TENAGA KERJA
Semen ( PC ) Kg Rp 1,400.00
Sirtu M3 Rp 200,000.00
ALAT
Mesin Gilas 6 - 10 T Jam Rp 350,000.00
Cangkul Bh Rp 70,000
Gergaji Besi Bh Rp 55,000
Linggis bh Rp 150,000
Sendok Semen Bh Rp 25,000
Palu bh Rp 30,000
Sekop Bh Rp 55,000
Meteran 7.5 m bh Rp 30,000
Ember bh Rp 10,000
Meteran 100 m bh Rp 150,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PENGADAAN CLEMBING WALL
LOKASI : BENGKULU
I Pekerjaan Persiapan
1 Pek. Persiapan dan Pas Bowplank 1.00 unit Ls
2 Biaya Listrik dan Air Kerja 1.00 unit Ls
3 Administrasi Dan dokumentasi 1.00 unit Ls
Halaman :5
A ANGGARAN BIAYA
HARGA
SATUAN Jumlah
Rp. Harga
1,000,000.00 1,000,000.00
2,500,000.00 2,500,000.00
1,500,000.00 1,500,000.00
Jumlah 5,000,000.00
93,750.00 675,000.00
67,500.00 162,000.00
1,133,686.10 979,504.79
3,454,788.60 6,304,851.00
1,133,686.10 544,169.33
Jumlah 8,665,525.12
55,832.50 21,546,878.40
55,832.50 22,085,103.70
55,832.50 24,387,636.00
174,915.00 1,574,235.00
140,000.00 3,108,000.00
58,995.00 1,309,689.00
91,942.50 91,942.50
6,000,000.00 12,000,000.00
347,281.60 7,813,836.00
57,178.00 1,372,272.00
1,500,000.00 3,000,000.00
100,000.00 2,400,000.00
Jumlah 100,689,592.60
Halaman :6
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBUATAN TOWER
LOKASI : KOTA BENGKULU
TH ANGGARAN : 2018
HARGA
NO ITEM PEKERJAAN VOL SAT SATUAN
Rp.
I Pekerjaan Persiapan Dan Akhir
1 Pek. Persiapan danPas Bowplank 1.00 unit 1,000,000.00
2 Biaya Listrik dan Air Kerja 1.00 unit 1,000,000.00
Jumlah I
III Pekerjaan Rehab Tower Air
1 0 - 0 -
2 0 - 0 -
3 0 - 0 -
4 0 - 0 -
5 0 - 0 -
6 0 - 0 -
7 0 5.00 0 -
8 0 - 0 -
9 0 - 0 -
10 0 - 0 -
11 0 - 0 -
12 0 - 0 -
13 0 - 0 -
14 0 - 0 -
15 0 - 0 -
16 0 - 0 -
17 0 - 0 -
18 0 192.00 0 -
19 Angkur + Baut 24.00 bh 50,000.00
20 Upah Dan Pengelasan 1.00 Unit 10,000,000.00
Jumlah
Halaman :7
A ANGGARAN BIAYA
HARGA
Jumlah
Harga
1,000,000.00
1,000,000.00
2,000,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,200,000.00
10,000,000.00
13,200,000.00
Halaman :8
DAFTAR ANALISA
ENGINEERING ESTIMATE
A. TENAGA :
1 pekerja L.01 OH 0.7500
2 Mandor L.04 OH 0.0250
Jumlah Tenaga Kerja............
B. BAHAN :
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 anah 0.5000
2 Mandor L.04 OH 0.0500
Jumlah Tenaga Kerja............
B. BAHAN :
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.3000
2 Mandor L.04 OH 0.0100
Jumlah Tenaga Kerja............
B. BAHAN :
1 tanah urug 1.2000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 1.6500
2 Tukang Batu L.02 OH 0.2750
3 Kepala Tukang L.03 OH 0.0280
4 Mandor L.04 OH 0.0830
Jumlah Tenaga Kerja............
