Paschimanchal
Vidyut Vitran Nigam Ltd.
(ooProcurer1'o)
and
5 ARTICLE 5 : CONSTRUCTION
7
8
9
10
ll
IE
I
IA
3
4
5
6
7
8 SCHEDULE S : DETAILS OF INTERCONNECTION POINT AND FACILITIES................
I 12
DATED,07.12.2010:
!!!!!!!!!!!!!:-
Pase4 of 128
Bajaj(2X 4s
!l
E
Shaktiij ,:.'nu tsxto.
€
E Lsokrow.
repugnant to the context or meaning thereof, be deemed to include their respective
nomineesandpermifledassigns);and
successors,
(4) Dakshinanchalvidyut vitran Nigam Ltd, a compaty incorporatedin India and
under.theCompaniesAct,1956,havingits registeredoffice at Urja Bhawan.NH2,
registered
Sikandr4Agra (Hereinafter referred to as "Procurer 4", which expression shall, unless
repugnant to the context or meaning thereof, be deemed to include their lespective
nomineesand permittedassigns)
successors,
THROUGH
UTTAR PRADESH POWER CORPORATION LIMITED ("LPPCL") a company
incorporatedin India and registeredunderthe CompanigsAct, 1956,having its registered
office at ShaktiBhawan, 14,Ashok Marg, I-ucknow,U.P duly authorisedby qachof,the
aboveProcurersto enterinto this Agreementon their behalf
And
Whereas:
A) The Govemmentof Uttar Pradesh("GoUP") has arurouncediEnergy Policy
2009, for the promotion of power generation,within uttar Pradesh and Bajaj
HindusthanLtd. ("BHL"), a companyengagedin the businessof manufacture,
production,processingor saleof sugax,molasses,molassesbasedindustrialalcohol'
organicmanUreand power and having its manufacturingunits locatedin the various
dishicts of Uttar Pradeshand presently having CogenerationPower Plants at its
various SugarMills in U.P. and supplyrngpower to the StateGrid under respective
power pwchaseAgreements,being desirousto set up additional generationcapacity
underthe MOU route as IndependentPowet Producer(IPP) in accordancewith Para
5,2,2oftheEnergyPolicy,2009(asamended)issuedbyDepartmentofEnergy'
Go.vt. of uttar Pradesh (GouP) entered inlo a Memolandum of understanding
("MoU") with the Governmentof UP on 14thJanuary2010 for settingup of the FIVE
(5) Thermal Power Plants each of 80 Mw capacily as Independent Power
U. f;-f .Y:. Lt
Shakti tsr I'iao Btt'!.
LBcLnoE.
Producing(IPPs)Units [,,Projects" or "Generating Plants"] on the land availableat
their SugarMills:
1.1 Definitions
The termsusedin this Agreement,unlessas definedbelow or repugnantto the context,shall
have the samemeaning as assignedto them by the Electricity Act, 2003 and the rules or
regulationsframed there under, including those issued/framedby Appropriate Commission
(asdefinedhereunder),as amendedor re-enactedfiom time to time.
The following terms when used in this Agreementshall have the respectivemeanings,as
specifiedbelow:
N
=
Availability (%) 10000x ! DCr / { N x IC x (100-AU()
l%
i=1
Where,
IC : Installed Capacity of the Unit in
MW;
DCi : av€tage Declared Capacity for
the i'n day of the period in MW
N = Number of days during the
period;and
AIIX' = Normative Auxiliary Consumptionas
a percentageof grossgeneration
Day''
"Business meanswith respectto Seller and each Procurer,a day other
than Sunday or a statutory holiday, on which the banks
remain open for businessin the State of Uttar Pradeshin
which the concemedProcurer'sregisteredoffice is located;
(2x 4sMw)
Shairti 1,1.iira;13.{ts.
Luchsow"
'Capital Shuctwe shall meansourcesof financeusedto financethe Capital Cost
Schedule' asprovided in the FinancingAgreements;
"CommercialOperation means, in relation to Unit, the date one day after the date
Date"or "COD" when eachofthe Procurersrcceivesa Final Test Certificateof
the IndependentEngineer as per the provisions of Article
6.3.1 and in relation to tle Power Station shall meanthe date
by which such-FinalTest Certificateas per Article 6.3.1are
receivedby the Procurersfor all the Units;
Unit"
"Commissioned meansthe Unit in respectof which COD hasoccurred;
"ConstructionPeriod" meansthe period from (and including) the date upon which
the Construction Contractor is instructed or required to
commencework under the ConstructionContract up to (but
not including)the CommercialOperationDateof the Unit in
relation to a Unit and of all the Units in relation to the Power
Statioh;
. ..! atr,':_
..:-.1
,, -'.i.i:,,'r
c E:(P. P,}A.
Ir i! .t{ f\ Lr
ii', dvli:
Sha:iti il.t :iwau EKt!.
tuckro$.
, *-4.y )
"'rl
for consultation between the Parties to mitigate the
consequenceof the relevant event having regard to all the
circumstances;
"Contract Year" meansthe period beginningon tle Effective Date (as defined
hereunder)and endingon the immediatelysucceedingMarch
31 and thereaftereach period of 12 months beginningon
April 1 and endingon March 31 provided that :
cE, {9
!-1. i:
Shak'ri3r :L,'ranExtt.
Luc kno6to
"Debt Service" means the amounts which are due under the Financing
Agreementsby the Sellerto the Lenders,expressedin Rupees
(with all amounts denominated in currencies other than
Rupeesbeing sonvertedto Rupeesat the Current Rate(s)of
Exchange;
"Electrical Output" meansthe net electrical output of the Power Station at the
C F {'!.pif|
r.i i.' t. '.i.'
{.r
fibakij iJ:r3."yao gxt[.
Luckr]ow.
Delivery Point asexpressedin kWh;
"Emergency'' means a condition or situation that, in.the opinion of the
Procurersor RLDC or SLDC or the agency responsiblefor
operating and maintaining the Interconnection and
TransmissionFacilities or the transmissioncompany,as the
casemay be, posesa significantthreatto the Procurer'sor the
said agency's or transmissioncompany's ability to r4aintain
safe, adequate and continuous electricity supply to its
custome(soor seriously urdangers the security of persons,
plantor equipment;
"EnergyCharges"or Shall have the meaningascribedto this term under Schedule
"Variable Charges"
Page12
EajajQ X a5 MW) Kundarkhi
ctr- {p.
V. P,,f .
ShaktiEtrrwenEx["
Lupkqoiy,
"Fuel" or'?rimary moans primary fuel used to generate electricity namely,
Fuel" domesticcoaland/orimporredcoal;
I T tr-, tr
St.r.,i
;, ,., J.L"
and Article 6, Article 12 andArticle 8 herein.
(2 X 45 MW) Kundarkhi
€
tt
"LIC"
'Meters" or "Metering Means metersused for accountingand billing of electricity in
System" accordancewith CentralElectricity Authority (Installation and
Operationsof Meters)Regulations, 2006,ftid CodeandABT,
asamendedfrom time to time;
"MaintenanceOutage" shall have the meaning as ascribed to this term as per the
provisionsofthe Grid Code;
,MCR' means grossPower Station or Unit Maximirm Continuous
Rating asdefinedin the Grid Code;
'Monthu Means a period of thirty (30) days from (and excluding) the
dateofthe event,whereapplicable,elsea calendarmonth;
"OperatingPeriod" in relation to the Unit meansthe period from its COD and in
relation to the Power Station the date by which all the Units
achieve COD, until the expiry or earliel termination of this
Agreementin accordancewith Article 2 of this Agreement;
"O&M Contract"or Means the contracvs entered into by the Seller with the
"O&M Contracts" Operatoror Operators, if anY;
n(. f t'.t,
tt | -4'
Sh:,r,ii
f . .,',,t.ritr.
Lu-n,i.rvr-
Commercial OperationDate till the end of 2400 hours on the
last Day of that Month and thereafterthe period commencing
at 0000 hourson the first Day of the Month and endingat 2400
hourson the last Day of the Month;
"Plant Load Factor" or for a given period, means the total senl out energy
"PLF" correspondingto ScheduledGeneration during the period,,
expressedas a percentageof sent out energy correspondingto
ContractedCapacity in that period and shall be computedin
accordancewith the following formula:
N
PLF (%)= 10000x E SGi / { N x CC x (100-AIIX")
|%
i=l
Where:
(1) "CC" Contracted Capacityin MW;
(2) "SGi" = ScheduledGenerationin MW for the Settlement
Periodi(only for the Procurers);
(3) 'TI" = Numberof SettlementPeriodsduring the period; and
(4) *AUX'"= 5romrativeAtxiliary Consumption(7o)
{l:) .I} o
facilities of the power genelation facility referred to
above;
(c) any water supply, featment or storage facilities
required for the operation of the power generation
facility referredto above;
(d) the ash disposal system including ash dyke [as
applicablel;
(e) township areafor the staff colony; and
(D bayls for transmissionsystemin the switchyardofthe
powerstation,
(g) all the other assets,buildings/structwes, equipments,
plant and machinery, facilities and related assets
requiredfor the effrcient and economicoperationof the
power generationfacility;
"ProjectDocuments" Mean
a) MOU dated22.04.2010r
b) ConstructionContracts;
c) Fuel Supply Agreements including the Fuel
TransportationAgreement,if any;
d) FinancingAgreements;
e) O&M contracts;
D any other agreementsdesignatedin writing as
such, from time to time , jointly by the
Procurersandthe Seller;
Shalrti ,i;.r..vr:r
il..ttc,
L gcKto !v.
the tlpe specified in this Agreement and which practices'
methodsand standardsshall be adjustedas necessary,to take
accountor:
a) operationand maintenanceguidelinesrecommendedby
the manufacturersof the plant and equipment to be
incorporatedin the Project;
b) the requirementsof Indian Law; and
c) thephysicalconditionsat the Site;
Sbahti J.r,rrv:r.l
E.rtl,
Lucknow.
for the residualperiod of the PPA by amendmentof the PPA
.or by executionof a fresh PPA in accordancewith the terms
and conditionscontainedin the said Schedule;
COD"or
"scheduled Means for the first lJnit, 24 months from the date of MOU
"Scheduled (22.04.2010)andfor the secondUnit, 28 monthsfrom the date
Operatiorr
Commercial of MOU, as determinedand announcedby the Seller to the
Date" Procurers,subjectto the extention of time by Procurersor in
acoordancewith the provisionsherein or due to ForceMajeure
Events;
"ScheduledCorurection Shall mean the date falling 120 days before the Scheduled
Date" COD of first Unit;
;'scheduledEnergy" Meansthe quantumof ex-busenergyin kWh scheduledto be
injected into the grid by the Unit correspondingto Scheduled
Generation;
"Scheduled At any time or for any period or time block meansscheduleof
Generationl'or "SG" generationin MW ex-bus given by the State Load Despatch
Centre;
"scheduledOutage" Shall have the meaning ascribed to this term as per the
provisionsof the Grid Code;
Period"
"Settlement Meansthe time block for issueof daily generationand drawal
schedulesasprovidedin ABT;
Period"
i'Stabilisation Shall mean, a period of One hundred Eighty (i80) days
commencingon the CommercialOperation Date of the each
Unit;
cY. iE p
*"";.;l;;
lJ i|,4
i*
"StateTransmission Shall have the meaningascribedthereto in the Electricity Act
Utility''or "STU" 2003;
"Supercritical Means technology with minimum steam paxametersat steam
Technology'' turbine inlet asdecidedwith the ConstructionContractor;
Bill"
"Supplementaxy Meansa bill other than a Monthly Bill raisedby any of the
Partiesin accordancewith Article 1l;
"TestedCapacity" In relation to a Unit, or the Power Station as a whole (if all the
Units of the Power Station have been Commissioned)means
the results of the most recent Perfornance Test or Repeat
PerformanceTest carried out in rclation to the Power Station
in accordancewith Article 6, Article 8 and Schedule5 of this
Agreement;
'lVr'.
heelingChiarges" Are the chargespaid by the Procurersto the CTU or STU or
or "Transmission any other agency for the transfer of power from the Power
Charges" : Stationswitchyardendto the Procurers'network;
L t: i] p
1.2 Interpretation
X 45MW) Kundark+i
c E. (P B.l,&.
lJ. Pzf . r,t g.
