LAPORAN PENGGANTIAN BARANG MULTIMEDIA IMBAS PERBAIKAN PLAFOND

No Item Date Qty Price Sub-Total Source


1 Kabel HDMI Fiber Optic 30M 30 January 2023 2 Rp 480.000 Rp 960.000 via toko
2 Kabel USB Aktif 30M 30 January 2023 1 Rp 350.000 Rp 350.000 via toko
3 HDMI Serat 30M 30 January 2023 1 Rp 299.000 Rp 299.000 via toko
4 hdmi 25m HD 30 January 2023 1 Rp 381.500 Rp 381.500 via toko
5 Kabel LAN D Link cat6 30 January 2023 20 Rp 4.000 Rp 80.000 via toko
6 RJ 45 30 January 2023 2 Rp 2.500 Rp 5.000 via toko
7 Dynabolt 10 30 January 2023 30 Rp 2.000 Rp 60.000 via toko
8 Mata Bor 8' 30 January 2023 1 Rp 30.000 Rp 30.000 via toko
9 Mata Bor 10' 30 January 2023 1 Rp 35.000 Rp 35.000 via toko
10 Dynabolt 8 30 January 2023 30 Rp 1.500 Rp 45.000 via toko
11 Kawat Beton 30 January 2023 1 Rp 30.000 Rp 30.000 via toko
12 Kabel Wilson 3x1,5 30 January 2023 1 Rp 597.000 Rp 597.000 via tokopedia
13 Kabel Wilson 2x2,5 30 January 2023 2 Rp 580.000 Rp 1.160.000 via tokopedia
14 Kawat Sling Galvanis meteran 30 January 2023 40 Rp 4.000 Rp 160.000 via tokopedia
15 Katrol 7inch 30 January 2023 2 Rp 50.000 Rp 100.000 via tokopedia
16 Kuku Macan /Klem Sling 30 January 2023 6 Rp 1.100 Rp 6.600 via tokopedia
17 Kabel Ties 25cm 30 January 2023 1 Rp 7.500 Rp 7.500 via tokopedia
18 Kabel Wilson 2x0,75 30 January 2023 2 Rp 129.125 Rp 258.250 via tokopedia
19 Klem Pipa 3/4 31 January 2023 20 Rp 1.500 Rp 30.000 via toko
20 Klem Kabel 9mm 31 January 2023 2 Rp 15.000 Rp 30.000 via toko
21 Kable Ducting 50x50 01 February 2023 2 Rp 35.000 Rp 70.000 via toko
22 Ducting TC3 01 February 2023 1 Rp 11.000 Rp 11.000 via toko
23 Ducting TC5 01 February 2023 1 Rp 13.000 Rp 13.000 via toko
24 Klem 01 February 2023 1 Rp 8.000 Rp 8.000 via toko
25 Kabel D-Link cat6 01 February 2023 20 Rp 4.000 Rp 80.000 via toko
26 RJ45 01 February 2023 2 Rp 2.500 Rp 5.000 via toko
27 Bracket Proyektor 01 February 2023 2 Rp 129.000 Rp 258.000 via tokopedia
28 Box MCB 4 Grup 02 February 2023 1 Rp 34.000 Rp 34.000 via tokopedia
29 Stop Kontak Arde 5 lubang 02 February 2023 1 Rp 23.000 Rp 23.000 via tokopedia
30 Stop Kontak Arde 2 lubang 02 February 2023 1 Rp 12.000 Rp 12.000 via tokopedia
31 Stop Kontak Arde 1 lubang 02 February 2023 3 Rp 8.000 Rp 24.000 via tokopedia
32 Steaker Arde 02 February 2023 2 Rp 9.000 Rp 18.000 via tokopedia
33 Konsumsi Siang Bongkar Multimedia (5 orang) 29 January 2023 1 Rp 102.000 Rp 102.000 via gofood
34 Konsumsi Malam Bongkar Multimedia (4 orang) 29 January 2023 1 Rp 82.000 Rp 82.000 via gofood
35 Konsumsi Malam Pasang Rack (3 orang) 30 January 2023 1 Rp 55.000 Rp 55.000 via gofood
36 Konsumsi Siang Instalasi Mulmed & Listrik (3 orang) 31 January 2023 1 Rp 59.200 Rp 59.200 via gofood
37 Konsumsi Malam Instalasi Mulmed & Listrik (4 orang) 31 January 2023 1 Rp 74.150 Rp 74.150 via gofood
38 Konsumsi Malam Instalasi Proyektor dan Kamera (3 orang) 02 February 2023 1 Rp 56.800 Rp 56.800 via gofood
39 Konsumsi Malam Penggantian kabel (3 orang) 03 February 2023 1 Rp 49.800 Rp 49.800 via gofood
40 Konsumsi Siang dan Malam Setting u/Ibadah (4 orang) 04 February 2023 1 Rp 140.000 Rp 140.000 via gofood
GRAND TOTAL Rp 5.799.800

Catatan :
1 Terima Dana dari Majelis Pembangunan tanggal 29 Januari 2023 Rp 4.900.000
2 Dana Dikeluarkan Tim Multimedia Rp 5.799.800
Kekurangan Dana -Rp 899.800 (minus)

Dana bisa overbudget karena kabel lama retak saat dibongkar dan
persiapan untuk plan sistem kedepan supaya tidak perlu naik Palembang, Februari 2023
dan bongkar plafond kembali Koordinator Multimedia

Immanuel Simatupang