B. BAHAN :
1 semen portland Kg 276.0000
2 pasir beton M³ 0.5914
3 Koral Beton M³ 0.7496
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 1.6500
2 Tukang Batu L.02 OH 0.2750
3 Kepala Tukang L.03 OH 0.0280
4 Mandor L.04 OH 0.0830
Jumlah Tenaga Kerja............
B. BAHAN :
1 semen portland Kg 276.0000
2 pasir beton M³ 0.5914
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 1.6500
2 Tukang L.2 OH 0.2750
3 Kepala Tukang L.03 OH 0.0280
4 Mandor L.04 OH 0.0830
Jumlah Tenaga Kerja............
B. BAHAN :
1 semen portland kg 326.0000
2 pasir beton M³ 0.5429
3 Koral Beton M³ 0.7622
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.0700
2 Tukang besi L.02 OH 0.0700
3 Kepala tukang L.03 OH 0.0070
4 Mandor L.04 OH 0.0040
Jumlah Tenaga Kerja............
B. BAHAN :
1 besi beton Kg 10.5000
2 kawat beton Kg 0.1500
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E ) ...............
G Harga satuan Pembesian / kg ( F/ 10) ...............
A. TENAGA :
1 Pekerja L.01 OH 0.5200
2 Tukang kayu L.02 OH 0.2600
3 kepala tukang L.03 OH 0.0260
4 Mandor L.04 OH 0.0260
Jumlah Tenaga Kerja............
B. BAHAN :
1 Batu/Batu Belah M³ 0.0400
2 paku 5 - 10 cm kg 0.3000
3 minyak bekisting liter 0.1000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.3500
2 Tukang L.02 OH 0.0350
3 Kepala tukang L.03 OH 0.3500
4 Mandor L.04 OH 0.0180
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Hollow 4/4 M1 4.0000
Jumlah harga bahan............
C. PERALATAN:
A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Siku kg 1.1500
Jumlah harga bahan............
C. PERALATAN:
A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Siku kg 1.1500
Jumlah harga bahan............
C. PERALATAN:
A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Siku kg 1.1500
Jumlah harga bahan............
C. PERALATAN:
A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Plat Kg 12.0000
Jumlah harga bahan............
C. PERALATAN:
A. TENAGA :
1 Pekerja L.01 OH 0.2500
2 Tukang L.02 OH 0.1250
3 Kepala tukang L.03 OH 0.0130
4 Mandor L.04 OH 0.0130
Jumlah Tenaga Kerja............
B. BAHAN :
1 keramik 40 x 40 Anti slip bh 6.6300
2 semen portland kg 9.8000
3 pasir pasang M³ 0.0450
4 semen warna kg 1.3000
Jumlah harga bahan............
C. PERALATAN:
A. TENAGA :
1 Pekerja L.01 OH 0.7000
2 Tukang L.02 OH 0.3500
3 Kepala tukang L.03 OH 0.0350
4 Mandor L.04 OH 0.0350
Jumlah Tenaga Kerja............
B. BAHAN :
1 keramik 20 x 20 bh 26.5000
2 semen portland kg 10.4000
3 pasir pasang M³ 0.0450
A. TENAGA :
1 Pekerja L.01 OH 0.0900
2 Tukang L.02 OH 0.0900
3 Kepala tukang L.03 OH 0.0350
4 Mandor L.04 OH 0.0050
Jumlah Tenaga Kerja............
B. BAHAN :
1 plint keramik bh 5.3000
2 semen portland kg 1.1400
3 pasir pasang M³ 0.0030
A. TENAGA :
1 Pekerja L.01 OH 0.9000
2 Tukang L.02 OH 0.4500
3 Kepala tukang L.03 OH 0.0450
4 Mandor L.04 OH 0.0450
Jumlah Tenaga Kerja............
B. BAHAN :
1 keramik dinding bh 20.0000
2 semen portland kg 9.3000
3 pasir pasang M³ 0.0180
A. TENAGA :
1 Pekerja L.01 OH 0.7000
2 Tukang L.02 OH 0.3500
3 Kepala tukang L.03 OH 0.0350
4 Mandor L.04 OH 0.0350
Jumlah Tenaga Kerja............
