Asbestos Hazard Abatement Plan - English 12.09.2023
Asbestos Hazard Abatement Plan - English 12.09.2023
RADU BOGDAN-ALEXANDRU
HSE MANAGER
0
Table of Contents
1. Introduction.................................................................................................................................2
1.1 Project Overview.....................................................................................................................2
1.2 Purpose..............................................................................................................................................2
1.3 Scope............................................................................................................................................. 3
2. Regulatory Compliance............................................................................................................5
3. Hazard Assessment....................................................................................................................7
4. Abatement Methods.................................................................................................................9
5. Personal Protective Equipment (PPE)...............................................................................11
6. Emergency Response..............................................................................................................13
7. Exposure Monitoring...........................................................................................................15
8. Waste Disposal and Recordkeeping...............................................................................18
9. Training.....................................................................................................................................20
10. Review and Updates.............................................................................................................22
11. Responsibilities......................................................................................................................24
12. References................................................................................................................................26
1
Asbestos Hazard Abatement Plan
1. Introduction
Provide a brief overview of the project, including its location, purpose, and scope.
1.2 Purpose
1. Worker and Public Safety: The primary purpose of an AHAP is to protect the
health and safety of workers, as well as the public, from the potential health
risks associated with asbestos exposure. Asbestos fibers, when inhaled, can
cause serious respiratory illnesses, including lung cancer, asbestosis, and
mesothelioma. The plan outlines measures to prevent asbestos exposure
during abatement activities.
2. Regulatory Compliance: Compliance with local, state, and federal regulations
is essential when dealing with asbestos-containing materials (ACMs). AHAPs
are designed to ensure that the abatement activities align with these
regulations, which may include guidelines from organizations like the
Occupational Safety and Health Administration (OSHA) and the Environmental
Protection Agency (EPA). Non-compliance can result in legal penalties and
liabilities.
3. Risk Assessment: The plan facilitates a systematic assessment of the risks
associated with ACMs. It involves identifying and documenting the location,
condition, and type of ACMs present. This information helps prioritize
abatement activities and allocate resources effectively.
4. Safe Work Practices: AHAPs provide detailed procedures and guidelines for
conducting asbestos abatement activities safely. This includes the use of
engineering controls, containment measures, ventilation, decontamination
procedures, and the proper handling and disposal of asbestos waste. It also
specifies the use of personal protective equipment (PPE) to minimize exposure.
2
5. Emergency Response: In the event of accidents, unexpected releases, or
incidents during asbestos abatement, the AHAP outlines emergency response
procedures to protect workers and the environment. It ensures that personnel
are prepared to respond effectively to unforeseen situations.
6. Training and Education: AHAPs typically include training requirements for
workers involved in asbestos abatement. Proper training ensures that
individuals are aware of asbestos hazards, understand safe work practices, and
are competent in their roles.
7. Documentation and Recordkeeping: The plan establishes procedures for
documenting all aspects of asbestos abatement activities, including surveys,
inspections, air monitoring results, waste disposal records, worker
certifications, and incident reports. Proper recordkeeping is essential for
compliance and liability protection.
8. Environmental Protection: In addition to protecting human health, the AHAP
may incorporate measures to minimize environmental contamination. This
includes safe disposal of asbestos waste and preventing asbestos fiber release
into the environment.
9. Quality Control and Assurance: The plan may include quality control and
assurance procedures to ensure that abatement work is performed to high
standards, reducing the likelihood of errors or subpar work.
10. Liability Mitigation: Having a well-documented AHAP in place demonstrates
an organization's commitment to asbestos safety. In the event of incidents or
legal issues related to asbestos exposure, the plan can serve as evidence of
due diligence and responsibility.
1.3 Scope
The scope of an Asbestos Hazard Abatement Plan (AHAP) outlines the specific
boundaries, objectives, and details of the plan, defining what it covers and what it
does not. The scope should be clearly defined to ensure that everyone involved in
asbestos abatement activities understands their responsibilities and the extent of the
plan's coverage. Here are some key elements typically included in the scope of an
AHAP:
3
1. Project or Facility Description: Begin by providing a brief description of the
project or facility where asbestos abatement activities are taking place. Include
details such as the location, size, purpose, and any relevant historical
information.