Shakti B:iawar! E.{td.
I-ucknor'.
1.2.12 Differentparts of this Agreementare to be laken as mutually explanatoryand
supplementaryto each other and if there is any inconsistencybetweenor irmong
the partsof this Agreement,they shall be interpretedin a harmoniousmannerso as
to give effect to eachpart.
1 . 2 . 1 3 The tables of contentsand any headingsor sub-headingsin this Agreementhave
beeninsertedfor easeof referenceonly and shall not affect the interpretationof
this Agreement.
1.2.14 All interest payable under this Agreementshall accrue fiom day to day and be
calculatedon the basisofa yearofthree hundredandsixty five (365)days.
1 . 2 . 1 5 The words "hereof' ot "herein", if and when usedin this Agreementshall meana
reference to this Agreement.
1.2.1,6 In case any thing in this Agreement is. found in consistencewith UPERC
Regulationsor orders passedby UPERC, then UPERC Regulations/Ordersshall
prevailoverthis Agreement.
This Agreementshall come into effect from the EffectiveDate. This Agreementshall be
valid for a term commencing from the Effective Date until the Expiry Date ("Term of
Agreement")unlessterminatedearlier pursuantto Article 2.2. lJpon the occurrenceof the
Expiry Date, this Agreement shall, subject to Article 18,9, automaticallyterminate.unless
mutually, extendedby all the Partieson mutually agreedterms and conditions,atleastone
hundred and eighty (180) days prior to the Expiry Date, subject to approval of the
AppropriateCorirmissionoasnecessary'
2.3.2 Whereeither party signifies its intentionto extendlhe term of this Agreement
and negotiations between them commence,then this agreementshall be
deemedtohavebeenextendedbeyondtheTermofAgreementuntilthe
negotiationsaxeended,provided that during this spill over period the terms
on non-extension
2,3,4 Consequences
(2 X 45MW)
2.4 Survival
2.4.t The expiry or termination of this Agreement shall not alfect accrued rights and
obligationi of the Parties under this Agreement, including the righJ to -receive
Liquidated Damages as per the terms of this Agreement, nor shall it affect any
continuing obligaiions for which this Agreementprovides, either expressly or by
necessaryimplication, the survival of, post its expiry or termination.
2.5.1 The Procurers hereby appoint and authorise "Procurer No' 3-"
[MadhyanchalVidyut Vitran Nigam Ltd- [hereinafterrefened to asthe "Lead
Procurer"] to represent all the Procurers for discharging the rights and
obligations of the Procurers,which are required to be undertakenby the
Procurers jointly as mentioned in Schedule 12 of this Agreement'
Accordingly, all the Procurersshall follow and be bound by the decisionsof
the Lead Procureron all suchmatters. EachProcureragreesthat any decision,
communication, notice, aciion or inaction of the Lead Procurer on such
mattersshall be deemedto havebeenon its/his behalf and shall be binding on
eachof the Procurers.The seller shall be entitledto rely upon any suchaction,
decision or communicationfrom the Lead Procurer. It is clarified that this
Article 2.5 is not intendedto and shall not renderthe Lead Procurerliable to
dischargeindividual Tariff paymentsof the other Procurers.
r\val€
Shal':r
i,,,1:i
a.raajixiu.
Luc&row^
2.5.2 Notwithstandinganything containedabove,any decisionwhich is requiredto
be taken by the Procurersjointly under the provisions of Article 14 shall be
takenby all the Procurersand in caseof differenceamongstthe Procurets,the
said decision s hall be taken by the Majority Procurersas defined in Article
2.5.3below.
:r:t tl
Prior to the Effective Date, Promoter has provided to GOUP, the B4nk
Guaranteeof an aggregateamount of Rupees22.5 crores in accordance
with the provisions of ClauseI 6 of the MOU dated22.04.201'0.The MOU
is valid till 18 monthsfrom the date of expcutionand the Bank Guarantee
shall remainvalid beyondsix monthsof the period of the MOU . In caseof
breachof the MOU or any.part thereof by above said company the said
Bank Guranteecanbe invoked by GOUP.
The Promoter shall provide for the same aggregateamount of Bank
Guaranteeas provided with GoUP with the procurers having validity
before 3 months from scheduledCOD to after 3 months from scheduled
COD. In casethe actual COD is different from the scheduledCOD then the
validity of performa.nceguaranteeshall be adjustedaccordingly so that it
remainswith the procurersuplo after 3 monthsfrom actualCOD.
,ri,
'* i!i
ggu,.
,; -.i-,".- :,i i
_
I"ucktror,
b) Not used.
c) Sellershall haveachievedFinancialClosure;
iv) the Seller shall have made availableto the Procurerthe data with
respect to the Project for design of Interconnection Facilities and
TransmissionFacilities, if required;
v) The Seller shall have finalised the specific delivery point for supply of
power in consultationwith the Procurer;
vi) The Seller shall haveprovided an irrevocableletter to the Lendersduly
acceptingand acknowledgingthe rights provided to the Lendersunderthe
termsof this Agreement.
vii) the Seller shall have sent a written notice to all the Procurer(s)
indicatingthat
a) the ScheduledCOD shall be as per the original ScheduledCOD i'e
24monthsfor the first Unit and 28 months for the secondUnit from the
MOU dateor
b) that it intendsto preponethe ScheduledCOD to be (i) for the first Unit,
to as
[Insert Date]; for the secondUnit [Insert Date] (hereinafterreferred
"RevisedScheduledCOD").?rovidedthat,the RevisedScheduled COD of
any Unit shall not be earlier than [Insert months] months from the MOU
date
ix) Not Used.
Page30 of
3.1.3 Not used
3.2 ProgressReport
The Seller and the Procurersshall noti$ one another in writing at least
oncea Month on the progressmadein satisSing the conditionsin Articles
3.1.2and3.1.2A.
3.3.1 if the conditionsspecifiedin Article 3.1 are not duly fulfilled within the
relevant stipulatedtime or after extendedtime, the Procwer or the Seller
shall have the right to terminatethis Agreementby giving a Termination
Notice to the Seller/ Procurers in writing of at least seven (7) days to
explain and/orperform
),J,4 In caseof inability ofthe Sellerto perform the activities specifiedin Article
3.1 within the relevant stipulatedtime period or during extendedperiod,
otherwise than for the reasons directly attributable to the Procurers/
UPPCL/GOUPor Force Majeureevent,this Agreementmay be terminated
by the UPPCL/the Lead Procurer at its option, by giving a Termination
Notice of at least seven(7) days,in writing to the Seller and in suchcase,
the Seller shall be liable to pay liquidated damages,as may be determined
by UPERC; provided that the amount of liquidated damagesshall in no
caseexceedthe amountof bank guaxantee given by the Promoter as stated
uhderAricle 3.I .1
3.3.3 Similalrly, in caseof inability ofUPPCL/Procurersto perform the activities
specifiedin Article 3.1 within the relevantstipulatedtime period of during
. extendedperiod, otherwisethan for the reasonsdirectly attributableto the
Seller or Force Majeure event, this Agreementmay be terminatedby the
Seller at its option, by giving a Termination Notice of at least seven(7)
the
. days, in writing to UPPCL/the Lead Procurer and in such case,
Procurershall be liable to pay liquidated damages,as may be determined
by UPERC, against site developmentand other charges,to Seller' Bank
Guaranteeof the Promoter shall be releasedforthwith
3.3.4 Any extension/increase in time period provided hereinaboveshall also lead
to iqual. increasein the time period of Bank Guaranteeprovided by the
sellerunderclause3.1.1,The new scheduledCoD shall be decidedwith
the approvalof Commissionaccordingly,
{:E (vP
S h r i , i j j , :: : l v r : i B x l G o
Lucl(now.
3.4 Not used
3.5 Not used
to be
4.1.l Subjectto the t,ermsandconditionsof this Ageement,the Sellerundenakes
responsible,at Seller'sown costandrisk, for:
a) obtaining (other than Initial Consenls)and maintaining in full force and effect all
Consentsrequiredby it pursuantto this AgteementandIndian Law;
c) owning the Project tlroughout the term of this Agreement free and clear of
encumbrancesoexceptthoseexpresslypermittedby Article l6;
4,2 Procurers'obligation
Subjectto the termsand conditionsof this ,Agreement,the Procurers:
a) shallbe responsiblefor procuringthe Interconnection andTransmissionFacilities
to enablethe Power Station to be connectedto the Grid Systemnot later than the
Scheduled CormectionDate;
b) shall ensurethat the Seller is provided an electrical connection for reasonable
constructiorLcommissioning and staxt up power at the Project as reasonably
requisltioned by the Seller by written intimation to the Procurers,on the then
prevalenttermsand conditionsasapplicableto suchconsumers .t
c) shall be responsiblefor payment of the Transmission Charges and RLDC and
SlDC.chargesin proportionto the conhactedcapacity;
d) shall make all reasonableafrangements for the evacuationof the Infirm Power
from the Power Station;and
Bajaj(2 x 4s Mw)
S h r : i j r . . , ': : i ! : r i t r .
l, u+lir,ow,
e) firlfilling obligationsundertakenby them underthis Agreement.
Bajaj(2 X 45 MW)
s!-J;,.T.,j;1,
u:,1".
Liictnos.
Procurer(s)for suchun-availedAvailable Capacrty.In sucha casethe surplusamount
receivedover variable chargeshall be adjustedagainstthe Fixed Chargeliability of
such Procurer(s)in respectof quantum of such capacity and/or power sold to third
partiesasprovidedbelow.
In case the surplus amount over variable charge is higher than the Fixed charge
liability of suchProcurer(s)in respectof quantumof suchcapacityand/orpower sold
by Seller to third parties,such excessamountshall be retainedby Seller. In casethe
. surplusamountover Variable Chargesis lower than the Fixed Chargeliability of such
Procurer(s)in respectof the quantumof suchcapacityand/orpower sold by seller to
third parties, such short fall amounl shall be payableby the respectiveProcwer(s).
Providedthat in suchcase, ifthe power is sold to its affiliate company then it should
not be sold at a tariff less than the agreed.in this PPA. In such case, the
Procurers/UPPCL/SLDC/STU shall haveno objectionin wheelingsuchpower .
