Transmittal Of Docume!
Sinohydro Bahirdar New
Lp __Terminal Project
erry
nts Date: /e9/a0a5
Date: RECEVED
Request no: SNOMAYOROMETTODAE
Project No. Tite: DESIGN-BUILD OF NEW PASSENGER TERMINAL BUILONG AND OTHER FACILTI
i PORT. CONTRACT NO=B.778t
Eetoyer EnaioorRopravanv camo
<<
(area eect —
RS
.oocument ype
Material samples catalogues rectal sheets
attr ce Bistesse
a Subtotal
temre, | Devcon a meat quant [et eae ae re
1 "Submital of C30/37, 7days compresive strength test resuit | SINOHAYDRO//
Jovnce 4 boar and S20 eros
| 1
| |
These are transmits for
Ci veurtematon opr
|suomited by
Sinohydro Bahirdar New Terminal Project
3. Engineser’s Representative comments:
$Eawee HO Commout
Dropravet as notes 9foalzoz3
Devise 8 resubmit
Clrejectea
Clotners
Sionatre oe 08 [0 4] 2092
ooo ake cs dere Coat or ot suo any change Corte acura
Dar SAE sa nnBahirdar Building Material producton Center
Quality TesttiaboratoryGaseteam
Project Name: Desing & Building new Terminal Projecr
Client: Ethiopian air liner Group
Sino hydro Corporation limited
DAR - AL handasah Shai
& ‘Amhara Building Works Construction Enterprise
Contractor:
Consultant:
sample submitted by:- _ Contractor & Consultant Joynty
Bahirdar international ait port
locati
Class of concrete: _C-30/37
Lab. no.: 1675/2015
Date tested: 2/9/2023 :
Date reported: 3/9/2023 F
Cement: ‘Stump 111. mm
cop: ‘Axis_1-4 Beam & Slab
CONCRETE COMPRESSIVE STRENGTH TEST RESULT
St. Dimension |P*°5S\"°| apptied | Cone: uni commerce
ee coe oys| Welaht (LxWxH) em? ee tee} tsoatKN) fea SMa,
1 {p6veva023 zrorors| 7 | sa7a | 15ei5x15 2o5 | e902 | 794.277 251 3s32__|
2 |aever2023 zanors| 7 | 9517 | 15055 aos | 6533 .| 75787 _| 252 33.68
3 |2erera023 zeros] 7 | esse | _15x1sx15 2s_| wss' | 7787 254 33.24
‘Average | 262 34.08
Remark:~ ee
Tested by Checked by: ° Approved by:
Terie Irs Terie Tarkegne i Bishaw Genet