The document lists materials and labor costs for soundproofing material requirements (BC). It includes 11 items such as styrofoam, gypsum, nails, paint, canvas, and aluminum tape. The total material cost is Rp18,399,356.06 and labor cost for installing 235.05 square meters of styrofoam is Rp5,443,052.85. The overall total cost for materials and labor is Rp23,842,408.91.
The document lists materials and labor costs for soundproofing material requirements (BC). It includes 11 items such as styrofoam, gypsum, nails, paint, canvas, and aluminum tape. The total material cost is Rp18,399,356.06 and labor cost for installing 235.05 square meters of styrofoam is Rp5,443,052.85. The overall total cost for materials and labor is Rp23,842,408.91.
The document lists materials and labor costs for soundproofing material requirements (BC). It includes 11 items such as styrofoam, gypsum, nails, paint, canvas, and aluminum tape. The total material cost is Rp18,399,356.06 and labor cost for installing 235.05 square meters of styrofoam is Rp5,443,052.85. The overall total cost for materials and labor is Rp23,842,408.91.