4.4.4 TheSellershall not itself use any of the electricitygeneratedby the Power Station
during the term of this Agreement, except for the purpose of meeting the Power
Station's auxiliary load requirements,as per the norms laid down by the Appropriate
commission and housingcolony for the staff and other incidental usageof the same
category.
4.5.2 7f the Partieshave not agreed,within thirty (30) days after the affectedParty's
performancehas ceasedto be affectedby the relevantcircumstance,on how long the
ScheduledCommercial Operations Date, the ScheduledConnection Date or the
LE liirow.
Expiry Date shouldbe deferredby, any Party may raisethe Disputeto be resolvedin
accordancewith Article 17.
Where:
a) "SLDb" are the liquidated damagespayableby the Seller during the period
bgginningwith the day from the Scheduledcommercial operation Date of the Unit
up to andincluclingthe day on which Unit is actuallyCommissioned;
amount
4.6.2 The Seller'smaximumliability underthis Article 4.6 shall be limited to t]Ie
of liquidateddamagescalculatedin accordancewith Article 4.6.1 for and upto twelve
Bajaj(2 X 45 Mw)
e
IJ.
Shairti ii :..v r.r i;iia
I-uc iilo t4i.
(12) Months of delay for the Unit, provided that the amount of such Liquidated
damagesshall in no casefor eachUnit exceedRupees2.25 crores. Providedthat in
caseof failure of the Seller to Commissionthe Unit evenafter expiry of twelve (12)
Months from its ScheduledCommercial Date, the provisions of Article 14 shall
apply.
If the Sellerfails to pay the amountof damageswithin the said period of ten (10)
days, the Procurersshall be entitled to recover the said amount of the liquidaled
damagesby invoking the Bank Guarantee.If the then existing Bank Guaranteeis for
an amount which is less than tle amountof the liquidated damagespayable by the
Seller tq the Procurers under this Article 4.6, then the Seller shall be liable to
forthwith pay the balanceamount.
4.6.4 The Parties agree that the formula specifiedin Arlicle 4'6.I for calculationof
liquidated damagespayableby the Seller underthis Article 4.6, read with Article 14
is a genuineand accuratepre-estimationofthe actual lossthat will be sufferedby the
Procurersin the event of Seller's delay in achieving Commissioningof a Unit by its
Scheduled COD.
4.6.5 If any Unit is not commissionedby its RevisedscheduledcoD other than for the
reasonsspecifiedin Article 4.5.1,the Seller sha1lpay to eachProcurerliquidated
damages,proportionateto their.then existing Allocated ContractedCapacity, for the
delay in suchCommissioningor makingthe Unit's ContractedCapacityavailablefor
tlispatchby such date.The sum total ofthe liquidated damagespayableby the Seller
. to the Procurersfor suchdelayedUnit shall be equivalentto the damagespayableby
the Procurersto the CTU/STU(asthe casemay be) for the periodofdelay, asper the
terms of agreementproposedto be enteredinto by the Procurerswith CTU/STU for
establishmentof hansmission system' Provided however, the liquidated damages
payableby the Seller to tle Procurersin caseof delay under this Article 4.6.5 shall
not be more than twenty percent (20%) of liquidated damagescomputed in the
manner mentioned in Article 4.6.1. Provided further, in case of delay beyond
. ScheduledCommercialOperationDate,the provisionsof Article 4.6.1to 4'6.4 will
apply for suchdelay beyondScheduledCommercialOperationDate.
suchurrit shall, until the effects of the ProcurerEvent of Default or of Non Natural
Force Majeure Event (or Natural Force Majeure affecting the Procurer/s)no longer
prevent the Seller from undertakinga ComrnissioningTesVs,be deemedto have a
TestedCapacityequalto the InstalledCapacrtyand to this extent,be deemedto have
beencommissionedwith effect from the scheduledcoD without taking into account
delay due to suchProcwer Event of Default or Non Natural ForceMajeure Event (or
Natural ForceMajeure affectingthe Procurer/s)and shall be treatedasfollows.
b) In case of delay on account of Direct Non Natural Force Majeure Event, the
Procurers shall make payment to the Seller of Capacity Charges calculated on
Normative Availability of conhacted capacity of such unit for the period of such
eventsin excessof three (3) continuousor nori-continuousMonths in the manner
providedin (d) below.
*-,,,\ .
ii tsr,rfir a EKtu
Lucboow,
("Debt Service") relatable to such Unit, which are due under the Financing
Agrbements, subject to a maximum of Capacity Charges based on Normative
Availability, for the period of such eventsin excessof three (3) continuousor non-
continuousMonths in the marurerprovidedin (d) below.
d) In caseof delay due to Direct and Inditect Non Natural Force Majeure Events (or
Natural ForceMajeure affecting the Procurer/s),the Procurershall be liable to make
paymentsmentionedin (b) and (c) above,after Commissioningof the Unit' in the
form of an increasein CapacityCharges.Provided.suchincreasein Capacity.Charges
shall be determinedby AppropriateCommissiononthe basis of putting the Seller in
the sameeconomicposition asthe Sellerwould havebeenin casethe Sellerhad been
paid amountsmentionedin (b) and (c) above in a situation where the Direct Non
Natural ForceMajeure or Indirect Non Natural ForceMajeure Event, asthe casemay
be,hadnot occurred.
4.8.1 The Partiesexpresslyagreethat the Procurers'only liability for any lossof profits or
any other loss of any other kind or description whatsoever (except claims for
indemnity underArticle 15), sufferedby the seller by reasonof the Procurers'failure
Bajaj(2 x 45Mw)
to meetits obligationsunderArticle 4.2(a) to Article 4.2(d) shall be to pay the Seller
the amountsspecifiedin Article 4.7 andAfticle 14.
4.8.2 Similarly, Seller's only liability for any loss sufhred by the Procurersof any kind or
descriptionwhatsoever(exceptclaims for indemnity under Article 15), by reasonof
the Seller's failure to meet its obligations of Commissioningthe various Units on
their ScheduledCOD, shall be asper Article 4'6 andArticle 14.
*fLoqrt
Bajaj(2 X 45 Mw)
ARTICLES : CONSTRUCTION
5.1 Seller'sConstructionResponsibilities
The seller acknowledgesthat, before entering into this Agleement, it has had
sufficient opportunity to investigatethe Site and acceptsfull responsibility for its
condition (including but not limited to its geological condition, on the site, the
adequacyofthe road and rail links to the Site andthe availability of adequatesupplies
ofwater) and agteesthat it shall not be relievedfiom any of its obligationsunderthis
Agreement or be entitled to any extension of time or financial compensationby
reasonofthe unsuitability ofthe Site for whatever'teason'
5.3 InformationRegardinglnterconnectionFacilities
The Lead Procurer shall provide the seller, on a timely basis,all information with
Consentb
The seller shall be responsiblefor obtaining all consents (other than thoserequited
for the Intercormectionand TransmissionFacilities and the Initial Consents)Iequired
for developing,financing, constructing,operatingandmaintenanceof the Project and
maintaining/ renewing all such Consentsin order to carry out its obligations under
this Agreementin generalandthis Article 5 in particularand shall supplyto the lead
Procurer(or Procurer,as applicable)plomptly with copiesof eachapplicationthat it
submits, and copy/ies of each consent/approval/license which it obtains. FoI the
avoidance of doubt, it is clarified that the seller shall also be responsible for
maintaining/renewingthe Initial Consentsand for fulfilling all conditions specified
therein.
5.6 ConstructionDocuments
by
The Seller individually and all the Procurers(ointly) shall designatefrom timq to time,
be
giving a written notice to the other party up to fi-ve (5) of its/their employeeswho shall
who shall
responsiblefor coordinatingall constructionactiviti€s relating to the Project and
Page42 of 128
Bajaj(2 X 45 MW) Kundarkhi
ShaktiEnewar E{to,
tucklou.
haveaccessat all reasonabletimesto the otherparty'sland for the purposeof apprisingthe
progressof the work being carried on, subject to such designatedpersons or the party
appointingthem giving ieasonablenotice to the other party of suchvisit and subjectto their
complyingwith all reasonablesafetyprocedures.
of all the
For the avoidanceof doubt, it is clarified that the total numberof the representatives
Procurers shallnot exceedfive (5).
,'1:'";t;,
Sbaliii.l:r*an Extl'
Lu€kuog.
ARTICLE 6 : SYNCHRONISATION, COMMISSIONING AND COMMERCIAL
OPERATION
6.1 Synchronization
6.2 Commissioning
6,3 CommercialOPeration
6.3.1 Unit shall be Commissionedon the day after the date when all the Procurers
receiveaFinalTestCertificateofthelndependentEngineerstatingthat:
Luckrov.
6.3.2 If Unit fails a commissioning Test,the seller may retakethe relevanttest,within
a reasonableperiod after the end of the previoustest, with three (3) day's prior
.written notice to the Procurersandthe IndependentEngineer.Providedhowever,
the Procurersshall have a right to require defermentof any such re-testsfor a
period not exceedingflfteen (15) days, without incurring any liability for such
deferment.if the Procurersare unable to provide evacuationof power to be
gdnerated,due to reasonsoutsidethe reasonablecontrol of the P.rocurersor due
to inadequatedemandin the Grid.
6.3.3 The Seller may retakethe PerformanceTest by giving at least fifteen (15) days
advancenotice in writing to the Procurers,up to eight (8) times, during a period
ofone hundredand eighty (1s0) days(Tnitial PerformanceRetestPeriod") from
a Unit's coD in order to demonstratean increasedTested capacity ovet and
above as provided in Article 6.3.1 O). Provided however, the Procurersshall
have a right to require defermentof any suchre-testsfor a period not exceeding
fifteen (15) days, without incuning any liability for such deferment, if the
Procruersare unable to provide evacuationof power to.be generated,due to
rdasonsoutside the reasonablecontrol of the Procurers or due to inadequate
demandin the Grid.
a)theUnil'slnstalledCapacrtyshallbereducedtoitsTestedCapacity,as
existing at the most recent PerformanceTest referred to in Article 6.3.3 and
capacity charges shall be paid with respect to such reduced contracted
Capacity;
b) Not Used
cdii'-ele
U P'I,. C] L;
Sha'.ti S rrw.ra Bxttl,
(ii) If at the end of Initial PerformanceRetestPeriod or the date of the eighth
Performance Test mentionedin Article 6.3'3,whicheveris earlier,, the Tested
capacity is lessthan the Installed capacity (as existing on the Effective Date)the
consequences mentioned in Article 8.2.2 shall apply for a period of one year'
Providedthat such consequences shall apply with respectto the TestedCapacity
existing at the end of Initial PerformanceRetestPeriod or the date ofthe eighth
PerformanceTest mentionedin Article 6.3.3,whicheveris earlier
6.4 CostsIncurred
c g.tr.