2. Regulatory Framework: Specify the regulatory framework under which the
AHAP operates. Identify the relevant local, state, and federal regulations,
standards, and guidelines that the plan must adhere to. This often includes
OSHA, EPA, and state-specific regulations.
3. Project Objectives: Clearly state the objectives of the asbestos abatement
project. These objectives may include removal, encapsulation, or enclosure of
asbestos-containing materials (ACMs) to eliminate or reduce asbestos hazards.
4. Work Area Boundaries: Define the physical boundaries of the work areas
where asbestos abatement activities will occur. Provide maps, drawings, or
descriptions to clearly delineate these boundaries.
5. Identification of ACMs: Specify the procedures and criteria used to identify
ACMs within the defined work areas. Detail how asbestos surveys and
inspections were conducted to locate and assess ACMs.
6. Abatement Methods: Describe the specific abatement methods and
techniques that will be employed, including engineering controls, containment,
ventilation, and safe work practices. Specify whether removal, encapsulation, or
enclosure will be used and under what circumstances.
7. Waste Handling and Disposal: Explain how ACM waste will be properly
handled, packaged, labeled, and disposed of in accordance with regulatory
requirements. Outline waste transportation procedures.
8. Worker Safety: Detail the safety measures in place to protect workers involved
in asbestos abatement activities. This includes the use of personal protective
equipment (PPE), fit testing, and decontamination procedures.
9. Emergency Response: Define the procedures for responding to emergencies,
incidents, or accidents related to asbestos exposure. Specify the steps to be
taken in the event of an unexpected release or injury.
10. Air Monitoring: Explain the air monitoring program, including the locations,
frequency, and methods used for monitoring airborne asbestos levels. Define
acceptable exposure limits.
11. Training Requirements: Outline the training and certification requirements for
workers and supervisors involved in asbestos abatement. Describe the content
and frequency of training programs.
12. Documentation and Recordkeeping: Detail the procedures for documenting
and maintaining records related to asbestos abatement activities, including
surveys, inspections, air monitoring results, waste disposal records, and worker
certifications.
4
13. Quality Control and Assurance: Specify any quality control and quality
assurance measures in place to ensure that abatement work is performed to
high standards.
14. Reporting: Describe the reporting procedures for incidents, accidents, non-
compliance with the AHAP, and changes in project conditions. Identify the
responsible parties for reporting.
15. Review and Updates: Indicate how and when the AHAP will be reviewed,
updated, and revised, particularly if project conditions change or regulations
are updated.
By clearly defining the scope of the AHAP, all stakeholders can better
understand their roles and responsibilities, ensuring that asbestos abatement
activities are conducted safely, compliantly, and effectively.
2. Regulatory Compliance
Failure to comply with these regulations can result in legal liabilities, fines, and
penalties. Therefore, ensuring strict adherence to all applicable regulatory
requirements is essential when developing and implementing an Asbestos Hazard
Abatement Plan. Additionally, it is advisable to consult with regulatory authorities or
experts in asbestos abatement to ensure full compliance with all relevant laws and
standards.
3. Hazard Assessment
7
Exposure Assessment: Evaluate the potential for asbestos exposure to
workers and building occupants. Consider factors such as the type and
condition of ACMs, the extent of disturbance required for the project,
and the proximity of ACMs to occupied areas.
Exposure Pathways: Identify potential exposure pathways, including
activities that may disturb ACMs, airflow patterns, and the movement of
workers and equipment. Assess how asbestos fibers could become
airborne and reach individuals.
Severity of Hazards: Assess the severity of hazards by considering the
quantity and accessibility of ACMs, as well as the likelihood of fiber
release during the project.
3. Regulatory and Industry Standards:
Ensure compliance with relevant regulatory requirements, such as
OSHA, EPA, state-specific regulations, and local building codes, which
may specify permissible asbestos exposure limits and control measures.
4. Engineering Controls and Risk Mitigation:
Identify engineering controls and risk mitigation measures that can be
implemented to minimize asbestos exposure. This may include
containment, isolation, and ventilation strategies to prevent the release
of asbestos fibers.
