HARGA SATUAN UNTUK DED 2017

URAIAN SATUAN HARGA SATUAN KETERANGAN


2 3 4 5

TENAGA KERJA

Pekerja Hari Rp 100,000.00

Mandor Hari Rp 150,000.00

Tukang Hari Rp 140,000.00

Kepala Tukang Hari Rp 150,000.00

Operator Alat berat Hari Rp 250,000.00

Pembantu Operator Hari Rp 120,000.00

BAHAN DAN MATERIAL

Semen ( PC ) Kg Rp 1,400.00

Semen ( PC ) @50 KG Zak Rp 70,000.00

Batu Kali M3 Rp 250,000.00

Batu Gunung M3 Rp 225,000.00

Koral Beton M3 Rp 300,000.00

Batu Bata Bh Rp 650.00

Pasir Pasang M3 Rp 200,000.00

Pasir Jagung M3 Rp 170,000.00

Pasir Urug M3 Rp 175,000.00

Kawat Beton Kg Rp 25,000.00

Kawat Brojong 4mm Kg Rp 30,000.00

Besi Beton polos dia 12 mm Kg Rp 102,000.00

Besi Beton polos dia 10 mm Btg Rp 76,000.00

Besi Beton polos dia 8 mm Btg Rp 40,000.00

Besi Beton polos dia 6 mm Btg Rp 24,500.00

Paku Kayu 2-4" Kg Rp 20,000.00

Paku Plywood Kg Rp 20,000.00


Kayu 5/7 Klas IV btg Rp 42,000.00

Kayu Kelas IV M3 Rp 3,000,000.00

Kayu Kelas II M3 Rp 4,000,000.00

Kayu 5/7 Klas II Btg Rp 56,000.00

Kayu Papan 2/25 klas IV Kpg Rp 60,000.00

Kayu Papan 2/25 klas II Kpg Rp 80,000.00

Kayu Balok 4/6 Klas II Btg Rp 38,400.00

Kayu Dolken Btg Rp 10,000.00

Plywood Tebal 3 mm Lbr Rp 65,000.00

Plywood Tebal 4 mm Lbr Rp 80,000.00


Plamur Kg Rp 35,000.00

Plywood Tebal 6 mm Lbr Rp 85,000.00

Cat Kayu Kg Rp 45,000.00

Cat Tembok Kg Rp 50,000.00

Cat Besi kg Rp 60,000.00

Minyak Cat Kg Rp 60,000.00

Batu Pecah 5-7 M3 Rp 350,000.00

Batu Pecah 3 - 5 M3 Rp 375,000.00

Batu Pecah 2 - 3 M3 Rp 400,000.00

Batu Pecah 1 - 2 M3 Rp 450,000.00

Abu Batu M3 Rp 430,000.00

Sirtu M3 Rp 200,000.00

Aspal 60/70 Kg Rp 14,000.00

Aspal 60/70 Drum Rp 2,170,000.00

Bensin Ltr Rp 9,900.00

Solar Ltr Rp 6,700.00

Batu Gunung 15-20 M3 Rp 225,000.00

Paving Block bh Rp 3,000.00

Grill besi 10 mm M' Rp 200,000.00

Pipa Galvanis 3" Btg Rp 635,000.00

Pipa Galvanis 4" Btg Rp 675,000.00

Drill m' Rp 200,000.00

Gorong-Gorong Dia 20cm x 100cm M' Rp 105,000.00

Gorong-Gorong Dia 30cm x 100cm M' Rp 131,250.00

Gorong-Gorong Bertulang Dia 40cm x 100 cm M' Rp 315,000.00

Gorong-Gorong Bertulang Dia 60cm x 100 cm M' Rp 472,500.00

Gorong-Gorong Bertulang Dia 80cm x 50 cm M' Rp 750,000.00

Gorong-Gorong Bertulang Dia 100cm x 50 cm M' Rp 850,000.00

ALAT
Mesin Gilas 6 - 10 T Jam Rp 350,000.00

Sewa Molen Hari Rp 250,000.00

Gerobak Dorong bh Rp 450,000.00

Cangkul Bh Rp 70,000
Gergaji Besi Bh Rp 55,000
Linggis bh Rp 150,000
Sendok Semen Bh Rp 25,000
Palu bh Rp 30,000

Sekop Bh Rp 55,000
Meteran 7.5 m bh Rp 30,000

Ember bh Rp 10,000
Meteran 100 m bh Rp 150,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PENGADAAN CLEMBING WALL

LOKASI : BENGKULU

TH. ANGGARAN : 2018

NO ITEM PEKERJAAN VOL SAT ANALISA

I Pekerjaan Persiapan
1 Pek. Persiapan dan Pas Bowplank 1.00 unit Ls
2 Biaya Listrik dan Air Kerja 1.00 unit Ls
3 Administrasi Dan dokumentasi 1.00 unit Ls

III Pekerjaan Tanah Dan pondasi


1 Pek. Galian Tanah 7.20 M3 A.2.3.1.1
2 Pek. Urugan Tanah Kembali 2.40 M3 A.2.3.1.9
3 Pek. Lantai Kerja 0.86 M3 A.4.1.1.5
4 Pek. Beton Pondasi Plat 1.82 M3 B.FP.1
5 Pek. Rabat Beton 0.48 M3 A.4.1.1.5