Shaiiti lJJai?aJ Edt["
BajajQ x 45 Kundarkhi
6.5 Fuel
CE
S h a l ' 1 ir l ' : a I r E r i l n
Luci'.uo$'
(2X 4sMW)
ARTICLE 8 : CAPACITY' AVAILABILITY AND DISPATCII
8.1 Tests
RepeatPerformance
8 . 1 . 1 The Procurers(ointly) may from time to time during the OperatmgPeriod, but only
if the Available capacrtyhas not beenone hundredper cent (100%) of the Installed
Capacrtyof the commissionedunits (excluding the unit(s) under plannedoutagefor
capital maintenancein consultationwith the Regional Power Committeeor SLDC)
evenfor one continuousperiod ofat leastttree (3) hoursduring any three continuous
months, require the Seller to demonstratea Unit's or (if all the Units have been
Commissioned,the Power Station's) Tested Capacity by carrying out a further
Performance Test (a ,.RepeatPerformanceTest") in accordance with this Alticle
8.1. A RepeatPerformanceTest shall be carriedout in accordancewith Schedule5,
savethat the test shall last twenty-four (24) hours insteadof seventytwo (72) hours'
Providedtllat if the TestedCapacityafter suchtest is less than one hundred percent
(100%) of the Installed Capacity (as existing on the Effective Date) of the
CommissionedUnit, the Seller shall also have a right to conductnot more than two
(2) RepeatPerformanceTest within a period six (6) months,by giving a notice of not
less than fifteen (15) days to the Ptocurers for each such test. Provided that the
Procurersshall have a right to require defermentof eachsuchre-testsfol a period not
exceedingfive (5) days, without incuning any liability for such deferment,if the
Procurersare unableto provide evapuationof power to be generated;due to reasOns
outsidethe reasonablecontrol of the Procurersor due to inadequatedemandin the
Grid.
8.1.2 The Procurers(ointly) shall give the Sellernot lessthan seven(7) days' adVance
written notice of the time when a RepeatPerformanceTest of a Unit (or if all the
Units have been Commissioned,of the Power Station's) is to begin. A Repeat
PerformanceTest may not be scheduledfor any period when the unit to be testedis
dueto ru:dergoa Scheduled Outage.
8.1.3 The Procurers (ointly) and Sellershalljointly appointthe Independent Engineerto
monitor the RepeatPerformanceTest and to certify the results in accordancewith
Article 8,2.
8.1,4 If the Sellerwistresto take Unit, out of servicefor repairbeforea RepeatPerformance
Test, it shall inform all the Procurersin writing before its scheduledstart of the
repairsand the estimatedtime requiredto completethe repairs,The Partiesshall then
schedulea MaintenanceOutagein accordancewith the Grid Codeto enablethe Seller
to cany out those repairs and in such a case,the Procurel.Sfiointly), requiring the
RepeatPerformanceTest, shall defer the RepeatPerformanceLest until suchUnit is
retumedto service following that MaintenanceOutage.Providedhowever the Seller
shall not schedulethe Maintenanceoutageof a unit when anotherunit of project is
$he; ti ;Jlar-'ranBrts.
LucktroE.
shut down or expectedto be shut down except under force majeure or when the
operationof unit is not permissibledueto technicalconsideration.
8,1.5 The Procurersrequiring the RepeatPerformanceTest, may jointly' for reasonable
cause,defer any RepeatPerformanceTest for up to fifteen (15) days from the date
originally notified to tlre Seller in accordancewith Article 8.1'2 if such Procurers
jointly notify the Seller in ttiting at leastone (1) day before the RepeatPerformance
Test startsofthe reasonfor the defenal andwhen the test is to be rescheduled.
Providedthat, such defermentat the joint requestof the Pfocurers shall be permitted
only oncein respectofeachof theRepeatPerformance Tests'
g.1.9 within one (1) Month of the dateby which all the Units havebeencommissioned,
the Seller shall conducta PerformanceTest of the Power Stationftereinafter referred
to as..PowerStationPerformanceTest") whereffisl ths provisionsof Article 8,2 shall
apply. A Pow.erStation PerformanceTest sha1lbe canied out in accordancewith
Article 1.1 of Schedule5 , savethat the test shall lasl twenty-four (24) hours instead
of seventytwo (72) hours.
8.2 Derating
8.2.2 (i) If a Unit's (or if all the Units havebeenCommissioned, of the PowerStation's)
then cunent TestedCapacityas establishedby the Repeat Performance Test and the
Final Test cprtificate issuedby the IndependentEngineer,is less than its Installed
Capacityasexisting on the Effective Date,the Seller shall not be permittedto declare
the Available Capacrtyof the Unit (or if all the Units havebeenCommissioned,of the
PowerStation's)at a level greaterthanits TestedCapacity,in which case:
Page50 of 128
b) Not Used;
the Availability Factor of the derated Unit (or if all .the Units have been
c) 'Commissioned,
of the Power Slation's ) shall be calculatedby referenceto the
reducedInstalledCapacity,and:
d) the Capital Cost and each element of the Capital Structwe Scheduleshall be
reducedin proportion to the reduction in the Installed Capacrtyof the Power
Station as a result of that derating(taking into accountthe Installed Capacityof
anyUnit which hasyet to be Commissioned);
(ii) The consequences mentionedin sub-Article(i) above shall apply from the
completion date of each RepeatPerformanceTest.' If at the end of secondRepeat
PerformanceTest conductedby the Seller or the last date of the end of the six month
periodreferredto in Article 8.1.1,whicheveris earlier,the TestedCapacityis less
than the Installed Capacrty(as existing on the Effective Date ), the consequences
mentionedin Article 8.2.2 shall apply for a period of at leastone year after which the
Sellershall havethe right to undertakea RepeatPerformanceTest.Providedthat such
consequences shall apply with respectto the TestedCapacity existing at the end of
secondRepeatPerformanceTest conductedby the Seller or the last dateof the end of
the six monthperiod referredto in Article 8.I .1, whicheveris earlier
8.2.4 If a Unit's-or if all the units have beencornmissioned,of the Power station's ,
TestedCapacity is found to be more than it's Installed Capacity,the provisions of
A-rricle6.3.5shallapplymutatismutandis.
8.3 Availability
The Seller shall comply with the provisions of the applicable Law regarding
Availability including, in particular, to the provisions of the ABT and Grid Code
relatingto intimation of A andthe mattersincidentalthereto.
t .,.
'1
(2 X 45 MW) Kundarkhi 1"v:l ll 5l of 128
Luck0on.
i, r\v;rtp
Dispatch
The Seller shall comply with the provisionsof the applicableLaw regardingDispatch
Instructions,in particular, to the provisions of the ABT and Grid Code relating to
Dispatchandthe mattersincidentalthereto.
S h a Lr i ; , , { - i a D t t n ,
luoLDot.
Bajaj(2x 4s MW)
ARTICLE 9 : METERING A}{D ENERGY ACCOUNTING
9.1 Meters
For installation of Meters,Meter testing,Meter calibration and Meter readingand all
mattersincidental thereto,the Seller and the Procurersshall follow and be bound by
the Cenhal Electricity Authority (Installation and Operationof Meters) Regulations,
2006,the Grid code and ABT asamendedandrevisedfrom time to time. In addition,
the Seller shall also allow and facilitate sTU in installation of one set of required
main and standbyspecialenergymetersfor accuratsrecording of energysuppliedby
Seller.For thesesTU meters( 1I 0V, I A, 4-wire), the seller shall providethe required
cormectionftom EHV current transformers/ bushing CTs/ voltage traasformers/
CVTs on EHV side of all generator-transformers, station transformersand outgoing
lines, of meter accuracy of 0.2 class or better. The Seller may install any further
metersfor its own comfort at its own cost.
10,1 Insurance
The Seller shall effect and maintainor causeto be effectedand maintainedduring the
ConstructionPeriod and OperatingPeriod , Insurancesagainstsuch risks, with such
deductiblesand with such endorsements and co-insured(s),which the Prudentutility
Practiceswould ordinarily merit maintenanceof and as requiredunderthe Financing
Asreements.
r ,;'i'1,1Lx
11.1 General
From tle COD of the Unit, Procurersshall pay the Seller the Mon*rly Tariff
Payment,on or before the Due Date, comprising of Tariff for every Contract Year,
determinedin aicordancewith this Article 11 and Schedule7. All Tariff paymentsby
Procurersshall be in Indian Rupees.
Provided that the Seller shatl inform to the Control Centre about its schedulefor
supplyof suchpower two hrs ahead(asa specialcase)to testingof the Unit.
Provided also that the start up power drawn by the Unit from the grid shall be
adjustedwith ex-busenergyandsuchenergyshall be billed to Procurersproportionto
its percentagesharein InstalledCapacity
11.2.1The Seller shall issue to Procurera signed Monthly Bill for the immediately
precedingMonth.
Providedthat:
i. If the COD of the first Unit falls during the period betweenthe first (1st) day
and up to and including the fifteenth (l5th) day of a Month, the first Monthly
Bill shall be issuedfor the period until the last day of suchMonth' or
ii. If the COD of the first Unit falls after the fifteenth (15th) day of a Month, the
first Monthly Bill shall be issuedfor the period commencingfrom the COD of
'
the first Unit until the last day of the immediatelyfollowing Month.
Arailability and energy accountfor the relevantMonth as per REA for Monthly
(2 X 45MW) Kundarkhi
u-P'P. d. L1
Sha' li 3:riraD Brtl.
Procuiersand notis the Sel1erof the detailsof such accountninety (90) days before
theCOD of the first Unit.
1L3.4 In the event of delay in paymentof a Monthly Bill by any Procurerbeyond its Due
Date month billing, a Late PaymentSurchargeshall be payableby suchProcurerto
the Seller at the rate of one point two five percent(1.25%)per month as per UPERC
Regulations.
Il.4 PaymentMechanism
I1.4.1Letter of Credit:
EachProcurershall provide to the Seller,in respectof payment.ofits Monthly Bil'ls, a
monthly unconditional, revolving and inevocable letter of credit ("Letter of
Credit'), openedandmaintainedby eachProcurerfor presentationofL/C documents
in termsof Article 11.3.5,whichmay be drawnuponby the sellerin accordance with
shallprovidethe seller draft of the
ArticlesI 1.4.1.1tlfough I 1.4.1.5.The Procurers.
Letter of credit proposedto be provided to the Seller before the NTP. Further, the
Letter of credit shall be provided ftom the bank which is appointed as Default
EscrowAgent underthe DefaultEscrowAgreement.
11.4.1,1Not later than one (1) Month prior to the the ScheduledCOD or the Revised
scheduled coD (as applicable)'of the first unit, each Procurer shall through a
scheduledbank at Lucknow opena Letter of credit in favour of the Seller,to be made
operative from a date prior to the Due Date of its first Monthly Bill under this
Agreement.The Letter of Credit shall havea term of twelve (12) Months and shall be
renewedannually,for an amountequalto:
i) For the first ContractYear, equalto one point one (1.1) times the estimated
averagemontlly billing basedon NormativeAvailability;
'XT,''.
g:tttl.
Silr\ii il ritir'ir
Luoklior3"
ii) For eachsubsequentConhactYear, equalto the one point one (1.1) times the
estimatedaveragemonthly billing basedon Normative Availability.
Providedthat the Seller shall not draw upon such Letter of cfedit prior to the Due
Date of the relevant Monthly Bill, and shall not make more than one drawal in a
Month.
11.4.1.3 In caseof drawalof the Letterof credit by the seller in accordance with the
terms of this Article I l 4.1, the amount of the Letter of credit shall be
. reinstatedin the marurerstatedin Article 11.4.2.3of this Agreement'
11.4.7.4 If any Procurerfails to pay a Monthly Bill or part theleof within and including
the Due Date, then, subjectto Article 11.6.7,the Sellermay draw upon the
Letter of Credit, and accordinglythe bank shall pay without any referenceor
instructionsfrom the Procurer,an amountequal to such Monthly Bill or part
thereofplus Late PaymentSurcharge,if applicable,in accordtmcewith Article
1.1.3.4 above,by presentingto the scheduled bankissuingthe Letterof Credit,
the following docunents:
otlJr.