5. Work Methods and Practices:
Define safe work methods and practices that will be employed during
asbestos abatement. Specify procedures for handling ACMs, minimizing
dust generation, and ensuring proper waste disposal.
6. Personal Protective Equipment (PPE):
Determine the appropriate PPE required for workers involved in
asbestos abatement activities, including respirators, protective clothing,
gloves, and eye protection. Ensure that PPE is consistent with regulatory
requirements.
7. Exposure Monitoring:
Implement a comprehensive exposure monitoring program that
includes air sampling and analysis to measure asbestos fiber
concentrations during abatement activities. Establish acceptable
exposure limits and action levels.
8. Documentation:
Document all hazard assessments, including surveys, inspection results,
risk assessments, and exposure monitoring data. Maintain records of
these assessments for compliance and reference.
9. Emergency Response:
8
Develop procedures for responding to unexpected asbestos releases,
accidents, or incidents during asbestos abatement activities. Establish
communication and emergency response protocols to protect workers
and the public.
10. Training and Education:
Ensure that workers and supervisors are adequately trained and
educated about asbestos hazards, control measures, and emergency
response procedures. Training should align with regulatory
requirements.
4. Abatement Methods
Abatement methods for asbestos are the techniques and procedures used to
safely manage, remove, encapsulate, or enclose asbestos-containing materials (ACMs)
while minimizing the release of asbestos fibers into the air. The choice of abatement
method depends on factors such as the type and condition of ACMs, the scope of the
project, and regulatory requirements. Here are some common abatement methods:
1. Complete Removal:
Description: This method involves the complete removal of all ACMs
from a structure or area. It is often used when demolition or major
renovation is planned, and all asbestos hazards need to be eliminated.
Process: Trained asbestos professionals carefully dismantle and remove
ACMs, taking precautions to prevent fiber release. The removed
materials are sealed, labeled, and disposed of in accordance with
regulatory requirements.
Considerations: Complete removal is the most effective way to
eliminate asbestos hazards but can be expensive and disruptive. It
should be done by licensed asbestos abatement contractors.
2. Encapsulation:
Description: Encapsulation involves sealing ACMs in a protective
coating or encapsulant to prevent the release of asbestos fibers. This
method is suitable for situations where the ACMs are in good condition
and not likely to be disturbed.
9
Process: A specialized encapsulant is applied over the ACMs, creating a
durable and impermeable barrier. This encapsulant locks in asbestos
fibers, reducing the risk of exposure.
Considerations: Regular inspections and maintenance are necessary to
ensure the encapsulant remains intact. Encapsulation may not be
suitable for ACMs subject to frequent disturbance.
3. Enclosure:
Description: Enclosure involves constructing an airtight barrier or
enclosure around ACMs to prevent fiber release. This method is often
used in buildings to isolate asbestos-containing building materials.
Process: Asbestos-containing areas are sealed off with airtight barriers
made of materials like plastic sheeting. Negative air pressure is
maintained inside the enclosure to prevent fibers from escaping.
Considerations: Enclosure can be cost-effective and less disruptive than
removal, but it requires careful design and maintenance to ensure the
integrity of the barriers.
4. Repair:
Description: Minor repairs can be made to damaged or deteriorated
ACMs to prevent further damage or fiber release. Repair is a short-term
solution until complete removal or encapsulation is possible.
Process: Trained personnel repair damaged ACMs using appropriate
materials and methods, such as sealing cracks, holes, or tears in
asbestos-containing materials.
Considerations: Repairs should only be made by individuals with
asbestos training, and the work area should be carefully contained to
prevent fiber release.
5. In-Place Management and Operations and Maintenance (O&M):
Description: This method involves managing ACMs in place and
implementing long-term O&M practices to minimize the risk of fiber
release.
Process: A management plan is developed to identify and manage
ACMs, and regular inspections and maintenance are conducted to
ensure their integrity. This approach is commonly used in non-friable
ACMs in good condition.
Considerations: Effective management and O&M require ongoing
monitoring, documentation, and worker training to prevent ACM
deterioration.