III Pekerjaan Tower Air


1 Pek. Rangka Tower Besi L 100 x 100 x 8 mm 385.92 Kg A.4.4.3.34
2 Pek. Rangka Tower Besi L 70 x 70 x 6 mm 395.56 Kg A.4.4.3.34
3 Pek. Rangka Tower Besi L 60 x 60 x 5 mm 436.80 Kg A.4.4.3.34
4 Pek. Reilling Besi Holllow 9.00 M2 A.4.2.1.21
5 Pek. Rangka Atap Baja Ringan 22.20 M2 Ls
6 Pek. Atap Seng Gelombang Warna 22.20 M2 A.4.5.2.32
7 Pek. Nok Seng plat 1.00 Unit A.4.5.2.36
8 Pek. Dinding Papan T 4 Cm + Baut 2.00 M3 Ls
9 Pek. Lantai Plat Besi 22.50 M2 A.4.4.3.34
10 Pek. Pengecatan Kayu Dan Besi 24.00 M2 A.4.7.1.10
11 Pek. Tangga 2.00 Unit Ls
12 Pak. Angkur 24.00 Bh Ls

Halaman :5
A ANGGARAN BIAYA

HARGA
SATUAN Jumlah
Rp. Harga

1,000,000.00 1,000,000.00
2,500,000.00 2,500,000.00
1,500,000.00 1,500,000.00
Jumlah 5,000,000.00

93,750.00 675,000.00
67,500.00 162,000.00
1,133,686.10 979,504.79
3,454,788.60 6,304,851.00
1,133,686.10 544,169.33
Jumlah 8,665,525.12

55,832.50 21,546,878.40
55,832.50 22,085,103.70
55,832.50 24,387,636.00
174,915.00 1,574,235.00
140,000.00 3,108,000.00
58,995.00 1,309,689.00
91,942.50 91,942.50
6,000,000.00 12,000,000.00
347,281.60 7,813,836.00
57,178.00 1,372,272.00
1,500,000.00 3,000,000.00
100,000.00 2,400,000.00
Jumlah 100,689,592.60

Halaman :6
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBUATAN TOWER
LOKASI : KOTA BENGKULU
TH ANGGARAN : 2018
HARGA
NO ITEM PEKERJAAN VOL SAT SATUAN
Rp.
I Pekerjaan Persiapan Dan Akhir
1 Pek. Persiapan danPas Bowplank 1.00 unit 1,000,000.00
2 Biaya Listrik dan Air Kerja 1.00 unit 1,000,000.00
Jumlah I
III Pekerjaan Rehab Tower Air
1 0 - 0 -
2 0 - 0 -
3 0 - 0 -
4 0 - 0 -
5 0 - 0 -
6 0 - 0 -
7 0 5.00 0 -
8 0 - 0 -
9 0 - 0 -
10 0 - 0 -
11 0 - 0 -
12 0 - 0 -
13 0 - 0 -
14 0 - 0 -
15 0 - 0 -
16 0 - 0 -
17 0 - 0 -
18 0 192.00 0 -
19 Angkur + Baut 24.00 bh 50,000.00
20 Upah Dan Pengelasan 1.00 Unit 10,000,000.00
Jumlah

Halaman :7
A ANGGARAN BIAYA

HARGA
Jumlah
Harga

1,000,000.00
1,000,000.00
2,000,000.00

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,200,000.00
10,000,000.00
13,200,000.00

Halaman :8
DAFTAR ANALISA
ENGINEERING ESTIMATE

PEKERJAAN : PENGADAAN CLEMBING WALL


LOKASI : KOTA BENGKULU
TH. ANGGARAN : 2018

A.2.3.1.1 : 1M3 Galian tanah biasa sedalam 1M 7.2 M3

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 pekerja L.01 OH 0.7500
2 Mandor L.04 OH 0.0250
Jumlah Tenaga Kerja............
B. BAHAN :
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.2.3.1.9 : 1M3 urugan kembali tanah galian 2.4 M3

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 anah 0.5000
2 Mandor L.04 OH 0.0500
Jumlah Tenaga Kerja............
B. BAHAN :
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.2.3.1.11a : 1M3 urugan tanah 2.4 M3

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.3000
2 Mandor L.04 OH 0.0100
Jumlah Tenaga Kerja............
B. BAHAN :
1 tanah urug 1.2000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.1.1.2 : membuat 1 M3 lantai kerja 1.344 M3

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 1.6500
2 Tukang Batu L.02 OH 0.2750
3 Kepala Tukang L.03 OH 0.0280
4 Mandor L.04 OH 0.0830
Jumlah Tenaga Kerja............
B. BAHAN :
1 semen portland Kg 276.0000
2 pasir beton M³ 0.5914
3 Koral Beton M³ 0.7496
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.1.1.2 : membuat 1 M3 beton Tumbuk rabat beton 0.48 M3

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 1.6500
2 Tukang Batu L.02 OH 0.2750
3 Kepala Tukang L.03 OH 0.0280
4 Mandor L.04 OH 0.0830
Jumlah Tenaga Kerja............
B. BAHAN :
1 semen portland Kg 276.0000
2 pasir beton M³ 0.5914
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E
F Harga satuan pekerjaan ( D + E )...............

A.4.1.1.5 : membuat 1 M3 beton 1 : 2 :3 1.82496 M3

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 1.6500
2 Tukang L.2 OH 0.2750
3 Kepala Tukang L.03 OH 0.0280
4 Mandor L.04 OH 0.0830
Jumlah Tenaga Kerja............
B. BAHAN :
1 semen portland kg 326.0000
2 pasir beton M³ 0.5429
3 Koral Beton M³ 0.7622
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.1.1.17 : pembesian 10 kg dengan besi polos atau besi ul 127.7472 kg

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0700
2 Tukang besi L.02 OH 0.0700
3 Kepala tukang L.03 OH 0.0070
4 Mandor L.04 OH 0.0040
Jumlah Tenaga Kerja............
B. BAHAN :
1 besi beton Kg 10.5000
2 kawat beton Kg 0.1500
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E ) ...............
G Harga satuan Pembesian / kg ( F/ 10) ...............

