Professional Documents
Culture Documents
MPCP Operation 2018 19
MPCP Operation 2018 19
Target Target
ACCOUNTABILITY MANAGING POINT UOM CHECK POINT UOM RESP. FOR CP
From To From To
A Customer A1 Improve Vehicle direct pass %-age A1.1 Engine Rework Neo / Rocks PPM 20,800 15,000 Yurdha/ Sandy/
Focus Neo / Rocks 73 80 Apache PPM 15,000 Heri
Apache - 80 Dazz PPm 10,000 8,500
Dazz 74 80 Max PPm 21,300 10,000
Max - 80 A1.2 Reduce vehicle defect due quality probrem Neo %-age 23 5 Soni / Satrio /
from fabrication part Rockz 5 3 ABS
Dazz 34 5
A1.3 Reduce OOD for vehicle assy Neo %-age 5 3 Lili /Cahyono
Rockz 20 5
Dazz 7 3
A1.4 Reduce painting rework : All models %-age Ali/Diah
Plastic 7.7 % 3.5 %
ACED 1.7 % 1.0 %
A1.5 Implement project improvement to increase All models No of projects Lili / Cahyono /
4 6
direct pass BS / ABS
A2 Reduce Export customer complaints Avg Nos / M A2.1 Reduce inhouse complaint from CKD/SKD No of part / 100 Lili / Cahyono
packing due to Missing / Wrong Part veh
Zero
Missing complaints 6 0 A2.2 Implement project improvement to reduce No of projects Lili / Cahyono /
export customer complaint Rudi
2 6
Damage complaints 7 0 A2.3 Closure inhouse PDI complaint for %-age complaint Lili / Cahyono
100%
CKD/SKD within 48 hrs closed
Wrong parts 0 0 A2.4 Implement self audit process related with % adherence to Cahyono
process improvement from customer weekly audit 100%
complaint
A2.5 Complete skill matrix for operator (Vehicle, No of process Yurdha/Lili
4 4
Engine, Packing CKD/SKD)
A3 Improve spare parts (FMP) availability at %-age 77% 95% A3.1 Improve service level of plastic part to %-age Ali/Pibri
99%
Dealer end spare warehouse
B Improve B1 Achieve delivery service level as per policy % -age 78% 90% B1.1 Improve productivity of direct manpower V/M/D 1.8 2 Lili/Roy
Productivity plan (Direct Productivity)
B1.2 Improve vehicle line efficiency All models %-age Lili/Cahyono/
88% 95%
Rudi / ABS
B1.3 Increase engine line efficiency (PvsA) All models %-age 84% 95% Yurdha / Rudi
B1.3 Increase painting line efficiency ( PvsA) All models %-age 92% 98% Ali/Pibri
Page 1 of 2
MANAGING POINTS & CHECK POINTS : 2018-19
DEPT/SECTION : Operations NAME ANDY NOVIJANTO DESIGNATION : Dep. GM
Target Target
ACCOUNTABILITY MANAGING POINT UOM CHECK POINT UOM RESP. FOR CP
From To From To
Page 2 of 2