6. Selective Demolition:
10
Description: Selective demolition is used during renovation projects
when it's necessary to remove or disturb specific ACMs. It involves
carefully removing only the asbestos-containing materials targeted for
renovation.
Process: Trained personnel identify and remove the specific ACMs
required for the renovation, following proper containment and handling
procedures.
Considerations: Selective demolition should be conducted with care to
avoid unnecessary disturbance of non-ACMs and to minimize asbestos
fiber release.
1. Respiratory Protection:
Respirators: Workers should wear appropriate respirators to prevent
the inhalation of asbestos fibers. Depending on the level of exposure,
N95 respirators, half-face respirators with P100 filters, or full-face
respirators may be required. The selection of respirators should comply
with OSHA or local regulatory standards.
Fit Testing: Respirator fit testing is crucial to ensure a proper seal.
Workers should undergo fit testing to select the right size and style of
respirator and verify its effectiveness.
Respirator Maintenance: Regular maintenance and inspections of
respirators are necessary to ensure they function correctly. Filters and
cartridges should be replaced according to the manufacturer's
recommendations.
2. Protective Clothing:
Disposable Coveralls: Workers should wear disposable coveralls made
of a suitable material (e.g., Tyvek) to prevent contamination of clothing
11
and skin. Coveralls should have a hood and elasticized cuffs and ankles
to minimize entry points for asbestos fibers.
Boot Covers: Disposable boot covers should be used to prevent the
transfer of asbestos fibers outside the work area.
3. Eye Protection:
Safety Goggles: Goggles or safety glasses with side shields provide eye
protection from dust and debris generated during asbestos abatement
activities.
4. Head Protection:
Head Covering: Disposable hoods or head coverings are essential to
protect the head and hair from asbestos exposure.
5. Hand Protection:
Disposable Gloves: Workers should wear disposable gloves made of
nitrile or latex to prevent direct contact with ACMs. Double gloving is
often recommended to reduce the risk of tears or punctures.
6. Foot Protection:
Disposable Shoe Covers: Disposable shoe covers should be worn over
regular work boots to prevent the spread of asbestos fibers outside the
work area.
7. Decontamination Supplies:
Decontamination Units: Decontamination units with separate clean
and dirty areas should be established. Workers need access to showers,
clean clothing, and decontamination procedures to remove asbestos-
contaminated PPE safely.
Bagging and Disposal: Special bags should be used to contain
asbestos-contaminated PPE for disposal as hazardous waste. These
bags should be labeled appropriately.
8. Training and Education:
Workers should receive proper training in the correct use of PPE,
including how to don and doff it safely. This training should also cover
the hazards associated with asbestos and the importance of PPE in
preventing exposure.
9. Personal Hygiene:
Workers should practice good personal hygiene, including thorough
washing of hands, face, and any exposed skin after removing PPE and
exiting the asbestos work area.
12. Documentation:
Maintain records of PPE use, training, fit testing, and maintenance as
part of the asbestos abatement documentation.
6. Emergency Response
13
Training: Provide comprehensive training for all workers involved in
asbestos abatement, including emergency response drills and exercises.
Ensure that workers understand how to recognize and respond to
potential hazards.
7. Exposure Monitoring
1. Preparation:
15
Regulatory Compliance: Familiarize yourself with the specific asbestos
exposure monitoring requirements and permissible exposure limits
(PELs) established by relevant regulatory authorities, such as the
Occupational Safety and Health Administration (OSHA) in the United
States. Ensure that your monitoring plan complies with these
regulations.
Select Monitoring Equipment: Choose appropriate air sampling
equipment capable of collecting air samples for asbestos fibers. The
equipment should meet regulatory standards and be properly
calibrated.
Qualified Personnel: Ensure that exposure monitoring is conducted by
qualified personnel who have the necessary training and expertise in
asbestos sampling and analysis.
2. Determine Sampling Locations:
Identify the locations within the asbestos abatement work area where
exposure monitoring will be conducted. Consider factors such as the
type of work being performed, the proximity to asbestos-containing
materials (ACMs), and worker activity.