A.4.1.1.20 : Pemasangan 1 M² bekesting untuk pondasi 8 m2

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.5200
2 Tukang kayu L.02 OH 0.2600
3 kepala tukang L.03 OH 0.0260
4 Mandor L.04 OH 0.0260
Jumlah Tenaga Kerja............
B. BAHAN :
1 Batu/Batu Belah M³ 0.0400
2 paku 5 - 10 cm kg 0.3000
3 minyak bekisting liter 0.1000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.2.1.21 : 1 m2rangka besi hollow 4//4 9

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.3500
2 Tukang L.02 OH 0.0350
3 Kepala tukang L.03 OH 0.3500
4 Mandor L.04 OH 0.0180
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Hollow 4/4 M1 4.0000
Jumlah harga bahan............
C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.34 : Pemasangan 1 kg besi rangka Besi Siku Besi L 100 x 100 x 8 mm

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Siku kg 1.1500
Jumlah harga bahan............
C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.34 : Pemasangan 1 kg besi rangka Besi Siku 70 x 70 x 6 mm

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Siku kg 1.1500
Jumlah harga bahan............
C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.34 : Pemasangan 1 kg besi rangka Besi Siku Besi L 60 x 60 x 5 mm

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Siku kg 1.1500
Jumlah harga bahan............
C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.34 : Pemasangan 1 m2 besi Plat Besi 22.5 M2

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang Besi L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0080
Jumlah Tenaga Kerja............
B. BAHAN :
1 Besi Plat Kg 12.0000
Jumlah harga bahan............
C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A.4.4.3.34b : Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm Anti slip
No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.2500
2 Tukang L.02 OH 0.1250
3 Kepala tukang L.03 OH 0.0130
4 Mandor L.04 OH 0.0130
Jumlah Tenaga Kerja............
B. BAHAN :
1 keramik 40 x 40 Anti slip bh 6.6300
2 semen portland kg 9.8000
3 pasir pasang M³ 0.0450
4 semen warna kg 1.3000
Jumlah harga bahan............
C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
A.4.4.3.36 : pemasangan 1m lantai keramik ukuran 20cm x 20cm
2

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.7000
2 Tukang L.02 OH 0.3500
3 Kepala tukang L.03 OH 0.0350
4 Mandor L.04 OH 0.0350
Jumlah Tenaga Kerja............
B. BAHAN :
1 keramik 20 x 20 bh 26.5000
2 semen portland kg 10.4000
3 pasir pasang M³ 0.0450

4 semen warna kg 1.6200

Jumlah harga bahan............


C. PERALATAN:

Jumlah harga peralatan............


D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.39 : pemasangan 1m' plint keramik ukuran 10cm x 20 cm

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0900
2 Tukang L.02 OH 0.0900
3 Kepala tukang L.03 OH 0.0350
4 Mandor L.04 OH 0.0050
Jumlah Tenaga Kerja............
B. BAHAN :
1 plint keramik bh 5.3000
2 semen portland kg 1.1400
3 pasir pasang M³ 0.0030

4 semen warna kg 0.0250

Jumlah harga bahan............


C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.54 : 1m2 Dinding keramik ukuran 20cm x 25cm

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.9000
2 Tukang L.02 OH 0.4500
3 Kepala tukang L.03 OH 0.0450
4 Mandor L.04 OH 0.0450
Jumlah Tenaga Kerja............
B. BAHAN :
1 keramik dinding bh 20.0000
2 semen portland kg 9.3000
3 pasir pasang M³ 0.0180

4 semen warna kg 1.9400

Jumlah harga bahan............


C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.4.3.58 : 1m2 Dinding Batu Andesut ( Napoly )

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.7000
2 Tukang L.02 OH 0.3500
3 Kepala tukang L.03 OH 0.0350
4 Mandor L.04 OH 0.0350
Jumlah Tenaga Kerja............
B. BAHAN :
1 Batu Andesit ( Napoly ) M2 1.1000
2 semen portland kg 11.7500
3 pasir pasang M 3 0.0350

Jumlah harga bahan............


C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.5.1.7 : 1 m² plafond gypsum ,tebal 9 mm

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.1000
2 Tukang L.02 OH 0.0500
3 Kepala tukang L.03 OH 0.0050
4 Mandor L.04 OH 0.0050
Jumlah Tenaga Kerja............
B. BAHAN :
1 gypsum board lembar 0.3640
2 paku skrup kg 0.1100
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.5.1.9 : Pemasangan 1 m² dinding papan kayu kelas I

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0600
2 Tukang L.02 OH 1.8000
3 Kepala tukang L.03 OH 0.1800
4 Mandor L.04 OH 0.0300
Jumlah Tenaga Kerja............
B. BAHAN :
1 Papan Kayu m3 0.0400
2 Skrup 10 Cm bh 12.0000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.5.2.32 : Pemasangan 1 m² atap seng gelombang 22.2000

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.1200
2 Tukang L.02 OH 0.0600
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0060
Jumlah Tenaga Kerja............
B. BAHAN :
1 Seng Gelombang lembar 0.7000
2 Paku Skrup kg 0.0200
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.5.2.36 : 1 M1 Nok Seng Plat 1

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.150
2 Tukang L.02 OH 0.070
3 Kepala tukang L.03 OH 0.0600
4 Mandor L.04 OH 0.006
Jumlah Tenaga Kerja............
B. BAHAN :
1 Seng Plat Bh 1.1000
2 Paku Skrup kg 0.0500
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.6.1.22 : 1 M1 Lisplank Double Kayu Err:509 Err:509

