You are on page 1of 3

NO UPAH SATUAN HARGA SATUAN (Rp)

1 2 3 4
A HARGA DASAR SATUAN UPAH
1 Pekerja Org / Jam Rp 12.100,00
2 Tukang Org / Jam Rp 13.500,00
3 Mandor Org / Jam Rp 15.700,00
4 Operator Org / Jam Rp 38.500,00
5 Pembantu Operator Org / Jam Rp 12.800,00
6 Sopir / Driver Org / Jam Rp 13.500,00
7 Pembantu Sopir / Driver Org / Jam Rp 11.400,00
8 Mekanik Org / Jam Rp 15.700,00
9 Pembantu Mekanik Org / Jam Rp 12.800,00
10 Kepala Tukang Org / Jam Rp 15.000,00
B HARGA DASAR SATUAN BAHAN
1 Pasir Pasang M3 Rp 288.750,00
2 Pasir Beton M3 Rp 336.000,00
3 Pasir Urug M3 Rp 73.500,00
4 Batu Kali M3 Rp 210.000,00
5 Sirtu M3 Rp 73.500,00
6 Batu Bronjong M3 Rp 241.500,00
7 Agregat Kls B M3 Rp 241.500,00
8 Agregat Kls A M3 Rp 294.000,00
9 Batu Pecah 10 - 15 cm M3 Rp 241.500,00
10 Batu pecah 5/7 M3 Rp 315.000,00
11 Batu pecah 3/5 M3 Rp 315.000,00
12 Batu pecah 2/3 M3 Rp 315.000,00
13 Batu pecah 1/2 M3 Rp 315.000,00
14 Batu pecah 0,5/1 M3 Rp 315.000,00
15 Abu Batu M3 Rp 315.000,00
16 Bahan Tanah Timbunan M3 Rp 44.100,00
17 Bahan Pilihan M3 Rp 58.275,00
18 Aspal (@ 155 Kg) KG Rp 11.100,00
19 Aspal Emulsi (@ 200 Kg) KG Rp 12.340,00
20 Semen / PC (50kg) Zak Rp 56.000,00
21 Semen / PC (50kg) m3 Rp 1.120,00
22 Baja Tulangan (Polos) U24 Kg Rp 11.440,00
23 Kawat Beton Kg Rp 20.000,00
24 Kawat Bronjong ( 3mm ) Kg Rp 31.500,00
25 Kawat Bronjong ( 4mm ) Kg Rp 33.600,00
26 Kawat Las Kg Rp 16.800,00
27 Pipa Galvanis Dia. 3" M' Rp 79.275,00
28 Pipa Galvanis Dia. 1,5" M' Rp 40.425,00
29 Paku Kg Rp 15.750,00
30 Rel Pengaman M' Rp 378.000,00
31 Baja Struktur Kg Rp 19.950,00
32 Beton K-350 (Readymix) M3 Rp 1.119.941,00
33 Beton K-300 (Readymix) M3 Rp 1.088.577,00
34 Beton K-250 (Readymix) M3 Rp 1.047.480,00
35 Beton K-225 (Readymix) M3 Rp 1.025.850,00
36 Beton K-200 (Readymix) M3 Rp 1.009.628,00
37 Beton K-175 (Readymix) M3 Rp 993.405,00
38 Beton K-125 (Readymix) M3 Rp 885.255,00
39 Beton Siklop M3 Rp 775.200,00
40 Biaya pompa redymix M3 Rp 108.150,00
41 Tiang Pancang Baja M1 Rp 26.510,00
42 T. Pancang Beton Pratekan M3 Rp 445.156,00
43 Multipleks 12 mm Lembar Rp 150.150,00
44 Kayu kls I (sek. raksamala) M2 Rp 4.465.000,00
45 Kayu kls II (sek. kihiang) M3 Rp 2.750.000,00
46 Kayu Bekisting M3 Rp 1.200.000,00
47 Kerosen / Minyak Tanah LITER Rp 8.000,00
48 Bensin LITER Rp 7.650,00
49 Solar LITER Rp 9.600,00
50 Minyak Pelumas / Olie LITER Rp 30.450,00
51 Thinner LITER Rp 27.090,00
52 Cat Marka (Non Thermoplas) Kg Rp 135.660,00
53 Cat Marka (Thermoplastic) Kg Rp 73.500,00
54 Cat Kg Rp 37.800,00
55 Solignem ltr Rp 17.300,00
56 Pemantul Cahaya (Reflector) Bh. Rp 15.750,00
57 Filter Plastik m2 Rp 17.850,00
58 Plastik M2 Rp 2.310,00
59 Gebalan Rumput M2 Rp 15.750,00
60 Cerucuk M Rp 1.575,00
61 Elastomer buah Rp 423.500,00
62 Expansion Join Baja Siku m1 Rp 52.500,00
63 Pracetak Gelagar Tipe 1 Bentang 16 meter Unit Rp 17.850.000,00
64 Pracetak Gelagar Tipe 1 Bentang 25 meter Unit Rp 23.100.000,00