11.4.1.5 Procurersshall ensurethat the Letter of Credit shall be renewednot later than
forty five (45) daysprior to its expiry'
11.4.1.6 A11costsfelating to openlngand maintenanceof the Letter of credit shall be
borne by the Procurers,however, Letter of credit negotialion chargesshall be
bome andpaid bY the Seller'
11.4.1.7 Wherenecessary,the Letter of Credit may alsobe substitutedby an unconditional
and inevocablebank guaranteeor an equivaleirtinstrumentasmutually agreedby
theProcurersandthe Seller.
11.4.1.8 Upon fi.rlfilmentof the conditionsmentionedunderArticle ll.4'2.2 the Letterof
Creditamountas mentionedin Article 11.4.1.1shall be changedto one (1) tirne
the averageofthe Monthly Tariff Paymentsof the previousContractYear instead
of one point one (1.1) timesthe averageof the Monthly Tariff Paymentsof the
previousContractYear.
I 1.4.2CollateralArrangement
Sha,rri
.Dja rrro EJtn,
Luc(!osf.
which have already been chargedor agreedto be chargedprior to the date of the
executionof the Default EscrowAgreement
(ii) Such Procurerhas achieved,for its ability to honour its Tarilf Pa}ment
'A' or better,
obligationsto the seller underthis Agreement,a credit rating of
fiom a sEBI registeredIndian credit rating agencymutually agreedbetween
Seller and the Lender/s,consistentlyfor a period of at least thrrce(3) years;
. and
11.42,3 Letlerof credit will be replenishedfor the drawalsmade,before the next d]re date
from the date drawl of the Letter of Credit occurs, the Letter of Credit shall be
reinstatedto the requisite amount specified in this Agreement,and in the manner
specifiedin the Default EscrowAgreement'
In case of both (a) and (b) above if non- defaulting Procurer(s)receive Default
Electricity, then, subjectto applicability of Article 11.4.2.2of this Agleement,such
non defaulting Procurer(s) shatl within seven (7) days of exercising the right of
of
election,,either open an additional Irtter of CrediVenhancethe existing Letter
Credit in accordansewith the principles set forth in Article 11.4or increasethe value
of escrow cover under the Default Escrow Agreement and related security under
part
Agreementto HypotJrecatecum deedof Hlpothecation secltle.payrnentfor that
of the Default Electricity assuchnon- defaultingProcurerelectsto receive.
Provided further within two (2) Months of such election by the non-defaulting
Procurer(s), unlessthe eventoutlinedin Article 11.5.7hasoccurred'suchProcurer(s)
with
shall open'aLetter of credit/enhancethe existing Letter of credit in accordance
the principles set forth in Article 11.4 and shall increasethe value of escrow cover
cum
underthe Default Escrow Agreementand related Agreementto Hypothecation
Deedof Hypothecation.Providedthat in casethe eventsmentioned in article 11.4.2.2
(i), (i0 ana (iii) are true, then the requirement with respect to Default Escrow
Xg."r-*t *d egreementto Hypothecatecum Deedof Hypothecationin this Article
ttlS.Z strattbi applicableasper Article l't'4'2'2'
Page6l of 128
P.
Shakti lhai{ru E;{fil-
I- uckro s'.
11.5.3If all the non defaultingProcurersdo not make the electionto receivethe Default
Electricity or a part tiereof, within two (2) BusinessDays of it being so offeredunder
and as per Articte 11.5.2,or all suchProcurersexpresslywaive their first right to
receive the same,the Seller shall have the right (but not the obligation) to make
availableand sell the Default Electricity or a part thereof to a third party, namely:
(a) any consumer,subjectto applicableLaw; or
(b) any licenseeunderthe Electricity Act, 2003;
I 1.5.6kl caseof tlird party salesor salesto any other non defaulting Procwersaspermitted
by this Article 11.5, the adjusf,nentof the surplus tevenue over Erlergy Charges
(applicableto the defaulting Procurer)atftibutable to such electricity sold, shall be
adjusledasunder:
(a) the surplusupto the Tariff shatl be used towards the extinguishmentof the
subsisting paymentliability of thedefaultingProcurertowardsthe Seller;and
(b) the surplusif any abovethe Tariff shall be retaintd by the Seller.
(2 X 45 MW) Kundarkhi
i-l '
Sha:'r. i :- .t ;;.,,riI
Lii6k[oU.
(a) the day on which the defaulting Procurerpays the amount due to the Seller
and renews the Letter of Credit and restores Default Escrow Account (if
applicable)asmentionedin Article I 1.4.2.1; or
(b) the date being '4" days ftom the date on which the defaulting Procurerpays
the amountdue to the Seller,where'k" daysshall be calculatedin accordance
with Schedule3.
11.6 DisputedBill
,r.u.,i*:ll,liTirli#*. payabte
amount under Bill,provisional
a Monthly Biuora
SupplementaryBill, as the casemay be, that Party shall, within thirty (30) days of
receiving such bill, issue a notice (the "Bill Dispute Notice") to the invoicing Party
settingout:
i) the detailsof the disputedamount;
ii) its estimateof what the correctamountshouldbe; and
iii) all writtenmaterialin supportof its claim.
11.6.3If the invoicing Party agreesto the claim raisedin the Bill DisputeNotice issued
pwsuantto Article 11.6.2,lheinvoicingPartyshallrevisesuchbill within seven(7)
d,aysof receiving such notice and if the disputing Party has alreadymadethe excess
. payment, refund to the disputing Party suchexcessamount within fifteen (15) days
of receiving such notice. In such a caseexcessamount shall be refrurdedalong with
interestat the samerate as Late PaymentSurchargewhich shall be applied from the
date on which such excesspaymentwas made to the invoicing Party and upto and
includingthe dateon which suchpal'rnenthasbeenreceived.
11.6.4If the invoicing Party does not agreeto the claim raised in the Bill Dispute Notice
issuedpursuantto Article ll ,6.2,it shall,within fifteen(15) daysof receivingthe Bill
DisputeNotice, fumish a notice to the disputingPartyproviding:
i) reasonsfor its disagreement;
ii) its estimateof what thecorrectamountshouldbe;and
iii) all written material in supportof its counter-claim.
11.6.5Uponreceiptof noticeof disagreement to theBill DisputeNoticeunderArticle 11.6.4,
authorisedrepresentative(s)or a director of the boardof directors/memberof boardof
eachParty shall meet and make best endeavoursto amicably resolve such dispute
within fifteen (15) days of receiving suchnotice of disagreementto the Bill Dispute
Notice.
11.6.6Ifthe Partiesdo not amicablyresolvethe Disputewithin fifteen (15) daysof receiptof
notice of disalreementto the Bill DisputeNotice pursuantto Article 11.6.4,the
mattershall be referredto DisputeResolutionin accordancewith Article 17'
11.6.7ln caseof DisputedBills, it shall be open to the aggrievedparty to approachthe
Appropriate Commissionfor Dispute Resolutionin accordancewith Article 17 and
Bi11")for paymenton
1l,8.1 EitherPartymay raisea bill on the otherParty("supplementary
accountof:
i) Adjustmentsrequiredby the RegionalEnergyAccount/ SLDC (if applicable);
ii) Tariff Paymentfor changein parameters,pursuantto provisions in Schedule
7; or
iii) Changein Law asprovidedin Article 13,
and suchBill shall bepaid by the other Party.
11.10 The copiesof all notices/offerswhich are requiredto be sent asper the provisionsof
this Article 11, shall be sentby eitherParty,simultaneouslyto all Parties.
S h a . i ; !fi r : , r , . r : B
r xltl.
LuckBov.
l2.l Definitions
An event of Force Majeure affecting the cTU/sTU or any other agentof Ptocurer,
which has alfected the InterconnectionFacilities, shall be deemedto be an event of
ForceMajeureaffecting Procwer/s
Similarly, any event of Force Majeure affecting the performanceof the Procurers'
contractorfor the settingup or operatingInterconnectionFacilities shall be deemedto
be an event of ForceMajeure affecting Procurer/sonly if the ForceMajeure eventis
resultingin a delay in the Performanceof Procurer'scontractots'
12,3 ForceMajeure
Act ofGod, including, but not limited to lightning, drought,fire and explosion(to the
extentoriginatingfrom a sourceextemalto the Site), earthquake, volcaaiceruptioru
landslide, flood, cyclone, typhoon, tomado, or exceptionally adverse weather
conditionswhich are in excessof the statisticalmeasuresfor the last hundred(100)
years,
2. IndirectNon - NaturalForceMajeureEvents
or their agents
b. Delay in the performanceof any contractor,sub-contractors
excludingthe conditionsasmentionedin Article 12,2;
The Affected Party shall give notice to the other Party of any event ofForce Majeure
as soon as reasonablypracticable,but not later than seven(7) days after the date on
which such Party knew or should reasonablyhave known of the com{nencementof
the event of Force Majewe. If an event of Force Majeure resultsin a breakdownof
communicationsrendering it urueasonableto give notice within the applicabletime
limit specifiedherein,then the Party claiming ForceMajeure shall give suchnotice as
soon as reasonablypracticableafter reinstatementof communications,but not later
than one (l) day after suchreinstatement. Providedthat suchnotice shall be a pre-
conditionto the Seller's entitlementto claim relief underthis Agreement.Suchnotice
shall include flrll particulars of the event of Force Majeure, its effects on the Party
claimingrelief andthe remedialmeafluesprcposed,The Affected Party shall give the
other Party regular (and not less than monthly) leports on the progress of those
remedial measuresand such other information as the other Party may reasonably
requestaboutthe situation.
The Affected Party shall give notice to the other Party of (i) the cessationof the
releyarrtevent of Force Majeure; and (ii) the cessationof the effectsof sucheventof
ForceMajeure on the performanceof its rights or obligationsunderthis Agreement,
assoonaspracticableafterbecomingawareof eachof thesecessations.
Page68 of 128
;lra?rq iirio.
12,6 Duty to perform and duty to mitigate
To the extent not preventedby a Force Majeure event pursuantto Article 12.3,the
Alfected Party shall continue to perform its obligationspursuantto this Agreement.
The Affected Party shall use its reasonableefforts to mitigate the effect of any event
ofForceMajeureassoonaspracticable.
CE:
13.l Definitions
13.1.1"Changein Lawu meansthe occunenceof any of the following eventsafter the date,
which is seven(7) daysprior to the Effective Date:
13.r.2
l
l
a) ConstructionPeriod
of capital cost of
As a result of any change in Law, the impact of increase/decrease
the project in the Tariff shall be as approvedby UPERC.In caseof Dispute, aticle
l7 shallapply.
Qajaj(2x asMw)
ti.< ,, a:. L:
b) OperationPeriod
As a result of Changein Law, the compensationfor any increase/decreasein revenues
oi costto the Seller shall be determinedand effective from suchdate,as decidedby
Appropriate commission whose decision shall be final and binding on both the
Parties,subjectto rights of appealprovidedunderapplicableLaw.