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.1000
2 Tukang L.02 OH 0.2000
3 Kepala tukang L.03 OH 0.0200
4 Mandor L.04 OH 0.0050
Jumlah Tenaga Kerja............
B. BAHAN :
1 Papan Kayu Kelas II M3 0.0110
2 Paku kg 0.0500
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.4.7.1.10 : pengecatan 1 m² Kayu 24 M2

No. Uraian Kode Satuan Koefisien

A. TENAGA :
1 Pekerja L.01 OH 0.0700
2 Tukang L.02 OH 0.0090
3 Kepala tukang L.03 OH 0.0060
4 Mandor L.04 OH 0.0030
Jumlah Tenaga Kerja............
B. BAHAN :
1 Cat menie Kg 0.2000
2 Plamuur Kg 0.1500
3 Cat dasar Kg 0.1700
4 Cat penutup Kg 0.2600
5 Kuas Bh 0.0100
6 Pengecer Bh 0.0300
7 Ampelas Lbr 0.2000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............

A.5.1.1.2 : Pemasangan 1 m² dinding papan kayu kelas 2.0000


No. Uraian Kode Satuan Koefisien
A. TENAGA :
1 Pekerja L.01 OH 0.6000
2 Tukang L.02 OH 1.8000
3 Kepala tukang L.03 OH 0.1800
4 Mandor L.04 OH 0.0300
Jumlah Tenaga Kerja............
B. BAHAN :
1 Papan Kayu M3 0.0420
2 Skrup 8-10 cm Bh 18.0000
Jumlah harga bahan............
C. PERALATAN:
Jumlah harga peralatan............
D Jumlah harga tenaga bahan dan peralatan ( A + B + C )...............
E Overhead & profit 15 % X D...............
F Harga satuan pekerjaan ( D + E )...............
ISA

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 90,000.00
150,000.00 3,750.00
Jumlah Tenaga Kerja............ 93,750.00

Jumlah harga bahan............

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 93,750.00
Overhead & profit 15 % X D............... 14,062.50
a satuan pekerjaan ( D + E )............... 107,812.50

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 60,000.00
150,000.00 7,500.00
Jumlah Tenaga Kerja............ 67,500.00

Jumlah harga bahan............

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 67,500.00
Overhead & profit 15 % X D............... 10,125.00
a satuan pekerjaan ( D + E )............... 77,625.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 36,000.00
150,000.00 1,500.00
Jumlah Tenaga Kerja............ 37,500.00

50,000.00 60,000.00
Jumlah harga bahan............ 60,000.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 97,500.00
Overhead & profit 15 % X D............... 14,625.00
a satuan pekerjaan ( D + E )............... 112,125.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 198,000.00
140,000.00 38,500.00
150,000.00 4,200.00
150,000.00 12,450.00
Jumlah Tenaga Kerja............ 253,150.00

1,400.00 386,400.00
200,000.00 118,285.71
220,000.00 164,918.52
Jumlah harga bahan............ 669,604.23

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 922,754.23
Overhead & profit 15 % X D............... 138,413.13
a satuan pekerjaan ( D + E )............... 1,061,167.37

Harga Jumlah
Satuan (Rp) Harga (Rp)

37,500.00 61,875.00
38,500.00 10,587.50
40,000.00 1,120.00
10,000.00 830.00
Jumlah Tenaga Kerja............ 74,412.50

8,000.00 2,208,000.00
2,600.00 1,537.71
Jumlah harga bahan............ 2,209,537.71

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 2,283,950.21
0 -
a satuan pekerjaan ( D + E )............... 2,283,950.21

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 198,000.00
140,000.00 38,500.00
150,000.00 4,200.00
150,000.00 12,450.00
Jumlah Tenaga Kerja............ 253,150.00

1,400.00 456,400.00
200,000.00 108,580.00
220,000.00 167,684.00
Jumlah harga bahan............ 732,664.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 985,814.00
Overhead & profit 15 % X D............... 147,872.10
a satuan pekerjaan ( D + E )............... 1,133,686.10

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 8,400.00
140,000.00 9,800.00
150,000.00 1,050.00
150,000.00 600.00
Jumlah Tenaga Kerja............ 19,850.00

12,000.00 126,000.00
20,000.00 3,000.00
Jumlah harga bahan............ 129,000.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 148,850.00
Overhead & profit 15 % X D............... 22,327.50
satuan pekerjaan ( D + E ) ............... 171,177.50
an Pembesian / kg ( F/ 10) ............... 17,117.75

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 62,400.00
140,000.00 36,400.00
150,000.00 3,900.00
150,000.00 3,900.00
Jumlah Tenaga Kerja............ 106,600.00

225,000.00 9,000.00
20,000.00 6,000.00
4,500.00 450.00
Jumlah harga bahan............ 15,450.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 122,050.00
Overhead & profit 15 % X D............... 18,307.50
a satuan pekerjaan ( D + E )............... 140,357.50

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 42,000.00
140,000.00 4,900.00
150,000.00 52,500.00
150,000.00 2,700.00
Jumlah Tenaga Kerja............ 102,100.00

12,500.00 50,000.00
Jumlah harga bahan............ 50,000.00

Jumlah harga peralatan............ -


dan peralatan ( A + B + C )............... 152,100.00
Overhead & profit 15 % X D............... 22,815.00
a satuan pekerjaan ( D + E )............... 174,915.00

385.92 Kg
Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 7,200.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 1,200.00
Jumlah Tenaga Kerja............ 19,800.00

25,000.00 28,750.00
Jumlah harga bahan............ 28,750.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 48,550.00
Overhead & profit 15 % X D............... 7,282.50
a satuan pekerjaan ( D + E )............... 55,832.50

