This document provides a budget breakdown for constructing a fence for the Baitul Qua Lambaet Mosque in Peukan Bada subdistrict. It lists materials needed like cement, sand, stone, rebar, wood planks, and paint supplies. The total cost for materials is estimated at 53,610,000 rupiah. It also includes a line item for contractor labor costs but does not provide a cost.
This document provides a budget breakdown for constructing a fence for the Baitul Qua Lambaet Mosque in Peukan Bada subdistrict. It lists materials needed like cement, sand, stone, rebar, wood planks, and paint supplies. The total cost for materials is estimated at 53,610,000 rupiah. It also includes a line item for contractor labor costs but does not provide a cost.
This document provides a budget breakdown for constructing a fence for the Baitul Qua Lambaet Mosque in Peukan Bada subdistrict. It lists materials needed like cement, sand, stone, rebar, wood planks, and paint supplies. The total cost for materials is estimated at 53,610,000 rupiah. It also includes a line item for contractor labor costs but does not provide a cost.
HARGA SATUAN A PERALATAN 1 SEMEN 400 SAK Rp 37,000 Rp 14,800,000 2 PASIR IKAT 100 M3 Rp 135,000 Rp 13,500,000 3 Batu Gunung 50 mp Rp 105,000 Rp 5,250,000 4 batu bata 10000 btg Rp 550 Rp 5,500,000 5 Besi 10" mm 100 btg Rp 70,000 Rp 7,000,000 6 papan cor 2 m3 Rp 2,300,000 Rp 4,600,000 7 kawat ikat 2 Glng Rp 70,000 Rp 140,000 8 paku 10 kg Rp 14,000 Rp 140,000 9 cat tembok 5 klg Rp 360,000 Rp 1,800,000 10 cat minyak 20 klg Rp 35,000 Rp 700,000 11 kuas cat 15 bwh Rp 12,000 Rp 180,000 sub total Rp 53,610,000