B. BAHAN :
1 Batu Andesit ( Napoly ) M2 1.1000
2 semen portland kg 11.7500
3 pasir pasang M 3 0.0350
A. TENAGA :
1 Pekerja L.01 OH 0.1000
2 Tukang L.02 OH 0.0500
3 Kepala tukang L.03 OH 0.0050
4 Mandor L.04 OH 0.0050
Jumlah Tenaga Kerja............
B. BAHAN :
1 gypsum board lembar 0.3640
2 paku skrup kg 0.1100
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang L.02 OH 1.8000
3 Kepala tukang L.03 OH 0.1800
4 Mandor L.04 OH 0.0300
Jumlah Tenaga Kerja............
B. BAHAN :
1 Papan Kayu m3 0.0400
2 Skrup 10 Cm bh 12.0000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.1200
2 Tukang L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0060
Jumlah Tenaga Kerja............
B. BAHAN :
1 Seng Gelombang lembar 0.7000
2 Paku Skrup kg 0.0200
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.150
2 Tukang L.02 OH 0.070
3 Kepala tukang L.03 OH 0.0600
4 Mandor L.04 OH 0.006
Jumlah Tenaga Kerja............
B. BAHAN :
1 Seng Plat Bh 1.1000
2 Paku Skrup kg 0.0500
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.1000
2 Tukang L.02 OH 0.2000
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0050
Jumlah Tenaga Kerja............
B. BAHAN :
1 Papan Kayu Kelas II M3 0.0110
2 Paku kg 0.0500
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A. TENAGA :
1 Pekerja L.01 OH 0.0700
2 Tukang L.02 OH 0.0090
3 Kepala tukang L.03 OH 0.0060
4 Mandor L.04 OH 0.0030
Jumlah Tenaga Kerja............
B. BAHAN :
1 Cat menie Kg 0.2000
2 Plamuur Kg 0.1500
3 Cat dasar Kg 0.1700
4 Cat penutup Kg 0.2600
5 Kuas Bh 0.0100
6 Pengecer Bh 0.0300
7 Ampelas Lbr 0.2000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 90,000.00
150,000.00 3,750.00
Jumlah Tenaga Kerja............ 93,750.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 60,000.00
150,000.00 7,500.00
Jumlah Tenaga Kerja............ 67,500.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 36,000.00
150,000.00 1,500.00
Jumlah Tenaga Kerja............ 37,500.00
50,000.00 60,000.00
Jumlah harga bahan............ 60,000.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 198,000.00
140,000.00 38,500.00
150,000.00 4,200.00
150,000.00 12,450.00
Jumlah Tenaga Kerja............ 253,150.00
1,400.00 386,400.00
200,000.00 118,285.71
220,000.00 164,918.52
Jumlah harga bahan............ 669,604.23
Harga Jumlah
Satuan (Rp) Harga (Rp)
37,500.00 61,875.00
38,500.00 10,587.50
40,000.00 1,120.00
10,000.00 830.00
Jumlah Tenaga Kerja............ 74,412.50
8,000.00 2,208,000.00
2,600.00 1,537.71
Jumlah harga bahan............ 2,209,537.71
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 198,000.00
140,000.00 38,500.00
150,000.00 4,200.00
150,000.00 12,450.00
Jumlah Tenaga Kerja............ 253,150.00
1,400.00 456,400.00
200,000.00 108,580.00
220,000.00 167,684.00
Jumlah harga bahan............ 732,664.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 8,400.00
140,000.00 9,800.00
150,000.00 1,050.00