395.56 Kg
Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 7,200.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 1,200.00
Jumlah Tenaga Kerja............ 19,800.00

25,000.00 28,750.00
Jumlah harga bahan............ 28,750.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 48,550.00
Overhead & profit 15 % X D............... 7,282.50
a satuan pekerjaan ( D + E )............... 55,832.50

436.8 Kg
Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 7,200.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 1,200.00
Jumlah Tenaga Kerja............ 19,800.00

25,000.00 28,750.00
Jumlah harga bahan............ 28,750.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 48,550.00
Overhead & profit 15 % X D............... 7,282.50
a satuan pekerjaan ( D + E )............... 55,832.50

Harga Jumlah
Satuan (Rp) Harga (Rp)

1,400.00 84.00
15,000.00 900.00
35,000.00 700.00
37,500.00 300.00
Jumlah Tenaga Kerja............ 1,984.00

25,000.00 300,000.00
Jumlah harga bahan............ 300,000.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 301,984.00
Overhead & profit 15 % X D............... 45,297.60
a satuan pekerjaan ( D + E )............... 347,281.60
Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 30,000.00
140,000.00 17,500.00
150,000.00 1,950.00
150,000.00 1,950.00
Jumlah Tenaga Kerja............ 51,400.00

12,500.00 82,875.00
1,400.00 13,720.00
200,000.00 9,000.00
15,000.00 19,500.00
Jumlah harga bahan............ 125,095.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 176,495.00
Overhead & profit 15 % X D............... 26,474.25
a satuan pekerjaan ( D + E )............... 202,969.25

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 84,000.00
140,000.00 49,000.00
150,000.00 5,250.00
150,000.00 5,250.00
Jumlah Tenaga Kerja............ 143,500.00

2,600.00 68,900.00
1,400.00 14,560.00
200,000.00 9,000.00
15,000.00 24,300.00
Jumlah harga bahan............ 116,760.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 260,260.00
Overhead & profit 15 % X D............... 39,039.00
a satuan pekerjaan ( D + E )............... 299,299.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 10,800.00
140,000.00 12,600.00
150,000.00 5,250.00
150,000.00 750.00
Jumlah Tenaga Kerja............ 29,400.00

1,500.00 7,950.00
1,400.00 1,596.00
200,000.00 600.00
15,000.00 375.00
Jumlah harga bahan............ 10,521.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 39,921.00
Overhead & profit 15 % X D............... 5,988.15
a satuan pekerjaan ( D + E )............... 45,909.15

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 108,000.00
140,000.00 63,000.00
150,000.00 6,750.00
150,000.00 6,750.00
Jumlah Tenaga Kerja............ 184,500.00

2,600.00 52,000.00
1,400.00 13,020.00
200,000.00 3,600.00
15,000.00 29,100.00
Jumlah harga bahan............ 97,720.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 282,220.00
Overhead & profit 15 % X D............... 42,333.00
a satuan pekerjaan ( D + E )............... 324,553.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 84,000.00
140,000.00 49,000.00
150,000.00 5,250.00
150,000.00 5,250.00
Jumlah Tenaga Kerja............ 143,500.00

275,000.00 302,500.00
1,400.00 16,450.00
200,000.00 7,000.00
Jumlah harga bahan............ 325,950.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 469,450.00
Overhead & profit 15 % X D............... 70,417.50
a satuan pekerjaan ( D + E )............... 539,867.50

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 12,000.00
140,000.00 7,000.00
150,000.00 750.00
150,000.00 750.00
Jumlah Tenaga Kerja............ 20,500.00

Err:509 Err:509
957,000.00 105,270.00
Jumlah harga bahan............ Err:509

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... Err:509
Overhead & profit 15 % X D............... Err:509
a satuan pekerjaan ( D + E )............... Err:509

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 7,200.00
140,000.00 252,000.00
150,000.00 27,000.00
150,000.00 4,500.00
Jumlah Tenaga Kerja............ 290,700.00

Err:509 Err:509
105,000.00 1,260,000.00
Jumlah harga bahan............ Err:509

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... Err:509
Overhead & profit 15 % X D............... Err:509
a satuan pekerjaan ( D + E )............... Err:509

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 14,400.00
140,000.00 8,400.00
150,000.00 3,000.00
150,000.00 900.00
Jumlah Tenaga Kerja............ 26,700.00

35,000.00 24,500.00
5,000.00 100.00
Jumlah harga bahan............ 24,600.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 51,300.00
Overhead & profit 15 % X D............... 7,695.00
a satuan pekerjaan ( D + E )............... 58,995.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 18,000.00
140,000.00 9,800.00
150,000.00 9,000.00
150,000.00 900.00
Jumlah Tenaga Kerja............ 37,700.00

37,500.00 41,250.00
20,000.00 1,000.00
Jumlah harga bahan............ 42,250.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 79,950.00
Overhead & profit 15 % X D............... 11,992.50
a satuan pekerjaan ( D + E )............... 91,942.50

Harga Jumlah
Satuan (Rp) Harga (Rp)
120,000.00 12,000.00
140,000.00 28,000.00
150,000.00 3,000.00
150,000.00 750.00
Jumlah Tenaga Kerja............ 43,750.00

3,850,000.00 42,350.00
20,000.00 1,000.00
Jumlah harga bahan............ 43,350.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 87,100.00
Overhead & profit 15 % X D............... 13,065.00
a satuan pekerjaan ( D + E )............... 100,165.00

Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 8,400.00
140,000.00 1,260.00
150,000.00 900.00
150,000.00 450.00
Jumlah Tenaga Kerja............ 11,010.00

