1 titik
HARGA SATUAN JUMLAH
NAMA / JENIS BARANG VOLUME SATUAN
NO ( RP ) ( RP )
1 2 3 4 5
I Belanja Bahan
1 Kabel TIC 2 X 10 mm 25 Meter 14,000 350,000
2 Kabel NYM 3 x 2,5 mm 5 Meter 14,000 70,000
3 Wade Clam 2 Set 15,000 30,000
4 Stainless Stell Strip 10 Meter 11,000 110,000
5 Stopink Buckle 4 Buah 10,000 40,000
6 Link 4 Buah 5,000 20,000
7 MCB 6 1 Buah 150,000 150,000
8 Box Pengaman MCB 1 Buah 12,000 12,000
9 Stang PJU Galvanis 1 Buah 200,000 200,000
10 Klem PJU 1 Set 150,000 150,000
11 Solasiban 1 Buah 12,000 12,000
12 Box KWH 1 Buah 255,000 255,000
13 Lampu LED 100 Watt 1 Unit 1,750,000 1,750,000
14 Foto Cell 6 A 1 Buah 135,000 135,000
15 Paralon PVC 1 inc 1 Batang 50,000 50,000
16 Paralon PVC 5/8 inc 1 Batang 40,500 40,500
17 Fleksibel 1" 1 Meter 15,000 15,000
18 Besi Arde 1 Batang 20,000 20,000
19 Terminal Nol 1 Buah 22,000 22,000
20 Kawat Arde/BC 3 Meter 12,000 36,000
JUMLAH 3,467,500
II Upah Kerja
1 Pemasangan Hantaran Udara Jaringan PJU 25 Meter 2,000 50,000
2 Perakitan instalasi PJU dan Pemasangannya berikut Gambar 1 Lokasi 100,000 100,000
3 Perakitan Instalasi APP 1 Lokasi 120,000 120,000
4 Ongkos Angkut 1 Rit 100,000 100,000
JUMLAH 370,000