GENERATION PERFORMANCE
Generation performance Month to Date (M-T-D) October 2023 vs May 2023 Baseline

UCLF, Partial
p.m. peak
Date Capacity Planned Losses & Partial Load Units at Risk Outage Slip
forecasted
(08:00 daily) Available (MW) outages (MW) outage delays Losses (MW) (MW) (MW)
(MW)
(MW)

Average
28268 5381 14113 6596 27491 5235 1148
02-06 Oct 2023

Average
28962 5368 13373 6878 27903 4835 766
09-13 Oct 2023

Average
16 - 20 Oct 29418 5207 13096 6415 27879 4158 1409
2023

M-T-D Avg 28883 5318 13527 6630 27758 4743 1108

May-23
27410 3120 17369 6793 31135 6579 3478
Baseline
ENERGY ACTION PLAN – KEY HIGHLIGHTS
ENERGY ACTION PLAN
PERFORMANCE HIGHLIGHTS

1338 MW is expected to connect to the grid in 2023 and 3081 MW in 2024.


A survey conducted by Eskom showed that the total number of projects in
development is 66 GW.

One project from RMIPPPP is on track to reach legal close by the end of October
New Gx 2023, and two further projects by December 2023. These projects will
contribute an additional 424 MW once completed.

Three more projects from Bid Window 5 are on track to reach commercial
close by the end of November 2023, representing 300 MW.

Wheeling Rooftop solar capacity in South Africa has more than doubled since July 2022 to
FRamework over 4,500 MW, helping to reduce load shedding over the winter months.
ENERGY ACTION PLAN
PERFORMANCE HIGHLIGHTS

A total of 1136.5 MW has been approved for Eskom’s Standard Offer


Standard Programme, exceeding the target of 1000 MW. The standard offer allows
Offer Programme Eskom to buy power from companies with extra capacity available at a
cheaper price than the use of OCGTs.

The NECOM wheeling framework is finalised and being prepared for submission to
NERSA. The framework sets out the principles of non-discriminatory rights of
Wheeling & Net access to wheel electricity and the charges to be raised.
Billing Framework
A draft Net Billing Framework has been developed and is awaiting approval by
NERSA. This will ensure all distributors have an export credit for feeding power
into the grid.