NOT TO SCALE
A B C D E F G
H
A B C D E F G H
25m 25m 25m 25m 25m 25m 25m
NOTA :
1. REKABENTUK PELAN KAWALAN TRAFIK ADALAH BERPANDUKAN GARIS PANDUAN ATJ 2C/85 (PINDAAN 2017).
AWAS AWAS
KERJA-KERJA
DI HADAPAN
40 30
PEMBINAAN
TAMAT
HOTLINE :
2. PERMUKAAN PAPAN TANDA AMARAN SEMENTARA MESTI MENGGUNAKAN FLUORESCENT ORANGE PRISMATIC RETRO-REFLECTIVE SHEETING
(LATAR BELAKANG) DAN HIGH INTENSITY PRISMATIC SHEETING (SELAIN LATAR BELAKANG)
KATEGORI TRAFIK : BANDAR HALAJU RENDAH
TAJUK PROJEK : 3. CONE PERLU DISUSUN PADA JARAK 2.0m SECARA BERTERUSAN DI SEPANJANG KAWASAN KERJA
km/j km/j
NAMA PEMOHON :
125m 100 50m 4.
5.
BLINKERS HENDAKLAH DIPASANG PADA SELANG JARAK 10.0m (TAPER) DAN 30.0m (BUFFER/LURUS)
STRING DELINEATOR HENDAKLAH HENDAKLAH DIPASANG DI SEPANJANG KAWASAN KERJA
TEMPOH : JANGKA MASA PENDEK
NO. TEL :
PANJANG KOREKAN :
6. PENGAWAL BENDERA HENDAKLAH DITEMPATKAN DI LALUAN KELUAR/MASUK KAWASAN KERJA HAD LAJU TEMPATAN : 60km/j
7. KERJA-KERJA YANG DITETAPKAN PADA WAKTU MALAM, KONTRAKTOR HENDAKLAH MEMASANG ANTI-GLARE FLOOD LIGHT DI KAWASAN KERJA
TEMPOH PROJEK :
8. PLASTIC BARRIER HENDAKLAH DIPASANG DI KAWASAN YANG MELIBATKAN KERJA-KERJA PENGOREKAN DI KAWASAN KERJA (JIKA PERLU)
PENGECILAN LORONG