Ensure that sampling locations are representative of potential exposure
areas. Locations should be selected in areas with the highest risk of fiber
release.
3. Sampling Methods:
Choose appropriate sampling methods based on the type of asbestos
abatement work and the equipment available. The two common
methods are:
PCM (Phase Contrast Microscopy): PCM is used for
determining the total airborne fiber concentration, including
non-asbestos fibers. It provides quick results but does not
differentiate between asbestos and non-asbestos fibers.
TEM (Transmission Electron Microscopy): TEM is a more
accurate method that specifically identifies and quantifies
asbestos fibers. It is often used for final clearance testing and in
situations where detailed asbestos fiber characterization is
required.
4. Sample Collection:
Follow established protocols for sample collection, including the use of
appropriate sampling media (e.g., filters) and sampling pumps. Ensure
that the sampling duration and flow rates are consistent with regulatory
requirements.
16
Place sampling pumps in the predetermined locations and connect
them to the sampling media. Start the pumps at the designated flow
rates to collect air samples.
5. Sample Analysis:
Send collected samples to an accredited laboratory with expertise in
asbestos fiber analysis. The laboratory should use approved methods
for asbestos identification and quantification, such as NIOSH (National
Institute for Occupational Safety and Health) or EPA (Environmental
Protection Agency) methods.
Ensure that sample analysis is performed promptly to obtain accurate
results.
6. Data Interpretation:
Review the results of asbestos exposure monitoring to determine if
workers are within acceptable exposure limits. Compare the measured
fiber concentrations to the regulatory PELs.
If PCM was used, consider that it measures total fibers, including non-
asbestos fibers. If TEM was used, it provides specific information about
asbestos fiber types and concentrations.
7. Worker Protection and Adjustments:
Based on the monitoring results, take appropriate action to protect
workers. If exposure levels exceed regulatory limits, implement control
measures, such as enhanced engineering controls or additional personal
protective equipment (PPE), to reduce exposure.
Re-evaluate exposure levels after implementing control measures to
ensure compliance with PELs.
8. Documentation:
Maintain thorough records of exposure monitoring, including the
sampling locations, methods used, results, laboratory reports, and any
corrective actions taken. Documentation is essential for regulatory
compliance and recordkeeping.
9. Periodic Monitoring:
Conduct periodic exposure monitoring throughout the asbestos
abatement project to ensure ongoing compliance with exposure limits.
This may be necessary as work progresses or when changes occur that
could affect exposure levels.
10. Final Clearance Testing:
Conduct final clearance testing at the conclusion of asbestos abatement
activities to ensure that the work area meets regulatory clearance
criteria and is safe for reoccupancy.
11. Review and Improvement:
17
Regularly review exposure monitoring data and incident reports to
identify opportunities for improving asbestos abatement procedures
and safety measures.
9. Training
1. Regulatory Compliance:
Understand and comply with local, state, and federal regulations
governing asbestos abatement, such as OSHA regulations in the United
States, EPA requirements, and any state-specific asbestos rules.
2. Training Requirements:
Identify the specific training requirements outlined in asbestos
regulations. Regulations typically mandate initial and ongoing training
for workers and supervisors involved in asbestos abatement activities.
3. Training Providers:
Select accredited training providers or institutions that offer asbestos
abatement training courses. These providers should have a track record
of delivering high-quality training that meets regulatory standards.
4. Training Curriculum:
Training programs should cover a range of topics, including:
Health risks associated with asbestos exposure.
Identification and assessment of ACMs.
Safe work practices, including containment, removal,
encapsulation, and enclosure.
Proper use of personal protective equipment (PPE).
Respiratory protection and fit testing.
Decontamination procedures.
Emergency response and incident reporting.
Regulatory requirements and record-keeping.
Asbestos waste handling and disposal.
20
5. Hands-On Training:
Practical, hands-on training is essential to teach workers the skills
required for safe asbestos abatement. This may include demonstrations
of proper work practices, containment construction, and equipment use.
6. Supervisor Training:
Supervisors and project managers should receive additional training
that covers leadership and management skills, as well as the ability to
oversee and ensure compliance with asbestos abatement work.