65 Pracetak Gelagar Tipe 1 Bentang 17 meter Unit Rp 18.900.000,00
66 Box Culvert 40x40 (precastt) M1 Rp 1.238.895,00
67 Box Culvert 50x50 (precastt) M1 Rp 1.484.500,00
68 Box Culvert 60x60 (precastt) M1 Rp 1.870.365,00
69 Box Culvert 80x80 (precastt) M1 Rp 2.554.440,00
70 Box Culvert 100x100 (precast) M1 Rp 3.218.460,00
71 Box Culvert 120x120 (precast) M1 Rp 5.100.000,00
72 Box Culvert 150x150 (precast) M1 Rp 7.254.000,00
73 Box Culvert 200x200 (precast) M1 Rp 9.834.930,00
74 Box Culvert 250x250 (precast) M1 Rp 13.552.500,00
75 Box M1 Rp 17.162.430,00
76 Marmer M2 Rp 420.000,00
Kerb Type
77 Buah Rp 57.750,00
A
78 Paving Block natural 6 cm M2 Rp 56.700,00
79 Paving Block natural 8 cm M2 Rp 67.200,00
80 Paving Block 8 cm (ex cisangkan) M2 Rp 152.250,00
81 Matras Concrete Buah Rp 425.250,00
82 Laston Ton Rp 1.146.600,00
83 Laston Lapis Antara (AC - BC) Levelling Ton Rp 1.161.043,00
84 Laston Ton Rp 1.221.680,00
85 Lataston Ton Rp 1.321.898,00
86 AC-Base Ton Rp 1.146.600,00
87 AC-BC Ton Rp 1.161.043,00
88 AC-WC Ton Rp 1.221.680,00
89 HRS Ton Rp 1.321.898,00
90 ATB Ton Rp 1.321.898,00
91 ATBL Ton Rp 1.321.898,00
92 Screen Ton Rp 1.440.968,00
93 Latasir Ton Rp 1.440.968,00
Gorong2
94 M1 Rp 63.000,00
tanpa
Gorong2
95 M1 Rp 78.750,00
tanpa
96 Gorong2 tanpa tulangan dia. Dalam 40 cm M1 Rp 98.700,00
97 Gorong2 tanpa tulangan dia. Dalam 50 cm M1 Rp 123.900,00
98 Gorong2 tanpa tulangan dia. Dalam 60 cm M1 Rp 165.900,00
99 Gorong2 tanpa tulangan dia. Dalam 80 cm M1 Rp 183.750,00
100 Gorong2 tanpa tulangan dia. Dalam 100 cm M1 Rp 199.500,00
C HARGA DASAR SATUAN SEWA PERALATAN
1 ASPHALT MIXING PLANT Jam Rp 3.634.545,00
2 ASPHALT FINISHER Jam Rp 139.818,00
3 ASPHALT SPRAYER Jam Rp 49.600,00
4 BULLDOZER 100-150 HP Jam Rp 240.000,00
5 COMPRESSOR 4000-6500 L\M Jam Rp 57.000,00
6 CONCRETE MIXER 0.3-0.6 M3 Jam Rp 50.000,00
7 CRANE 5-15 TON Jam Rp 110.000,00
8 CRANE ON TRACK Jam Rp 162.000,00
9 DUMP TRUCK 6 - 8 TON Jam Rp 105.000,00
10 DUMP TRUCK 10 - 12 TON Jam Rp 159.000,00
11 EXCAVATOR 80-140 HP Jam Rp 300.000,00
12 FLAT BED TRUCK 3-4 M3 Jam Rp 73.000,00
13 GENERATOR SET Jam Rp 28.000,00
14 MOTOR GRADER >100 HP Jam Rp 279.100,00
15 TRACK LOADER 75-100 HP Jam Rp 148.000,00
16 WHEEL LOADER 1.0-1.6 M3 Jam Rp 242.000,00
17 THREE WHEEL ROLLER 6-8 T Jam Rp 150.000,00
18 TANDEM ROLLER 6-8 T. Jam Rp 105.000,00
19 TIRE ROLLER 8-10 T. Jam Rp 88.000,00
20 VIBRATORY ROLLER 5-8 T. Jam Rp 55.200,00
21 CONCRETE VIBRATOR Jam Rp 21.000,00
22 STONE CRUSHER Jam Rp 430.000,00
23 WATER PUMP 70-100 mm Jam Rp 16.300,00
24 WATER TANKER 3000-4500 L. Jam Rp 171.000,00
25 PEDESTRIAN ROLLER Jam Rp 38.350,00
26 STAMPER Jam Rp 22.500,00
27 JACK HAMMER Jam Rp 21.000,00
28 AIR COMPRESSOR Jam Rp 50.000,00
29 TANDEM ROLLER 8-10 T. Jam Rp 120.000,00
30 STEMPER 4 HP Jam Rp 20.000,00
31 ROLLER PNEUMATIC 8-15 TON Jam Rp 100.000,00
32 TRUCK TRONTON Jam Rp 350.000,00
33 TRAILLER Jam Rp 235.000,00

You might also like