26,000.00 5,200.00
8,000.00 1,200.00
70,000.00 11,900.00
70,000.00 18,200.00
7,500.00 75.00
4,500.00 135.00
10,000.00 2,000.00
Jumlah harga bahan............ 38,710.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 49,720.00
Overhead & profit 15 % X D............... 7,458.00
a satuan pekerjaan ( D + E )............... 57,178.00

M3
Harga Jumlah
Satuan (Rp) Harga (Rp)

120,000.00 72,000.00
140,000.00 252,000.00
150,000.00 27,000.00
150,000.00 4,500.00
Jumlah Tenaga Kerja............ 355,500.00

3,850,000.00 161,700.00
1,400.00 25,200.00
Jumlah harga bahan............ 186,900.00

Jumlah harga peralatan............


dan peralatan ( A + B + C )............... 542,400.00
Overhead & profit 15 % X D............... 81,360.00
a satuan pekerjaan ( D + E )............... 623,760.00
Bahan dan Alat Pekerja

5.40
0.18

Bahan dan Alat Pekerja

1.20
0.12

Bahan dan Alat Pekerja

0.72
0.02

2.88
Bahan dan Alat Pekerja

2.22
0.37
0.04
0.11

370.94
0.79
1.01

untuk lantai kerja

Bahan dan Alat Pekerja

0.79
0.13
0.01
0.04

132.48
0.28

Bahan dan Alat Pekerja

3.01
0.50
0.05
0.15

594.94
0.99
1.39

Bahan dan Alat Pekerja

8.94
8.94
0.89
0.51

1,341.35
19.16

Bahan dan Alat Pekerja

4.16
2.08
0.21
0.21

0.32
2.40
0.80
Bahan dan Alat Pekerja

3.15
0.32
3.15
0.16

36.00

Bahan dan Alat Pekerja

23.16
23.16
7.72
3.09

443.81

Bahan dan Alat Pekerja

23.73
23.73
7.91
3.16
454.89

Bahan dan Alat Pekerja

26.21
26.21
8.74
3.49

502.32

Bahan dan Alat Pekerja

1.35
1.35
0.45
0.18

270.00
Bahan dan Alat Pekerja

2.66
1.33
0.44
0.13

15.54
0.44

Bahan dan Alat Pekerja

0.15
0.07
0.06
0.01

1.10
0.05

Bahan dan Alat Pekerja


Err:509
Err:509
Err:509
Err:509

Err:509
Err:509

Bahan dan Alat Pekerja

1.68
0.22
0.14
0.07

4.80
3.60
4.08
6.24
0.24
0.72
4.80

Bahan dan Alat Pekerja

1.20
3.60
0.36
0.06

0.08
36.00
1 m2rangka besi hollow 4//4

Pemasangan 1 kg besi r Besi L 100 x 100 x 8 mm


REKAPITULASI
Rencana Anggaran Biaya
PEKERJAAN : PENGADAAN CLEMBING WALL
LOKASI : KOTA BENGKULU
TH. ANGGARAN : 2018

NO URAIAN PEKERJAAN JUMLA HARGA (Rp)

I Pekerjaan Persiapan 5,000,000.00

II.### Pekerjaan Tanah Dan pondasi 8,665,525.12

III.
### Pekerjaan Tower Air 100,689,592.60
Jumlah 114,355,117.72
Ppn 10% 11,435,511.77
Jumlah Total 125,790,629.49
Dibulatkan 125,700,000.00

Terbilang : Seratus Dua Puluh Empat Juta Lima Ratus Ribu Rupiah
DAFTAR HARGA SATUAN UPAH & BAHAN

PEKERJAAN : PENGADAAN CLEMBING WALL


LOKASI : KOTA BENGKULU
TH. ANGGARAN : 2018

NO URAIAN PEKERJAAN HARGA SATUAN SATUAN KETERANGAN


( RP. )

I HARGA UPAH
1 Pekerja 120,000.00 Org/Hari
2 Tukang 140,000.00 Org/Hari
3 Kepala Tukang 150,000.00 Org/Hari
4 Mandor 150,000.00 Org/Hari
II HARGA BAHAN
1 Batu belah 225,000.00 / M3
2 Batu bata merah 750.00 / Buah
3 Batu Split 337,000.00 / M3
4 Koral Beton 220,000.00 / M3
5 Pasir Pasang 200,000.00 / M3
6 Pasir Urug 135,000.00 / M3
7 Sirtu/Koral 180,000.00 / M3
8 Tanah Urug 50,000.00 / M3
9 Kayu Kualitas Baik 3,850,000.00 / M3
10 Dolken 10,000.00 / Btg
11 Plywood 9 mm 125,000.00 / Lbr
12 Triplek 4 mm 70,000.00 / Lbr
13 Semen PC Type I ( 50 kg ) 1,400.00 / kg
14 Semen PC Type I ( 50 kg ) 70,000.00 / Zak
15 Semen warna 15,000.00 / kg
16 Seng Gelombang BJLS 20 35,000.00 / Lbr
17 Seng Plat 37,500.00 / Lbr
18 Atap Metal t. 0,25 38,500.00 / Lbr
19 Nok Plat Metal 40,000.00 / Bh
20 Amplas 10,000.00 / Lbr
21 Besi beton 12,000.00 / Kg
22 Kawat beton 20,000.00 / Kg
23 Paku Halus 20,000.00 / Kg
24 Paku 2" - 6 " 20,000.00 / Kg
25 Paku Seng 33,000.00 / Kg
26 Keramik dinding 20 x 20 cm. 2,600.00 / Bh
27 Keramik 40 x 40 cm. 11,200.00 / Bh
28 Keramik 40 x 40 cm. Anti Slip 12,500.00 / Bh
29 Keramik 20 x 20 cm. 2,600.00 / Bh
30 plint Keramik 10 x 20 cm. 1,500.00 / Bh
31 Batu Andesit ( Napoly ) 275,000.00 / M2
32 Minyak Begisting 4,500.00 / Ltr
33 Cat Kayu 70,000.00 / Kg
34 Cat menie kayu 26,000.00 / Kg
35 Cat Warna Tembok 40,000.00 / Kg
36 Plamir Tembok 8,000.00 / Kg
37 Cat Dasar 25,000.00 / Kg
38 Kuas 7,500.00 / Bh
39 Skrup/Baut 5,000.00 / Kg
40 Besi Hollow 4/4 12,500.00 / M1
48 Compound 105,000.00 / Sak
49 Besi Plat 25,000.00 / Kg
NO URAIAN PEKERJAAN HARGA SATUAN SATUAN KETERANGAN
( RP. )
50 Besi Siku ( L ) 25,000.00 / Kg
51 Besi L 100 x 100 x 8 mm 1,809,000.00 / Btg
52 Besi L 70 x 70 x 6 mm 957,000.00 / Btg
53 Besi L 60 x 60 x 5 mm 682,500.00 / Btg
54 - Besi Plat 1,200,000.00 / Lbr
55 Papan 3,850,000.00 / M3
56 Tinner/Pengencer 25,000.00 / kaleng
PERHITUNGAN KEBUTUHAN TENAGA KERJA/ALAT/BAHAN
PEKERJAAN : PENGADAAN CLEMBING WALL
LOKASI : KOTA BENGKULU
TH. ANGGARAN : 2018

