP12-25, SP5-20.

Concrete Compressive Strength Test at 28 days for Silo Pile #


61 JB1071-HAI-04-ZZ-WIR-W-00061 CVL 13-Dec-22 OPEN
SP6-24.

Compressive Strength Concrete at 7 days of Trial Mixes of


62 JB1071-HAI-04-ZZ-WIR-W-00062 CVL 13-Dec-22 OPEN
40MPA mix design with silica fume for Haif Batch Plant.

Concrete Compressive Strength Test at 7 days for Silo Piles #


63 JB1071-HAI-04-ZZ-WIR-W-00063 CVL 14-Dec-22 OPEN
SP12-2, SP12-33 and SP5-18, SP5-22, SP5-25.
Concrete Compressive Strength Test at 28 days for Silo Pile #
64 JB1071-HAI-04-ZZ-WIR-W-00064 CVL 14-Dec-22 OPEN
SP6-22.

Concrete Trial Mixes of 40MPA mix design with silica fume at


65 JB1071-HAI-04-ZZ-WIR-W-00065 CVL 14-Dec-22 OPEN
Haif Batch Plant.

Compressive Strength Test at 7 days for Silo Pile # SP12-1,


66 JB1071-HAI-04-ZZ-WIR-W-00066 CVL 15-Dec-22 CLOSED
SP12-21 and SP12-23.

Concrete Compressive Strength Test at 7 days for Silo Pile #


67 JB1071-HAI-04-ZZ-WIR-W-00067 CVL 15-Dec-22 OPEN
SP12-1, SP5-21 and SP5-23.

Concrete Compressive Strength Test at 28 days for Silo Pile #


68 JB1071-HAI-04-ZZ-WIR-W-00068 CVL SP6 – 18, SP6-20 and SP6-25 15-Dec-22 OPEN

69 JB1071-HAI-04-ZZ-WIR-W-00069 CVL Pile Load Testing for Test Pile # 2 of silos area. 15-Dec-22 OPEN

Concrete Compressive Strength Test at 28 days for Silo Piles #


70 JB1071-HAI-04-ZZ-WIR-W-00070 CVL 17-Dec-22 OPEN
SP6-10, SP6-27, SP6-37.

Concrete Compressive Strength Test at 7 days for Silo Pile #


71 JB1071-HAI-04-ZZ-WIR-W-00071 CVL SP12– 15, SP12-32 and SP5-19, SP5-26 17-Dec-22 OPEN

Concrete Compressive Strength Test at 28 days for Silo Piles #


72 JB1071-HAI-04-ZZ-WIR-W-00072 CVL 18-Dec-22 OPEN
SP6-9, SP6-12, SP6-19 and SP6-21.

Concrete Compressive Strength Test at 7 days for Silo Pile #


73 JB1071-HAI-04-ZZ-WIR-W-00073 CVL SP12– 6, SP12-12, SP12-31 and SP5-9, SP5-12, SP5-36 18-Dec-22 OPEN

Concrete Compressive Strength Test at 28 days for Silo Piles #


74 JB1071-HAI-04-ZZ-WIR-W-00074 CVL 19-Dec-22 OPEN
SP6-23, SP6-26 and SP6-28.

Concrete Compressive Strength Test at 7 days for Silo Pile #


75 JB1071-HAI-04-ZZ-WIR-W-00075 CVL 19-Dec-22 OPEN
SP12– 5, SP12-27, SP12-30 and SP5-8, SP5-10, SP5-27, SP5-35