150,000.00 600.00
Jumlah Tenaga Kerja............ 19,850.00
12,000.00 126,000.00
20,000.00 3,000.00
Jumlah harga bahan............ 129,000.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 62,400.00
140,000.00 36,400.00
150,000.00 3,900.00
150,000.00 3,900.00
Jumlah Tenaga Kerja............ 106,600.00
225,000.00 9,000.00
20,000.00 6,000.00
4,500.00 450.00
Jumlah harga bahan............ 15,450.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 42,000.00
140,000.00 4,900.00
150,000.00 52,500.00
150,000.00 2,700.00
Jumlah Tenaga Kerja............ 102,100.00
12,500.00 50,000.00
Jumlah harga bahan............ 50,000.00
385.92 Kg
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 7,200.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 1,200.00
Jumlah Tenaga Kerja............ 19,800.00
25,000.00 28,750.00
Jumlah harga bahan............ 28,750.00
395.56 Kg
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 7,200.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 1,200.00
Jumlah Tenaga Kerja............ 19,800.00
25,000.00 28,750.00
Jumlah harga bahan............ 28,750.00
436.8 Kg
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 7,200.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 1,200.00
Jumlah Tenaga Kerja............ 19,800.00
25,000.00 28,750.00
Jumlah harga bahan............ 28,750.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
1,400.00 84.00
15,000.00 900.00
35,000.00 700.00
37,500.00 300.00
Jumlah Tenaga Kerja............ 1,984.00
25,000.00 300,000.00
Jumlah harga bahan............ 300,000.00
120,000.00 30,000.00
140,000.00 17,500.00
150,000.00 1,950.00
150,000.00 1,950.00
Jumlah Tenaga Kerja............ 51,400.00
12,500.00 82,875.00
1,400.00 13,720.00
200,000.00 9,000.00
15,000.00 19,500.00
Jumlah harga bahan............ 125,095.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 84,000.00
140,000.00 49,000.00
150,000.00 5,250.00
150,000.00 5,250.00
Jumlah Tenaga Kerja............ 143,500.00
2,600.00 68,900.00
1,400.00 14,560.00
200,000.00 9,000.00
15,000.00 24,300.00
Jumlah harga bahan............ 116,760.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 10,800.00
140,000.00 12,600.00
150,000.00 5,250.00
150,000.00 750.00
Jumlah Tenaga Kerja............ 29,400.00
1,500.00 7,950.00
1,400.00 1,596.00
200,000.00 600.00
15,000.00 375.00
Jumlah harga bahan............ 10,521.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 108,000.00
140,000.00 63,000.00
150,000.00 6,750.00
150,000.00 6,750.00
Jumlah Tenaga Kerja............ 184,500.00
2,600.00 52,000.00
1,400.00 13,020.00
200,000.00 3,600.00
15,000.00 29,100.00
Jumlah harga bahan............ 97,720.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 84,000.00
140,000.00 49,000.00
150,000.00 5,250.00
150,000.00 5,250.00
Jumlah Tenaga Kerja............ 143,500.00
275,000.00 302,500.00
1,400.00 16,450.00
200,000.00 7,000.00