Kebutuhan Tenaga K
Volume Tenaga Kerja
Item Kegiatan Satuan
/Kuantitas Kepala tanah semen
Pekerja Tukang Mandor
Tukang urug portland
Galian tanah biasa sedalam 1M M3 7.2 5.40 0.18
urugan kembali tanah galian M3 2.4 1.20 0.12
urugan tanah M3 2.4 0.72 0.02 2.88
lantai kerja M3 1.344 2.22 0.37 0.04 0.11 370.94
beton Tumbuk rabat beton M3 0.48 0.79 0.13 0.01 0.04 132.48
beton 1 : 2 :3 M3 1.82496 3.01 0.50 0.05 0.15 594.94
pembesian dengan besi polos atau besi ulir Kg 127.7472 8.94 8.94 0.89 0.51
Pemasangan bekesting untuk pondasi M2 8 4.16 2.08 0.21 0.21
rangka besi hollow 4//4 M1 9 3.15 0.32 3.15 0.16
Besi L 100 x 100 x 8 mm Kg 385.92 23.16 23.16 7.72 3.09
Besi L 70 x 70 x 6 mm Kg 395.56 23.73 23.73 7.91 3.16
Besi L 60 x 60 x 5 mm Kg 436.8 26.21 26.21 8.74 3.49
Plat Besi M2 22.5 1.35 1.35 0.45 0.18
atap seng gelombang M2 22.2 2.66 1.33 0.44 0.13
Nok Seng Plat Bh 1 0.15 0.07 0.06 0.01
Lisplank Double Kayu M1 Err:509 Err:509 Err:509 Err:509 Err:509
pengecatan Kayu M2 24 1.68 0.22 0.14 0.07
Pemasangan dinding papan M2 2 1.20 3.60 0.36 0.06

Jumlah Total Err:509 Err:509 Err:509 Err:509 2.88 1,098.36


Satuan HOK HOK HOK HOK M3 Kg
Diverifikasi
Diverifikasi
DisiapkanOleh
Oleh
Oleh:: :
Ketua
Faskel,
UPL,
KSM/Panitia

(………………………..)
(………………………..)
(………………………..)
/BAHAN

han Tenaga Kerja, Bahan dan Alat


Bahan
minyak Besi Hollow Besi L 100 x Besi L 70 x 70 Besi L 60 x 60 x atap seng Paku
pasir koral paku Besi Plat Seng Plat
bekisting 4/4 100 x 8 mm x 6 mm 5 mm gelombang Skrup

- - - -
- - - -
0.79 1.01 - - - -
0.28 - - - -
0.99 1.39 - - - -
- -
0.32 2.40 0.80
36.00
443.81
454.89
502.32
270.00
15.54
1.10 0.05
Err:509

36.00

2.07 2.72 ### 0.80 36.00 443.81 454.89 502.32 270.00 15.54 1.10 36.05
M3 M3 Kg Kg M1 Kg Kg Kg Kg Lembar Bh Kg
Papan Cat Pengenc
Cat Menie Plamur Kuas Amplas
Kayu Penutup er

Err:509
4.80 3.60 4.08 0.72 0.24 0.72
0.08

Err:509 4.80 3.60 4.08 0.72 0.24 0.72


M3 Kg Kg Kg Bh Bh Lembar
RENCANA ANGGARAN BIAYA

PEKERJAAN : PENGADAAN CLEMBING WALL


LOKASI : KOTA BENGKULU
TH. ANGGARAN : 2018

VOLUME KEBUTUHAN
NO. URAIAN Sat TOTAL
Jumlah Pembulatan
'(1) (2) (3) (4) (5)