13.3.1If the Selleris affectedby a change in Law in. accordancewith Arlicle 13.2 and
wishes to claim a Change in Law under this Article, it shall give notice to the
procurersof such change in Law as soon as rcasonablypracticableafter becoming
awareofthe sameor shouldreasonablyhaveknown of the Changein Law.
13.3,2Notwithstanding Article 13.3.1,the seller shallbe obligedto selvea noticeto all the
Procurersunder this ArtieIe 13,3,2if it is beneficially affected by a Changein Law.
Without prejudice to the factor of materialily or other provisions containedin this
Agreement,the obligation to inform the Procurerscontainedherein shall be material.
Provided that in case the Seller has not provided such notice, the Procurersshall
jointly havetheright to issuesuchnoticeto tle Seller.
Page73 of 128
i,':\v;:lir'r,
The occunence and continuation of any of the following events,unless any such
eventoccurs as a result of a Force Majeure Event or a breachby Procurersof their
obligationsunderthis Agreement,shall constitutea SellerEvent of Default:
i) The failure to Commissionany Unit by the date falling twelve (12) Months after its
ScheduledCommercialOperationDate,or
ii) After flre commencementof eonstructionof the Project, the abandonmentby the
Selleror the Seller's ConstructionContractorsof the constructionof the Project for a
continuousperiod of two (2) Months and such default is not rectified within thitty
(30) days from the receipt of first notice from any of the P'rocurersor Procurers
(lointly) in this regard,or
iii) If at any time following a Unit being Commissionedand during its retest, as per
Article 8, such Unit's Tested Capacity is less than ninety two (92) percent of its
Installed Capacrty., as existing on the Effective Date, and such Tested Capacity
remains below ninety two (92) percent even for a period of three (3) Months
'i,'*i*ri;
.,1.',,\:a[$'i'
"f;<"J'?iir
.t.tiv_ix E{f,d.
LucklroE.
. however,prior to consideringany event specifiedunder this sub-anicleto be
an Event of Default, the Seller shall give a notice to the concemedProcurerin
writing of at leastthifty (30) days;or
v) If (a) any Procurer becomesvoluntarily or involuntarily the subject of any
bankruptcy or insolvency or winding up proceedingsand such proceedings
remain uncontestedfor a period of thirty (30) days, or (b) any winding up or
bankruptcyor insolvencyorder is passedagainstthe Procurer,or (c) the
Procurergoesinto liquidation or dissolution or has a receiver or any similar
officer appointedover all or substantiallyall of its assetsor official liquidator
is appointed to manage its affairs, pursurult to Law, except where such
dissolution or liquidation of such Procurer is for the pulpose of a merger,
consolidationor reorganizationandwherethe resultingentity hasthe financial
standing to perform its obligations under this Agteement and has
creditworthiness similar to such Procurer and expressly assumes all
obligationsof such Procurerunder this Agreementand is in a position to
perform them; or;
vi) Occurenceof any other event which is specified in this AgreemenJto be a
materialbreachor default of the Procurels'
14.3.1Upon the occurrenceand continuation of any Seller Event of Default under Article
. 14.1,the Procurersjointly shall have the right to deliver to the Seller a Procurer
Preliminary Default Notice, which shall specify in reasonable detail, the
giving rise to the issueof suchnotice.
circumstances
X 45 MW) Kundarkhi
exercisetheir rights as mentionedherein above, the Capacity Charge of the Seller
shallbe reducedby 20% for the periodofSeller Eventof Default'
14.4.5(i) After a periodof seven(7) days following the expiry of the ConsultationPeriod
and unless the Parties shall have otherwise agXeedto the contrary or the Procurer
Event of Default giving rise to the CbnsultationPeriod shall havebeenremedied,the
seller shall be free to sell the then existing Allocated contracted capacity and
. associatedAvailabl.eCapacity of Procurer/scommitting Procurer/sEvent of Default
to any third party of his choice. Provided such Procurer shall have the liability to
make paymentsfor Capacity Chargesbasedon Normative Availability to the Seller
for theperiodthree(3) yearsfrom the eighthday afterthe expiry ofthe consultation
Period.Providedfurther that in suchthreeyear period, in casethe seller is ableto sell
electricity to any third party at a price which is in excessof the Energy Charges,then
such excessrealization will reduce the capacity charge payments due from such
ProCurer/s.For the avoidanceof doubt, the aboveexcessadjustmentwould be applied
on a cumulalive basis for the three year period. During suchperiod, the seller shall
use its best effort to sell the Allocated contracted capacity and associatedAvailable
Capacity of such Procurer generatedor capable of being generatedto such third
partiesat the most reasonableterms availablein the market at sYcllti_melhaving due
regardto the circumstancesat suchtime andthe pricing of electricity in the marketat
such time. Provided further, the Seller shall ensure that sale of power to the
shareholdersof the Seller or any diiect or indirect affrliate of the Seller/shareholders
of t{,reSeller,is not at a price lessthan the Tariff, without obtainingthe prior written
.! rivi,,'.i'-.
r 5, i!:9 /\*"'.1.,i-
$haiti :) r.r,;.ra E:i}!o
L uc JiEotrf.
Bajaj (2 45 MW)
consentof suchProcurer/s.Suchrequestfor consentwould be respondedto within a
maximum period of 3 days failing which it would be deemedthat the Procurerhas
given his consent. Provided further that at the end of the three year period, this
Agreementshall automaticallyterminatebut only with respectto suchProcurer/sand
thereafter,suchProcurer/sshall haveno frrther CapacrtyChargeliability towmdsthe
Seller. Provided further, the Seller shall have the right to terminatethis Agreement
with respectto such Procurer/seven before the expiry of such three year period
provided on such termination,the future CapacityChargeliability of suchProcurer/s
shallceaseimmediately,
e '''
1:111'
gbal;ri :) r ;;ia Eatr.
* ,,, \/
Luo;k&gy.
ii;1',;'!',';1
(2 X 45 MW) Kundarkhi
ARTICLE 15 : LIABILITY AND INDEMNIFICATION
l5.l Indemnity
(a) Any and all third party claims, actions, suits or proceedingsagainst the
Procurer/sfor any loss of or damageto property of suchthird party, or death
or qiury to suchthird party, arising out ofa breachby the Seller of any of its
obligations under this Agteement,exceptto the extent that any such claim,
'
action, suit or proceedinghasarisendueto a negligentact or omission,breach
of this Agreementor breach of st4tutory duty on the part of Procurers,its
conlractotsoservantsor agents;and
(a) Any and all third party claims, actions,.suitsor proceedingsagarnstthe Seller,
for any loss of or damageto propertyof suchthird party, or deathor injury to
suchthird party, arising out of a breachby Procurerof any of its obligations
underthis Agreementexceptto the extentthat any such claim, action, suit or
proceeding has arisen due to a negligent act or omission, breach of this
Agreementor breachof statutoryduty on the part of the Seller,its contractors,
seryantsor agents;and
i\illi*
The Indemniffing Party shall become liable to pay the claim amount to the
Indemnified Party or to the third party, as the casemay be, promptly following the
resolutionof the Dispute, if such Dispute is not settledin favour of the Indemnified
Party.
: ,r?1tr Eitttt,
Lucknow.
proceedingswithout first getting the consent of the indemniffing Party, which
consentshall not be unreasonablywithheld or delayed.
15.4 IndemnifiableLosses
S h a i r i i: , : . ; , : . :E ; t O .
LuckiioE
16.l Assignments
This Agreementshall be binding upon, and inure to the benefit of the Partiesand
their respective successorsand permitted assigns. Subject to Article 76.2, this
Agreementshall not be assignedby any Party (and no Party shall createor permit to
subsist any encumbranceover all or any of its dghts and beneflts under this
Agreement)other tlan by mutual consentbetween the Parties to be evidencedin
writing:
Provided that, such consentshall not be withheld if any of the Procurersseeksto
transferto any transfereeall of its rights and obligationsunderthis Agreement;and
(a) Suchtransfereeis either the owner or operatorofall or substantiallyall of the
distribution system of such Procurer and /or such transfereeis a successor
entity ofany of the Procurers;and
(b) This Agreementshall continue to remain valid and binding on such
. successor.
16.2 PermittedCharges
Bajaj(2 X 4s Mw)
:l:r::,,t*nnExin.
well as compensatedby any person other than the Procurersfor the same
(b) Pledgesof goods, the related documentsof title and / or other related
documents,arising or createdin the ordinary courseof the Sellercarrying out
the Project;or
cr.{Pr
\).'fi:i. L!
ShaLti iJialral El '
l7,l GoverningLaw
17.2 AmicableSettlenent
17.2.2The othel Party shall, within thirty (30) days of issue of dispute notice issuedunder
Article 17,2.1,furnish:
17.2.3 Within thirty (30) daysof issueof noticeby any Partypursuantto Article 17.2.1or
Arhcle 17.2.2, both the Parties to the Dispute shall meet to settle such Dispute
amicably. If the Partiesfail to resolvethe Dispute amicably within thirty (30) days
of receipt of the notice referred to in the precedingsentence,the Dispute shall be
referredto DisputeResolutionin accordancewith Article 17.3.
17.3 DisputeResolution
17.3.1 Where any Dispute arises ftom a claim made by any Party for any changein or
detetminationof the Tariff or any matter related to Tariff or claims madeby any
Party which partly or wholly relate to any changein the Tariff or determinationof
any of such claims could result in changein the Tariff or (ii) relatesto any matter
agreedto be referredto the AppropriateCommissionunderArticles4'7.1,13,2,l8.l
or clause 10,1.3 of Schedule17 hereof, such Dispute shall be submittedto
adjudicationby the Appropriate Commission.Appeal againstthe decisionsof the
AppropriateCommissionshall be madeonly as per the provisions of the Electricity
Act, 2003,asamendedfrom time to time.
7jli.'i,,".
i1:.'{"-"i,rl
l:''iclv/lfil
:ltl;-in /
'|. ..-"
The obligationsofthe Procurersunderthis Agreementtowardsthe Sellet shall not be
affectedin any mannerby reasonof inter-sedisputesamongstthe Procurers.
(i) The Arbitration tribunal shall consistof three (3) arbitratorsto be appointedin
accordancewith the Indian Council of Arbitration Rules
(iv) The award shall be enforceablein any court having jurisdictioq subjectto the
applicableLaws.
(v) The provisions of this Clauseshall survive the ter'rninationof this PPA for any
reasonwhatsoever.
18.1 Amendment
This Agreementis solely for the benefit of the Partiesand their respectivesuccessors
and permitted assignsand shall not be construedas creating qny du1y,standardof
careor any liability to, any personnot a party to this Agreement-
18.3 No Waiver
18.4 Entirety
18.4.1This Agreementandthe Schedules are intendedby the Partiesas tle final expression
of theii agreementand are intendedalso as a completeand exclusivestatementofthe
termsof their agreement.
18.4.2Except as provided in this Agreement,all prior written or oral understandings,ofters
or other communicationsof every kind pertainingto this Agreementor the sale or
purchaseof Electrical output and contractedcapacrty under this Agreementto the
Procurersby the Seller shall standsupersededand abrogated.