Concrete Compressive Strength Test at 7 days for Silo Pile #


76 JB1071-HAI-04-ZZ-WIR-W-00076 CVL 20-Dec-22 OPEN
SP12– 14, SP12-28, and SP5-3, SP5-11, SP5-28, SP5-37

Inspection request for collecting Soil Sample from Silo Area


77 JB1071-HAI-04-ZZ-WIR-W-00077 CVL 20-Dec-22 OPEN
and Admin Building.

Concrete Compressive Strength Test at 7 days for Silo Pile #


78 JB1071-HAI-04-ZZ-WIR-W-00078 CVL 21-Dec-22 OPEN
SP12– 13, and SP5-4, SP5-13, SP5-17 and SP11-34, SP11-37

Concrete Compressive Strength Test at 7 days for C40 Trial Mix


79 JB1071-HAI-04-ZZ-WIR-W-00079 CVL 21-Dec-22 OPEN
from Haif Batching Plant.

Concrete Compressive Strength Test at 28 days for Silo Piles #


80 JB1071-HAI-04-ZZ-WIR-W-00080 CVL 21-Dec-22 OPEN
SP6-8, SP6-11, SP6-13 and SP6-36.

81 JB1071-HAI-04-ZZ-WIR-W-00081 CVL Coordinates for Admin Building. 22-Dec-22 OPEN

82 JB1071-HAI-04-ZZ-WIR-W-00082 CVL Coordinates of Piling for Silo Number 4. 22-Dec-22 OPEN

Concrete Compressive Strength Test at 28 days for Silo Piles #


83 JB1071-HAI-04-ZZ-WIR-W-00083 CVL 22-Dec-22 OPEN
SP6-3, SP6-5, SP6-29, SP6-35 and SP12-22.

Concrete Compressive Strength Test at 7 days for Silo Piles #


84 JB1071-HAI-04-ZZ-WIR-W-00084 CVL 22-Dec-22 OPEN
SP5-2, SP5-5, SP11-36, SP11-21 and SP12-29.

Concrete Compressive Strength Test at 7 days for Silo Piles #


85 JB1071-HAI-04-ZZ-WIR-W-00085 CVL 24-Dec-22 OPEN
SP5-1, SP5-29, SP11-19, SP11-24 and SP11-35.

Concrete Compressive Strength Test at 28 days for Silo Piles #


86 JB1071-HAI-04-ZZ-WIR-W-00086 CVL 24-Dec-22 OPEN
SP6-2, SP6-4, SP6-17, SP6-30 and SP12-20.

Concrete Compressive Strength Test at 7 days for Silo Piles #


87 JB1071-HAI-04-ZZ-WIR-W-00087 CVL SP5-6, SP5-16, SP5-30, SP11-17, SP11-18, SP11-20, SP11-22, 25-Dec-22 OPEN
SP11-23 and SP11-33.

Concrete Compressive Strength Test at 28 days for Silo Piles #


88 JB1071-HAI-04-ZZ-WIR-W-00088 CVL 25-Dec-22 CLOSED
SP6-1, SP6-14, SP12-21, SP12-24 and SP5-24.
89 JB1071-HAI-04-ZZ-WIR-W-00089 CVL Setting Out Coordinates of Piling for Silo Number 10. 25-Dec-22 OPEN

Concrete Compressive Strength Test at 7 days for Silo Piles #


90 JB1071-HAI-04-ZZ-WIR-W-00090 CVL SP5-7, SP5-14, SP5-34, SP11-8, SP11-11, SP11-9, SP11-16, 26-Dec-22 OPEN
SP11-32 and SP4-18.