Jumlah harga bahan............ 325,950.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 12,000.00
140,000.00 7,000.00
150,000.00 750.00
150,000.00 750.00
Jumlah Tenaga Kerja............ 20,500.00
Err:509 Err:509
957,000.00 105,270.00
Jumlah harga bahan............ Err:509
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 7,200.00
140,000.00 252,000.00
150,000.00 27,000.00
150,000.00 4,500.00
Jumlah Tenaga Kerja............ 290,700.00
Err:509 Err:509
105,000.00 1,260,000.00
Jumlah harga bahan............ Err:509
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 14,400.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 900.00
Jumlah Tenaga Kerja............ 26,700.00
35,000.00 24,500.00
5,000.00 100.00
Jumlah harga bahan............ 24,600.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 18,000.00
140,000.00 9,800.00
150,000.00 9,000.00
150,000.00 900.00
Jumlah Tenaga Kerja............ 37,700.00
37,500.00 41,250.00
20,000.00 1,000.00
Jumlah harga bahan............ 42,250.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 12,000.00
140,000.00 28,000.00
150,000.00 3,000.00
150,000.00 750.00
Jumlah Tenaga Kerja............ 43,750.00
3,850,000.00 42,350.00
20,000.00 1,000.00
Jumlah harga bahan............ 43,350.00
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 8,400.00
140,000.00 1,260.00
150,000.00 900.00
150,000.00 450.00
Jumlah Tenaga Kerja............ 11,010.00
26,000.00 5,200.00
8,000.00 1,200.00
70,000.00 11,900.00
70,000.00 18,200.00
7,500.00 75.00
4,500.00 135.00
10,000.00 2,000.00
Jumlah harga bahan............ 38,710.00
M3
Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 72,000.00
140,000.00 252,000.00
150,000.00 27,000.00
150,000.00 4,500.00
Jumlah Tenaga Kerja............ 355,500.00
3,850,000.00 161,700.00
1,400.00 25,200.00
Jumlah harga bahan............ 186,900.00
5.40
0.18
1.20
0.12
0.72
0.02
2.88
Bahan dan Alat Pekerja
2.22
0.37
0.04
0.11
370.94
0.79
1.01
0.79
0.13
0.01
0.04
132.48
0.28
3.01
0.50
0.05
0.15
594.94
0.99
1.39
8.94
8.94
0.89
0.51
1,341.35
19.16
4.16
2.08
0.21
0.21
0.32
2.40
0.80
Bahan dan Alat Pekerja
3.15
0.32
3.15
0.16
36.00
23.16
23.16
7.72
3.09
443.81
23.73
23.73
7.91
3.16
454.89
26.21
26.21
8.74
3.49
502.32
1.35
1.35
0.45
0.18
270.00
Bahan dan Alat Pekerja
2.66
1.33
0.44
0.13
15.54
0.44
0.15
0.07
0.06
0.01
1.10
0.05
Err:509
Err:509
1.68
0.22
0.14
0.07
4.80
3.60
4.08
6.24
0.24
0.72
4.80
1.20
3.60
0.36
0.06
0.08
36.00
1 m2rangka besi hollow 4//4
III.
### Pekerjaan Tower Air 100,689,592.60
Jumlah 114,355,117.72
Ppn 10% 11,435,511.77
Jumlah Total 125,790,629.49
Dibulatkan 125,700,000.00
Terbilang : Seratus Dua Puluh Empat Juta Lima Ratus Ribu Rupiah
DAFTAR HARGA SATUAN UPAH & BAHAN
I HARGA UPAH
1 Pekerja 120,000.00 Org/Hari
2 Tukang 140,000.00 Org/Hari
3 Kepala Tukang 150,000.00 Org/Hari
4 Mandor 150,000.00 Org/Hari
II HARGA BAHAN
1 Batu belah 225,000.00 / M3