18.5 Confidentiality
The Partiesundertaketo hold in confidencethis Agreementand not to disclosethe
termsand conditionsofthe transactioncontemplatedherebyto tlird parties,except:
(a) To their professional
advisors;
(b) To their officers, contractors,employees,agentsor representatives,financiers;
l. who need to have accessto such information for the proper performanceof
their activities;or
{i!at..
c g. (P.
u.vi.\:.. Lt
Sl.ai.ti i:],i3.,vf,
a Brta.
LricknoE.
(c) DisclosuresrequiredunderLaw.
without the prior written consentofthe otherParties.
Providedthat the Seller agreesand acknowledgesthat any of the Procurersmay at
any time, disclose the terms and conditions of the Agreement and the Project
Documentsto any person,to the extentstipulatedunderthe Law.
18.6 Aflirmation
TheSellerandProcurers,eachaffirmthat:
(ii) It has not in any other mannerpaid any sums,whether in Indian cr rercy or
foreign currency and whether in India or abroadto the other Party to procure
this Agreement,and the Sellerand Procurerhereby undetake not to engagein
any similar actsduring the Term of Agreement.
18.7 Severability
tre invalidity or enforceability,for any reason,of any parl of this Agreementshall not
prejudiceor aflect the validity or enforceability of the remainderof this Agreement,
unlessthe part held invalid or unenforceableis fundamentalto this Agreement'
18.8 No PartnershiP
None of the provisions of this Agreementshall constitutea partnershipor agencyor
any suchsimilar relationshipbetweenthe SellerandProcurers.
18.9 Survival
Notwithstandinganythingto the contraryherein,the provisionsof this Agreement,
including, Article 10.2 (Application of lnsuranceProceeds),Article 12 (Force
Majeure),Article 14 (Eventsof Default and Termination),Article 15 (Liability and
Indemnification), Article .17 including Atticle 17.3.2 (Governing Law and Dispute
Resolution),Article 18 (Miscellaneous), and other Articles and schedulesof this
Agreementwhich expresslyor by their naturesurvive the term or termination of this
Agreenent shall continueand survive any expiry or terminationof tlis Agreement.
18.10 Counterparts
g;t16.
lihai(ii -.itr;:!::
18.11 Notices
All noticesto be given under this Agreementshall be in writing and in the English
Language.
-.':
Seller:
Bajaj EnergyPrivateLimited
negister:edOffice : 2ndFloor, Bajaj Bhawarl JamnaLal Bajaj Marg, Nariman
Point,Mumbai-400021
CorporateOffice : B-10 Sector3, Noid4GautamBudhNagar(U'P.)
Pin- 201301
Procurerl:
ManagingDirector
PaschimanchalVidyrt Vitran Nigam Limited
HydelInspectionHouse,Hydel Colony,VictoriaParh Meerut-250001
Fax: 012l-2666062
Phone:0121-2665734
2:
Procurer
Director
lvlanaging
PoorvanchalVidyut VitranNigamLimited
VidyutNagar,BhiKraripur,P.O.DLW' Varanasi-221010
Fax: 0542-2319758
Phone:0542-2318437
Procurer3:
ManagingDirector
MadhyanchalVidlut Vitran Nigam Limited
4.AGhokleMarg, Lucknow-226001
Fax: 0522-2208769
Phone:0522-2208737
criP?
Shal.riI r ' r'1i1Exttr'
Lucknog;
Bajaj (2 X 45 MW) Kundarkhi Page88 of 128
Procurer4:
ManagingDirector
DakshinanchalVi$ut Vitran Nigam Limited
U{a Bhavan,NH - 2 (Agra - Delhi BypassRoad),Sikandra,Aga - 282002
Fax: 0522-2208769
Phone:0522-2208737
Any Party may by notice of at least fifteen (15) days to the other Partieschangethe
addressand / or addressesto which suchnotices and communicationsto it are to be
deliveredor mailed.
18.12 Language
The languageof this Agreementand all written communicationbetweenthe Parties
relatingto this Agreementshall be in English.
18,14NominationRestriction
Notwithstandinganything containedto the contrary in this Agreement,wherevera
referenceiS made to the right of a Procurerto nominate a third Party to receive
benefits under.this Agreement, such Third Party ,shall have a financial standing
comparableto that of the Procurerin question.
18.1! CommercialActs
The Procurersand Seller unconditionally and irrevocably agreethat the execution,
delivery and perfonnanceby eachof them of this Agreementand those agreements
includedin the Collateral Arrangementto which it is a Party constituteprivate and
commercialactsratherthan or governmentalacts;
'rtl'J
or Indirect Losses
18.17 No Consequential
The liability of the Seller and the Procurersshall be limited to that explicitly provided
in this Agreement. Provided that notwitlstanding anlthing contained in this
Agreement,under no event shall the Proburersor .theseller claim from one anothet
any indirect or consequentiallossesor damages.
Sisnaturewith Seal
Witness:,^
t/t,..-"='a-
r. t 9.(-{**rr.<*;1t-fl4114-
v€ (?t A)
Signaturewith seal
witness: {b"*-'+-
1. (E.etPr.o€f )lkw X-
2. lYe&4
eaa^24'r:-*)Eu
For andon behalf of
Sisnaturewith seal
Witness: rht**-'--,rl-
a,
1. U-P.Qa-xo47 ffi(L+
2. fit,"-l
taffilt
'.-
11
/
\]r
cE. (P.P,A,l
.IJ.
P, F, {. LI
ProcurerI :
ManagingDirectot
. PaschimanchalVidyut Vitran Nigam Limited
Hydel InspectionHouse,Hydel Colony,VictoriaPark,Meerut-250001
Fax: 0127-2666062
Phone:0121-2665734
Procurer2:
ManagingDirector
PoorvanchalVidyut Vitran Nigam Limited
Vidyut Nagar,Bhikharipur,P.O. DLW Y aranasi-221010
Fax:0542-2319158
Phone:0542-2318431
Procurer3:
ManagingDirector
MadhyanchalVidyut Vitmn Nigam Limited
4A Ghokle Marg, Lucknow-226001
' Fax: 0522-2208769
P]none0522-2208737
Procurer4:
ManagingDirector
DakshinanchalVidyut Vihan Nigam Limited
Urja Bhavan,NH - 2 (Agp - Delhi BypassRoad),Sikandra'Agra - 282002
Far': 0522-2208769
Phone:0522-2208737
Luoktros'
2x45 MW Thermal Power Plant is being set up by M/s Bajaj Energy PrivateLtd.
on the surplusland , measuringabout 23.36 acres.of SugarMill - Kundarkhi
situated in Village-Kundarkhi, Post Office-Govindpar4 Tehsil and District -
Gonda. The site is located at about 4'0 KM from Darjikuan on Gonda -
Mankapur Road. The nearestRailway Station is Motiganj which is situatedat
about3.0 KM from the site.
ShaktitlhnwanExtt*
Llr,t kjto $/,
StateGovemmentClearance GoUP/UPPCL
approvalof FeasibilityReport
A
Pollution Clearance(Watsr & U.P.PollutionControlBoard
Ai0
5 EnvironmentalClearance Ministry of Environmentand
Forests(GoI) / U.P.Agency
l4 Financing FinancialInstitutions
15
\j..-, .
,!.'
c.i I
; l:: I
'i_;
ry
!" ,v
nn7---:.
{l
sbo,otiil.t ,'o
't't E *to ' st
Bajaj(2 X 45 MW) Kundarkhi Page94 of 128
SCHEDULE3 : CALCULATION OF'X' DAYS
(ReferArticle 11.5.7)
MECHANICAL
Coai Handling Plart - Capacity : 160TPH ( 12Hrs working)
Plant Requirement: 72 TPH
ExecutionType : Tum Key ( excludingCivil work )
SiesmicZone : 4 for all the sites.
Coal - F Grade
GCV -3865 kcal/kg
Boiler -
CFBCBoiler, 190TPH steam,pressure1l0(a) bar,
Temperature- 540 Deg C at superheateroutlet.
DMPlant-
RO + DM and softenerplant, Capacity- l2M3/hr
CoolingTower -
Induceddraughtcounterflow coolingtower,Capacity-
16000M3/hr.No. of cells(6)
II
il
II drtn'
Shairti li:a 'van'
Luckno{'
I .1 PerformanceTest
(i) (a) The PerformanceTest shall be conductedunder any and
all ambient
conditions(temperaturqhumidity etc.) and any and all Fuel qualities trrat
may exist during the time of the performanceTest and no correctionsin
'
final gross output of trre unit will be arlowed as a result of preva ing
ambientconditionsor Fuelqualitv.
(b) The correction curves will only be used if the Grid System
operation
duringthe Performance Testexceedselectricalsystemlimits,
(c) The PerformanceTest shall be deemedto have demonstmtedthe Instaled
capacity of the unit under all designed conditions and therefore no
adjustments shall be made on account of fuel quality or ambient
conditions.
(d) The seller shall perform in respectof eachunit a performanceTest,which
such unit shall be deemedto have passedif it operatescontinuouslyfor
seventytwo consecutivehours at or aboveninety five (95) percentof its
Installed Capacity ,as existing on the Effective Date and within the
electricalsystemlimits and the FunctionalSpecifications.
(ii) For the purposesof any PerformanceTest pursuantto this sub_article
the electricalsystemlimits to be achievedshall be asfollows:
(a) Voltage
The Unit must operatewithin the voltage levels describedin the
Functional Specificationfor the duration of the performanceTest.
If, during the PerformanceTest,voltage tesls c:rnnotbe performed
due to Grid System,data suppliedfrom testsof the geneiatorstep_
up toansformersandgeneratorssuppliedby the manufacturersshall
be used to establishthe ability of the Unit to operatewithin the
specified voltagelimits.
(c) PowerFactor
The Unit shall operatewithin the powerfactorrangedescribedin
the Functional Specification for the duration of the performance
Test. If during the PerformanceTest,power factor testscarurotbe
performeddue {o the Grid data suppliedfrom testsof the
{iual".""'.
ri)
a1 Ulti.
Bajaj(2 Xa5 MW) KundarkhiSbai.ti i].r::...r:rn r'l
E.(t{ Page98 of
I- uci(sor'.
generatorcand the generatorstep-uptransformerssuppliedby the
manufacturersshall be usedto establishthe ability #the Unit to
operatewithin the specifiedpower factot range.
(d) Fuel quality and cooling water temperature
The Unit must operateto its Installed Capacity with Fuel quality
and-water temperatue available at the time of Testing and no
adjustmentshall be allowedfor any variation in theseparamet€rs.
E9.TE,E4
u . P - 9 .r ) l L ;
Sbakti B;rarvanE*tB
Luchnos.
b. Not used;
SbaktiiJtia,vauBnta.
Luo&!oI|.
General
Intereston loancapital;
Rerurnon Equity;
OperationandMaintenanceexpensesincluding insurance;
Intereston workingcapital;and
Bajaj(2 X 4s MW)
It -T: :r. {. L.
Shaiiii .l r 1 .rl |1 gxt0,
I ua I l-iow.
For determinationof Tariff, the debt-equity ratio as on the dateof
COD shall be 70:30.In caseequity employedis more than 30%,
the amountof equity for determinationof Tarif,f shall be limited to
30% andthe balanceamountshall be consideredas the normative
loan. Hoqever, where actualequity employedis lessthan 30oi, the
actual debt and equity shall be consideredfor determinationof
tariff. The debt and equity amountso arrived at shall be usedfor
calculating interest on loaq return on equity, Advance Against
Depreciationand ForeignExchangeRateVariation.