Concrete Compressive Strength Test at 7 days for Silo Piles #


91 JB1071-HAI-04-ZZ-WIR-W-00091 CVL SP5-15, SP5-33, SP4-20, SP11-10, SP11-25, SP11-2, SP11-12, 27-Dec-22 OPEN
SP11-15.

Concrete Compressive Strength Test at 28 days for Silo Piles #


92 JB1071-HAI-04-ZZ-WIR-W-00092 CVL 27-Dec-22 OPEN
SP6-6, SP6-18 and SP6-31.

Concrete Compressive Strength Test at 7 days for Silo Piles #


93 JB1071-HAI-04-ZZ-WIR-W-00093 CVL 28-Dec-22 OPEN
SP5-31, SP11-31, SP11-37, SP11-26, SP4-22, SP4-19 and SP4-25

Concrete Compressive Strength Test at 28 days for Silo Piles #


94 JB1071-HAI-04-ZZ-WIR-W-00094 CVL 28-Dec-22 OPEN
SP6-7, SP6-15, SP12-9 and SP12-23.

Material Inspection Request - MIR - Log Sheet

ReinforcementSteel Bars.Diameter.10mm, 16mm,


1 JB1071-HAI-04-ZZ-MA-W-00001 CIVIL 29-Oct-22 OPEN
20mm,25mm (Al-Rajhi)

2 JB1071-HAI-04-ZZ-MA-W-00002 CIVIL ReinforcementSteel Bars.Diameter.10mm,20mm, 25mm 18-Oct-22 20-Oct-22 CLOSED

3 JB1071-HAI-04-ZZ-MA-W-00003 CIVIL Reinforcement Steel Bars. Diameter.10mm, 25mm 3-Nov-22 OPEN

4 JB1071-HAI-04-ZZ-MA-W-00004 CIVIL Reinforcement Steel Bars. Diameter.10mm 9-Nov-22 OPEN

5 JB1071-HAI-04-ZZ-MA-W-00005 CIVIL Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 13-Nov-22 OPEN

6 JB1071-HAI-04-ZZ-MA-W-00006 CIVIL Reinforcement Steel Bars. Diameter.20mm, 25mm 15-Nov-22 OPEN

7 JB1071-HAI-04-ZZ-MA-W-00007 CIVIL Ordinary Portland Cement (OPC) in Bulk for Haif Batching Plant 15-Nov-22 OPEN

8 JB1071-HAI-04-ZZ-MA-W-00008 CIVIL Reinforcement Steel Bars. Diameter 25mm 28-Nov-22 OPEN

9 JB1071-HAI-04-ZZ-MA-W-00009 CIVIL Coarse Aggregates 10mm, 20mm Fine Aggregates (Sand) 28-Nov-22 28-Nov-22 R&R

10 JB1071-HAI-04-ZZ-MA-W-00010 CIVIL Reinforcement Steel Bars. Diameter. 10mm, 20mm, 25mm 8-Dec-22 OPEN

Method of Statement Log Sheet

REF. THRU EMAIL


1 CVL DESIGN METHOD OF STATEMENT 3-Nov-22 12-Nov-22 CLOSED
JB1071-HAI-TR-0030

JB-1071-HAIF-02-ZZ-LT-S-0001
2 CVL METHOD OF STATEMENT FOR BOREHOLE. 20-Jun-22 CLOSED
JB1071-HAIF-02-XX-LT-S-0003

METHOD OF STATEMENT FOR SITE PREPARATION,


3 JB-1071-HAIF-EW-ZZ-LT-C-0001 CVL 29-May-22 7-Jun-22 CLOSED
EXCAVATION & BACKFILLING.

4 JB-1071-HAI-TR-0005 CVL METHOD OF STATEMENT FOR CONCRETE WORK 13-Sep-22 9-Oct-22 CLOSED

METHOD STATEMENT OF BORED CAST IN SITU PILES


5 JB1071-HAI-TR-00050 CVL 18-Sep-22 27-Sep-22 CLOSED
(STROMEK)

METHOD STATEMENT OF BORED CAST IN SITU PILES


6 JB1071-HAI-TR-00054 CVL 17-Sep-22 20-Sep-22 CLOSED
(JEDDDAH )

JB1071-HAIF-04-XX-LT-W-1030 METHOD STATEMENT FOR PILE LOAD TEST (NON-WORKING


7 CVL 1-Nov-22 CLOSED
JB1071-HAIF-04-XX-LT-W-1047 PILE)

8 JB-1071-HAI-TR-00112 CVL METHOD STATEMENT FOR PILE INTEGRITY TEST 8-Dec-22 18-Dec-22 CLOSED
9 JB-1071-HAI-TR-00120 CVL METHOD STATEMENT FOR PILE LOAD TEST OF WORKING PILE 20-Dec-22 24-Dec-22 CLOSED

10 JB-1071-HAI-TR-00121 CVL METHOD STATEMENT FOR PILE HEAD BREAKING 20-Dec-22 CLOSED

11 JB-1071-HAI-TR-00122 CVL METHOD STATEMENT FOR TERMITE CONTROL 26-Dec-22 CLOSED

INSPECTION AND TEST PLAN ( ITP) LOG SHEET

1 JB1071-HAI-TR-0012 CAST IN SITU CONCRETE WORKS 6-Aug-22 26-Aug-22 CLOSED

2 JB1071-HAI-TR-0013 EXCAVATION & BACKFILLING 7-Aug-22 26-Aug-22 R&R

3 JB1071-HAI-TR-00075 BORE PILE CONSTRUCTION 20-Nov-22 3-Dec-22 R&R

4 JB1071-HAIF-04-XX-LT-W-1051 LIST OF ITP'S COVERING WHOLE OF THE WORK'S 7-Nov-22 OPEN


DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG
DWG

DWG

DWG
DWG
DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG
DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DWG

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS
DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

DOCUMENTS

PQA

PQA

PQA

PQA

PQA
PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA

PQA
PQA

PQA

PQA

PQA

PQA

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

MATERIALS

WIR
100

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR
WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR
WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR
WIR

WIR

WIR MISTAKE

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR

WIR
WIR

WIR

WIR

WIR

WIR

WIR

MIR

MIR

MIR

MIR

MIR

MIR

MIR

MIR

MIR

MIR

MIR

MOS

MOS

MOS

MOS

MOS

MOS

MOS

MOS

MOS
ITP

ITP

ITP

ITP

ITP