COORDINAT SEAM 1 (M) SEAM 2 (M) SEAM 3 (M) SEAM 4 (M) REMARK TOTAL
CODE DATE REMARK
SOUTH EASTHING ELV (M) DEEP COAL DEEP COAL DEEP COAL DEEP COAL COAL DEEP OPEN (M)
BR 01 RT 05 Desember 2021 357025 9984423 53 16.00 5.90 22 Area PiT Roda Tehnik
BR 02 RT 06 Desember 2021 357025 9984307 55 25.10 7.00 34 Area PiT Roda Tehnik
BR 03 KMP 06 Desember 2021 356990 9984201 55 16.50 7.00 24 Area PiT KMP
BR 03 B KMP 07 Desember 2021 356999 9984199 55 16.50 4.50 Coring (bottom BB) 21 Area PiT KMP
BR 08 23 Desember 2021 356486 9984065 55 22.50 8.20 Finish 51m, BB kotor 30 Area Pak Wiyono
BR 10 30 Desember 2021 356587 9983638 58 30.00 1.80 38.20 4.30 45 Area Pak Ayang
BR 11 31 Desember 2021 356540 9983720 62 15.80 2.20 Water loses, BB kotor 24 Area Pak Janet
BR 11B 03 Januari 2022 356527 9983705 62 36.00 2.70 Water loses, BB kotor 40 Area Pak Janet
TOTAL 505