Professional Documents
Culture Documents
Payment No. 3 To Architect
Payment No. 3 To Architect
Payment No. 3 To Architect
BILL TO
Secretary
Peradeniya Engineering Faculty Alumni Association,
(PEFAA), colombo chapter
Payment for the consultancy for landscape design conceptula drawing phase LKR 170,000.00
Part payment number 1
75 % of total conceptual drawing stage
OTHER COMMENTS
-
TOTAL LKR 170,000.00
TEAM WORKS ASSOCIATES (PVT)LTD, 137/5 Beddagana Road(South), Pitakotte. T: 011 288 6953 E:info@teamworkslk.com