7. Worker Certification:
Successful completion of training should result in worker certification or
accreditation, which is often required by regulatory authorities. Workers
may need to pass written and practical exams to obtain certification.
8. Retraining and Refresher Courses:
Regular retraining and refresher courses are typically required to keep
workers and supervisors up-to-date with the latest asbestos abatement
techniques, equipment, and regulations. Refresher training is typically
conducted annually.
9. Record-Keeping:
Maintain detailed records of training, including certificates of
completion, training content, dates, and the names of trained
individuals. These records are essential for compliance and audit
purposes.
10. Language and Literacy:
Ensure that training is provided in a language and format that all
workers can understand. Workers should be able to read and
comprehend training materials and instructions.
11. Supervision and Oversight:
Designate qualified individuals to oversee asbestos abatement activities,
ensuring that workers are applying their training effectively and
following safe work practices.
12. Emergency Response Training:
Workers should receive training on how to respond to emergencies and
incidents involving asbestos, including proper procedures for
evacuations, containment breaches, and exposure incidents.
13. Documentation:
21
Maintain records of all training activities, including course materials,
sign-in sheets, and certificates. Keep these records readily accessible for
inspection by regulatory authorities.
14. Continual Improvement:
Continually assess the effectiveness of the training program and make
necessary improvements based on worker feedback, incident reports,
and changes in regulations or best practices.
The review and updates of an Asbestos Hazard Abatement Plan (AHAP) are
essential to ensure that it remains effective, compliant with current regulations, and
responsive to changing conditions or lessons learned from previous asbestos
abatement projects. Here's a guide on how to review and update an AHAP:
1. Regular Reviews:
Conduct periodic reviews of the AHAP at least annually, or more frequently if
there are significant changes in asbestos abatement activities or regulations.
The purpose of these reviews is to assess the plan's effectiveness and
relevance.
2. Regulatory Compliance:
Stay informed about changes in local, state, and federal asbestos regulations.
Ensure that the AHAP is updated to reflect the most current regulatory
requirements.
3. Documentation Review:
Review all documentation associated with asbestos abatement projects,
including exposure monitoring reports, incident reports, worker training
records, and waste disposal documentation. Use this information to evaluate
the AHAP's effectiveness in protecting workers and the environment.
4. Lessons Learned:
Consider any lessons learned from previous asbestos abatement projects or
incidents. Identify areas where the AHAP can be improved to prevent similar
issues in the future.
5. Risk Assessments:
22
Conduct updated hazard assessments to identify any new sources of asbestos
exposure or changes in the condition of ACMs. Assess the risk of exposure and
determine if additional control measures are needed.
6. Worker Feedback:
Seek input from workers and supervisors who have experience with asbestos
abatement activities. They may provide valuable insights into potential
improvements or areas of concern.
7. Emergency Response Evaluation:
Review the emergency response procedures outlined in the AHAP. Assess their
effectiveness and make any necessary updates to ensure the safety of workers
and the public during emergencies.
8. Engineering Controls and Work Practices:
Reevaluate engineering controls, containment methods, and work practices to
ensure they align with current best practices and technological advancements
in asbestos abatement.
9. Personal Protective Equipment (PPE):
Review and update PPE requirements to reflect the latest advancements in
respiratory protection, protective clothing, and other safety equipment. Ensure
that PPE selection aligns with current regulations.
10. Training:
Assess the effectiveness of worker and supervisor training programs. Ensure
that training content is up-to-date and comprehensive. Make any necessary
adjustments to training materials and curricula.
11. Communication and Reporting:
Evaluate communication protocols and reporting procedures within the AHAP.
Ensure that there are clear lines of communication between all stakeholders,
including workers, supervisors, regulatory agencies, and emergency
responders.
12. Record-Keeping:
Verify that record-keeping practices align with regulatory requirements.
Maintain detailed records of all asbestos-related activities, including training,
exposure monitoring, and incident reports.
13. Emergency Drills:
Conduct periodic emergency response drills and exercises to test the
effectiveness of the AHAP's emergency procedures and ensure that workers
are adequately trained for various scenarios.