1. A. TENAGA KERJA :
Pekerja HOK Err:509 Err:509
Tukang HOK Err:509 Err:509
Kepala Tukang HOK Err:509 Err:509
Mandor HOK Err:509 Err:509
Sub Total Tenaga Kerja (1)
2. B. BAHAN/MATERIAL :
Tanah urug M3 2.88 3.00
semen portland Zak 21.97 20.00
pasir M3 2.07 -
koral M3 2.72 2.75
paku Kg Err:509 4.00
Besi Hollow 4/4 M1 36.00 40.00
Besi L 100 x 100 x 8 mm Btg 6.13 7.00
Besi L 70 x 70 x 6 mm Btg 11.88 10.00
Besi L 60 x 60 x 5 mm Btg 18.40 19.00
Besi Plat Kg 1.80 5.00
seng gelombang Lembar 15.54 16.00
Seng Plat Bh 1.10 2.00
Paku Skrup Kg 36.05 433.00
Papan Kayu M3 Err:509 1.25
Cat Menie Kg 4.80 25.00
Plamur Kg 3.60 18.00
Cat Penutup Kg 4.08 21.00
Kuas Bh 0.72 4.00
Pengencer Bh 0.24 2.00
Amplas Lembar 0.72 4.00
Pek. Rangka Atap Baja Ringan Ls 22.20 22.20
Pas. Angkur Ls 24.00 24.00
Sub Total Bahan (2)
3. C. A L A T :
Gerobak Dorong Bh 4.00 4.00
Cangkul Bh 5.00 5.00
Skop Bh 3.00 3.00
Ember Bh 5.00 5.00
Crane Hr 1.00 1.00
Molen Hr 2.00 2.00
Sub Total Alat (3)
4. D. ADMINISTRASI :
Administrasi dan
Unit 1.00 -
Dokumentasi

Sub Total Administrasi (4)


ANA ANGGARAN BIAYA

Harga
Satuan DARI
(Rp.) BLM
(6) (7)=(5)x(6)

120,000.00 Err:509
140,000.00 Err:509
150,000.00 Err:509
150,000.00 Err:509
Err:509

50,000.00 150,000.00
70,000.00 1,400,000.00
200,000.00 -
220,000.00 605,000.00
20,000.00 80,000.00
12,500.00 500,000.00
1,809,000.00 12,663,000.00
957,000.00 9,570,000.00
682,500.00 12,967,500.00
1,200,000.00 6,000,000.00
35,000.00 560,000.00
37,500.00 75,000.00
5,000.00 2,165,000.00
3,850,000.00 4,812,500.00
26,000.00 650,000.00
8,000.00 144,000.00
26,000.00 546,000.00
7,500.00 30,000.00
25,000.00 50,000.00
10,000.00 40,000.00
110,000.00 2,442,000.00
95,500.00 2,292,000.00
60,146,000.00

450,000.00 1,800,000.00
70,000.00 350,000.00
55,000.00 165,000.00
10,000.00 50,000.00
5,000,000.00 5,000,000.00
250,000.00 500,000.00
7,865,000.00

2,000,000.00 -

2,000,000.00
1 25 x 25 x 3 mm – 6 meter 6,72 Kg

2 30 x 30 x 3 mm – 6 meter 8,16 Kg

3 40 x 40 x 3 mm – 6 meter 10,92 Kg


4 40 x 40 x 4 mm – 6 meter 14,34 Kg
5 40 x 40 x 5 mm – 6 meter 17,70 Kg

6 45 x 45 x 4 mm – 6 meter 16,44 Kg


7 45 x 45 x 5 mm – 6 meter 20,28 Kg

8 50 x 50 x 4 mm – 6 meter 18,36 Kg


9 50 x 50 x 5 mm – 6 meter 22,62 Kg
10 50 x 50 x 6 mm – 6 meter 26,58 Kg

11 60 x 60 x 5 mm – 6 meter 27,30 Kg


12 60 x 60 x 6 mm – 6 meter 32,46 Kg

13 65 x 65 x 6 mm – 6 meter 35,46 Kg

14 70 x 70 x 6 mm – 6 meter 38,28 Kg


15 70 x 70 x 7 mm – 6 meter 44,28 Kg

16 75 x 75 x 6 mm – 6 meter 41,10 Kg


17 75 x 75 x 7 mm –  meter 47,64 Kg
18 75 x 75 x 8 mm – 6 meter 54,00 Kg

19 80 x 80 x 7 mm – 6 meter 50,88 Kg


20 80 x 80 x 8 mm – 6 meter 57,66 Kg

21 90 x 90 x 7 mm – 6 meter 57,54 Kg


22 90 x 90 x 9 mm – 6 meter 73,02 Kg

23 100 x 100 x 8 mm – 6 meter 72,36 Kg


24 100 x 100 x 10 mm – 6 meter 89,40 Kg

25 120 x 120 x 11 mm – 6 meter 119,4 Kg


26 120 x 120 x 12 mm – 6 meter 129,6 Kg

27 130 x 130 x 12 mm – 6 meter 140,4 Kg


28 150 x 150 x 12 mm – 6 meter 163,8 Kg
29 150 x 150 x 15 mm – 6 meter 201,6 Kg
Rp 44.500

Rp 54.000

Rp 72.500
Rp 95.000
Rp 117.000

Rp 109.000
Rp 134.000

Rp 122.000
Rp 150.000
Rp 176.000

per
Rp 181.000 meter
4.55 kg/M hitung vol 96
berrat
Rp 215.000 436.8

Rp 234.000

per
Rp 253.000 meter
6.38 kg/M hitung vol 62
berrat
Rp 293.000 395.56

Rp 272.000
Rp 315.000
Rp 357.000

Rp 336.000
Rp 381.000

Rp 380.000
Rp 482.000

per
Rp 478.000 meter
12.06 kg/M hitung vol 32
berrat
Rp 590.000 385.92

Rp 788.000
Rp 856.000

Rp 927.000
Rp 1.081.000
Rp 1.331.000
m