2 Batu bata merah 750.00 / Buah
3 Batu Split 337,000.00 / M3
4 Koral Beton 220,000.00 / M3
5 Pasir Pasang 200,000.00 / M3
6 Pasir Urug 135,000.00 / M3
7 Sirtu/Koral 180,000.00 / M3
8 Tanah Urug 50,000.00 / M3
9 Kayu Kualitas Baik 3,850,000.00 / M3
10 Dolken 10,000.00 / Btg
11 Plywood 9 mm 125,000.00 / Lbr
12 Triplek 4 mm 70,000.00 / Lbr
13 Semen PC Type I ( 50 kg ) 1,400.00 / kg
14 Semen PC Type I ( 50 kg ) 70,000.00 / Zak
15 Semen warna 15,000.00 / kg
16 Seng Gelombang BJLS 20 35,000.00 / Lbr
17 Seng Plat 37,500.00 / Lbr
18 Atap Metal t. 0,25 38,500.00 / Lbr
19 Nok Plat Metal 40,000.00 / Bh
20 Amplas 10,000.00 / Lbr
21 Besi beton 12,000.00 / Kg
22 Kawat beton 20,000.00 / Kg
23 Paku Halus 20,000.00 / Kg
24 Paku 2" - 6 " 20,000.00 / Kg
25 Paku Seng 33,000.00 / Kg
26 Keramik dinding 20 x 20 cm. 2,600.00 / Bh
27 Keramik 40 x 40 cm. 11,200.00 / Bh
28 Keramik 40 x 40 cm. Anti Slip 12,500.00 / Bh
29 Keramik 20 x 20 cm. 2,600.00 / Bh
30 plint Keramik 10 x 20 cm. 1,500.00 / Bh
31 Batu Andesit ( Napoly ) 275,000.00 / M2
32 Minyak Begisting 4,500.00 / Ltr
33 Cat Kayu 70,000.00 / Kg
34 Cat menie kayu 26,000.00 / Kg
35 Cat Warna Tembok 40,000.00 / Kg
36 Plamir Tembok 8,000.00 / Kg
37 Cat Dasar 25,000.00 / Kg
38 Kuas 7,500.00 / Bh
39 Skrup/Baut 5,000.00 / Kg
40 Besi Hollow 4/4 12,500.00 / M1
48 Compound 105,000.00 / Sak
49 Besi Plat 25,000.00 / Kg
NO URAIAN PEKERJAAN HARGA SATUAN SATUAN KETERANGAN
( RP. )
50 Besi Siku ( L ) 25,000.00 / Kg
51 Besi L 100 x 100 x 8 mm 1,809,000.00 / Btg
52 Besi L 70 x 70 x 6 mm 957,000.00 / Btg
53 Besi L 60 x 60 x 5 mm 682,500.00 / Btg
54 - Besi Plat 1,200,000.00 / Lbr
55 Papan 3,850,000.00 / M3
56 Tinner/Pengencer 25,000.00 / kaleng
PERHITUNGAN KEBUTUHAN TENAGA KERJA/ALAT/BAHAN
PEKERJAAN : PENGADAAN CLEMBING WALL
LOKASI : KOTA BENGKULU
TH. ANGGARAN : 2018
Kebutuhan Tenaga K
Volume Tenaga Kerja
Item Kegiatan Satuan
/Kuantitas Kepala tanah semen
Pekerja Tukang Mandor
Tukang urug portland
Galian tanah biasa sedalam 1M M3 7.2 5.40 0.18
urugan kembali tanah galian M3 2.4 1.20 0.12
urugan tanah M3 2.4 0.72 0.02 2.88
lantai kerja M3 1.344 2.22 0.37 0.04 0.11 370.94
beton Tumbuk rabat beton M3 0.48 0.79 0.13 0.01 0.04 132.48
beton 1 : 2 :3 M3 1.82496 3.01 0.50 0.05 0.15 594.94
pembesian dengan besi polos atau besi ulir Kg 127.7472 8.94 8.94 0.89 0.51
Pemasangan bekesting untuk pondasi M2 8 4.16 2.08 0.21 0.21
rangka besi hollow 4//4 M1 9 3.15 0.32 3.15 0.16
Besi L 100 x 100 x 8 mm Kg 385.92 23.16 23.16 7.72 3.09
Besi L 70 x 70 x 6 mm Kg 395.56 23.73 23.73 7.91 3.16
Besi L 60 x 60 x 5 mm Kg 436.8 26.21 26.21 8.74 3.49
Plat Besi M2 22.5 1.35 1.35 0.45 0.18
atap seng gelombang M2 22.2 2.66 1.33 0.44 0.13
Nok Seng Plat Bh 1 0.15 0.07 0.06 0.01
Lisplank Double Kayu M1 Err:509 Err:509 Err:509 Err:509 Err:509
pengecatan Kayu M2 24 1.68 0.22 0.14 0.07
Pemasangan dinding papan M2 2 1.20 3.60 0.36 0.06
(………………………..)
(………………………..)
(………………………..)