14. Stakeholder Involvement:
Engage stakeholders, including workers, supervisors, and management, in the
review and update process. Encourage feedback and input from all parties
involved in asbestos abatement projects.
23
15. Approval and Documentation:
Once updates are made, ensure that the revised AHAP is approved by all
relevant parties, including management, regulatory agencies, and any other
stakeholders. Maintain documentation of the approval process.
16. Distribution and Training:
Distribute the updated AHAP to all relevant personnel and ensure that they are
trained on any changes or revisions.
17. Periodic Review Schedule:
Establish a schedule for ongoing reviews and updates of the AHAP to ensure
that it remains current and effective.
11. Responsibilities
The Asbestos Hazard Abatement Plan (AHAP) outlines the responsibilities and
roles of various parties involved in managing and executing asbestos abatement
activities. The responsibilities within an AHAP can vary depending on the specific
project, but here are some common responsibilities for key stakeholders:
1. Project Manager/Coordinator:
Overall responsibility for asbestos abatement project planning,
execution, and monitoring.
Develop the AHAP in accordance with regulatory requirements.
Ensure that all personnel involved in the project are properly trained
and certified.
Oversee the work site and ensure that asbestos abatement activities are
conducted safely and in compliance with the AHAP.
Coordinate with regulatory authorities and ensure all necessary permits
and notifications are obtained.
Maintain documentation of the AHAP, including updates, revisions, and
approvals.
Implement and oversee emergency response procedures.
Ensure that waste disposal and record-keeping are conducted according
to the AHAP.
2. Qualified Person (QP):
24
Conduct initial asbestos surveys to identify the location and condition
of asbestos-containing materials (ACMs).
Assess the risk of asbestos exposure and recommend control measures.
Verify that the AHAP is followed and that work practices are consistent
with the plan.
Conduct periodic inspections to ensure that the work area remains
compliant with containment and safety requirements.
Perform clearance testing to confirm that the work area meets
regulatory criteria for reoccupancy.
Provide guidance and recommendations for work methods and
engineering controls.
3. Supervisor:
Oversee and direct asbestos abatement activities.
Ensure that workers are following safe work practices and using
appropriate personal protective equipment (PPE).
Conduct pre-job safety meetings to review the AHAP and work plan
with workers.
Implement and enforce emergency response procedures.
Monitor worker exposure to asbestos and adjust work practices as
necessary.
Ensure that decontamination procedures are followed.
Maintain records of daily work activities, incidents, and observations.
4. Workers:
Follow all instructions and procedures outlined in the AHAP.
Use appropriate PPE, including respiratory protection, disposable
coveralls, gloves, and eye protection.
Perform asbestos abatement tasks safely and according to the AHAP.
Report any incidents, accidents, or potential asbestos hazards promptly.
Participate in ongoing training and maintain required certifications.
Comply with decontamination procedures before leaving the work area.
5. Safety Officer:
Monitor and assess workplace safety and compliance with the AHAP.
Identify and address potential safety hazards.
Conduct regular safety inspections and audits.
Assist in the development and implementation of safety protocols.
Ensure that first aid supplies and emergency response equipment are
readily available.
6. Emergency Response Team:
25
Be prepared to respond to emergencies or incidents involving asbestos
exposure.
Follow established emergency response procedures to protect workers
and the public.
Coordinate with medical personnel and emergency services as needed.
7. Regulatory Authorities:
Review and approve the AHAP, permits, notifications, and project plans.
Conduct inspections and audits to ensure compliance with regulations.
Enforce regulatory requirements and impose penalties for non-
compliance.
8. Healthcare Providers:
Provide medical examinations, consultations, and treatment for workers
who may have been exposed to asbestos.
Maintain records of medical evaluations.
9. Environmental Consultants:
Conduct air monitoring and asbestos testing to assess the level of
asbestos exposure.
Provide data and analysis to ensure compliance with exposure limits.
Offer recommendations for adjustments to containment and work
practices.
10. Waste Disposal Contractors:
Collect, transport, and dispose of asbestos waste in compliance with
regulations.
Maintain records of waste disposal and provide documentation of
proper disposal.
12. References
26
Regulations:
National Standards:
Guidance Documents:
28