INSPECTION REPORT

( HARDNESS TESTING )
Project Name : PECIKO 8 B Report No. 01 / HT / ARUNG /X/2023
Contract No. :- Procedure PQP/1167002/007
Client : PERTAMINA HULU MAHAKAM Type of Hardness HUH-6M
Contractor : PT. ASTA REKAYASA UNGGUL Type Equipment UCI PROBE
Test Date : 16 - Oct - 2023 Serial No. HT 022208002
SKETCH

HARDNESS TEST RESULT


AVG AVG
Joint SHEET / BEFORE PWHT AFTER PWHT
No. DRAWING No./ Line No. BEFORE PWHT AFTER PWHT REMARK
No FOLIO TOP BOTTOM TOP BOTTOM
HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 TOP BOTTOM TOP BOTTOM
1 SW 1 206 196 209 248 207 226 199 191 201 240 198 221 204 227 197 219 HV
2 SW 2 218 270 238 195 217 223 209 262 228 188 216 215 242 212 233 206 HV
3 SW 3 278 234 238 199 240 198 268 227 225 191 233 189 250 212 240 204 HV
4 SW 4 193 210 251 271 272 249 185 198 247 261 261 241 218 264 210 254 HV
12''-G-F05-13022 MWPB 1 OF 1
5 SW 4A 215 275 200 225 195 204 204 268 195 218 187 195 230 208 222 200 HV
6 SW 4B 221 222 243 197 284 263 213 214 237 187 278 257 229 248 221 240 HV
7 SW 5 212 199 306 232 251 191 207 192 295 202 243 184 239 225 231 209 HV
8 SW 6 235 270 216 241 254 196 227 262 208 234 245 190 240 230 232 223 HV
SCOPE of INSPECTION : H / W SCOPE of INSPECTION : H / W SCOPE of INSPECTION : H / W
PT. SHAHIB SEJATI PT. ASTA REKAYASA UNGGUL PERTAMINA HULU MAHAKAM
DATE DATE DATE

SIGN SIGN SIGN

NAME JAKA CAKRA W. NAME NAME


POSITION NDE LEVEL II POSITION POSITION
INSPECTION REPORT
( HARDNESS TESTING )
Project Name : PECIKO 8 B Report No. 02 / HT / ARUNG /X/2023
Contract No. :- Procedure PQP/1167002/007
Client : PERTAMINA HULU MAHAKAM Type of Hardness HUH-6M
Contractor : PT. ASTA REKAYASA UNGGUL Type Equipment UCI PROBE
Test Date : 16 - Oct - 2023 Serial No. HT 022208002
SKETCH

HARDNESS TEST RESULT


AVG AVG
Joint SHEET / BEFORE PWHT AFTER PWHT
No. DRAWING No./ Line No. BEFORE PWHT AFTER PWHT REMARK
No FOLIO TOP BOTTOM TOP BOTTOM
HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 TOP BOTTOM TOP BOTTOM
1 SW 11 213 256 234 206 210 216 207 247 225 199 202 209 234 211 226 203 HV
2 SW 12 219 244 271 204 280 255 211 237 262 195 271 248 245 246 237 238 HV
3 SW 22 236 270 214 206 220 260 227 263 209 200 213 250 240 229 233 221 HV

12''-G-F05-13022 MWPB 1 OF 1

SCOPE of INSPECTION : H / W SCOPE of INSPECTION : H / W SCOPE of INSPECTION : H / W


PT. SHAHIB SEJATI PT. ASTA REKAYASA UNGGUL PERTAMINA HULU MAHAKAM
DATE DATE DATE

SIGN SIGN SIGN

NAME JAKA CAKRA W. NAME NAME


POSITION NDE LEVEL II POSITION POSITION
INSPECTION REPORT
( HARDNESS TESTING )
Project Name : PECIKO 8 B Report No. 03 / HT / ARUNG /X/2023
Contract No. :- Procedure PQP/1167002/007
Client : PERTAMINA HULU MAHAKAM Type of Hardness HUH-6M
Contractor : PT. ASTA REKAYASA UNGGUL Type Equipment UCI PROBE
Test Date : 16 - Oct - 2023 Serial No. HT 022208002
SKETCH

HARDNESS TEST RESULT


AVG AVG
Joint SHEET / BEFORE PWHT AFTER PWHT
No. DRAWING No./ Line No. BEFORE PWHT AFTER PWHT REMARK
No FOLIO TOP BOTTOM TOP BOTTOM
HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 HAZ 1 WM HAZ 2 TOP BOTTOM TOP BOTTOM
1 SW 41 279 232 225 234 218 252 272 223 216 227 208 241 245 235 237 225 HV

10''-G-F05-13003 MWPB 2 OF 2

SCOPE of INSPECTION : H / W SCOPE of INSPECTION : H / W SCOPE of INSPECTION : H / W


PT. SHAHIB SEJATI PT. ASTA REKAYASA UNGGUL PERTAMINA HULU MAHAKAM
DATE DATE DATE

SIGN SIGN SIGN

NAME JAKA CAKRA W. NAME NAME


POSITION NDE LEVEL II POSITION POSITION