CRANE CHECKLIST

VESSEL PORT / LOCATION

DATE TIME

PRE-START GENERAL CHECKS

NO DESCRIPTIONS NORMAL ABNORMAL REMARKS


1 Inform bridge prior starting the crane  
2 Hydraulic tank level  
3 Power pack, visual check  
4 Hoses and Connection’s good conditions  
5 Power supply online  
6
Visually check hoses and connection for any
leaks on crane boom
 
7 Free area of slew  
8
Test al levers and check and stay marked
actions
 
9 Visible load chart  
10 Check rusty and damage areas  
11 Emergency push button, ready  
12 Lock accesses at crane when use  
13 Bar Lock of operator, good condition  
LIFTING COMPLETED GENERAL CHECKS

NO DESCRIPTIONS NORMAL ABNORMAL REMARKS


1 Secure Crane  
2 Retrack in of boom extension to inside  
3
Pick up hook until to touch in top and make a
little tension on winch
 
4 Knuckle in Close complete  
5 Slewing to position of ladder  
6 Switch down the power pack and secure the area  
7 Inform Bridge, it Completed of Lifting Operation  
OTHER REMARKS

THIS CRANE CHECKLIST TO BE FILLED UP BY THE CRANE OPERATOR BEFORE STARTING UP THE CRANE AND DURING EVERY
WATCH CHANGES. IT IS NOT NECESSARY TO FILL THIS UP IF THERE ARE FREQUENT STARTS UP IN A WATCH UNLESS ANY
ABNORMALITIES OBSERVED
NAME RANK SIGNATURE