/BAHAN
- - - -
- - - -
0.79 1.01 - - - -
0.28 - - - -
0.99 1.39 - - - -
- -
0.32 2.40 0.80
36.00
443.81
454.89
502.32
270.00
15.54
1.10 0.05
Err:509
36.00
2.07 2.72 ### 0.80 36.00 443.81 454.89 502.32 270.00 15.54 1.10 36.05
M3 M3 Kg Kg M1 Kg Kg Kg Kg Lembar Bh Kg
Papan Cat Pengenc
Cat Menie Plamur Kuas Amplas
Kayu Penutup er
Err:509
4.80 3.60 4.08 0.72 0.24 0.72
0.08
VOLUME KEBUTUHAN
NO. URAIAN Sat TOTAL
Jumlah Pembulatan
'(1) (2) (3) (4) (5)
1. A. TENAGA KERJA :
Pekerja HOK Err:509 Err:509
Tukang HOK Err:509 Err:509
Kepala Tukang HOK Err:509 Err:509
Mandor HOK Err:509 Err:509
Sub Total Tenaga Kerja (1)
2. B. BAHAN/MATERIAL :
Tanah urug M3 2.88 3.00
semen portland Zak 21.97 20.00
pasir M3 2.07 -
koral M3 2.72 2.75
paku Kg Err:509 4.00
Besi Hollow 4/4 M1 36.00 40.00
Besi L 100 x 100 x 8 mm Btg 6.13 7.00
Besi L 70 x 70 x 6 mm Btg 11.88 10.00
Besi L 60 x 60 x 5 mm Btg 18.40 19.00
Besi Plat Kg 1.80 5.00
seng gelombang Lembar 15.54 16.00
Seng Plat Bh 1.10 2.00
Paku Skrup Kg 36.05 433.00
Papan Kayu M3 Err:509 1.25
Cat Menie Kg 4.80 25.00
Plamur Kg 3.60 18.00
Cat Penutup Kg 4.08 21.00
Kuas Bh 0.72 4.00
Pengencer Bh 0.24 2.00
Amplas Lembar 0.72 4.00
Pek. Rangka Atap Baja Ringan Ls 22.20 22.20
Pas. Angkur Ls 24.00 24.00
Sub Total Bahan (2)
3. C. A L A T :
Gerobak Dorong Bh 4.00 4.00
Cangkul Bh 5.00 5.00
Skop Bh 3.00 3.00
Ember Bh 5.00 5.00
Crane Hr 1.00 1.00
Molen Hr 2.00 2.00
Sub Total Alat (3)
4. D. ADMINISTRASI :
Administrasi dan
Unit 1.00 -
Dokumentasi
Harga
Satuan DARI
(Rp.) BLM
(6) (7)=(5)x(6)
120,000.00 Err:509
140,000.00 Err:509
150,000.00 Err:509
150,000.00 Err:509
Err:509
50,000.00 150,000.00
70,000.00 1,400,000.00
200,000.00 -
220,000.00 605,000.00
20,000.00 80,000.00
12,500.00 500,000.00
1,809,000.00 12,663,000.00
957,000.00 9,570,000.00
682,500.00 12,967,500.00
1,200,000.00 6,000,000.00
35,000.00 560,000.00
37,500.00 75,000.00
5,000.00 2,165,000.00
3,850,000.00 4,812,500.00
26,000.00 650,000.00
8,000.00 144,000.00
26,000.00 546,000.00
7,500.00 30,000.00
25,000.00 50,000.00
10,000.00 40,000.00
110,000.00 2,442,000.00
95,500.00 2,292,000.00
60,146,000.00
450,000.00 1,800,000.00
70,000.00 350,000.00
55,000.00 165,000.00
10,000.00 50,000.00
5,000,000.00 5,000,000.00
250,000.00 500,000.00
7,865,000.00
2,000,000.00 -
2,000,000.00
1 25 x 25 x 3 mm – 6 meter 6,72 Kg
2 30 x 30 x 3 mm – 6 meter 8,16 Kg
13 65 x 65 x 6 mm – 6 meter 35,46 Kg
Rp 54.000
Rp 72.500
Rp 95.000
Rp 117.000
Rp 109.000
Rp 134.000
Rp 122.000
Rp 150.000
Rp 176.000
per
Rp 181.000 meter
4.55 kg/M hitung vol 96
berrat
Rp 215.000 436.8
Rp 234.000
per
Rp 253.000 meter
6.38 kg/M hitung vol 62
berrat
Rp 293.000 395.56
Rp 272.000
Rp 315.000
Rp 357.000
Rp 336.000
Rp 381.000
Rp 380.000
Rp 482.000
per
Rp 478.000 meter
12.06 kg/M hitung vol 32
berrat
Rp 590.000 385.92
Rp 788.000
Rp 856.000
Rp 927.000
Rp 1.081.000
Rp 1.331.000
m