7.3.4 Depreciation
7.3.5 AdvanceagainstDepreciation(AAD)
ri. fr P. ,-1.Lr
Shaiiii iti:.wai ilxtd
Explanation
7.3.8 WorkingCapital
1 1 .F - F , i l . L r
Shat;ti il r rwrl Ert[,
Page104of l?8
(iv) Maintenance spares @ 20%oof Operation and
Mfitenance expenses;and
(v) Receivablesequivalentto two months or actual,
whichever is lower, comprising of Fixed Charge
and Variable Charges calculated on the Target
Availabilitv.
. tr i-".J. Li
Sbakti iiha'"vat E;tc,
(2 X 45 MW) Kundarkhi
7.3.10 Taxes,duties,Ieviesandimpositionsetc.
7.3.11Tax on Income
Tax on the income streamsof the Seller from its core business
shall be computedas an expenseand shall be permittedto be
recoveredfrom Procurersin proportion to its percentagesharein
InstalledCapacityof the PowerStationin accordancewith UpERC
Regulations,
7.3.12ExtraRupeeLiability
i';'*H
Sha,ii; riiratr ExtA"
Lucknory.
Where,
(1OO-(AUXn)
)
Where,
Priceof Secondary
Fueloil in Rs./ml,
c R:(P
1.1* :t.
Sba:(ii ;-rrtr.r
.-i:t:l
7.4.4 Land,ed,
Costof Coal
7.5.1 Incentive shall be payableat a flat late of 25 paise per KWH for
ex-bus ScheduledEnergy correspondingto ScheduledGeneration
in excessof ex-bus energy cplresponding to Target PLF. This
shall be paid on arrrual basis and shall be paid in the
cE. ir'.
$hakti.^ :,r+r Eitu.
(a) Penalty paid to the Fuel Supplier under the Fuel Supply
Agreements in that ContractYear,alongwith documentary
proof for paymentof suchpenalty,or
Where:
c
n . P- 2 7 T L t
Shcl t"1liJ,r!v3a Ext6
I ucknOW,
7.9 Records
For the purposesof this Agreement,the assets,liabilities, Equity, revenueand
expensesof the Seller shall be recordedand maintainedin the accountsof the
Seller in Rupees. Either Party shall have the right, upon reasonableprior
written notice to the other Party,to examineand/ or make copiesof the records
anddataof the other Partyrelating to this Agreement
7.10 Norms of Operation
'
For the purposeof tariff determinatio&the Norms of Operationshallbe
decidedby UPERC separately.
S.NO. Particulars
1. @ the procurersfrom the 132 KV Switch
Yard of the B.E.P.L.Power GeneratingStation,Kundarkhithrough
132 KV Double Circuit TransmissionLine at 220 KV Gonda Sub
Station
?,?{1Ti.
Shakliiglrrva::Eltr
LucLloE.
Page113of 128
SCHEDULE 10 : REPRESENTATIONAND WARRANTIES
c E. (P g:\4;
u.Yi-.a\t,.
ShaktiJ;rr,,'..t J.rtn,
Article1.1
Article2.2
Article3.1.2
Article4.3.2
Atttcle4.7.2
Article5.3
Article5.5
Article6.2.3
Artisle8.1.1
Article8.1.2
Article8.1.3
Article8.1.4
Article8.1.5
Article8.1.6
Article8.2.2(c)
Article13.3.2
Article14.1(ii)
Article14.1(ix)
Article14.1(x)
Article14.1(xi)
Article14.3.1
'.\-2-4, l"
Sharr:.i9 :i',,vri: Eltn
ShaLriSrrt.i:rErt[.
Luci(Eoa'
Siiakri3.;.r*;:-:.Extn"
LucLi]os.
Pagel2l of 128
nai4 1ZX +SUW1Kundarkhi
SCHEDULE 17 : SUBSTITUTTONRIGHTS OF THE LENDERS
eF.-
ghakti ;:l
, ,,.
continueto opefatethe Project in accordancewith the PPA till suchtime as the selectee
underclause8.8hereof.
is finally substituted
d) The Lendersand the Procurersshall, simultaneouslyhave the right to commence
the processof substitutionof the Seller by the Selecteein accordancewith theseterms
andthe Sellerherebyirrevocablyconsentsto the same.
6. Processof Substitutionof Seller
The Lenders' Representativemayr on delivery of a Substitution Notice notify the
Procurersand the Seller on behalf of all the Lendersaboutthe Lenders' decisionto invite
andnegotiate,at the cost of the Lenders,offers from third partiesto ac1as selectee,either
throughprivate negotiationsor public auctionand / or a tenderprocess,for the residual
period of the PPA. subject to and upon approval of the Lead Procurer referred to in
clause8.5, such Selecteeshall be entitled to receiveall the rights of the Seller and shall
undertakeall the obligations of the Seller under the PPA and other Project Documents
executedbetween the Seller and the Procutets, in accordance.with these temts of
substitution.
The Lenders and the seller shall ensurethat, upon the Lead Prgcurer approving the
Selectee,the Seller shall transferabsolutelyand irrevocably,the ownershipof the Project
to such Selecteesimultaneouslywith the amendm€ntor novation of the PPA and other
Project Documents executedbetween the Sellel arid the Procurersin favour of the
Selecteeasmentionedin clause1 (b).
7. Modalityfor Substitution
7.1 Criteriafor selectionof the Selectee.
The Lendersand / or the Lenders' Representativesha1lin addition to any other
criteria that they may deemfit and necessary,apply the following critefia in the
selectionof the Selectee:
Bajaj(2 X Page123of
(d) Any,other appropriate criteria, whereby continuity in the performanceof the
Sellctee's obligationsunder the PPA is maintainedand the security in favour of
the T,endersunderthe FinancingAgreementsis preserved.
Modalities
The following modalities shall be applicable to any substitution of the Seller by the
Selectee pursuantto this Agreement:
8.1 The Lenders' Representative shall on behalf of the Lenders proposeto the
.,Proposal") pursuant to sub-clause8.2 below, the name of the
Procurers(the
Selecteefor acceptance,seeking:
(a) Cnant of all the rights and obligations under the PPA and the other Project
Documentsexecutedbetweenthe Procurersand the Seller, to the Selectee(as
substitutefor the Seller);
(c)Theexecutionofnewagreementsasnecessary,bytheproposedSelecteeforlhe
residualperiod of the PPA on the sameterms and conditions as are included in
this Agreement.
g.2 The Proposal shall contain the particulars and information in respect of the
seleoteethe data and information as any of the Procurersmay reasonablyrequire.
The Procurersmay intimate any additionalrequirementwithin thirty (30) days of
the dateofreceipt of the Proposal.
9k+-?.v:.tl
Shalrii 3la..van Extn
Ln.i know.
then
o) Be liable for and shall assume,dischargeand pay the Total Debt Amount or
outstandingdues to the Lenddrs under and in accordancewith the Financing
Agreementsor in any other manneragreedto by the Lendersand the Procurersas
ii such Selectee was the Seller originally named under such Financing
Agreements.
the
Notwithstanding anything to the contrary mentioned in this Agreement'
irpprovalofthe Procure(s) or LeadProcurerfor the Selecteeshall not be withheld
:
in casethe Selecteemeetsthe criteria mentionedin Clause7' 1'
Selectee
8.6 Upon approval of the Proposaland the Selecteeby the Ptocurers'the
-"ntion.d io the Proposalshall becomethe Selecteehereunder'
Lenders'
8.7 Following the rejection of a Proposal, the Lenders and/or the
proposal,proposinganother
Represeniativeshall t ave the right to submit a fresh
party
Selectee(if the rejection was on the grounds of an inappropriatethird
proposed as Selectee) within sixty (60) days of receipt of communication
of this
iegardirrg rejection of the Selecteepreviously proposed'The provisions
clauseshall apply mutatismutandisto suchftesh Proposal'
upon
8.8 The Jubstitutin of the Sellerby the Selecteeshall be deemedto be complete
the Selecteeexecuting all necessarydocumentsand writings with or in favorn of
-and
the Seller, Procurers the Lenders so as to give full effect to the terms and
by
conditionsof the substitution,subjectto which the selecteshasbeenaccepted
complete
the Lenders and the Procurersand upon transfer of ownership and
possessionoftheProjectbytheProcurersortheSeller'asthecasemaybe,tothe
^selectee.
The Procurersshall novate all the Project Documents,which they had
Page125of
Bajaj (2 X 45 MW) Kundarkhi
SbafttiIkaw:rnBxtl.
&uokoow.
$
enteredin to with the Seller in order to makethe substitutiQnof the Sellerby the
selectee effective, The quantum ard manner of payment of the consideration
payable by the selectee to the Seller towards purchase of the Project and
ussumptionof all the rights and obligationsof the Seller under the PPA and the
Project Documentsas mentionedin this Agreementshall be entirely betweenthe
Selier, Selecteeand the Lendersand the Procurersshall in no way be responsible
to beartle same.
8.9 Upon the substitutionbecomingeffectivepursuant_tosub-clause8.8 above,all the
rights ofthe Sellerunderthe PPA shall ceaseto exist:
Providedthril, nothing containedin this sub-clalse shall prejudiceany pending /
subsistingclaims of the Seller againsta Plocufer or any claim of the Procurers
againstthe erstv!+rileSelleror the Selectee.
9. Seller'sWaiver
law
9.1 The seller irrevocably agreesand consents(to the extent to which applicable
may require such consent) to any actions of the Lenders' the Lender's
RepresentativeandtheProcurersorexergiseoftheirrightsunderandin
accordanceradththeseterms.
g.2Thesellerirrevocablyagreesandconsents(totheextenttowhichapplicablelaw
cease
may requiresuchconsents)that ftom tfe d31especifiedin clause8'9' it shall
tohaveanyrightsunderthePPAortheFinancingAgreementsotherthanthose
expresslystatedtherein.
Page126of
najaj(Z X +SUW) Kundarkhi
{,-
U, Lr
ShaktiB}a'x3r Exto.
LucksoB,
9.3 The Seller wafrants and covenantsthat any agreemententeredinto by the Seller,
in relation to the Project, shall include a legally enforceableclauseproviding for
automaticnovation of such agreementin favour of the Selectee'at the option of
the Lpndersor the Procurers'The Seller further warrants and covenantsthat, in
respectof any agreementswhich have alreadybeen executedin relation to the
Project and which lack a legally enforceableclause providing for automatic
novation of such agteenent, the Seller shall procure an amendmentin the
concludedagreementto incorporatesuchclause.
r ,-p
Bajaj(2 X 45 MW) Kundarkhi . ql6
1ir/il{or.
4 ,'
'-:'
L.
--j.rn.,t.t[3nttr_ I'rKXi+. j(n
I"ucklo ur.
loss to the Power Station or for any other reasonwhatsoever,except for wilful
defaultof the Procurers.
11. SubstitutionConsideration
ll.2 The Seller shall be deemed to have nominated, constitutes and appoints the
Lenders' Representativeas its constitutedattorney for doing all acts, deedsand
things as may be required to be done for the substitution of the seller by the
Selecteepursuantto theseterms.
c E ,( P .
Bfftt"
!ihai(i.i B:la;trt
I/$0l.to{"
Page128of 128